Download as pdf or txt
Download as pdf or txt
You are on page 1of 89

REHABILITASI SUB TERMINAL AGROBISNIS

PROVINSI KALIMANTAN SELATAN DI BARABAI

PEJABAT PEMBUAT KOMITMEN

CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS

DAFTAR GAMBAR

NTS STR BT

00 32
- Mutu Beton : K-225 Kg/cm2
: U - 24 (Polos) < 12
- Mutu Baja Tulangan D : U - 32 (Ulir) > 13
- Mutu Baja Profil : Bj - 37 Mpa

104.00

4.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 8.00 4.00
PS3 KB5
PS3 KB5
PS3 KB5 PS3
KB5 PS3 KB5
PS3
KB5
KB5
PS3 KB5 PS3 PS3
KB5 KB5
KB5 PS3 KB5
PS3 PS3
PS3 KB5 KB5 PS3
KB5 KB5 KB5 KB5
1 PS3
PS3 PS3
KB1 P3 KB1 P4 KB1 P4 KB1 P4 KB1 P4 KB1 P4 KB1 P4 KB1 P4 K1 P5 K1 P5 KB1 P4 KB1 P4 KB1 P4 KB1 P4 KB1 P4 KB1 P4 KB1 P4 KB1 P3
6.00

KB2 P1 KB2 P1
2
6.00

PEJABAT PEMBUAT KOMITMEN

KB2 P1 KB2 P1
3
6.00

KB4 PS1 PS1 KB4


KB2 P1 KB2 P1
4
6.00

KB3 PS2 KB4 PS1 PS1 KB4 PS2 KB3


KB3 P2 KB3 P2
5

KB2 PS1 KB2 PS1 PS1 KB2 PS1 KB2


60.00

12.00

KB3 PS2 KB4 PS1 PS1 KB4 PS2 KB3


KB3 P2 KB3 P2
6
6.00

PS1 PS1
KB2 P1 KB2 P1
7
6.00

KB2 P1 KB2 P1 CV . PRAKTIRA KONSULTAN


8 KONSULTAN PERENCANA PENGAWAS
6.00

KB2 P1 KB2 P1
9
6.00

10
KB1 P3 KB1 P4 KB1 P4 KB1 P4 KB1 P4 KB1 P4 KB1 P4 KB1 P4 K1 P5 K1 P5 KB1 P4 KB1 P4 KB1 P4 KB1 P4 KB1 P4 KB1 P4 KB1 P4 KB1 P3
4.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 8.00 4.00

104.00

A" A' A B C D E F G H I J K L M N P Q R S S' S"

DENAH PONDASI & KOLOM


SKALA 1 : 450

SIMBOL KETERANGAN SIMBOL KETERANGAN SIMBOL KETERANGAN


KB1 Kolom Uk. 120 x 50 cm P1 Pile Cap Uk. 80 x 80 cm PS1 Pondasi Setempat Uk. 200 x 200 cm
DENAH PONDASI & KOLOM
KB2 Kolom Uk. 30 x 50 cm P2 Pile Cap Uk. 80 x 155 cm PS2 Pondasi Setempat Uk. 150 x 250 cm
KB3 Kolom Uk. 40 x 70 cm P3 Pile Cap Uk. 145 x 155 cm PS3 Pondasi Setempat Uk. 100 x 100 cm
KB4 Kolom Uk. 40 x 40 cm P4 Pile Cap Uk. 155 x 155 cm 1 : 450 STR BT
P5 Pile Cap Uk. 185 x 185 cm
01 32
- Mutu Beton : K-225 Kg/cm2
: U - 24 (Polos) < 12
- Mutu Baja Tulangan D : U - 32 (Ulir) > 13
- Mutu Baja Profil : Bj - 37 Mpa

104.00

4.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 8.00 4.00

TOILET TEMPAT CUCI TOILET


-0.30 -0.15 -0.30

1
KB1 S1 KB1 S1 KB1 S1 KB1 S1 KB1 S1 KB1 S1 KB1 S1 KB1 S1 KB1 S2 KB1 S1 KB1 S1 KB1 S1 KB1 S1 KB1 S1 KB1 S1 KB1 S1 KB1 S1 KB1
6.00

S1 S1

KB2 KB2
2
6.00

S1 S1

KB2 KB2
3 PEJABAT PEMBUAT KOMITMEN
6.00

S1 S1

KB4 S1 KB2 KB2 S1 KB4


4
6.00

S1 S1 S1 S1

KB3 S1 KB4 S1 KB3 KB3 S1 KB4 S1 KB3


5

S1 S1 S1 S1
A

60.00
12.00

KB2 KB2 KB2 KB2

t=15 +0.00
S1 S1 S1 S1

KB3 S1 KB4 S1 KB3 PAKAI TULANGAN WIREMESH M6, KB3 S1 KB4 S1 KB3
6 OVERLAPING 1.5 x LUBANG
6.00

S1 S1 S1 S1

KB4 S1 KB2 KB2 S1 KB4


7 X X
6.00

S1 S1

KB2 KB2
8
CV . PRAKTIRA KONSULTAN
6.00

S1 S1 KONSULTAN PERENCANA PENGAWAS

KB2 KB2
9
6.00

S1 S1

S1 S1 S1 S1 S1 S1 S1 S1 S2 S1 S1 S1 S1 S1 S1 S1 S1
10
KB1 KB1 KB1 KB1 KB1 KB1 KB1 KB1 KB1 KB1 KB1 KB1 KB1 KB1 KB1 KB1 KB1 KB1
4.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 8.00 4.00

104.00

A" A' A B C D E F G H I J K L M N P Q R S S' S"

DENAH PENULANGAN LANTAI T=15CM JOINT SILENT 2CM


WIREMASH M6, OVERLAPING 1.5 x LUBANG
DOWEL D13-500
SKALA 1 : 450 PLAT LANTAI t=15CM
LAPISAN PLASTIK
150

SIRTU t= 15CM

75
DIPADATKAN DENGAN
WALES LOT/VIBRO
SIMBOL KETERANGAN SIMBOL KETERANGAN
150

KB1 Kolom Uk. 120 x 50 cm S1 Sloof Uk. 30 x 50 cm 500 DENAH MODUL LANTAI & SLOOF
KB2 Kolom Uk. 30 x 50 cm S2 Sloof Uk. 30 x 70 cm
KB3 Kolom Uk. 40 x 70 cm
POTONGAN X - X
KB4 Kolom Uk. 40 x 40 cm SKALA NTS 1 : 450 STR BT
KB5 Kolom Uk. 30 x 40 cm
02 32
- Mutu Beton : K-225 Kg/cm2
: U - 24 (Polos) < 12
- Mutu Baja Tulangan D : U - 32 (Ulir) > 13
- Mutu Baja Profil : Bj - 37 Mpa
B
POT. 2-2
B
POT. 2-2
12.00
KB4 PS1 12.00
S1 KB2 P1 KB4 B1
4 4
A KB2
t=

BA
12CM +4.80

SP
BA BA
6.00

6.00
C S1 S1 C C B1 B1 C
POT. 3 - 3 POT. 3 - 3 POT. 3 - 3 POT. 3 - 3

SP

BA
KB3 PS2
S1 S1
KB4
5 5
KB3 B1 KB3
KB4 PS1 KB3 P2 PEJABAT PEMBUAT KOMITMEN

A A
POT. 1 - 1 POT. 1 - 1
A A
POT. 1 - 1 POT. 1 - 1

S1 S1

KB2 PS1 KB2 PS1


12.00

12.00
S1 S1

KB3 PS2 KB4 PS1


S1 KB3 P2
S1 KB3 B1 KB3
6 6
KB4 A
CV . PRAKTIRA KONSULTAN

BA
t=
+4.80
SP 12CM KONSULTAN PERENCANA PENGAWAS

BA BA
6.00

6.00
S1 S1 B1 B1
SP

BA
S1
KB2
7 7
KB2 P1 KB4 B1
KB4 PS1 4.00 8.00
4.00 8.00
B
B A" A' POT. 2-2 A
POT. 2-2
A" A' A

DENAH RENCANA PONDASI DENAH PLAT ATAP


SKALA 1 : 150 SKALA 1 : 150

MAIN ENTRANCE
SIMBOL KETERANGAN SIMBOL KETERANGAN SIMBOL KETERANGAN DENAH RENCANA PONDASI dan
KB2 Kolom Uk. 30 x 50 cm S1 Sloof Uk. 30 x 50 cm P1 Pile Cap Uk. 80 x 80 cm PLAT ATAP
KB3 Kolom Uk. 40 x 70 cm B1 Balok Uk. 30 x 65 cm P2 Pile Cap Uk. 80 x 155 cm
KB4 Kolom Uk. 40 x 40 cm BA Balok Uk. 25 x 50 cm PS1 Pondasi Setempat Uk. 200 x 200 cm 1 : 150 STR BT
PS2 Pondasi Setempat Uk. 150 x 250 cm
03 32
- Mutu Beton : K-225 Kg/cm2
: U - 24 (Polos) < 12
- Mutu Baja Tulangan D : U - 32 (Ulir) > 13
- Mutu Baja Profil : Bj - 37 Mpa

+6.65 +6.65 +6.65 +6.65

DAK BETON DAK BETON


+ 4.80 + 4.80
+ 4.80 + 4.80 + 4.80 + 4.80 PEJABAT PEMBUAT KOMITMEN

BA
B1 B1

KB4 KB3 KB4 KB3

LANTAI RENCANA LANTAI RENCANA


KB3
MUKA HALAMAN
- 0.60 S1
- 0.65 S1
- 0.65 - 0.65 - 0.65
S1
- 1.15 S1 - 1.15
- 1.50 - 1.50

P2 P1
PS2 PS1 - 2.40 - 2.50 PS1 - 2.40
- 2.50

CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS

4.00 8.00 8.00


12.00
A' A
A" A' A

POTONGAN A - A POTONGAN C - C
SKALA 1 : 100 SKALA 1 : 100

MAIN ENTRANCE
SIMBOL KETERANGAN SIMBOL KETERANGAN SIMBOL KETERANGAN
POTONGAN A - A DAN C - C
KB2 Kolom Uk. 30 x 50 cm S1 Sloof Uk. 30 x 50 cm P1 Pile Cap Uk. 80 x 80 cm
KB3 Kolom Uk. 40 x 70 cm B1 Balok Uk. 30 x 65 cm P2 Pile Cap Uk. 80 x 155 cm
KB4 Kolom Uk. 40 x 40 cm BA Balok Uk. 25 x 50 cm PS1 Pondasi Setempat Uk. 200 x 200 cm 1 : 100 STR BT
PS2 Pondasi Setempat Uk. 150 x 250 cm
04 32
- Mutu Beton : K-225 Kg/cm2
: U - 24 (Polos) < 12
- Mutu Baja Tulangan D : U - 32 (Ulir) > 13
- Mutu Baja Profil : Bj - 37 Mpa

+6.65
PEJABAT PEMBUAT KOMITMEN

ATAP DAK ATAP DAK


+ 4.80 + 4.80
+ 4.80
BA BA
B1 B1 B1 B1

KB3 KB3

LANTAI RENCANA LANTAI RENCANA LANTAI RENCANA

- 0.65
S1 S1
- 1.15

CV . PRAKTIRA KONSULTAN
- 2.25 PS1 KONSULTAN PERENCANA PENGAWAS

- 2.50
6.00 12.00 6.00

24.00

4 5 6 7

POTONGAN B - B
SKALA 1 : 100

MAIN ENTRANCE
SIMBOL KETERANGAN SIMBOL KETERANGAN SIMBOL KETERANGAN
POTONGAN B - B
KB2 Kolom Uk. 30 x 50 cm S1 Sloof Uk. 30 x 50 cm P1 Pile Cap Uk. 80 x 80 cm
KB3 Kolom Uk. 40 x 70 cm B1 Balok Uk. 30 x 65 cm P2 Pile Cap Uk. 80 x 155 cm
KB4 Kolom Uk. 40 x 40 cm BA Balok Uk. 25 x 50 cm PS1 Pondasi Setempat Uk. 200 x 200 cm 1 : 100 STR BT
PS2 Pondasi Setempat Uk. 150 x 250 cm
05 32
- Mutu Beton : K-225 Kg/cm2
: U - 24 (Polos) < 12
- Mutu Baja Tulangan D : U - 32 (Ulir) > 13
- Mutu Baja Profil : Bj - 37 Mpa

F G
POT. 3-3 POT. 4-4

3.50 4.58 3.93 3.93 4.58 3.50


PS3
1D
K5
PEJABAT PEMBUAT KOMITMEN

PS3
K5
1C PS3
K5 PS3 PS3 SP
K5
SP SP SP PS3 K5 SP SP
D K5
D
POT. 1 - 1 POT. 1 - 1
PS3 PS3 PS3 PS3
1B SP K5 SP 1B
E K5 K5 K5 K5 K5 E
POT. 2-2 POT. 2-2
PS3 PS3
SP SP SP SP

SP SP PS3 PS3 SP SP
PS3 K5 K5 PS3
1A 1A
K5 K5 K5 K5 PS3 K5 K5
1
S1 PS3 S1 PS3 S2 PS3 S1 S1
K1 K1 K1 K1
P5
P51.85 K1
K1
4.00 3.50 1.50 1.50 1.50 2.43 3.15 2.43 1.50 1.50 1.50 1.50 2.00 4.00
6.00 6.00 8.00 6.00 6.00

G G' H H' H" H"' I I' I" J J' J" J"' K K' L CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS

F G
POT. 4-4 POT. 3-3

DENAH RENCANA PONDASI


SKALA 1 : 150

SIMBOL KETERANGAN SIMBOL KETERANGAN


KAMAR MANDI
KB1 Kolom Uk. 120 x 50 cm SP Sloof Praktis Uk. 15 x 20 cm
KB5 Kolom Uk. 30 x 40 cm P5 Pile Cap Uk. 185 x 185 cm DENAH RENCANA PONDASI
PS3 Pondasi Setempat Uk. 100 x 100 cm
1 : 150 STR BT

06 32
- Mutu Beton : K-225 Kg/cm2
: U - 24 (Polos) < 12
- Mutu Baja Tulangan D : U - 32 (Ulir) > 13
- Mutu Baja Profil : Bj - 37 Mpa

3.50 4.58 3.93 3.93 4.58 3.50 PEJABAT PEMBUAT KOMITMEN

1D
KB5

KB5
1C
KB5

KB5
KB5 KB5

KB5 KB5 KB5 KB5 KB5 KB5


1B KB5 1B
-0.45 -0.45
TOILET TEMPAT CUCI TOILET
-0.30 -0.15 -0.30

KB5 KB5 KB5 KB5 KB5 KB5


1A -0.05 -0.05
1A
KB5 KB5
1
KB1 KB1 KB1 KB1 KB1 KB1

4.00 3.50 1.50 1.50 1.50 2.43 3.15 2.43 1.50 1.50 1.50 1.50 2.00 4.00 CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS
6.00 6.00 8.00 6.00 6.00

G G' H H' H" H"' I I' I" J J' J" J"' K K' L

DENAH PERLETAKAN KOLOM


SKALA 1 : 150

SIMBOL KETERANGAN
KB1 Kolom Uk. 120 x 50 cm KAMAR MANDI

KB5 Kolom Uk. 30 x 40 cm DENAH PERLETAKAN KOLOM

1 : 150 STR BT

07 32
- Mutu Beton : K-225 Kg/cm2
: U - 24 (Polos) < 12
- Mutu Baja Tulangan D : U - 32 (Ulir) > 13
- Mutu Baja Profil : Bj - 37 Mpa

F G
POT. 3-3 POT. 4-4

3.50 4.58 3.93 3.93 4.58 3.50

1D
B1'
PEJABAT PEMBUAT KOMITMEN

1C

B1'
B1'
B1'
B1'

B1'
B1'

B1'

B1'
D D

B1'
POT. 1 - 1 POT. 1 - 1
B1' B1' B1' B1'
1B 1B
E E

B1'
B1'

B1'
B1'

B1'

B1'
POT. 2-2 POT. 2-2
4.08

B1' B1' B1' B1' B1'


1A 1A
B1'

B1'
B1'

B1'

B1'
B1'
1
TEMPAT TANGKI TANDON ATAS TEMPAT TANGKI TANDON ATAS
PLAT LANTAI tb 20 cm PLAT LANTAI tb 20 cm

4.00 3.50 1.50 1.50 1.50 2.43 3.15 2.43 1.50 1.50 1.50 1.50 2.00 4.00
6.00 6.00 8.00 6.00 6.00

G G' H H' H" H"' I I' I" J J' J" J"' K K' L
CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS
F G
POT. 4-4 POT. 3-3

RENCANA PENULANGAN ATAP DAK


SKALA 1 : 150

SIMBOL KETERANGAN
S1 Sloof Uk. 30 x 50 cm
KAMAR MANDI
S2 Sloof Uk. 30 x 70 cm
RENCANA PENULANGAN ATAP
B1 Balok Uk. 30 x 65 cm
DAK
BA Balok Uk. 25 x 50 cm
B1' Balok Uk. 20 x 50 cm 1 : 150 STR BT
RB1 Balok Uk. 15 x 30 cm
08 32
- Mutu Beton : K-225 Kg/cm2
: U - 24 (Polos) < 12
- Mutu Baja Tulangan D : U - 32 (Ulir) > 13
- Mutu Baja Profil : Bj - 37 Mpa

+6.00

PEJABAT PEMBUAT KOMITMEN

+4.50
+4.00 B1' B1' B1' B1' B1' B1'

KB5 KB5 KB5 KB5 KB5 KB5

+ 1.50

- 0.75

- 1.85

- 2.50 PS3 PS3 PS3 PS3 PS3 PS3

CV . PRAKTIRA KONSULTAN
2.00 1.50 1.50 1.50 1.50 2.43 3.15 2.43 1.50 1.50 1.50 1.50 2.00 KONSULTAN PERENCANA PENGAWAS

8.00 8.00 8.00

G' H H' H" H"' I I' I" J J' J" J"' K K'

POTONGAN D - D
SKALA 1 : 100

SIMBOL KETERANGAN SIMBOL KETERANGAN


KAMAR MANDI
KB1 Kolom Uk. 120 x 50 cm SP Sloof Praktis Uk. 15 x 20 cm
KB5 Kolom Uk. 30 x 40 cm P5 Pile Cap Uk. 185 x 185 cm POTONGAN D - D
PS3 Pondasi Setempat Uk. 100 x 100 cm
1 : 100 STR BT

09 32
- Mutu Beton : K-225 Kg/cm2
: U - 24 (Polos) < 12
- Mutu Baja Tulangan D : U - 32 (Ulir) > 13
- Mutu Baja Profil : Bj - 37 Mpa

+6.00

+4.50
PEJABAT PEMBUAT KOMITMEN
+4.00 B1' B1' B1' B1' B1' B1'

KB5 KB5 KB5 KB5 KB5

+ 1.50

- 0.75

- 1.85

- 2.50 PS3 PS3 PS3 PS3 PS3 PS3

2.00 1.50 1.50 1.50 1.50 2.43 3.15 2.43 1.50 1.50 1.50 1.50 2.00
8.00 8.00 8.00 CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS

G' H H' H" H"' I I' I" J J' J" J"' K K'

POTONGAN E - E
SKALA 1 : 100

SIMBOL KETERANGAN SIMBOL KETERANGAN


KAMAR MANDI
KB1 Kolom Uk. 120 x 50 cm SP Sloof Praktis Uk. 15 x 20 cm
KB5 Kolom Uk. 30 x 40 cm P5 Pile Cap Uk. 185 x 185 cm POTONGAN E - E
PS3 Pondasi Setempat Uk. 100 x 100 cm
1 : 100 STR BT

10 32
- Mutu Beton : K-225 Kg/cm2
: U - 24 (Polos) < 12
- Mutu Baja Tulangan D : U - 32 (Ulir) > 13
- Mutu Baja Profil : Bj - 37 Mpa

+6.00 +6.00

PEJABAT PEMBUAT KOMITMEN


+4.50 +4.50
+4.00 B1' B1' +4.00 B1' B1' B1' B1'

KB5 KB5 KB5 KB5


KB5

+ 1.50 + 1.50

- 0.75 S1 S1
- 0.75

- 1.85 - 1.85

- 2.50 PS3 PS3 - 2.50 PS3 PS3 PS3

0.80 0.80 2.83 5.37 CV . PRAKTIRA KONSULTAN


2.83 8.99 KONSULTAN PERENCANA PENGAWAS

1A 1B 1A 1B 1D

POTONGAN F - F POTONGAN G - G
SKALA 1 : 100 SKALA 1 : 100

SIMBOL KETERANGAN SIMBOL KETERANGAN


KB1 Kolom Uk. 120 x 50 cm SP Sloof Praktis Uk. 15 x 20 cm KAMAR MANDI

KB5 Kolom Uk. 30 x 40 cm P5 Pile Cap Uk. 185 x 185 cm POTONGAN F - F dan G - G
PS3 Pondasi Setempat Uk. 100 x 100 cm
1 : 100 STR BT

11 32
- Mutu Beton : K-225 Kg/cm2
: U - 24 (Polos) < 12
- Mutu Baja Tulangan D : U - 32 (Ulir) > 13 5D19
4D19
- Mutu Baja Profil : Bj - 37 Mpa

0.50
4D19

0.70
8D19

4D19
0.30
5D19
0.40
POT K-K
K K K K POT K-K
LANTAI RENCANA
LANTAI RENCANA

PEJABAT PEMBUAT KOMITMEN


MUKA ASPHAL
MUKA ASPHAL
-1.00
- 1.00 -1.00
- 1.00

D13-125 D13-100
- 1.50 - 1.50
0.60

0.70
1 D13
- 2.10
2 D13
- 2.15 D13-125 - 2.20
- 2.30
- 2.25 D16-100
LANTAI KERJA 1:3:5 T=5CM - 2.40
PASIR URUG T=15CM LANTAI KERJA 1:3:5 T=5CM
PASIR URUG T=15CM
MINI PILE 25x25 PRATEKAN K500
PANJANG =16M (8+8)M MINI PILE 25x25 PRATEKAN K500
BOTTOM+MIDDLE (TANPA UPPER) PANJANG =16M (8+8)M
EX WIKA (KELAS B), BOTTOM+MIDDLE (TANPA UPPER)
EX WIKA (KELAS B), CV . PRAKTIRA KONSULTAN
SAMBUNGAN SESUAI DENGAN KONSULTAN PERENCANA PENGAWAS
PABRIK MASING - MASING SAMBUNGAN SESUAI DENGAN
KAWAT LAS AWS E-7018 PANCANG SYSTEM PABRIK MASING - MASING
INJECTION KAPASITAS ALAT 120 TON. KAWAT LAS AWS E-7018 PANCANG SYSTEM
0.28 0.25 0.28 ALAT EX. METROPILE, PERAK JAYA, INJECTION KAPASITAS ALAT 120 TON.
ALAS KASIH, MODERN 0.28 0.25 0.50 0.25 0.28 ALAT EX. METROPILE, PERAK JAYA,
0.40 0.40
ALAS KASIH, MODERN
0.40 0.75 0.40

0.40 0.40 0.40 0.75 0.40


0.40

0.40

D13-125 D13-100

D13-100

D16-100
0.80

0.80
D13-125 D16-100
0.40

D13-125

D13-125

0.40

Tebal : 700mm
Tebal : 600mm

1.55
0.80
DETAIL PC1 dan PC2

DETAIL PC1 DETAIL PC2


SKALA 1 : 30
SKALA 1 : 30
1 : 30 STR BT

12 32
5D19
- Mutu Beton : K-225 Kg/cm2
: U - 24 (Polos) < 12 5D19
- Mutu Baja Tulangan D : U - 32 (Ulir) > 13
- Mutu Baja Profil : Bj - 37 Mpa

1.20
14D19

1.20
14D19 + 1.00
+ 1.00

5D19
0.50

5D19 K K
K K 0.50
POT K-K
POT K-K LANTAI RENCANA
LANTAI RENCANA

MUKA ASPHAL
MUKA ASPHAL -1.00 PEJABAT PEMBUAT KOMITMEN
- 1.00
-1.00
- 1.00

D16-100
D16-100 - 1.50
- 1.50

0.80
0.80

2 D16
2 D16 - 2.30
- 2.30 - 2.35 D19-100
- 2.35 - 2.50
D19-100
- 2.50 LANTAI KERJA 1:3:5 T=5CM
LANTAI KERJA 1:3:5 T=5CM PASIR URUG T=15CM
PASIR URUG T=15CM

MINI PILE 25x25 PRATEKAN K500


MINI PILE 25x25 PRATEKAN K500 PANJANG =16M (8+8)M
PANJANG =16M (8+8)M BOTTOM+MIDDLE (TANPA UPPER)
BOTTOM+MIDDLE (TANPA UPPER) EX WIKA (KELAS B),
EX WIKA (KELAS B),
SAMBUNGAN SESUAI DENGAN
SAMBUNGAN SESUAI DENGAN PABRIK MASING - MASING
PABRIK MASING - MASING KAWAT LAS AWS E-7018 PANCANG SYSTEM
KAWAT LAS AWS E-7018 PANCANG SYSTEM
0.28 0.25 0.50 0.25 0.28
INJECTION KAPASITAS ALAT 120 TON. CV . PRAKTIRA KONSULTAN
INJECTION KAPASITAS ALAT 120 TON. ALAT EX. METROPILE, PERAK JAYA, KONSULTAN PERENCANA PENGAWAS
0.28 0.25 0.25 0.25 0.25 0.28 ALAT EX. METROPILE, PERAK JAYA, ALAS KASIH, MODERN
0.40 0.75 0.40
ALAS KASIH, MODERN
0.40 0.38 0.38 0.40
0.40 0.75 0.40
0.53 0.50 0.53

0.40
0.40

0.95

D16-100
0.75

1.55
D16-100

D19-100

D19-100
0.65

D16-100

D19-100
D16-100
0.40

D19-100
0.50
0.40

Tebal : 800mm
Tebal : 800mm

1.55
1.55

DETAIL PC3 dan PC4


DETAIL PC4
DETAIL PC3 SKALA 1 : 35
SKALA 1 : 35 1 : 35 STR BT

13 32
- Mutu Beton : K-225 Kg/cm2 5D19
: U - 24 (Polos) < 12
- Mutu Baja Tulangan D : U - 32 (Ulir) > 13
- Mutu Baja Profil : Bj - 37 Mpa

1.20
14D19

+ 1.00 4D19

0.40
4D19
5D19
0.50 4D19
K K 0.40
POT K-K
LANTAI RENCANA
POT K-K
LANTAI RENCANA

K K

MUKA ASPHAL
-1.00
- 1.00
PEJABAT PEMBUAT KOMITMEN

MUKA ASPHAL
-1.00
- 1.00
D16-100
- 1.50
0.90

3 D16
- 2.40
- 2.45 D19-100
- 2.60 D13-125
LANTAI KERJA 1:3:5 T=5CM

0.25
0.20
PASIR URUG T=15CM
- 2.35
- 2.40
MINI PILE 25x25 PRATEKAN K500 - 2.50 D13-125
PANJANG =16M (8+8)M
BOTTOM+MIDDLE (TANPA UPPER)
LANTAI KERJA 1:3:5 T=5CM
EX WIKA (KELAS B), 0.80 0.40 0.80 PASIR URUG T=10CM
2.00
SAMBUNGAN SESUAI DENGAN
PABRIK MASING - MASING
KAWAT LAS AWS E-7018 PANCANG SYSTEM
INJECTION KAPASITAS ALAT 120 TON. CV . PRAKTIRA KONSULTAN
0.28 0.25 0.28 0.25 0.28 0.25 0.28 ALAT EX. METROPILE, PERAK JAYA, KONSULTAN PERENCANA PENGAWAS
ALAS KASIH, MODERN
0.40 0.53 0.53 0.40

0.40 1.05 0.40


0.40

2.00

D13-125

D13-125
D16-100
D13-125
1.05

1.85

D19-100
D13-125
D16-100

D19-100
0.40

2.00
Tebal : 900mm
DETAIL PC5 dan PS1
1.85
DETAIL PS1
DETAIL PC5 SKALA 1 : 30
1 : 35 STR BT
SKALA 1 : 35
14 32
- Mutu Beton : K-225 Kg/cm2 5D19
: U - 24 (Polos) < 12
- Mutu Baja Tulangan D : U - 32 (Ulir) > 13

0.70
- Mutu Baja Profil : Bj - 37 Mpa 8D19

4D19
5D19
0.40 2D16

0.40
POT K-K
4D19
+ 0.20 LANTAI RENCANA 0.30

POT
LANTAI K-K
RENCANA
K K
K K

MUKA ASPHAL
-1.00 PEJABAT PEMBUAT KOMITMEN
- 1.00
MUKA ASPHAL
-1.00
- 1.00

D13-125
0.25
0.20

- 2.35 D13-125
- 2.40

0.25
0.20
- 2.50 D13-125
- 2.35
LANTAI KERJA 1:3:5 T=5CM - 2.40
0.55 0.40 0.55 PASIR URUG T=10CM - 2.50 D13-125
1.50 LANTAI KERJA 1:3:5 T=5CM
0.35 0.30 0.35 PASIR URUG T=10CM
1.00

CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS
D13-125

D13-125
2.50

D13-125
D13-125
1.00
D13-125
D13-125

D13-125
D13-125 1.00

1.50 DETAIL PS2 dan PS3

DETAIL PS2 DETAIL PS3


SKALA 1 : 30
SKALA 1 : 30 1 : 30 STR BT

15 32
- Mutu Beton : K-225 Kg/cm2
: U - 24 (Polos) < 12
KODE KOLOM KB1 KB2 KB3
- Mutu Baja Tulangan D : U - 32 (Ulir) > 13 POSISI TUMPUAN LAPANGAN TUMPUAN LAPANGAN TUMPUAN LAPANGAN
- Mutu Baja Profil : Bj - 37 Mpa 5D19 5D19

5D19 5D19
4D19 4D19
GAMBAR
POTONGAN
4D19 4D19 8D19 8D19
14D19 14D19

4D19 4D19
0.30 0.30 5D19 5D19
0.40 0.40

5D19 5D19
0.50 0.50
DIMENSI 1200x500 mm 1200x500 mm 300x500 mm 300x500 mm 400x700 mm 400x700 mm
TULANGAN 10 D19 10 D19 8 D19 8 D19 10 D19 10 D19
SENGKANG
SABUK 14 D19 14 D19 4 D19 4 D19 8 D19 8 D19
KODE KOLOM KB4 KB5 KP
POSISI TUMPUAN LAPANGAN TUMPUAN LAPANGAN TUMPUAN LAPANGAN
+ 1.50

GAMBAR 4D19 4D19 4D19 4D19


POTONGAN 2D16 2D16

4D19 4D19 0.15 0.15


0.40 0.40 0.30 0.30
PEJABAT PEMBUAT KOMITMEN

DIMENSI 400x400 mm 400x400 mm 300x400 mm 300x400 mm 150x150 mm 150x150 mm


LANTAI RENCANA TULANGAN 8 D19 8 D19 8 D19 8 D19
SENGKANG
SABUK 4 D19 4 D19 2 D16 2 D16 - -

KODE BALOK S1 S2 B1
POSISI TUMPUAN LAPANGAN TUMPUAN LAPANGAN TUMPUAN LAPANGAN
6D19 6D19
LANTAI RENCANA 4D19 4D19 6D19 6D19
MUKA HALAMAN 2D16 2D16
PAS. TRASRAM GAMBAR
- 0.60 POTONGAN 2D16 2D16
1PC : 2Ps 2D16 2D16
2D13 2D13
- 0.65 PAS. TRASRAM
1PC : 2Ps
4D19 4D19
0.30 0.30 6D19 6D19 6D19 6D19
0.30 0.30 0.30 0.30
S1 MUKA HALAMAN DIMENSI 300x500 mm 300x500 mm 300x700 mm 300x700 mm 300x650 mm 300x650 mm
- 0.55 - 0.60 TULANGAN 8 D19 8 D19 12 D19 12 D19 12 D19 12 D19
- 1.15
SENGKANG

- 0.75
SP SABUK 2 D16 2 D16 4 D16 4 D16 2 D13 2 D13
KODE BALOK BA B1' RB1
POSISI TUMPUAN LAPANGAN TUMPUAN LAPANGAN TUMPUAN LAPANGAN

4D16 4D16
5D16 5D16 CV . PRAKTIRA KONSULTAN
GAMBAR 3D13 3D13 KONSULTAN PERENCANA PENGAWAS
POTONGAN 2D13 2D13
2D13 2D13

3D13 3D13
- 1.95 PAS. BATU KALI
4D16 4D16
5D16 5D16 0.15 0.15
0.20 0.20
1PC : 4Ps 0.25 0.25
- 1.55 PAS. BATU KALI
- 2.15 1PC : 4Ps DIMENSI 250x500 mm 250x500 mm 200x500 mm 200x500 mm 150x300 mm 150x300 mm
- 2.25
ONDERLAAG 15/20
- 1.75 TULANGAN 8 D16 8 D16 10 D16 10 D16 6 D13 6 D13

- 1.85 SENGKANG

ONDERLAAG 15/20 SABUK 2 D13 2 D13 2 D13 2 D13


PASIR URUG PADAT
0.30 KODE BALOK SP

0.70 0.30 PASIR URUG PADAT POSISI TUMPUAN LAPANGAN

0.70
GAMBAR
POTONGAN

0.15 0.15

DET. BATU KALI (MAINENTRANCE) DET. BATU KALI (KM/WC)


SKALA 1 : 25 SKALA 1 : 25 DIMENSI 150x200 mm 150x200 mm
TULANGAN
SENGKANG DETAIL PONDASI BATU KALI dan
SABUK - - DETAIL KOLOM BALOK

DET. KOLOM dan BALOK 1 : 25 STR BT


SKALA NTS

16 32
B
POT. 2 - 2

A B C D E F G H I J K L M N P Q R S
A" A' 8M (4+4)M 8M 8M 8M (4+4)M 8M (4+4)M 8M 8M 8M (4+4)M 8M (4+4)M 8M (4+4)M 8M 8M S' S"

12.00 104.00 12.00

1
K1 K1S K1 K1 K1 K1S K1 K1S K1 K1 K1 K1S K1 K1S K1 K1S K1 K1
6.00

K2 K2
2
6.00

K3 K3
3
6.00

K4 K4
4
6.00

K7 K5 K5 K7
5

A A
POT. 1 - 1 POT. 1 - 1
PEJABAT PEMBUAT KOMITMEN

60.00
12.00

K6" K6 K6 K6"

K7 K5 K5 K7
6
6.00

K4 K4
7
6.00

K3 K3
8
6.00

K2 K2
9
6.00

K1 K1 K1S K1 K1S K1 K1S K1 K1 K1 K1S K1 K1S K1 K1 K1 K1S K1


10

4.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 8.00 4.00

104.00
CV . PRAKTIRA KONSULTAN
A B C D E F G H I J K L M N P Q R S KONSULTAN PERENCANA PENGAWAS
A" A' 8M 8M (4+4)M 8M (4+4)M 8M (4+4)M 8M 8M 8M (4+4)M 8M (4+4)M 8M 8M 8M (4+4)M 8M
S' S"

B
POT. 2 - 2

DENAH KOLOM WF
SKALA 1 : 450 WF 700 x 300 x 13 x 24

20 20 WF 700 x 300 x 13 x 24

20
CONNECTION PLATE
KODE PLAT K1- K1S K2,K3,K4,K5,K6,K6" K7 PL. t= 20MM

20
CONNECTION PLATE
PL. t= 20MM,

800
75

X X SAMBUNGAN SYSTEM LAS

550
WF 500x200x10x16
RIB SIRIP
WF 298 x 149 x 5,5 x 8
170

PL. t= 20MM
GAMBAR RIB PLATE
RIB t= 9 mm PL. t=16mm
170

POTONGAN WF 700 x 300 x BASE PLATE


KET : BASE PLATE 13 x24
1000

20
170

PL. t=12mm
BASE PLATE 550
K1 = KOLOM WF UTUH
170

PL. t=20MM

20
BASE PLATE
170

K1S = KOLOM WF SAMBUNGAN PL. t=25MM


50 150 50
300

60 180 60
700
75

250
50 85 130 85 50
300
400

- Semua ukuran dalam milimeter TAMPAK POT.X-X


DIMENSI PLAT 1000x400x25 mm 350x250x12 mm 350x250x20 mm
- Mutu Baja Profil : BJ37 DENAH KOLOM WF
KOLOM WF 700x300x13x24 298x149x5,5x8 500x200x10x16
- Tebal Pengelasan harus disesuaikan dengan RIB PLAT t=20 mm PLAT t=12 mm PLAT t=12 mm DETAIL SAMBUNGAN KOLOM (K1S) WF 700
tebal material yang akan dilas. ANCHOR
SKALA NTS

- Kawat las A.W.S. : E7016 / E7018 1 : 450 STR BJ

17 32
B
POT. 2 - 2

A" A' A B C D E F G H I J K L M N P Q R S S' S"

12.00 104.00 12.00

IKATAN
1
2.00

GORDING CNP
150.65.20.2,8

3 ATAP B.LYSAGHT t=0,4 mm


RANGKA KUDA - KUDA PEJABAT PEMBUAT KOMITMEN
30.00

PIPA MEDIUM GALVANIS

A A
POT. 1 - 1 POT. 1 - 1
60.00

7
DETAIL DENAH
RAFTER PIPA MEDIUM
30.00

(30,1 Kg/m)
8
REGEL PIPA MEDIUM
CV . PRAKTIRA KONSULTAN
(17,8 Kg/m) KONSULTAN PERENCANA PENGAWAS

9
2.00

RANGKA TALANG
10
SIKU 50.50.5
JARAK 50 CM

4.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 8.00 4.00

104.00

A" A' A B C D E F G H I J K L M N P Q R S S' S"


B
POT. 2 - 2

- Semua ukuran dalam milimeter


- Mutu Baja Profil : BJ37
- Tebal Pengelasan harus disesuaikan dengan DENAH RENCANA ATAP
DENAH RENCANA ATAP tebal material yang akan dilas.
- Kawat las A.W.S. : E7016 / E7018
SKALA 1 : 450
1 : 450 STR BJ

18 32
RAFTER PIPA MEDIUM
GORDING CNP
(30,1 Kg/m) 150.65.20.2,8
+ 18.65

PEJABAT PEMBUAT KOMITMEN

+ 9.00

DAK BETON DAK BETON


+ 4.80 60.60.6 REGEL 1/2 WF + 4.80
+ 4.80 298 x 149 x 5.5 x 8 120.120.12 WF 700 x 300
x 13 x 24

+ 3.00

+ 1.00 LANTAI RENCANA LANTAI RENCANA LANTAI RENCANA LANTAI RENCANA


MUKA HALAMAN MUKA HALAMAN
- 0.60 - 0.60

- 2.50

2.00 4.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 8.00 4.00 2.00
104.00

A" A' A B C D E F G H I P Q A' A"

CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS

POTONGAN A - A
SKALA 1 : 300

KODE PLAT K1- K1S K2,K3,K4,K5,K6,K6" K7


75

WF 500x200x10x16
RIB SIRIP
WF 298 x 149 x 5,5 x 8
170

PL. t= 20MM
GAMBAR RIB PLATE
RIB t= 9 mm PL. t=16mm
170

POTONGAN WF 700 x 300 x BASE PLATE


BASE PLATE 13 x24
1000
170

PL. t=12mm
BASE PLATE
170

PL. t=20MM
BASE PLATE
170

PL. t=25MM
50 150 50
60 180 60
- Semua ukuran dalam milimeter
75

250
50 85 130 85
400
50
300 - Mutu Baja Profil : BJ37
- Tebal Pengelasan harus disesuaikan dengan POTONGAN A - A
DIMENSI PLAT 1000x400x25 mm 350x250x12 mm 350x250x20 mm tebal material yang akan dilas.
KOLOM WF 700x300x13x24 298x149x5,5x8 500x200x10x16
- Kawat las A.W.S. : E7016 / E7018
RIB PLAT t=20 mm PLAT t=12 mm PLAT t=12 mm
ANCHOR 1 : 300 STR BJ

19 32
PIPA MEDIUM GALVANIS
+ 18.65
GORDING CNP
150.65.20.2,8
PIPA MEDIUM GALVANIS

PIPA MEDIUM GALVANIS

REGEL 1/2 WF 298 x 149 x 5.5 x 8 PIPA MEDIUM GALVANIS


60.60.6
PIPA MEDIUM GALVANIS DET. G GORDING CNP
PIPA MEDIUM GALVANIS 150.65.20.2,8
DET. F
(42,4 Kg/m) PIPA MEDIUM GALVANIS PEJABAT PEMBUAT KOMITMEN

DET. B
DET. E (42,4 Kg/m)
+ 9.00 K5 K6 K5

DET. D PIPA MEDIUM GALVANIS


K4 K4
+ 6.65 DET. C PIPA MEDIUM GALVANIS
RIB t = 16 mm
+ 4.80 WF 700 x 300 x 13 x 24
K3 K2 K1
K2 K3
DET. A
K1
+ 1.00 LANTAI RENCANA
KB1 KB2 KB2 KB2 KB3 KB3 KB2 KB2 KB2 KB1

- 1.50
- 2.50

4.00 6.00 6.00 6.00 6.00 12.00 6.00 6.00 6.00 6.00 4.00
30.00 30.00
60.00
CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS
1 2 3 4 5 6 7 8 9 10

POTONGAN B - B
SKALA 1 : 250

KODE PLAT K1- K1S K2,K3,K4,K5,K6,K6" K7


75

WF 500x200x10x16
RIB SIRIP
WF 298 x 149 x 5,5 x 8
170

PL. t= 20MM
GAMBAR RIB PLATE
RIB t= 9 mm PL. t=16mm
170

POTONGAN WF 700 x 300 x BASE PLATE


BASE PLATE 13 x24
1000
170

PL. t=12mm
BASE PLATE
170

PL. t=20MM
BASE PLATE
170

PL. t=25MM
50 150 50
60 180 60
- Semua ukuran dalam milimeter
75

250
50 85 130 85
400
50
300 - Mutu Baja Profil : BJ37
- Tebal Pengelasan harus disesuaikan dengan POTONGAN B - B
DIMENSI PLAT 1000x400x25 mm 350x250x12 mm 350x250x20 mm tebal material yang akan dilas.
KOLOM WF 700x300x13x24 298x149x5,5x8 500x200x10x16
- Kawat las A.W.S. : E7016 / E7018
RIB PLAT t=20 mm PLAT t=12 mm PLAT t=12 mm
ANCHOR 1 : 250 STR BJ

20 32
GORDING CNP
150.65.20.2,8
RIB t = 16 mm WF 700 x 300 x 13 x 24
REGEL 1/2 WF 298 x 149 x 5.5 x 8
WF 700 x 300 x 13 x 24
RIB SIRIP PL. t = 20 mm
BASE PLATE 1.20 PIPA MEDIUM GALVANIS
1000 x 400 x 25 mm 50.50.5
JARAK 50cm 1.20
PIPA MEDIUM GALVANIS
0.80

0.70
K K
PLAT LANTAI 0.30
tbl =15 cm

246

1.50
1000
KOLOM BETON

2.50
500
1200 x 500 x 2000 mm
1.70

RIB SIRIP PL. t= 20MM


WF 700 x 300 x 13 x24

1.50
PANJANG 1700MM PEJABAT PEMBUAT KOMITMEN

BASE PLATE SIKU 60.60.6


PL. t=25MM
K1

50
85 130 85
400
500
50
75 170 170 170 170 170 75

1000
1200

DETAIL KUDA - KUDA B


POT. K-K SKALA 1 : 50
DETAIL KUDA - KUDA A
SKALA 1 : 50

GORDING CNP
GORDING CNP 150.65.20.2,8
150.65.20.2,8 PIPA MEDIUM GALVANIS
PIPA MEDIUM GALVANIS

PIPA MEDIUM GALVANIS


PIPA MEDIUM GALVANIS
CV . PRAKTIRA KONSULTAN
1.20 1.20 KONSULTAN PERENCANA PENGAWAS
PIPA MEDIUM GALVANIS
1.20 1.20 PIPA MEDIUM GALVANIS
PIPA MEDIUM GALVANIS

1.93
2.55
2.13
2.75

SLIP - ON
SLIP - ON

1.50 1.50
1.50 1.50
DETAIL KUDA - KUDA A, B, C, D

DETAIL KUDA - KUDA C DETAIL KUDA - KUDA D


SKALA 1 : 50 SKALA 1 : 50 1 : 50 STR BJ

21 32
GORDING CNP
GORDING CNP
150.65.20.2,8
150.65.20.2,8 PIPA MEDIUM GALVANIS
PIPA MEDIUM GALVANIS

PIPA MEDIUM GALVANIS


PIPA MEDIUM GALVANIS
1.20
PIPA MEDIUM GALVANIS
1.20 PIPA MEDIUM GALVANIS 1.20
1.20

1.72

1.52
2.35

2.11
SLIP - ON SLIP - ON

PEJABAT PEMBUAT KOMITMEN

1.50 1.50 1.50 1.50

DETAIL KUDA - KUDA E DETAIL KUDA - KUDA F


SKALA 1 : 50 SKALA 1 : 50

PLAT SIMPUL tb. 10 mm

1.30
3.00 GORDING CNP
1.30 150.65.20.2,8

1.20 1.30
PIPA MEDIUM GALVANIS PIPA MEDIUM GALVANIS CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS

(15 Kg/m) SLIP - ON


SLIP - ON
1.20

GORDING CNP
150.65.20.2,8
1.20 1.20
PIPA MEDIUM GALVANIS

PIPA MEDIUM GALVANIS

PIPA MEDIUM

t = 5,8 mm (30,1 Kg/m)


SLIP - ON

1.50 1.50 1.50 1.50 1.50 1.50


- Semua ukuran dalam milimeter DETAIL KUDA - KUDA E, F, G
- Mutu Baja Profil : BJ37
DETAIL KUDA - KUDA G - Tebal Pengelasan harus disesuaikan dengan
SKALA 1 : 50
tebal material yang akan dilas. 1 : 50 STR BJ
- Kawat las A.W.S. : E7016 / E7018
22 32
GORDING CNP 150.65.20.5,8
X
2000 2000 2000

100 100
X
6000

DETAIL GORDING PANJANG 6 M


SKALA 1 : 30

PEJABAT PEMBUAT KOMITMEN

PLAT PENGAKU GORDING t=3mm


GORDING CNP 150.65.20.5,8
X
2000 2000 2000 2000

100 100 100


X
6000

8000

DETAIL GORDING PANJANG 8 M


SKALA 1 : 30

GORDING CNP CV . PRAKTIRA KONSULTAN


150.65.20.2.8 KONSULTAN PERENCANA PENGAWAS
KUPINGAN KUPINGAN
200 GORDING t=6mm GORDING t=6mm
50 100 50 GORDING CNP
150.65.20.2.8
20

130
140
90

200
200
60

6 PLAT PENGAKU t=3mm

PIPA MEDIUM GALVANIS

- Semua ukuran dalam milimeter


- Mutu Baja Profil : BJ37
DETAIL KUPINGAN GORDING - Tebal Pengelasan harus disesuaikan dengan DETAIL GORDING DAN
SKALA 1 : 10 tebal material yang akan dilas. KUPINGAN GORDING
- Kawat las A.W.S. : E7016 / E7018
1 : 30 STR BJ

23 32
REGEL WF 298 x 149 x 5.5 x 8
60.60.6

1
RK
6.00

REGEL PIPA MEDIUM

2 (17,8 Kg/m)
6.00

RA
3
6.00

RAFTER PIPA MEDIUM


PEJABAT PEMBUAT KOMITMEN

4
(30,1 Kg/m)
6.00

RA
5 IKATAN
6.00
60.00

6
6.00

RF 5

RA
7
RF 4
6.00

8
REGEL PIPA MEDIUM
6.00

RF 3

(17,8 Kg/m)
RA CV . PRAKTIRA KONSULTAN
9 KONSULTAN PERENCANA PENGAWAS
RF 2
6.00

10
REGEL WF 298 x 149 x 5.5 x 8
6.00

RF 1

60.60.6

RK
11

6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00

104.00

A B C D E F G H I J K L M N P Q R S

- Semua ukuran dalam milimeter


- Mutu Baja Profil : BJ37
- Tebal Pengelasan harus disesuaikan dengan DENAH PENGAKU KUDA - KUDA
KET :
RF = RAFTER
DENAH PENGAKU KUDA - KUDA tebal material yang akan dilas.
SKALA 1 : 350 - Kawat las A.W.S. : E7016 / E7018
RA = REGEL ATAP
RK = REGEL KOLOM 1 : 350 STR BJ

24 32
PIPA MEDIUM GALVANIS PIPA MEDIUM GALVANIS UNP 120.55.6 UNP 80.45.6 PLAT 1000.400.1,2
+ 18.65

PEJABAT PEMBUAT KOMITMEN

+ 9.00

60.60.6 REGEL 1/2 WF


298 x 149 x 5.5 x 8 120.120.12
WF 700 x 300
x 13 x 24
+ 3.00

+ 1.00

CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS

6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00

104.00

A B C D E F G H I P Q

- Semua ukuran dalam milimeter


- Mutu Baja Profil : BJ37
POT. MEMANJANG PENGAKU KUDA - KUDA - Tebal Pengelasan harus disesuaikan dengan POT. MEMANJANG PENGAKU
SKALA 1 : 200
tebal material yang akan dilas. KUDA - KUDA
- Kawat las A.W.S. : E7016 / E7018
1 : 200 STR BJ

25 32
- Semua ukuran dalam milimeter
- Mutu Baja Profil : BJ37
- Tebal Pengelasan harus disesuaikan dengan
tebal material yang akan dilas. KOLOM WF 700 x 300 x 13 x 24
REGEL 1/2 WF
- Kawat las A.W.S. : E7016 / E7018 298 x 149 x 5.5 x 8 60.60.6

1.50

PEJABAT PEMBUAT KOMITMEN

1.50 1.50 1.50 1.50 2.00 2.00 2.00 2.00


6.00 8.00

H I J

DETAIL REGEL KOLOM


SKALA 1 : 50

PIPA MEDIUM GALVANIS

PIPA MEDIUM GALVANIS


SLIP - ON PIPA MEDIUM GALVANIS

CV . PRAKTIRA KONSULTAN
1.39

KONSULTAN PERENCANA PENGAWAS


3.10

SLIP - ON

1.50 1.50 1.50 1.50 2.00 2.00 2.00 2.00


6.00 8.00

DETAIL REGEL KOLOM dan ATAP


H I J

DETAIL REGEL ATAP 1 : 50 STR BJ


SKALA 1 : 50

26 32
Y
UNP 120.55.6 UNP 100.50.6 PLAT 900.400.2
5.93
0.97 1.00 1.00 1.00 1.00 0.97 PEJABAT PEMBUAT KOMITMEN

X X
0.94

0.94
0.12
Y
POT. Y
0.12

CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS

0.97 1.00 1.00 1.00 1.00 0.97


5.93

POT. X

DETAIL KISI - KISI


SKALA 1 : 50

- Semua ukuran dalam milimeter


- Mutu Baja Profil : BJ37
- Tebal Pengelasan harus disesuaikan dengan DETAIL KISI - KISI
tebal material yang akan dilas.
- Kawat las A.W.S. : E7016 / E7018
1 : 50 STR BJ

27 32
1

3
30.00

PEJABAT PEMBUAT KOMITMEN

5
60.00

8
30.00

CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS
10

11

6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00
1.50 1.50
104.00

A B C D E F G H I J K L M N P Q R S

DENAH CUTTING ATAP


DENAH CUTTING ATAP
SKALA 1 : 450
1 : 450 STR BJ

28 32
GORDING CNP
150.65.20.2,8
+ 17.36

1.20
1.20
+ 9.00

K-5

K-6

K-5
1.20
+ 6.65
RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1

K-1

K-2

K-4

K-4

K-2

K-1
BJ-1

K-3

K-3
+ 4.80

KP

KP

KP

KP

KP

KP

KP

KP
RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1

+ 1.00 LANTAI RENCANA

- 1.50
- 2.50
PEJABAT PEMBUAT KOMITMEN

4.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 6.00 6.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 4.00
30.00 30.00
60.00

1 2 3 4 5 6 7 8 9 10

TAMPAK RANGKA CLADING


SKALA 1 : 250 ATAP BLUESCOPE
LYSAGHT t=0,4 mm
+ 17.36

+ 9.00

CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS
+ 6.65
K-1

K-2

K-3

K-3

K-2

K-2

K-1
BJ-1
K-2

K-2

K-2
+ 4.80
B1

+ 1.00 LANTAI RENCANA

- 1.50
- 2.50

4.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 6.00 6.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 4.00
60.00

1 2 3 4 5 6 7 8 9 10

- Semua ukuran dalam milimeter TAMPAK RANGKA CLADING


- Mutu Baja Profil : BJ37
- Tebal Pengelasan harus disesuaikan dengan
TAMPAK CLADING BLUESCOPE tebal material yang akan dilas.
SKALA 1 : 250 1 : 250 STR BJ
- Kawat las A.W.S. : E7016 / E7018

29 32
GORDING CNP

K5

K6

K5
150.65.20.2,8
+10.80 +10.80 +10.80

KUDA - KUDA
WF 298.149.5,5.8

WF 298.149.5,5.8

K5
WF 600.200.11.17

+6.65 +6.65 +6.65


WF 500.200.10.16
BJ1
BJ2
BJ1
DAK BETON
+ 4.80 WF 600.200.11.17
+ 4.80 + 4.80

WF 500.200.10.16
K7

LANTAI RENCANA LANTAI RENCANA

MUKA HALAMAN
- 0.60
- 0.60 - 0.60

1.50 12.00 1.50


4.00 8.00
12.00 15.00 PEJABAT PEMBUAT KOMITMEN

A" A' A 5 6

POTONGAN A - A POTONGAN B - B
SKALA 1 : 200 SKALA 1 : 200

CONNECTION CONNECTION
PLATE PL. 20mm PLATE PL. 20mm

100 125 125 125 125 100

120 120 120 120 120


RANGKA TALANG D WF 500.200.10.16
POT. 2-2
WF 600.200.11.17
50.50.5, JARAK 500mm

600
2.00 12.00

700
WF 500.200.10.16
P=400mm

WF 298.149.5,5.8
1.50

5 35 230 35 30 140 30
K7 K5 300 200
C C
POT. 1 - 1 POT. 1 - 1

DETAIL BJ1 DETAIL BJ2


BJ2 BJ1 CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS

KODE PLAT K1- K1S K2,K3,K4,K5,K6,K6" K7


12.00

K6" K6

75
WF 600.200.11.17 WF 500x200x10x16
RIB SIRIP
WF 298 x 149 x 5,5 x 8

170
PL. t= 20MM
GAMBAR RIB PLATE
RIB t= 9 mm PL. t=16mm

170
POTONGAN WF 700 x 300 x BASE PLATE
BASE PLATE 13 x24

1000
BJ2 BJ1

170
PL. t=12mm
BASE PLATE

170
PL. t=20MM
BASE PLATE

170
PL. t=25MM
50 150 50
60 180 60

75
250
K7 K5 50 85 130 85 50
300
400
6
1.50

DIMENSI PLAT 1000x400x25 mm 350x250x12 mm 350x250x20 mm


KOLOM WF 700x300x13x24 298x149x5,5x8 500x200x10x16
RIB PLAT t=20 mm PLAT t=12 mm PLAT t=12 mm
2.00 4.00 8.00 ANCHOR

A" A
D
POT. 2-2

- Semua ukuran dalam milimeter


RENCANA ATAP MAIN ENTRANCE
- Mutu Baja Profil : BJ37
dan POTONGAN C - C, D - D
- Tebal Pengelasan harus disesuaikan dengan
RENCANA ATAP ENTRANCE tebal material yang akan dilas.
SKALA 1 : 200 - Kawat las A.W.S. : E7016 / E7018 1 : 200 STR BJ

30 32
"Y" CONNECTING PLATE "C4"

POT. "Y"~"Y"
"Y"

PEJABAT PEMBUAT KOMITMEN

DETAIL CANOPY SAMPING +4.00


CONNECTING PLATE "C5"
CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS

DETAIL CANOPY SAMPING

1 : 25 STR BJ
RANGKA LISPLANK H=1000
31 32
L 50.50.5 L 50.50.5

L 50.50.5 L 50.50.5

DETAIL

PEJABAT PEMBUAT KOMITMEN

3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 6.00 6.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
60.00

1 2 3 4 5 6 7 8 9 10

RANGKA LISPLANK
SKALA 1 : 200

1000
UNP 100.50.5
CV . PRAKTIRA KONSULTAN
5862

0.5
KONSULTAN PERENCANA PENGAWAS

0.5
0.5
L 50.5

L5

0
L 50.50.5

8
900

13
30
14
PLATE 9t

30
14
220
10
80
3023 10 0.5
220

L 50.5
0.5
PLATE 9t 80 L 50.5
300
88
0
170 0.5

250
0.5
0
L5
L 50.50.5

200
1340
70
1070

15

UNP 100.50.5
00
13

L 50.50.5
152 215 200
970 1000 1000 662 1000 1000 1000 1000 1000
RANGKA LISPLANK dan DETAIL

DETAIL LISPLANK
SKALA 1 : 40 1 : 200 STR BJ

32 32
CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS
Pintu Mushalla
Area
K ios
Kio
s

Par
kira
Pasar Ikan n
Agrobisnis

Agrobisnis

Agrobisnis

Agrobisnis

Agrobisnis
Pos
Polisi Kantor
Terminal

Area Kios Terbuka

UPTD wc Terminal

2
Luas Area Pasar = 13.763,71 M
LAY OUT PASAR KARAMAT LAY OUT E

1 : 700

01
Luas Area Pasar = 13.763,71 M

Pintu Mushalla
BAK SAMPAH

washtafel washtafel
-0.60 beton
-0.05 -0.05
beton

-0.05 -0.05

-0.45 -0.45
TOILET TEMPAT CUCI TOILET

SELASAR -0.30 -0.15 -0.30 SELASAR


-0.05 -0.05
washtafel
beton
-0.05 -0.05 washtafel
beton
BAK SAMPAH
-0.05 -0.05

AREA AREA
BONGKAR MUAT BONGKAR MUAT AREA
PEDAGANG TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO PEDAGANG PARKIR MOTOR
+0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15
SIRKULASI MOBIL BARANG DAN PENGUNJUNG

AREA LOS PEDAGANG BUAH AREA LOS PEDAGANG BUAH


+0.15 +0.15
AREA GROSIR IKAN BASAH AREA GROSIR IKAN BASAH
+0.15 +0.15

AREA PEDAGANG BUAH AREA PEDAGANG BUAH


+0.15 +0.15

T. WUDHU
WANITA
GUDANG MUSHOLA

AREA GROSIR IKAN BASAH AREA GROSIR IKAN BASAH

T. WUDHU
AREA PEDAGANG BUAH AREA PEDAGANG BUAH

PRIA
+0.15 +0.15
+0.15 +0.15

JALAN ASPAL HALAMAN HALAMAN


-1.00 -0.60 SIRKULASI MOBIL BARANG DAN PENGUNJUNG -0.60
JALAN ASPAL
-1.00

R. KOPERASI R. PENGELOLA

AREA AGRO BISNIS AREA AGRO BISNIS AREA AGRO BISNIS


+0.15 +0.15 +0.15

SIRKULASI MOBIL BARANG DAN PENGUNJUNG

TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO
+0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15

SELASAR
-0.05

-0.25

JALAN ASPAL
-1.00

KAPASITAS :
TOKO : 42 BUAH @UKURAN 3 X 6
GROSIR IKAN BASAH : 44 BUAH @UKURAN 3,75 X 5 SITE PLAN
AREA LOS PEDAGANG BUAH : 2 BUAH @UKURAN 7,5 X 18 PASAR MODERN KARAMAT SITE PLAN
AREA PEDAGANG BUAH : 72 BUAH @UKURAN 2 X 1,5
AREA AGRO BISNIS : 120 BUAH @UKURAN 3 X 2,4 SKALA 1 : 700
PARKIR MOTOR : 210 BUAH 1 : 700
PARKIR TRUCK : 16 BUAH

02
washtafel washtafel
-0.60 beton
-0.05 -0.05 beton

-0.05 -0.05

-0.45 -0.45
TOILET TEMPAT CUCI TOILET

SELASAR -0.30 -0.15 -0.30 SELASAR


-0.05 washtafel -0.05 washtafel
-0.05
-0.05
beton -0.05 -0.05 beton

1
TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO
+0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15
SIRKULASI MOBIL BARANG DAN PENGUNJUNG

AREA LOS PEDAGANG BUAH AREA LOS PEDAGANG BUAH


3 AREA GROSIR IKAN BASAH AREA GROSIR IKAN BASAH
+0.15 +0.15

+0.15 +0.15

4 AREA PEDAGANG BUAH


+0.15
AREA PEDAGANG BUAH
+0.15

T. WUDHU
WANITA
GUDANG MUSHOLA

AREA GROSIR IKAN BASAH AREA GROSIR IKAN BASAH

T. WUDHU
AREA PEDAGANG BUAH AREA PEDAGANG BUAH

PRIA
+0.15 +0.15
+0.15 +0.15
5

HALAMAN HALAMAN
-0.60 SIRKULASI MOBIL BARANG DAN PENGUNJUNG -0.60

R. KOPERASI R. PENGELOLA

7 AREA AGRO BISNIS


+0.15
AREA AGRO BISNIS
+0.15
AREA AGRO BISNIS
+0.15

SIRKULASI MOBIL BARANG DAN PENGUNJUNG

TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO
+0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15

10

SELASAR
-0.05

-0.25

JALAN ASPAL
-1.00

A B C D E F G H I J K L M N P Q R S

DENAH DENAH
PASAR MODERN KARAMAT
SKALA 1 : 500 1 : 500

03
TAMPAK DEPAN
PASAR KARAMAT
SKALA 1 : 500

ACP WARNA BIRU

PENEBALAN DINDING

PASAR KARAMAT

TAMPAK SAMPING KIRI


PASAR KARAMAT
SKALA 1 : 500

TAMPAK DEPAN, BELAKANG


DAN SAMPING KIRI
TAMPAK BELAKANG
PASAR KARAMAT
1 : 500 - 03
SKALA 1 : 500

04
A B
+ 18.65 + 18.65
KISI - KISI ANGIN
RANGKA ALUMINIUM

TWINLITE POLYCARBONAT TEBAL 5mm


WARNA CLEAR

TWINLITE POLYCARBONAT TEBAL 5mm


WARNA CLEAR
ExLITE POLYCARBONAT TEBAL 4,5mm ExLITE POLYCARBONAT TEBAL 4,5mm
WARNA CLEAR WARNA CLEAR

PLAFOND ACP
+ 9.00 + 9.00
LIST PLANK ACP ATAP MEMBRAN
RANGKA PIPA + 7.85

+ 6.00

+ 4.50
+ 4.00 LIST PLANK ACP
+ 2.90
+ 2.70 + 2.40

+ 1.00 + 1.00

+ 0.15 + 0.15 + 0.15 - 0.05


- 0.05 - 0.25 rabat
muka halaman - 0.60 -0.60 pedestrian - 0.60 muka halaman
muka aspal / muka tanah asal - 1.00 - 1.00 muka aspal / muka tanah asal

- 2.50 - 2.50

1 10

POTONGAN A - A
PASAR KARAMAT
SKALA 1 : 500

C
+ 18.65
KISI - KISI ANGIN
RANGKA ALUMINIUM
+ 18.65
D
TWINLITE POLYCARBONAT TEBAL 5mm
WARNA CLEAR

TWINLITE POLYCARBONAT TEBAL 5mm


WARNA CLEAR
EXLITE POLYCARBONAT TEBAL 4,5mm ExLITE POLYCARBONAT TEBAL 4,5mm
WARNA CLEAR WARNA CLEAR

PLAFOND ACP
ATAP POLYCARBONAT
+ 9.00 + 9.00
RANGKA HOLLOW
LIST PLANK ACP
+ 7.85

+ 6.00

dak beton + 4.50 + 4.50

+ 2.90
+ 2.40

+ 1.00 + 1.00

+ 0.15 + 0.15 - 0.05


- 0.15
muka halaman - 0.60 - 0.60 muka halaman
muka aspal / muka tanah asal - 1.00 - 1.00 muka aspal / muka tanah asal

- 2.50

1 10

POTONGAN B - B
PASAR KARAMAT
SKALA 1 : 500

E
+ 18.65

LISTPLANK ACP LISTPLANK ACP

PLAFOND ACP
PLAFOND ACP

GORDING CNP GORDING CNP


150.65.20.2,8 150.65.20.2,8
+10.80

KUDA - KUDA KUDA - KUDA


WF 298.149.5,5.8 WF 298.149.5,5.8

+ 9.00

+ 6.85
+6.65
WF 500.200.10.16 WF 500.200.10.16

ACP ACP
+ 5.50 + 5.50 + 5.00
+ 4.80
SIKU 60.60.6 REGEL 1/2 WF
WF 500.200.10.16 350 x 175 SIKU 120.120.15 WF 700 x 300
LAPIS BATU ALAM

BATU ALAM

+ 1.00

MUKA HALAMAN
- 0.60
- 0.65 - 0.60 muka halaman
muka aspal / muka tanah asal - 1.15
- 1.00 muka aspal / muka tanah asal

- 2.50 - 2.50

A' A" A B C D E F G H I J K L M N P Q R S S' S"

POTONGAN A - A, POTONGAN B - B
DAN POTONGAN C - C
POTONGAN C - C
PASAR KARAMAT
SKALA 1 : 500
1 : 500

05
TWINLITE POLYCARBONAT TEBAL 5mm
WARNA CLEAR
ExLITE POLYCARBONAT TEBAL 4,5mm
WARNA CLEAR

PLAFOND ACP
+ 9.00
LIST PLANK ACP

+ 6.00

+ 4.00 LIST PLANK ACP

+ 1.00

- 0.05 + 0.15
muka halaman - 0.60
muka aspal / muka tanah asal - 1.00

- 2.50

DETAIL POTONGAN
DETAIL A POTONGAN
PASAR KARAMAT
1 : 100
SKALA 1 : 100

06
ExLITE POLYCARBONAT TEBAL 4,5mm
WARNA CLEAR

+ 9.00
ATAP MEMBRAN
RANGKA PIPA + 7.85

+ 4.50

+ 2.90
+ 2.40

+ 1.00

+ 0.15 - 0.05 - 0.25 rabat


-0.60 pedestrian - 0.60 muka halaman
- 1.00 muka aspal / muka tanah asal

- 2.50

10

DETAIL B POTONGAN DETAIL POTONGAN


PASAR KARAMAT
SKALA 1 : 100
1 : 100

07
TWINLITE POLYCARBONAT TEBAL 5mm
WARNA CLEAR
EXLITE POLYCARBONAT TEBAL 4,5mm
WARNA CLEAR

ATAP POLYCARBONAT
+ 9.00
RANGKA HOLLOW

+ 6.00

dak beton + 4.50

+ 1.00

+ 0.15
- 0.15
muka halaman - 0.60
muka aspal / muka tanah asal - 1.00

- 2.50

DETAIL POTONGAN

DETAIL C POTONGAN
PASAR KARAMAT
1 : 100

SKALA 1 : 100
08
ExLITE POLYCARBONAT TEBAL 4,5mm
WARNA CLEAR

PLAFOND ACP
+ 9.00
LIST PLANK ACP
+ 7.85

+ 4.50

+ 2.90
+ 2.40

+ 1.00

- 0.05
- 0.60 muka halaman
- 1.00 muka aspal / muka tanah asal

10

DETAIL POTONGAN
DETAIL D POTONGAN
PASAR KARAMAT
1 : 100
SKALA 1 : 100

09
LISTPLANK ACP

PLAFOND ACP

GORDING CNP
150.65.20.2,8
+10.80

KUDA - KUDA
WF 298.149.5,5.8

+6.65
WF 500.200.10.16

ACP

+ 4.80

WF 500.200.10.16
LAPIS BATU ALAM

MUKA HALAMAN - 0.60


- 0.65
muka aspal / muka tanah asal - 1.15

- 2.50

DETAIL POTONGAN

DETAIL E POTONGAN
PASAR KARAMAT A' A" A B 1 : 100

SKALA 1 : 100
10
1

HALAMAN
-0.60

10

A B C D E F G H I J K L M N P Q R S

RENCANA PLAFOND RENCANA PLAFOND

PASAR MODERN KARAMAT


SKALA 1 : 500 1 : 500

11
DETAIL PLAFOND

1 : 10

12
DETAIL PLAFOND

1 : 10

13
-0.60

HOMOGENIOUS HOMOGENIOUS
UNPOLISH UNPOLISH
60 60 60 60
1
HOMOGENIOUS HOMOGENIOUS
UNPOLISH UNPOLISH
60 60 60 60

HOMOGENIOUS HOMOGENIOUS
UNPOLISH UNPOLISH
3 60 60 60 60

T. WUDHU
WANITA
HOMOGENIOUS HOMOGENIOUS HOMOGENIOUS
UNPOLISH UNPOLISH UNPOLISH
60 60 60 60 60 60
HOMOGENIOUS

T. WUDHU
PRIA
UNPOLISH
60 60
5

LANTAI COR
HALAMAN TEBAL 15 CM
-0.60

HOMOGENIOUS HOMOGENIOUS
UNPOLISH UNPOLISH
60 60 60 60
7

9
HOMOGENIOUS HOMOGENIOUS
UNPOLISH UNPOLISH
60 60 60 60

10
HOMOGENIOUS
SELASAR UNPOLISH
-0.15 60 60

A B C D E F G H I J K L M N P Q R S

RENCANA LANTAI RENCANA LANTAI

PASAR MODERN KARAMAT


SKALA 1 : 500 1 : 500

14
washtafel washtafel
-0.60 RS1 beton
-0.25
-0.25 -0.25
-0.25 beton
RS1
P1 P1 P1 P1TOILET
-0.45
TEMPAT CUCI P1 P1 P1 P1
-0.45
TOILET

P1 P1 P1 P1 -0.20 -0.30 -0.25 -0.30


P1 P1 P1 P1
-0.20

washtafel -0.25 -0.25 washtafel


beton -0.25 -0.25 beton

AREA LOS PEDAGANG BUAH AREA LOS PEDAGANG BUAH


3 AREA GROSIR IKAN BASAH AREA GROSIR IKAN BASAH
+0.15 +0.15

+0.15 +0.15

V1 V2
4 AREA PEDAGANG BUAH AREA PEDAGANG BUAH
+0.15 +0.15 PJ1

T. WUDHU
J2 J2

WANITA
AREA GROSIR IKAN BASAH AREA GROSIR IKAN BASAH
J1 J1

T. WUDHU
AREA PEDAGANG BUAH AREA PEDAGANG BUAH

PRIA
+0.15 +0.15
+0.15 +0.15
PJ1 PJ2
5

HALAMAN
-0.60

6
PJ2 PJ1
J1 J1

J2 J2
7 AREA AGRO BISNIS
+0.15
AREA AGRO BISNIS
+0.15
AREA AGRO BISNIS
+0.15

V1 V1

10

A B C D E F G H I J K L M N P Q R S

RENCANA KUSEN RENCANA KUSEN

PASAR MODERN KARAMAT


SKALA 1 : 500 1 : 500

15
TYPE : PJ2
Jumlah : 2 bh

+ 2.70
0.04 0.04

0.51
C 0.04
0.04

1.07

0.04

1.00

Pot. A Pot. B
SKALA 1:50 SKALA 1:50

0.04 0.04

Pot. C
SKALA 1:50

0.04 0.04

DETAIL KUSEN

1 : 50

16
+ 2.70 + 2.70
0.04 0.04

1.92 1.92

+ 0.70 + 0.70
0.04 0.04

Pot. A Pot. A
SKALA 1:50 SKALA 1:50

0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04

Pot. B Pot. B
SKALA 1:50 SKALA 1:50

Kusen
Kaca
: Aluminium Finish Powder Coating 4"
: Kaca bening t = 5 mm
Kusen
Kaca
: Aluminium Finish Powder Coating 4"
: Kaca bening t = 5 mm
TYPE : RS1
Hardware & accesories Hardware & accesories
Jumlah : 2 bh

+ 2.70
0.04

0.92

+ 1.70 + 2.70
0.04 0.04

0.92
Pot. A
SKALA 1:50
+ 1.70
0.04 0.04 0.04 0.04 0.04 0.04

Pot. B
SKALA 1:50

Pot. A
Kusen : Aluminium Finish Powder Coating 4" SKALA 1:50

Kaca : Kaca bening t = 5 mm 0.04 0.04 0.04

Hardware & accesories


Pot. B DETAIL KUSEN
SKALA 1:50

Kusen : Aluminium Finish Powder Coating 4"


Kaca : Kaca bening t = 5 mm 1 : 50

Hardware & accesories


17
washtafel washtafel
-0.60 beton
-0.25 -0.25 beton

-0.25 -0.25

-0.45 -0.45
TOILET TEMPAT CUCI TOILET
-0.20 -0.30 -0.25 -0.30 -0.20

washtafel -0.25 -0.25 washtafel


beton -0.25 beton
-0.25

AREA LOS PEDAGANG BUAH AREA LOS PEDAGANG BUAH


3 AREA GROSIR IKAN BASAH AREA GROSIR IKAN BASAH
+0.15 +0.15

+0.15 +0.15

4 AREA PEDAGANG BUAH


+0.15
AREA PEDAGANG BUAH
+0.15

T. WUDHU
WANITA
AREA GROSIR IKAN BASAH AREA GROSIR IKAN BASAH

T. WUDHU
AREA PEDAGANG BUAH AREA PEDAGANG BUAH

PRIA
+0.15 +0.15
+0.15 +0.15

HALAMAN
-0.60

7 AREA AGRO BISNIS


+0.15
AREA AGRO BISNIS
+0.15
AREA AGRO BISNIS
+0.15

10

A B C D E F G H I J K L M N P Q R S

RENCANA SALURAN LUAR RENCANA SALURAN LUAR

PASAR MODERN KARAMAT


SKALA 1 : 500 1 : 500

18
rabat beton
- 0.30

muka halaman
- 0.60

DETAIL BAK KONTROL


SKALA 1:20

rabat beton
- 0.30

muka halaman
- 0.60

DETAIL SALURAN

DETAIL SALURAN 1 : 20 - 10
SKALA 1:20
19
1

10

11

6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00
1.50 1.50
104.00

A B C D E F G H I J K L M N P Q R S

DENAH ATAP DENAH ATAP


PASAR MODERN KARAMAT
SKALA 1 : 500 1 : 500

20
0.60 1.75 3.15 1.75 0.60

0.60

0.65

0.60
-0.45 -0.45 5.75

5.00
0.60
TEMPAT CUCI
-0.30 -0.15 -0.30
0.60

0.60

0.85

2.50 3.00 2.50

DETAIL TEMPAT CUCI

1 : 50

21
1.50 5.00 1.50

2.35

2.00

0.60

0.52 2.00 1.50

2.35 2.35

2.15
2.30

POTONGAN

1 : 50

22
3.20

-0.05

1.50

0.75

shower washtafel
2.90
beton
1.50 -0.05 1.50

-0.05 -0.05 -0.05

TOILET
2.00 1.20

-0.05 -0.05 -0.05 1.90


washtafel
1.50
beton
-0.05
0.60
shower

0.70 0.65

1.50 1.50 1.50 1.50 2.00

DETAIL TOILET PRIA

1 : 50

23
1.50 1.50

0.85 0.85

1.25
1.40

0.30

0.60
0.60

0.20

1.50 1.50

0.85 0.85

1.40

2.20

0.60

0.20

POTONGAN

1 : 50

24
0.95

2.50 shower
2.90 washtafel
beton
-0.05 1.50

-0.05 -0.05 -0.05

0.60

TOILET
1.20 2.00

1.90 washtafel -0.05 -0.05 -0.05


1.50
beton 1.50
-0.05
0.60
shower

0.70 0.65

2.00 1.50 1.50 1.50 1.50

DETAIL TOILET WANITA

1 : 50

25
1.50 1.50

0.85 0.85

1.25
1.40

0.30

0.60
0.60

0.20

1.50 1.50

0.85 0.85

1.40 1.40

0.60
0.80

0.20

POTONGAN

1 : 50

26
0.85

washtafel washtafel
beton beton
-0.05 -0.05

-0.05 -0.05

-0.45 -0.45
TOILET TEMPAT CUCI TOILET
SELASAR -0.30 -0.15 -0.30 SELASAR
0.80 -0.15 washtafel -0.05 -0.05 washtafel
-0.15
beton -0.05 -0.05 beton

0.40

0.55

1.90

GUDANG

0.40

MAIN ENTRANCE MAIN ENTRANCE


-0.05 -0.05

2
R. KOPERASI R. PENGELOLA

2.50

A
0.40

0.55
0.85
0.70 SELASAR
-0.15

0.70 0.40 4.00 0.40 3.28

0.60 0.60

LAPIS ACP 1.20 1.20


LAPIS ACP
LAPIS ACP LAPIS ACP

LAPIS ACP
DINDING BATA
LAPIS ACP
3.20 3.20

LAPIS ACP

LAPIS ACP

LAPIS ACP DINDING BATA


LAPIS ACP

LAPIS ACP 1.00 LAPIS ACP 1.00

LAPIS ACP LAPIS ACP

RENCANA DINDING LAPIS ACP

1 : 100

27
5.00 5.00 5.00

1.75

3.75

2.00

4.00 1.00 1.00 4.00 4.00 1.00

DETAIL MEJA DAN PENAMPUNGAN


GROSIR IKAN BASAH

1 : 50

28
KERAMIK 30X30 KERAMIK 30X30
COR BETON BALOK 15/15 COR BETON BALOK 15/15
KOLOM 15/15 KOLOM 15/15

0.80 0.70 0.70 0.80

0.15 0.15

4.00 1.00 1.00 4.00 4.00 1.00

KERAMIK 30X30
COR BETON BALOK 15/15
KOLOM 15/15
0.10

0.70 0.95

0.15

2.00 1.75

POTONGAN

1 : 50

29
2.00 2.00 2.00

0.90

1.50

0.60

0.75 1.25 1.25 0.75 0.75 1.25

KERAMIK 30X30
COR BETON BALOK 15/15
KOLOM 15/15
0.10

0.80 0.70

0.15 0.15

0.75 1.25 1.25 0.75 0.75 1.25

DETAIL MEJA PEDAGANG BUAH

1 : 50

30
1.30

3.70 3.70

2.40

0.80
T. WUDHU
WANITA

0.20

3.00 3.00

6.00

POTONGAN A
PASAR MODERN KARAMAT
SKALA 1 : 50
T. WUDHU
PRIA

1.30

3.70

2.40

0.80

0.40
DETAIL TEMPAT WUDHU 0.20
PASAR MODERN KARAMAT
SKALA 1 : 50

2.00

DETAIL TEMPAT WUDHU

POTONGAN B
PASAR MODERN KARAMAT
1 : 50
SKALA 1 : 50

31
5.35

1.20 2.15 2.00 0.35


0.35

0.35
- 0.15 9.00

WC
2.00

2.00
- 0.05 R. JAGA
R. ISTIRAHAT
0.35

0.35
1.20 2.15 2.00 0.35

5.35

DENAH
POS JAGA (2 BUAH)

SKALA 1 : 100

TAMPAK S. KANAN TAMPAK S. KIRI


POS JAGA POS JAGA
SKALA 1 : 100 SKALA 1 : 100

TAMPAK DEPAN TAMPAK BELAKANG


POS JAGA POS JAGA
SKALA 1 : 100 SKALA 1 : 100

DENAH DAN TAMPAK


POS JAGA

1 : 100

32
A

2.00 2.15 1.20


5.35

POTONGAN A - A POTONGAN B - B

5
8

POS JAGA POS JAGA

5 SKALA 1 : 100 SKALA 1 : 100

5.35 5.35

1.20 2.15 2.00 0.35 1.20 2.15 2.00 0.35


0.35

0.35

0.35

0.35
V PJ
1 1
PV
- 0.15

J
2.00

2.00

2.00

2.00
WC R. JAGA
- 0.05
R. ISTIRAHAT
1
P
1

V V
0.35

0.35

0.35

0.35
2 1
1.20 2.15 2.00 0.35 1.20 2.15 2.00 0.35

5.35 5.35

RENCANA LANTAI RENCANA KUSEN


POS JAGA POS JAGA
SKALA 1 : 100 SKALA 1 : 100

POTONGAN A - A, POTONGAN B - B
RENCANA LANTAI DAN KUSEN

1 : 100

33
PJ 1 V2 V1 PVC

2 UNIT 2 UNIT 4 UNIT 2 UNIT

DETAIL KUSEN

1 : 50

34
P1 J1

2 UNIT 2 UNIT

DETAIL KUSEN

1 : 50

35
5.35

1.20 2.15 2.00 0.35

0.35

0.35
Pipa PVC Vertikal Air Hujan 2" Pipa PVC Vertikal Air Hujan 2"

- 0.15

WC
2.00

2.00
- 0.05 R. JAGA
R. ISTIRAHAT

5.35

Pipa PVC Vertikal Air Hujan 2" Pipa PVC Vertikal Air Hujan 2"
0.35

0.35
1.20 2.15 2.00
1.20 2.15 2.00 0.35

Biofiil Resapan

2.00

2.00
TABEL INST. AIR
RENCANA SANITAIR
POS JAGA
SKALA 1 : 100

1.20 2.15 2.00

TABEL INST. LISTRIK

RENC. TITIK LAMPU


POS JAGA
SKALA 1 : 100

5.35

1.20 2.15 2.00


2.00

2.00

1.20 2.15 2.00

KETERANGAN

RENCANA PLAFOND
POS JAGA
SKALA 1 : 100

RENCANA SANITAIR, PLAFOND


DAN TITIK LAMPU

1 : 100

36
5.35 5.35

1.20 2.15 2.00 1.20 2.15 2.00

RINGBALK 15/ 25 RINGBALK 15/ 25 SLOOF 20/ 25 SLOOF 20/ 25 SLOOF 20/ 25

RINGBALK 15/ 25

RINGBALK 15/ 25

SLOOF 20/ 25

SLOOF 20/ 25

SLOOF 20/ 25

SLOOF 20/ 25
RINGBALK 15/ 25

RINGBALK 15/ 25
2.00

2.00

2.00

2.00
RINGBALK 15/ 25 RINGBALK 15/ 25 SLOOF 20/ 25 SLOOF 20/ 25 SLOOF 20/ 25

1.20 2.15 2.00 1.20 2.15 2.00

RENCANA RINGBALK RENCANA PONDASI


POS JAGA POS JAGA
SKALA 1 : 100 SKALA 1 : 100

5.35

1.20 2.15 2.00

RD RD
PVH PVH

Pipa masukkan ke kolom Pipa masukkan ke kolom

3.40
Pipa masukkan ke kolom Pipa masukkan ke kolom
2.00

2.00

PVH PVH
RD RD

6.75
1.20 2.15 2.00

RENCANA DAK
ROOF DRAIN
RD
POS JAGA
RENCANA PENULANGAN PIPA VERTIKAL AIR HUJAN
SKALA 1 : 100
POS JAGA PVH

SKALA 1 : 100

20 20 20
20 20

RENCANA PONDASI, RINGBALK ATAP DAK


DAN PENULANGAN

1 : 100

37
Ringbalk 15/25
Lapisan Waterproofing
1.20 + 3.10

+ 2.70
- 0.15
+ 2.10
WC
2.00

2.00
- 0.05

Lantai Homogenious 60X60

Rabatan t=5cm
Urugan Pasir t=10cm
+ 0.20
Tanah Urug
1.20

1.20

POTONGAN WC
POS JAGA
SKALA 1 : 100

DETAIL WC

1 : 100

38
PEJABAT PEMBUAT KOMITMEN

CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS

PENULANGAN PLAT DASAR


TANDON & POTONGAN
- Mutu Beton : K-225 Kg/cm2
: U - 24 (Polos) < 12
1 : 100 ARS
- Mutu Baja Tulangan D : U - 32 (Ulir) > 13
- Mutu Baja Profil : Bj - 37 Mpa
39 40
PEJABAT PEMBUAT KOMITMEN

CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS

PENULANGAN PENUTUP
TANDON & ATAP R. POMPA
- Mutu Beton : K-225 Kg/cm2
: U - 24 (Polos) < 12
1 : 100 ARS
- Mutu Baja Tulangan D : U - 32 (Ulir) > 13
- Mutu Baja Profil : Bj - 37 Mpa
40 40
CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS
washtafel washtafel
-0.60 beton
-0.05 -0.05 beton

-0.05 -0.05

-0.45 -0.45
TOILET TEMPAT CUCI TOILET

SELASAR -0.30 -0.15 -0.30 SELASAR


-0.05 washtafel
-0.05
-0.05 -0.05 washtafel
beton -0.05 beton
-0.05

1
TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO
+0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15
SIRKULASI MOBIL BARANG DAN PENGUNJUNG

T. WUDHU
WANITA
GUDANG MUSHOLA

T. WUDHU
PRIA
5

HALAMAN HALAMAN
-0.60 SIRKULASI MOBIL BARANG DAN PENGUNJUNG -0.60

R. KOPERASI R. PENGELOLA

SIRKULASI MOBIL BARANG DAN PENGUNJUNG

TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO
+0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15

10

SELASAR
-0.05

-0.30

A B C D E F G H I JALAN ASPAL
-1.00 J K L M N P Q R S

SALURAN BUANGAN AIR BEKAS


PASAR MODERN KARAMAT

SALURAN BUANGAN AIR BEKAS


DETAIL GAMBAR SALURAN DAN PENUTUP

NTS

01
+ PUMP ROOM

washtafel washtafel
-0.60 beton
-0.05 -0.05 beton

-0.05 -0.05

-0.45 -0.45
TOILET TEMPAT CUCI TOILET

SELASAR -0.30 -0.15 -0.30 SELASAR


-0.05 washtafel
-0.05
-0.05 -0.05 washtafel
beton -0.05 beton
-0.05

1
TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO
+0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15
SIRKULASI MOBIL BARANG DAN PENGUNJUNG

T. WUDHU
WANITA
GUDANG MUSHOLA

T. WUDHU
PRIA
5

HALAMAN HALAMAN
-0.60 SIRKULASI MOBIL BARANG DAN PENGUNJUNG -0.60

R. KOPERASI R. PENGELOLA

SIRKULASI MOBIL BARANG DAN PENGUNJUNG

TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO
+0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15

10

SELASAR
-0.05

-0.30

A B C D E F G H I JALAN ASPAL
-1.00 J K L M N P Q R S

INSTALASI AIR BERSIH


PASAR MODERN KARAMAT

INSTALASI AIR BERSIH

NTS

02
washtafel washtafel
beton beton

TEMPAT CUCI
washtafel -0.15 washtafel
beton beton

RENCANA SALURAN AIR BERSIH

washtafel washtafel
beton beton

CO 4"
TEMPAT CUCI
washtafel -0.15 washtafel
beton beton

RENCANA SALURAN AIR BERSIH,


AIR KOTOR DAN BEKAS

1 : 100
RENCANA SALURAN AIR KOTOR DAN BEKAS
PASAR MODERN KARAMAT 03
BLOK DIAGRAM AIR BERSIH

NTS

04
+ PUMP ROOM

6.77

washtafel washtafel
beton beton
-0.05 -0.05

-0.05 -0.05

-0.45 -0.45
TOILET TEMPAT CUCI TOILET

SELASAR -0.30 -0.15 -0.30 SELASAR


-0.15 -0.15
washtafel -0.05 -0.05 washtafel
beton -0.05 beton
-0.05

AREA AREA
BONGKAR MUAT BONGKAR MUAT
PEDAGANG TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO PEDAGANG

GUDANG MUSHOLA

HALAMAN MAIN ENTRANCE MAIN ENTRANCE HALAMAN


-0.60 -0.05 -0.05 -0.60

R. PENGELOLA

R. KOPERASI

SELASAR
-0.15

-0.30

RENCANA HYDRANT
PASAR MODERN KARAMAT
SKALA NTS RENCANA HYDRANT

NTS

05
BLOK DIAGRAM HYDRANT

NTS

06
GROUP
TKI 2 x 36
DOWN
LIGHT 13
DOWN
LIGHT 7
STOP
KONTAK
R S T
WATT WATT WATT 200 WATT
1 450
2 270
3 270
4 2 72
Cadangan 5

Cadangan 6

9 1 1 1 2 450 270

GROUP
TKI 2 x 36
DOWN
LIGHT 13
DOWN
LIGHT 7
STOP
KONTAK
R S T
WATT WATT WATT 200 WATT
1 360
2 270
3 270
4 2 72
Cadangan 5

Cadangan 6

8 1 1 1 2 360 270

BLOK DIAGRAM ELEKTRIK


BLOK DIAGRAM ELEKTRIK
PASAR MODERN KARAMAT
NTS
SKALA NTS

01
PP-PASAR
JARINGAN PLN PANEL UTAMA
20 KV/380 V A Hz MCCB 80 A 3 ph

V 160 kVA
Q MCCB 20 A 3 ph

MCCB 20 A 3 ph
ACB 400-800 A 3ph
50 kA 4P MCCB 260 A 3 ph

MCCB 40 A 3 ph
CADANGAN

MCCB 40 A 3 ph
CADANGAN
ATS MCB 16 A 1Ph
CADANGAN

P-Hydrant

ACB 400-800 A
3ph 50 kA 4P SDP-POMPA

GENSET
200 BC 50 mm2 V A Hz Q

kVA

SPARE

SPARE

7,5 PK Transfer
Pump (5.595 VA)

7,5 PK Transfer
Pump (5.595 VA)

SPARE

SPARE

BLOK DIAGRAM ELEKTRIK

NTS

02
PP-P

GROUP
TKI 2 X
36 W
INDUSTRIAL INDUSTRIAL
LIGHT
120 WATT
LIGHT
80 WATT
STOP
KONTAK
16 A
AC 1.500
WATT
R S T
MCB 4 A 1 480
MCB 4 A 2 480
MCB 4 A 3 480
MCB 4 A 4 480
MCB 4 A 5 480
MCB 10 A 6 6 1.200
MCB 4 A 7 5 360
MCB 10 A 8 5 1.000
MCB 4 A 9 5 360
MCB 10 A 10 5 1.000
MCB 4 A 11 5 360
MCB 4 A 12 5 1.000
MCCB 100 A MCB 4 A 13 5 360
3ph 25 kA MCB 10 A 14 5 1.000
MCB 4 A 15 5 360
MCB 10 A 16 5 1.000
MCB 4 A 17 5 360
18
MCB 10 A 6 1.200
19
MCB 4 A 6 432
20
MCB 10 A 5 1.000
21
MCB 4 A 5 360
MCB 10 A 22 5 1.000
MCB 4 A 23 5 360
MCB 10 A 24 6 1.200
MCB 4 A 25 6 432
MCB 4 A 26 5 360
MCB 10 A 27 5 1.000
MCB 4 A 28 5
MCB 10 A 29 5 1.000
MCB 4 A 30 6 432
MCB 10 A 31 6 1.200
MCB 4 A 32 5 360
MCB 10 A 33 5 1.000
MCB 4 A 34 5 360
MCB 4 A 35 6 1.200
MCB 4 A 36 6 432
MCB 4 A 37 4 800
MCB 4 A 38 4 2 448
MCB 4 A 39 6 108
MCB 4 A 40 6 108
MCB 4 A 41 9 162
MCB 4 A 42 8 144
MCB 4 A 43 11 77
MCB 4 A 44 6 42
MCB 4 A 45 14 98
MCB 10 A
Spare 46 1 1500
MCB 4 A 47
Spare
BC 16 mm2
9.019

JUMLAH

SINGLE LINE DIAGRAM


ELEKTRIK DALAM PASAR
SINGLE LINE DIAGRAM ELEKTRIK DALAM PASAR
PASAR MODERN KARAMAT
NTS
SKALA NTS

03
KETERANGAN
TKI 2 x 28 W
pedestrian
INDUSTRIAL LIGHT LED 120 W
INDUSTRIAL LIGHT LED 100 W
GSM Watherproof 2 x 18 W
PEMASANGAN LAMPU DALAM PASAR Baret LHE 18 W
Down Light LHE 7 W
Great switch 6 gang
Stop kontak 1 ph 200 W
Saklar Engkel
Saklar double

SELASAR
SELASAR TEMPAT CUCI
-0.15

GUDANG MUSHOLA

MAIN ENTRANCE
MAIN ENTRANCE

R. PENGELOLA

R. KOPERASI

2
SELASAR
SELASAR

SELASAR

A B C D E F G H I J K L M N O P Q R

RENCANA PENERANGAN RENCANA PENERANGAN


PASAR MODERN KARAMAT
SKALA NTS NTS

04
Luas Area Pasar = 13.763,71 M

washtafel washtafel
beton beton
-0.05 -0.05

-0.05 -0.05

-0.45 -0.45
TOILET TEMPAT CUCI TOILET

SELASAR -0.30 -0.15 -0.30 SELASAR


-0.15 -0.15
washtafel -0.05 -0.05 washtafel
beton -0.05 beton
-0.05

AREA AREA
BONGKAR MUAT BONGKAR MUAT
PEDAGANG TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO PEDAGANG

PEJABAT PEMBUAT KOMITMEN

GUDANG MUSHOLA

HALAMAN MAIN ENTRANCE MAIN ENTRANCE HALAMAN


-0.60 -0.05 -0.05 -0.60

R. KOPERASI R. PENGELOLA

TOKO

TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO

SELASAR
-0.15

-0.30

CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS

RENCANA PENERANGAN LINGKUNGAN


PASAR MODERN KARAMAT
SKALA 1 : 700 RENCANA PENERANGAN LINGKUNGAN

NTS EL

05 08
washtafel washtafel
beton beton
-0.05 -0.05

-0.05 -0.05

-0.45 -0.45
TOILET TEMPAT CUCI TOILET

SELASAR -0.30 -0.15 -0.30 SELASAR


-0.15 -0.15
washtafel -0.05 -0.05 washtafel
beton -0.05 beton
-0.05

AREA AREA
BONGKAR MUAT BONGKAR MUAT
PEDAGANG TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO PEDAGANG

PEJABAT PEMBUAT KOMITMEN

GUDANG MUSHOLA

HALAMAN MAIN ENTRANCE MAIN ENTRANCE HALAMAN


-0.60 -0.05 -0.05 -0.60

R. PENGELOLA

R. KOPERASI

TOKO

TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO

SELASAR
-0.15

-0.30

CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS

RENCANA GARDU PLN


PASAR MODERN KARAMAT
RENCANA GARDU PLN
SKALA NTS
DAN JALUR FEDDER

NTS EL

06 08
TEMPAT CUCI

RENCANA PENERANGAN TOILET


PASAR MODERN KARAMAT

KETERANGAN
TKI 2 x 28 W
INDUSTRIAL LIGHT LED 120 W
INDUSTRIAL LIGHT LED 100 W
GSM Watherproof 2 x 18 W
Baret LHE 18 W
Down Light LHE 7 W
Great switch 6 gang
Stop kontak 1 ph 200 W
Saklar Engkel
Saklar double

NTS

07
SPLITZEN dia 3/4"

GIP dia 3/4"


BC 50 mm2

conector BC 50 panjang 20 cm jarak 30 cm

KE GROUND

TAMPAK SAMPING

TAMPAK DEPAN

PENANGKAL PETIR KONVENSIONAL PENANGKAL PETIR KONVENSIONAL


PASAR KARAMAT
SKALA NTS

NTS

08

You might also like