DAILY FIT UP INSPECTION

RAPID PACKAGE 6A LLDPE PROJEC

INFORMATION
INSPECTION DATE 12-Apr-18
ITP NO. RAPID-P006A-SCS-QAC-ITP-3200-0007 REV. 2

No Area Line No / Drawing No Rev. No Pipe Class Spool No Joint No Type Size(Inch)

P3121-1BTN-5295-00008-04
1 13120 00 3C356 SP-002 008 BW 3
P006A-SCS-PIP-ISO-5295-3121-0019
REMARKS:

PREPARED BY CHECKED BY
(Subcontractor QA/QC) (Contractor QA/QC)

Name/Signature/Date Name/Signature/Date
P6A-WD-FORM-014 REV. 1
P INSPECTION REPORT
D PACKAGE 6A LLDPE PROJECT

REPORT NO. P6A-FIT-PI-PV-8304


RFI NO. P6A-RFI-PI-PV-3458

Sch.(THK) Heat No(Mat'l) WPS No Fit-Up Date Remark

SCH40 16207251(PIPE)
P6A-WPS-PI-PV-0003 10-Apr-18
5.49 15-209731(ELBOW)
CHECKED BY ACKNOWLEDGED BY
(Contractor QA/QC) (Owner)

Name/Signature/Date Name/Signature/Date
PAGE 1 OF 1
DAILY FIT UP INSPECTION
RAPID PACKAGE 6A LLDPE PROJEC

INFORMATION
INSPECTION DATE 12-Apr-18
ITP NO. RAPID-P006A-SCS-QAC-ITP-3200-0007 REV. 2

No Area Line No / Drawing No Rev. No Pipe Class Spool No Joint No Type Size(Inch)

P3121-DC-5295-10072-01
1 13120 01 1C108EQ SP-004 014 BW 2
P006A-SCS-PIP-ISO-5295-3121-0013

P3121-DC-5295-10049-01
2 13120 02 1C108EQ SP-001 001 BW 1
P006A-SCS-PIP-ISO-5295-3121-0136

P3121-DC-5295-10049-01
3 13120 02 1C108EQ SP-002 006 BW 1
P006A-SCS-PIP-ISO-5295-3121-0136

P3121-DC-5295-10049-01
4 13120 02 1C108EQ SP-001 012 BW 1
P006A-SCS-PIP-ISO-5295-3121-0136
REMARKS:

PREPARED BY CHECKED BY
(Subcontractor QA/QC) (Contractor QA/QC)

Name/Signature/Date Name/Signature/Date
P6A-WD-FORM-014 REV. 1
P INSPECTION REPORT
D PACKAGE 6A LLDPE PROJECT

REPORT NO. P6A-FIT-PI-PV-8305


RFI NO. P6A-RFI-PI-PV-3458

Sch.(THK) Heat No(Mat'l) WPS No Fit-Up Date Remark

SCH40 666229(PIPE)
P6A-WPS-PI-PV-0001 10-Apr-18
3.91 860253(ELBOW)

SCH80 Q70M(FLANGE)
P6A-WPS-PI-PV-0001 10-Apr-18
4.55 666229(PIPE)

SCH80 08342(ELBOW)
P6A-WPS-PI-PV-0001 10-Apr-18
4.55 666229(PIPE)

SCH80 14704613 (TEE)


P6A-WPS-PI-PV-0001 10-Apr-18
4.55 666229(PIPE)
CHECKED BY ACKNOWLEDGED BY
(Contractor QA/QC) (Owner)

Name/Signature/Date Name/Signature/Date
PAGE 1 OF 1
DAILY FIT UP INSPECTION
RAPID PACKAGE 6A LLDPE PROJEC

INFORMATION
INSPECTION DATE 12-Apr-18
ITP NO. RAPID-P006A-SCS-QAC-ITP-3200-0007 REV. 2

No Area Line No / Drawing No Rev. No Pipe Class Spool No Joint No Type Size(Inch)

P3121-LPN-5295-10010-01
1 13120 01 1C108EQ SP-001 001 BW 2
P006A-SCS-PIP-ISO-5295-3121-0257

P3121-LPN-5295-10016-03
2 13120 00 1C108EQ SP-001 007 BW 3/4
P006A-SCS-PIP-ISO-5295-3121-0268

P3121-LPN-5295-10018-03
3 13120 00 1C108EQ SP-002 010 BW 3/4
P006A-SCS-PIP-ISO-5295-3121-0273

P3121-LPN-5295-10018-03
4 13120 00 1C108EQ SP-002 014 BW 3/4
P006A-SCS-PIP-ISO-5295-3121-0273

P3121-LPN-5295-10018-03
5 13120 00 1C108EQ SP-002 016 BW 3/4
P006A-SCS-PIP-ISO-5295-3121-0273

P3121-LPN-5295-10022-01
6 13120 01 1C108EQ SP-002 011 BW 3/4
P006A-SCS-PIP-ISO-5295-3121-0278
REMARKS:

PREPARED BY CHECKED BY
(Subcontractor QA/QC) (Contractor QA/QC)

Name/Signature/Date Name/Signature/Date
P6A-WD-FORM-014 REV. 1
P INSPECTION REPORT
D PACKAGE 6A LLDPE PROJECT

REPORT NO. P6A-FIT-PI-PV-8306


RFI NO. P6A-RFI-PI-PV-3458

Sch.(THK) Heat No(Mat'l) WPS No Fit-Up Date Remark

SCH40 666229(PIPE)
P6A-WPS-PI-PV-0001 10-Apr-18
3.91 38412(TEE)

SCH80 1634043(PIPE)
P6A-WPS-PI-PV-0001 10-Apr-18
3.91 11600480B(OLET)

SCH80 861697(PIPE)
P6A-WPS-PI-PV-0001 10-Apr-18
3.91 1003-00669(OLET)

SCH80 861697(PIPE)
P6A-WPS-PI-PV-0001 10-Apr-18
3.91 1003-00669(OLET)

SCH80 861697(PIPE)
P6A-WPS-PI-PV-0001 10-Apr-18
3.91 1003-00669(OLET)

SCH80 666229(PIPE)
P6A-WPS-PI-PV-0001 10-Apr-18
3.91 11600480B(OLET)
CHECKED BY ACKNOWLEDGED BY
(Contractor QA/QC) (Owner)

Name/Signature/Date Name/Signature/Date
PAGE 1 OF 1
DAILY FIT UP INSPECTION
RAPID PACKAGE 6A LLDPE PROJEC

INFORMATION
INSPECTION DATE 12-Apr-18
ITP NO. RAPID-P006A-SCS-QAC-ITP-3200-0007 REV. 2

No Area Line No / Drawing No Rev. No Pipe Class Spool No Joint No Type Size(Inch)

P3122-PA-5295-10113-01
1 13120 00 1C108EQ SP-001 003 BW 3/4
P006A-SCS-PIP-ISO-5295-3122-0126
REMARKS:

PREPARED BY CHECKED BY
(Subcontractor QA/QC) (Contractor QA/QC)

Name/Signature/Date Name/Signature/Date
P6A-WD-FORM-014 REV. 1
P INSPECTION REPORT
D PACKAGE 6A LLDPE PROJECT

REPORT NO. P6A-FIT-PI-PV-8307


RFI NO. P6A-RFI-PI-PV-3458

Sch.(THK) Heat No(Mat'l) WPS No Fit-Up Date Remark

SCH80 13-202184(ELBOW)
P6A-WPS-PI-PV-0001 10-Apr-18
3.91 1623080(PIPE)
CHECKED BY ACKNOWLEDGED BY
(Contractor QA/QC) (Owner)

Name/Signature/Date Name/Signature/Date
PAGE 1 OF 1
DAILY FIT UP INSPECTION
RAPID PACKAGE 6A LLDPE PROJEC

INFORMATION
INSPECTION DATE 12-Apr-18
ITP NO. RAPID-P006A-SCS-QAC-ITP-3200-0007 REV. 2

No Area Line No / Drawing No Rev. No Pipe Class Spool No Joint No Type Size(Inch)

P3122-PA-5295-10113-01
1 13120 00 1C108EQ SP-001 003 BW 3/4
P006A-SCS-PIP-ISO-5295-3122-0126
REMARKS:

PREPARED BY CHECKED BY
(Subcontractor QA/QC) (Contractor QA/QC)

Name/Signature/Date Name/Signature/Date
P6A-WD-FORM-014 REV. 1
P INSPECTION REPORT
D PACKAGE 6A LLDPE PROJECT

REPORT NO. P6A-FIT-PI-PV-8308


RFI NO. P6A-RFI-PI-PV-3458

Sch.(THK) Heat No(Mat'l) WPS No Fit-Up Date Remark

SCH80 13-202184(ELBOW)
P6A-WPS-PI-PV-0001 10-Apr-18
3.91 1623080(PIPE)
CHECKED BY ACKNOWLEDGED BY
(Contractor QA/QC) (Owner)

Name/Signature/Date Name/Signature/Date
PAGE 1 OF 1
DAILY FIT UP INSPECTION
RAPID PACKAGE 6A LLDPE PROJEC

INFORMATION
INSPECTION DATE 12-Apr-18
ITP NO. RAPID-P006A-SCS-QAC-ITP-3200-0007 REV. 2

No Area Line No / Drawing No Rev. No Pipe Class Spool No Joint No Type Size(Inch)

P3122-PCF-5295-10018-01
1 13120 01 1C352 SP-003 012 BW 1
P006A-SCS-PIP-ISO-5295-3122-0128
REMARKS:

PREPARED BY CHECKED BY
(Subcontractor QA/QC) (Contractor QA/QC)

Name/Signature/Date Name/Signature/Date
P6A-WD-FORM-014 REV. 1
P INSPECTION REPORT
D PACKAGE 6A LLDPE PROJECT

REPORT NO. P6A-FIT-PI-PV-8309


RFI NO. P6A-RFI-PI-PV-3458

Sch.(THK) Heat No(Mat'l) WPS No Fit-Up Date Remark

SCH80 016070157(PIPE)
P6A-WPS-PI-PV-0003 10-Apr-18
4.55 15-108930(ELBOW)
CHECKED BY ACKNOWLEDGED BY
(Contractor QA/QC) (Owner)

Name/Signature/Date Name/Signature/Date
PAGE 1 OF 1

You might also like