LAMPIRAN G

PERBANDINGAN GEOMETRI PELEDAKAN


 Perhitungan Geometri Peledakan Berdasarkan Teori ‘ R. L. Ash ” Pada

Peledakan Tanah Penutup (Overburden) Di Pit Central (Bukit

Cempedak) Dengan Jenis Material Claystone.

Diketahui :

- Kbstd = 30

- SG = berat jenis bahan peledak yang dipakai (Emulsi) = 1,15 gr/cc

- SGsrd = Berat jenis bahan peledak standart = 1,2 gr/cc

- Ve = VOD bahan peledak dipakai (Emulsi) = 18.044 fps

- Vestd = VOD bahan peledak standart = 12.000 fps

𝟕
- De = Diameter lubang ledak = 7 = 7,875
𝟖

- D = Bobot isi batuan = 2,25 ton/m = 140,46 lb/ft

- Dstd = Bobot isi batuan standar = 160 lb/ft

- AF1 = Adjusment factor batuan yang akan diledakan

- AF2 = Adjusment factor bahan peledak yang akan digunakan

Perhitungan:

𝐷𝑠𝑡𝑑 1/3 𝑆𝐺 . 𝑉𝑒 2
- AF1 = ( ) - AF2 = ( 𝑆𝐺𝑠𝑡𝑑 . )1/3
𝐷 𝑉𝑒 2 𝑠𝑡𝑑

1
160 1/3 1,15 . 18.0442 3
= ( 140,46 ) = ( )
1,2 . 12.0002

= 1,04 = 1,3
- KB = Kbstd x AF1 x AF2

= 30 x 1,04 x 1,3

= 40,56

 Burden
𝐾𝑏 𝑥 𝐷𝑒
B = 39,3

40,56 𝑥 7,875
= 39,3

= 8,12 m

 Spasi (S)

S = KS x B

= 1,14 x 8,12

= 9,25 m

Keterangan :

( KS = spacing ratio (1,00 - 2,00) )

 Stemming (T)

T = KT x B

= 0,75 x 8,12

= 6,1 m

Keterangan ;

KT= stemming ratio ( 0,75 – 1 ) = 0,75


 Subdrilling (J)

J = KJ x B

= 0,2 x 8,12

= 1,6 m

Keterangan :

Kj = subdrilling ratio (0,2 – 0,3)

 Kedalaman Lubang Ledak (H)

H = KH x 3,62

= 1,5 x 8,12

= 12,18 m

(Harga H/B = 12,18/8,12 = 1,5)

Keterangan :

KH = hole depth ratio (1,5 – 4)

 Tinggi Jenjang (L)

L = H–J

= 12,18 – 1,6

= 10,58 m
 Powder Columm Kolom Isian (PC)

PC = L–T

= 10,58 – 6,1

= 4,48 m

 Geometri Peledakan PT. Saptaindra Sejati Pada Peledakan Tanah

Penutup (Overburden) Dengan Jenis Material Claystone Pit Central

(Bukit Cemepedak).

 Pada Penerapan Pattern 9 x 10

- Burden (B) = 9m

- Spacing (S) = 10 m

- Stemming (T) = 3,5 m

- Subdrilling (J) = 0,5 m

- Tinggi Jenjang (L) = 8m

- Kedalaman Lubang = 8,5 m

- Kolom Isian Handak = 5m

 Pada Penerapan Pattern 10 x 10

- Burden (B) = 10 m

- Spacing (S) = 10 m

- Stemming (T) = 3,4 m

- Subdrilling (J) = 0,5 m

- Tinggi Jenjang (L) = 9,5 m


- Kedalaman Lubang = 10 m

- Kolom Isian Handak = 6,2 m

Tabel G.1
Perbandingan Geometri Peledakan Secara Teoritis dan Aktual

PT. SIS
Keterangan R. L. Ash
Pattern 9 x 10 Pattern 10 x 10
Burden (m) 8,12 9 10
Spacing (m) 9,25 10 10
Stemming (m) 6,1 3,5 3,4
Subdrilling (m) 1,6 0,5 0,5
Deft Hole (m) 12,18 8,5 10
Tinggi Jenjang (m) 10,58 8 9,5
Powder Columm (m) 4,48 5 6,2