Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

DEPARTMENT/FLOOR:

Any technical faults & repairs required to furniture, fittings & equipment are to be logged

Any requests for New Works and or new Construction Work Authorizations should be e-mailed by the department head to the Engineer (Shelving required, New Power Point etc)

When calling please advice: Department, Work Order Request , Location /Floor/Room/Item, Priority: 1 Hour/1 Day/ 1 Week/ 1 Month

DATE PRIORITY STATUS/DETAILS


JOB ORDER DETAILS including area LOGGED BY REF. NO.
CALLED IN 1H 1D 1W 1M OF FOLLOW-UP

1H

1D 1 Day: Repairs needed to maintain the standards of your front of house areas of your department

1W 1 Week: Repairs needed to maintain your back of house areas of your department

1M 1 Month: Repairs that are desired but will not affect your areas and performance

Follow up if the fault/repair has not been rectified within the specified time limit
Note: Departments may choose to use a logbook in place of this form, however if using a logbook they must ensure that the above column are replicated.

www.foodandbeveragetrainer.com

You might also like