Download as pdf
Download as pdf
You are on page 1of 56
VASCO (Ammember of Weng Yat Group) YOUR ONE-STOP SCAFFOLD, FALSEWORK. & FORMWORK SOLUTION SPECIALIST. “CREAT RS ACS RK, AERA SER MRT Rs” ee PRODUCT CATALOGUE PHB R RIES © GDNTENTS 3 —@ Introduction: Ais or Vasco" Shoring System Vasco" ALI 8G oz Projet Gallery sc eMi Erection Procedures #ef8lF Vasco" Tabloform System veseo" QBRy frbbRSE a Erection Procedures sete Vasco" Modular System. Vaso" Sie ( Rt a9 Project Gallery "ARAOLF Erection Procedures ide 8) Vasco" System Accessories Vasco" 1% At Frame Scaffolding (J2\)9-F% 51 ‘Assembly Of Model Raise Basic Of Assembling External Soatfolding Yeilh-Patlttath Frame Scaffolding And Accessories []=CM-PAE2P Scaffolding JIS Clamp Meeset Safety Net esi ‘Vertical Shore Steel Prop WS RE HL 54 Formwork Accessories (cH 55 ‘Metal Deck iste 58 ‘BS'1139 Coupler | Pipe Accessories estdn (+) (4 VenEhe 56 ‘GAPipe tf 56 ‘Copyright© 2017 Vasea Scaffold Sdn Bhd afi INTRODUCTION Vasco Scaffold, a member of Weng Yat Group’ which isa well established and prestigious manufacturer and distributor of quality steel scaffolding in Malaysia & South East Asia. The company offers a broad range of ‘products, capable of meeting all the requirement of the modern and sophisticated civil, infrastructure, building industry works (such as oil & gas, shipyard and aircraft) and in line with the mast evolved ndeds in terms af both performance and safety. ‘The company has continuously rising on the growth chart and setting very high quality standards. Its product ‘ange includes Frame Scaffolding, Steel Props, Shoring System, Scaffold System, Formwork ard accessories. ‘The: company has a complete in-house range of modern machinery for manufacturing modern system. The: group’s vision is to'be the world’s leading manufacturer of steel scaffolding for Construction, it and Gas industry benchmark through the excellence of its people, its innavative approach and overall conduct, Underpinning this vision is 2 performance culture committed to aspiration targets, safety and social responsibilty, continudus improvement, openness and transparency. Vasco Scaffold, Weng Yat ATA MRR, REM R AAEM TIR, WERT PRAT Ro RAAT MARS Er eRe SJenbinaenieie, ARIEL CMSA, Ak) SPO Re BR, BATH AK, MASE OR SERN AM Re, SP et ROROENAAAR, 2 TMMEA ihe ANE WOATIAAER, HSM, RRS, HR, MRE. RSS ER A a SR SA A a, COT Ace, FCA THEO RG, ANTE TERT he RRS, BA BT ‘EAGAN RNB, KROGH, INRT RR A aE. ‘YOUR ONE-STOP SCAFFOLD, FALSEWORK SFORMWORK SOLUTION SPECIALIST EORRNERAERER, HEEROMA E The 40KN, 60kN & 80kN Capacity Heavy-Duty Shoring System f% SOKIN, 6OKN & BOKN AERHE SI HAS RABE Your One-Stop Scaffold, Falsework & Formwork Solution Specialist, it REWER EBM ER, ms HERES RMIT i = 1 Vasco’ #i#)¢)4%% VASCO* SHORING SYSTEM Vasco" Shoring steel, jad carrying capacit is being widely used in Europe and worldwide, Vasedt aS AREA ASRS NURSE: SHAD BURT RRM, JEM ARAAENNOIR 60k AL SORNMAED « MARA TT CORAL, is made from bi }OkN, 6OKM and 8OkW per leg. The shori strength system Features and Benefits ES Shoring systems with a horizontal struts and bra virtually any shoring co ‘structure shoring needs XARA ME, MADE A, WA SAMRAT, Hae ation to suit PEAR, MIM MGR AER, sik ashi ity, resulting in {i indation preparation and primary soffit bearers PRAHA, BTN ACA, BL ASR ZRRARRUMKE RE * aly sini and increasing lifespan integrity of system REUBEN TTR, WARTHI JOA TREE ‘© Ensy to assemble and rapid wedge connection detail enabling installation productivity up ‘to-100m* per man day RRNA, HARLAN, OES Serer ion Cee, PRAT. ‘set up'as tableforms for slab support on ‘multi-storey construction ATR Aco Ate, sit Vasco LH TEE OTRO KAVA, OE SRSA Extremely versatile and compatible with all Vasco” Shoring equipment or clients” ‘own primary soffit bearers PPI, STM REA Vasco PRE Re ASAD ORR ‘YOUR ONE-STOP SCAFFOLD, FALSEWORK B FORMWORK SOLUTION SPECIALIST CORNER IAL R. SEER RANT E, ‘YOUR ONE-STOP SCAFFOLD, FALSIWOIK & FORMWORK SOLUTION SPECIALIST MOREA TAREE, RERR-BAMMATS, PROJECT GALLERY TR#H% + VASCO" SHORING SYSTEM VASCO"Htsci# Aa BRIDGES #2 VASCO’ { Lael PROJECT GALLERY VASCO' tle VASCO’ SHORING SYSTEM PPR BRIDGES VASEO! ‘YOUR ONE-STOP SCAFFOLD, FALSEWORK B FORMWORK SOLUTION SPECIALIST EORRMER SAREE, SEMEL ATH YOUR ONE STOP ScARFOLD: FALSIWORK & FORUAWORK SOLUTION StreUAtIST: fos hsResRianes, TAMe-aaHATE, tu PROJECT GALLERY ‘© Fixpost connector into the base jack. RPA © Install strut, 28 bttF © Check level. #tEACE. ‘Fix the post nto the post connector. ASU IER Install the frst platform. BSB. lostall the firs it of strut. REN. » Uist FRAME SCAFFOLDING ASSEMBLY OF MODEL GrossBrave Sint on = Never fai tosttach the ross brace or 2 strip frame tothe frst stage to prevent n ont , 7 DX the deformation and torsion of the tower: ar er a SERRCH SEER ik a Be, SARTRE ELE, neue teen Seams Pewee ed Frame Pa o ° o. ‘Connect the frames by joint pins. | | Hat. i i e i } 4 Transfer (22 ye | apt teh Never mine the tower with the operation Lt El ‘on. Confirm the inserted length of the jac) © Walking Joint Pin Adjustable Adjustable ‘anid condition of springs of the easters,so- Board Ae U-Head Jack Base ‘aah, that pt on Atle apa EN ‘from the frame, Sera. waa A DE eat AUPRR ARMAND. CLE EMETRAAT TAR te Reserve Pillar aicett Prapate a reserve pillar forthe operation, RR ae i z Es : e = ge 5G 36 3, be BES St st S* ak SELE AE Re 8a 85 88 5255 Ss - EEEEEE SE EE EE EE a es @¢ s ¢ ai a # é Ss j = z S 4 3 & z z = 3 LE : 4 cont Pt gh 63 Peay, i a 2 ge ee eee & ay = = Ze z 2 Eidi#ha# be oe en 2 3 B< 28 Se ie z Be Be fa 8g 82 8a G3 Be = 2s EEES SESS S555 22 a Se <8 6 € Bw oe OK == ot a ae g a= zs PUPS FRAME’SCAFFOLDING:AND ACCESSORIES peje I Se Et — tas" iE | 1700 ——| Vertical Frame Vertical Frame aH STR WY. 1018, Wy. 101 ‘YOUR ONE-STOF SCAFFOLD TALSIWOWK & FORAWORK SOLUTION SPEEALISE RORRHSRIREER, ALDR-OROWETE. ‘YOUR ONE-STOP SCAFFOLD, FALSIWOIK & FORMWORK SOLUTION SPECIALIST MOREA TAREE, RERR-BAMMATS, SCAFFOLDING JIS CLAMP 3 F2eduth ‘48,6mm & 48.6mm Swivel Clamp ‘48.6mm & 48,6mm Fixed Clamp 48.60 & 4B. 48.6 8 48.8 Bi SAFETY NET “2/4 Size Available In Meter IRR CR) Width 818 (wn Length FUE) +B. VERTICAL SHORE/ STEEL PROP Wisinie/ axai }-———_—_—— — £ ‘Top Plate ie Uprer Tie —— 4050 Pin "ott Prop nut—+ Threaded with Hanate | “Tube ars a wr70 '3,500mm (11'- 5") 2,000mm (6'- 5.6") wys0 3,900mm (12'- 8") 2.4000nm (7"- 8:7"), Base Plate AEBE FORMWORK ACCESSORIES Tie Bod Wing Nat od mes ———————————————— iit: ~ METAL DECK ‘Sizes Available In Millimeter “(Ue !24f (ae) ‘Width (WW), ‘Length (L) “peste Age 210 1500 2000. 3000 4000, 240 1500 2000 3000 ‘a000 ‘YOUR ONE-STOF SCAFFOLD.TALSIW ON & FORAWORE- SOLUTION SPEEALISE ORNS RARER, ALD OROWETE.

You might also like