Professional Documents
Culture Documents
Power Track
Power Track
62 (x)
Publication No. 010702
Electrak under floor systems consist of As well as dual tap-offs both standard and low
continuous lengths of power track, noise tap offs can be plugged into any socket
(generally arranged in a parallel format) outlet along the track length. The dual tap-off
which are fed from the distribution board incorporates both standard and low noise cables.
via track feed boxes and can be installed
By positioning the power tracks a maximum of
in a floor void of only 48mm.
5.2 metres apart and 2.5 metres from the wall,
The track feed boxes are provided with one by connecting the 3 metre tap-off units to floor
or two 25mm diameter holes to suit MICC, outlet boxes, optimum layout flexibility is
armoured cables or single core in conduit. achieved. This means every part of the floor
area can be served.
The first length of track connects to the
track feed by snap fitting the integral track When connecting tap-offs directly through the
connector into the track feed outlet socket. floor via grommet outlets to workstations care
must be taken to ensure that the tap-off
Lengths of track fit together by simply snap
length is adequate.
fitting the track connector which is integral
to each length of track into the shuttered Flexible interlinks can be used to overcome
end of the previous fitted track length. obstructions or used as corners if required.
nylon conduit.
Track feed Integral power track connector Tap-off Integral track connector on
snap fits into track feed next power track snap fits
to end of previous fixed
track length
PUSH DOWN
13A
3m 16mm Ø DP 1327 DP 1327
“607”
5m L, N, PE DP 1527 DP 1527
Fused
13A
3m 20mm Ø JP 2327 JP 2327
“607”
5m CE, L, N, PE JP 2527 JP 2527
Fused
32A
3m 20mm Ø NZ 4331
415v
5m L1, L2, L3, N, PE NZ 4531
3-Phase
Unfused Reconfigurable
32A 3m NP 4332*
live pin
L1 5m NP 4532*
16mm Ø L, N, PE
Unfused Reconfigurable
32A 3m NP 4302*
live pin
L2 5m NP 4502*
16mm Ø L, N, PE
Unfused Reconfigurable
32A 3m NP 4303*
live pin
L3 5m NP 4503*
16mm Ø L, N, PE
L2 N2 PE L1 N1 CE PE L2 N2 L1 N1 CE PE L3 L2 L1 N PE
A tap-off length is determined by the cable and not the conduit length, e.g. a 3m
tap-off has 3m of cable and 2.8m of conduit.
A B
93 75 250 109
118 68
47 32
46 46
15
2x25Ø 25Ø 65 92
Dual Track Standard & Track Feed Power track Integral fixing Tap off Track connector End View B Integral fixing bracket
Feed low noise brackets1.2m fixing centres
feed average spacing
End View
Access Floor Grommet Outlets Quick Fit Consett Range Floor Service
Outlet Boxes and underfloor Power Track
Modular Desk and Screen Power,
Data and Telecom Outlet Units
Electrical Accessories
Lighting and Power Distribution Systems Services pass through access floor
with Integral Communication Bus grommet outlet to workstation power,
telecom and data
www.electrak.co.uk
Electrak International Limited No.1 Industrial Estate Medomsley Road Consett Co. Durham DH8 6SR
Tel: +44 (0) 1207 503400 Fax: +44 (0) 1207 501799 Email: sales@electrak.co.uk
Because of their policy of continuous improvement, Electrak reserves the right to change product specification without notice.