Professional Documents
Culture Documents
Gambar Rencana Kerja
Gambar Rencana Kerja
CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS
DAFTAR GAMBAR
NTS STR BT
00 32
- Mutu Beton : K-225 Kg/cm2
: U - 24 (Polos) < 12
- Mutu Baja Tulangan D : U - 32 (Ulir) > 13
- Mutu Baja Profil : Bj - 37 Mpa
104.00
4.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 8.00 4.00
PS3 KB5
PS3 KB5
PS3 KB5 PS3
KB5 PS3 KB5
PS3
KB5
KB5
PS3 KB5 PS3 PS3
KB5 KB5
KB5 PS3 KB5
PS3 PS3
PS3 KB5 KB5 PS3
KB5 KB5 KB5 KB5
1 PS3
PS3 PS3
KB1 P3 KB1 P4 KB1 P4 KB1 P4 KB1 P4 KB1 P4 KB1 P4 KB1 P4 K1 P5 K1 P5 KB1 P4 KB1 P4 KB1 P4 KB1 P4 KB1 P4 KB1 P4 KB1 P4 KB1 P3
6.00
KB2 P1 KB2 P1
2
6.00
KB2 P1 KB2 P1
3
6.00
12.00
PS1 PS1
KB2 P1 KB2 P1
7
6.00
KB2 P1 KB2 P1
9
6.00
10
KB1 P3 KB1 P4 KB1 P4 KB1 P4 KB1 P4 KB1 P4 KB1 P4 KB1 P4 K1 P5 K1 P5 KB1 P4 KB1 P4 KB1 P4 KB1 P4 KB1 P4 KB1 P4 KB1 P4 KB1 P3
4.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 8.00 4.00
104.00
104.00
4.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 8.00 4.00
1
KB1 S1 KB1 S1 KB1 S1 KB1 S1 KB1 S1 KB1 S1 KB1 S1 KB1 S1 KB1 S2 KB1 S1 KB1 S1 KB1 S1 KB1 S1 KB1 S1 KB1 S1 KB1 S1 KB1 S1 KB1
6.00
S1 S1
KB2 KB2
2
6.00
S1 S1
KB2 KB2
3 PEJABAT PEMBUAT KOMITMEN
6.00
S1 S1
S1 S1 S1 S1
S1 S1 S1 S1
A
60.00
12.00
t=15 +0.00
S1 S1 S1 S1
KB3 S1 KB4 S1 KB3 PAKAI TULANGAN WIREMESH M6, KB3 S1 KB4 S1 KB3
6 OVERLAPING 1.5 x LUBANG
6.00
S1 S1 S1 S1
S1 S1
KB2 KB2
8
CV . PRAKTIRA KONSULTAN
6.00
KB2 KB2
9
6.00
S1 S1
S1 S1 S1 S1 S1 S1 S1 S1 S2 S1 S1 S1 S1 S1 S1 S1 S1
10
KB1 KB1 KB1 KB1 KB1 KB1 KB1 KB1 KB1 KB1 KB1 KB1 KB1 KB1 KB1 KB1 KB1 KB1
4.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 8.00 4.00
104.00
SIRTU t= 15CM
75
DIPADATKAN DENGAN
WALES LOT/VIBRO
SIMBOL KETERANGAN SIMBOL KETERANGAN
150
KB1 Kolom Uk. 120 x 50 cm S1 Sloof Uk. 30 x 50 cm 500 DENAH MODUL LANTAI & SLOOF
KB2 Kolom Uk. 30 x 50 cm S2 Sloof Uk. 30 x 70 cm
KB3 Kolom Uk. 40 x 70 cm
POTONGAN X - X
KB4 Kolom Uk. 40 x 40 cm SKALA NTS 1 : 450 STR BT
KB5 Kolom Uk. 30 x 40 cm
02 32
- Mutu Beton : K-225 Kg/cm2
: U - 24 (Polos) < 12
- Mutu Baja Tulangan D : U - 32 (Ulir) > 13
- Mutu Baja Profil : Bj - 37 Mpa
B
POT. 2-2
B
POT. 2-2
12.00
KB4 PS1 12.00
S1 KB2 P1 KB4 B1
4 4
A KB2
t=
BA
12CM +4.80
SP
BA BA
6.00
6.00
C S1 S1 C C B1 B1 C
POT. 3 - 3 POT. 3 - 3 POT. 3 - 3 POT. 3 - 3
SP
BA
KB3 PS2
S1 S1
KB4
5 5
KB3 B1 KB3
KB4 PS1 KB3 P2 PEJABAT PEMBUAT KOMITMEN
A A
POT. 1 - 1 POT. 1 - 1
A A
POT. 1 - 1 POT. 1 - 1
S1 S1
12.00
S1 S1
BA
t=
+4.80
SP 12CM KONSULTAN PERENCANA PENGAWAS
BA BA
6.00
6.00
S1 S1 B1 B1
SP
BA
S1
KB2
7 7
KB2 P1 KB4 B1
KB4 PS1 4.00 8.00
4.00 8.00
B
B A" A' POT. 2-2 A
POT. 2-2
A" A' A
MAIN ENTRANCE
SIMBOL KETERANGAN SIMBOL KETERANGAN SIMBOL KETERANGAN DENAH RENCANA PONDASI dan
KB2 Kolom Uk. 30 x 50 cm S1 Sloof Uk. 30 x 50 cm P1 Pile Cap Uk. 80 x 80 cm PLAT ATAP
KB3 Kolom Uk. 40 x 70 cm B1 Balok Uk. 30 x 65 cm P2 Pile Cap Uk. 80 x 155 cm
KB4 Kolom Uk. 40 x 40 cm BA Balok Uk. 25 x 50 cm PS1 Pondasi Setempat Uk. 200 x 200 cm 1 : 150 STR BT
PS2 Pondasi Setempat Uk. 150 x 250 cm
03 32
- Mutu Beton : K-225 Kg/cm2
: U - 24 (Polos) < 12
- Mutu Baja Tulangan D : U - 32 (Ulir) > 13
- Mutu Baja Profil : Bj - 37 Mpa
BA
B1 B1
P2 P1
PS2 PS1 - 2.40 - 2.50 PS1 - 2.40
- 2.50
CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS
POTONGAN A - A POTONGAN C - C
SKALA 1 : 100 SKALA 1 : 100
MAIN ENTRANCE
SIMBOL KETERANGAN SIMBOL KETERANGAN SIMBOL KETERANGAN
POTONGAN A - A DAN C - C
KB2 Kolom Uk. 30 x 50 cm S1 Sloof Uk. 30 x 50 cm P1 Pile Cap Uk. 80 x 80 cm
KB3 Kolom Uk. 40 x 70 cm B1 Balok Uk. 30 x 65 cm P2 Pile Cap Uk. 80 x 155 cm
KB4 Kolom Uk. 40 x 40 cm BA Balok Uk. 25 x 50 cm PS1 Pondasi Setempat Uk. 200 x 200 cm 1 : 100 STR BT
PS2 Pondasi Setempat Uk. 150 x 250 cm
04 32
- Mutu Beton : K-225 Kg/cm2
: U - 24 (Polos) < 12
- Mutu Baja Tulangan D : U - 32 (Ulir) > 13
- Mutu Baja Profil : Bj - 37 Mpa
+6.65
PEJABAT PEMBUAT KOMITMEN
KB3 KB3
- 0.65
S1 S1
- 1.15
CV . PRAKTIRA KONSULTAN
- 2.25 PS1 KONSULTAN PERENCANA PENGAWAS
- 2.50
6.00 12.00 6.00
24.00
4 5 6 7
POTONGAN B - B
SKALA 1 : 100
MAIN ENTRANCE
SIMBOL KETERANGAN SIMBOL KETERANGAN SIMBOL KETERANGAN
POTONGAN B - B
KB2 Kolom Uk. 30 x 50 cm S1 Sloof Uk. 30 x 50 cm P1 Pile Cap Uk. 80 x 80 cm
KB3 Kolom Uk. 40 x 70 cm B1 Balok Uk. 30 x 65 cm P2 Pile Cap Uk. 80 x 155 cm
KB4 Kolom Uk. 40 x 40 cm BA Balok Uk. 25 x 50 cm PS1 Pondasi Setempat Uk. 200 x 200 cm 1 : 100 STR BT
PS2 Pondasi Setempat Uk. 150 x 250 cm
05 32
- Mutu Beton : K-225 Kg/cm2
: U - 24 (Polos) < 12
- Mutu Baja Tulangan D : U - 32 (Ulir) > 13
- Mutu Baja Profil : Bj - 37 Mpa
F G
POT. 3-3 POT. 4-4
PS3
K5
1C PS3
K5 PS3 PS3 SP
K5
SP SP SP PS3 K5 SP SP
D K5
D
POT. 1 - 1 POT. 1 - 1
PS3 PS3 PS3 PS3
1B SP K5 SP 1B
E K5 K5 K5 K5 K5 E
POT. 2-2 POT. 2-2
PS3 PS3
SP SP SP SP
SP SP PS3 PS3 SP SP
PS3 K5 K5 PS3
1A 1A
K5 K5 K5 K5 PS3 K5 K5
1
S1 PS3 S1 PS3 S2 PS3 S1 S1
K1 K1 K1 K1
P5
P51.85 K1
K1
4.00 3.50 1.50 1.50 1.50 2.43 3.15 2.43 1.50 1.50 1.50 1.50 2.00 4.00
6.00 6.00 8.00 6.00 6.00
G G' H H' H" H"' I I' I" J J' J" J"' K K' L CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS
F G
POT. 4-4 POT. 3-3
06 32
- Mutu Beton : K-225 Kg/cm2
: U - 24 (Polos) < 12
- Mutu Baja Tulangan D : U - 32 (Ulir) > 13
- Mutu Baja Profil : Bj - 37 Mpa
1D
KB5
KB5
1C
KB5
KB5
KB5 KB5
4.00 3.50 1.50 1.50 1.50 2.43 3.15 2.43 1.50 1.50 1.50 1.50 2.00 4.00 CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS
6.00 6.00 8.00 6.00 6.00
G G' H H' H" H"' I I' I" J J' J" J"' K K' L
SIMBOL KETERANGAN
KB1 Kolom Uk. 120 x 50 cm KAMAR MANDI
1 : 150 STR BT
07 32
- Mutu Beton : K-225 Kg/cm2
: U - 24 (Polos) < 12
- Mutu Baja Tulangan D : U - 32 (Ulir) > 13
- Mutu Baja Profil : Bj - 37 Mpa
F G
POT. 3-3 POT. 4-4
1D
B1'
PEJABAT PEMBUAT KOMITMEN
1C
B1'
B1'
B1'
B1'
B1'
B1'
B1'
B1'
D D
B1'
POT. 1 - 1 POT. 1 - 1
B1' B1' B1' B1'
1B 1B
E E
B1'
B1'
B1'
B1'
B1'
B1'
POT. 2-2 POT. 2-2
4.08
B1'
B1'
B1'
B1'
B1'
1
TEMPAT TANGKI TANDON ATAS TEMPAT TANGKI TANDON ATAS
PLAT LANTAI tb 20 cm PLAT LANTAI tb 20 cm
4.00 3.50 1.50 1.50 1.50 2.43 3.15 2.43 1.50 1.50 1.50 1.50 2.00 4.00
6.00 6.00 8.00 6.00 6.00
G G' H H' H" H"' I I' I" J J' J" J"' K K' L
CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS
F G
POT. 4-4 POT. 3-3
SIMBOL KETERANGAN
S1 Sloof Uk. 30 x 50 cm
KAMAR MANDI
S2 Sloof Uk. 30 x 70 cm
RENCANA PENULANGAN ATAP
B1 Balok Uk. 30 x 65 cm
DAK
BA Balok Uk. 25 x 50 cm
B1' Balok Uk. 20 x 50 cm 1 : 150 STR BT
RB1 Balok Uk. 15 x 30 cm
08 32
- Mutu Beton : K-225 Kg/cm2
: U - 24 (Polos) < 12
- Mutu Baja Tulangan D : U - 32 (Ulir) > 13
- Mutu Baja Profil : Bj - 37 Mpa
+6.00
+4.50
+4.00 B1' B1' B1' B1' B1' B1'
+ 1.50
- 0.75
- 1.85
CV . PRAKTIRA KONSULTAN
2.00 1.50 1.50 1.50 1.50 2.43 3.15 2.43 1.50 1.50 1.50 1.50 2.00 KONSULTAN PERENCANA PENGAWAS
G' H H' H" H"' I I' I" J J' J" J"' K K'
POTONGAN D - D
SKALA 1 : 100
09 32
- Mutu Beton : K-225 Kg/cm2
: U - 24 (Polos) < 12
- Mutu Baja Tulangan D : U - 32 (Ulir) > 13
- Mutu Baja Profil : Bj - 37 Mpa
+6.00
+4.50
PEJABAT PEMBUAT KOMITMEN
+4.00 B1' B1' B1' B1' B1' B1'
+ 1.50
- 0.75
- 1.85
2.00 1.50 1.50 1.50 1.50 2.43 3.15 2.43 1.50 1.50 1.50 1.50 2.00
8.00 8.00 8.00 CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS
G' H H' H" H"' I I' I" J J' J" J"' K K'
POTONGAN E - E
SKALA 1 : 100
10 32
- Mutu Beton : K-225 Kg/cm2
: U - 24 (Polos) < 12
- Mutu Baja Tulangan D : U - 32 (Ulir) > 13
- Mutu Baja Profil : Bj - 37 Mpa
+6.00 +6.00
+ 1.50 + 1.50
- 0.75 S1 S1
- 0.75
- 1.85 - 1.85
1A 1B 1A 1B 1D
POTONGAN F - F POTONGAN G - G
SKALA 1 : 100 SKALA 1 : 100
KB5 Kolom Uk. 30 x 40 cm P5 Pile Cap Uk. 185 x 185 cm POTONGAN F - F dan G - G
PS3 Pondasi Setempat Uk. 100 x 100 cm
1 : 100 STR BT
11 32
- Mutu Beton : K-225 Kg/cm2
: U - 24 (Polos) < 12
- Mutu Baja Tulangan D : U - 32 (Ulir) > 13 5D19
4D19
- Mutu Baja Profil : Bj - 37 Mpa
0.50
4D19
0.70
8D19
4D19
0.30
5D19
0.40
POT K-K
K K K K POT K-K
LANTAI RENCANA
LANTAI RENCANA
D13-125 D13-100
- 1.50 - 1.50
0.60
0.70
1 D13
- 2.10
2 D13
- 2.15 D13-125 - 2.20
- 2.30
- 2.25 D16-100
LANTAI KERJA 1:3:5 T=5CM - 2.40
PASIR URUG T=15CM LANTAI KERJA 1:3:5 T=5CM
PASIR URUG T=15CM
MINI PILE 25x25 PRATEKAN K500
PANJANG =16M (8+8)M MINI PILE 25x25 PRATEKAN K500
BOTTOM+MIDDLE (TANPA UPPER) PANJANG =16M (8+8)M
EX WIKA (KELAS B), BOTTOM+MIDDLE (TANPA UPPER)
EX WIKA (KELAS B), CV . PRAKTIRA KONSULTAN
SAMBUNGAN SESUAI DENGAN KONSULTAN PERENCANA PENGAWAS
PABRIK MASING - MASING SAMBUNGAN SESUAI DENGAN
KAWAT LAS AWS E-7018 PANCANG SYSTEM PABRIK MASING - MASING
INJECTION KAPASITAS ALAT 120 TON. KAWAT LAS AWS E-7018 PANCANG SYSTEM
0.28 0.25 0.28 ALAT EX. METROPILE, PERAK JAYA, INJECTION KAPASITAS ALAT 120 TON.
ALAS KASIH, MODERN 0.28 0.25 0.50 0.25 0.28 ALAT EX. METROPILE, PERAK JAYA,
0.40 0.40
ALAS KASIH, MODERN
0.40 0.75 0.40
0.40
D13-125 D13-100
D13-100
D16-100
0.80
0.80
D13-125 D16-100
0.40
D13-125
D13-125
0.40
Tebal : 700mm
Tebal : 600mm
1.55
0.80
DETAIL PC1 dan PC2
12 32
5D19
- Mutu Beton : K-225 Kg/cm2
: U - 24 (Polos) < 12 5D19
- Mutu Baja Tulangan D : U - 32 (Ulir) > 13
- Mutu Baja Profil : Bj - 37 Mpa
1.20
14D19
1.20
14D19 + 1.00
+ 1.00
5D19
0.50
5D19 K K
K K 0.50
POT K-K
POT K-K LANTAI RENCANA
LANTAI RENCANA
MUKA ASPHAL
MUKA ASPHAL -1.00 PEJABAT PEMBUAT KOMITMEN
- 1.00
-1.00
- 1.00
D16-100
D16-100 - 1.50
- 1.50
0.80
0.80
2 D16
2 D16 - 2.30
- 2.30 - 2.35 D19-100
- 2.35 - 2.50
D19-100
- 2.50 LANTAI KERJA 1:3:5 T=5CM
LANTAI KERJA 1:3:5 T=5CM PASIR URUG T=15CM
PASIR URUG T=15CM
0.40
0.40
0.95
D16-100
0.75
1.55
D16-100
D19-100
D19-100
0.65
D16-100
D19-100
D16-100
0.40
D19-100
0.50
0.40
Tebal : 800mm
Tebal : 800mm
1.55
1.55
13 32
- Mutu Beton : K-225 Kg/cm2 5D19
: U - 24 (Polos) < 12
- Mutu Baja Tulangan D : U - 32 (Ulir) > 13
- Mutu Baja Profil : Bj - 37 Mpa
1.20
14D19
+ 1.00 4D19
0.40
4D19
5D19
0.50 4D19
K K 0.40
POT K-K
LANTAI RENCANA
POT K-K
LANTAI RENCANA
K K
MUKA ASPHAL
-1.00
- 1.00
PEJABAT PEMBUAT KOMITMEN
MUKA ASPHAL
-1.00
- 1.00
D16-100
- 1.50
0.90
3 D16
- 2.40
- 2.45 D19-100
- 2.60 D13-125
LANTAI KERJA 1:3:5 T=5CM
0.25
0.20
PASIR URUG T=15CM
- 2.35
- 2.40
MINI PILE 25x25 PRATEKAN K500 - 2.50 D13-125
PANJANG =16M (8+8)M
BOTTOM+MIDDLE (TANPA UPPER)
LANTAI KERJA 1:3:5 T=5CM
EX WIKA (KELAS B), 0.80 0.40 0.80 PASIR URUG T=10CM
2.00
SAMBUNGAN SESUAI DENGAN
PABRIK MASING - MASING
KAWAT LAS AWS E-7018 PANCANG SYSTEM
INJECTION KAPASITAS ALAT 120 TON. CV . PRAKTIRA KONSULTAN
0.28 0.25 0.28 0.25 0.28 0.25 0.28 ALAT EX. METROPILE, PERAK JAYA, KONSULTAN PERENCANA PENGAWAS
ALAS KASIH, MODERN
0.40 0.53 0.53 0.40
2.00
D13-125
D13-125
D16-100
D13-125
1.05
1.85
D19-100
D13-125
D16-100
D19-100
0.40
2.00
Tebal : 900mm
DETAIL PC5 dan PS1
1.85
DETAIL PS1
DETAIL PC5 SKALA 1 : 30
1 : 35 STR BT
SKALA 1 : 35
14 32
- Mutu Beton : K-225 Kg/cm2 5D19
: U - 24 (Polos) < 12
- Mutu Baja Tulangan D : U - 32 (Ulir) > 13
0.70
- Mutu Baja Profil : Bj - 37 Mpa 8D19
4D19
5D19
0.40 2D16
0.40
POT K-K
4D19
+ 0.20 LANTAI RENCANA 0.30
POT
LANTAI K-K
RENCANA
K K
K K
MUKA ASPHAL
-1.00 PEJABAT PEMBUAT KOMITMEN
- 1.00
MUKA ASPHAL
-1.00
- 1.00
D13-125
0.25
0.20
- 2.35 D13-125
- 2.40
0.25
0.20
- 2.50 D13-125
- 2.35
LANTAI KERJA 1:3:5 T=5CM - 2.40
0.55 0.40 0.55 PASIR URUG T=10CM - 2.50 D13-125
1.50 LANTAI KERJA 1:3:5 T=5CM
0.35 0.30 0.35 PASIR URUG T=10CM
1.00
CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS
D13-125
D13-125
2.50
D13-125
D13-125
1.00
D13-125
D13-125
D13-125
D13-125 1.00
15 32
- Mutu Beton : K-225 Kg/cm2
: U - 24 (Polos) < 12
KODE KOLOM KB1 KB2 KB3
- Mutu Baja Tulangan D : U - 32 (Ulir) > 13 POSISI TUMPUAN LAPANGAN TUMPUAN LAPANGAN TUMPUAN LAPANGAN
- Mutu Baja Profil : Bj - 37 Mpa 5D19 5D19
5D19 5D19
4D19 4D19
GAMBAR
POTONGAN
4D19 4D19 8D19 8D19
14D19 14D19
4D19 4D19
0.30 0.30 5D19 5D19
0.40 0.40
5D19 5D19
0.50 0.50
DIMENSI 1200x500 mm 1200x500 mm 300x500 mm 300x500 mm 400x700 mm 400x700 mm
TULANGAN 10 D19 10 D19 8 D19 8 D19 10 D19 10 D19
SENGKANG
SABUK 14 D19 14 D19 4 D19 4 D19 8 D19 8 D19
KODE KOLOM KB4 KB5 KP
POSISI TUMPUAN LAPANGAN TUMPUAN LAPANGAN TUMPUAN LAPANGAN
+ 1.50
KODE BALOK S1 S2 B1
POSISI TUMPUAN LAPANGAN TUMPUAN LAPANGAN TUMPUAN LAPANGAN
6D19 6D19
LANTAI RENCANA 4D19 4D19 6D19 6D19
MUKA HALAMAN 2D16 2D16
PAS. TRASRAM GAMBAR
- 0.60 POTONGAN 2D16 2D16
1PC : 2Ps 2D16 2D16
2D13 2D13
- 0.65 PAS. TRASRAM
1PC : 2Ps
4D19 4D19
0.30 0.30 6D19 6D19 6D19 6D19
0.30 0.30 0.30 0.30
S1 MUKA HALAMAN DIMENSI 300x500 mm 300x500 mm 300x700 mm 300x700 mm 300x650 mm 300x650 mm
- 0.55 - 0.60 TULANGAN 8 D19 8 D19 12 D19 12 D19 12 D19 12 D19
- 1.15
SENGKANG
- 0.75
SP SABUK 2 D16 2 D16 4 D16 4 D16 2 D13 2 D13
KODE BALOK BA B1' RB1
POSISI TUMPUAN LAPANGAN TUMPUAN LAPANGAN TUMPUAN LAPANGAN
4D16 4D16
5D16 5D16 CV . PRAKTIRA KONSULTAN
GAMBAR 3D13 3D13 KONSULTAN PERENCANA PENGAWAS
POTONGAN 2D13 2D13
2D13 2D13
3D13 3D13
- 1.95 PAS. BATU KALI
4D16 4D16
5D16 5D16 0.15 0.15
0.20 0.20
1PC : 4Ps 0.25 0.25
- 1.55 PAS. BATU KALI
- 2.15 1PC : 4Ps DIMENSI 250x500 mm 250x500 mm 200x500 mm 200x500 mm 150x300 mm 150x300 mm
- 2.25
ONDERLAAG 15/20
- 1.75 TULANGAN 8 D16 8 D16 10 D16 10 D16 6 D13 6 D13
- 1.85 SENGKANG
0.70
GAMBAR
POTONGAN
0.15 0.15
16 32
B
POT. 2 - 2
A B C D E F G H I J K L M N P Q R S
A" A' 8M (4+4)M 8M 8M 8M (4+4)M 8M (4+4)M 8M 8M 8M (4+4)M 8M (4+4)M 8M (4+4)M 8M 8M S' S"
1
K1 K1S K1 K1 K1 K1S K1 K1S K1 K1 K1 K1S K1 K1S K1 K1S K1 K1
6.00
K2 K2
2
6.00
K3 K3
3
6.00
K4 K4
4
6.00
K7 K5 K5 K7
5
A A
POT. 1 - 1 POT. 1 - 1
PEJABAT PEMBUAT KOMITMEN
60.00
12.00
K6" K6 K6 K6"
K7 K5 K5 K7
6
6.00
K4 K4
7
6.00
K3 K3
8
6.00
K2 K2
9
6.00
4.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 8.00 4.00
104.00
CV . PRAKTIRA KONSULTAN
A B C D E F G H I J K L M N P Q R S KONSULTAN PERENCANA PENGAWAS
A" A' 8M 8M (4+4)M 8M (4+4)M 8M (4+4)M 8M 8M 8M (4+4)M 8M (4+4)M 8M 8M 8M (4+4)M 8M
S' S"
B
POT. 2 - 2
DENAH KOLOM WF
SKALA 1 : 450 WF 700 x 300 x 13 x 24
20 20 WF 700 x 300 x 13 x 24
20
CONNECTION PLATE
KODE PLAT K1- K1S K2,K3,K4,K5,K6,K6" K7 PL. t= 20MM
20
CONNECTION PLATE
PL. t= 20MM,
800
75
550
WF 500x200x10x16
RIB SIRIP
WF 298 x 149 x 5,5 x 8
170
PL. t= 20MM
GAMBAR RIB PLATE
RIB t= 9 mm PL. t=16mm
170
20
170
PL. t=12mm
BASE PLATE 550
K1 = KOLOM WF UTUH
170
PL. t=20MM
20
BASE PLATE
170
60 180 60
700
75
250
50 85 130 85 50
300
400
17 32
B
POT. 2 - 2
IKATAN
1
2.00
GORDING CNP
150.65.20.2,8
A A
POT. 1 - 1 POT. 1 - 1
60.00
7
DETAIL DENAH
RAFTER PIPA MEDIUM
30.00
(30,1 Kg/m)
8
REGEL PIPA MEDIUM
CV . PRAKTIRA KONSULTAN
(17,8 Kg/m) KONSULTAN PERENCANA PENGAWAS
9
2.00
RANGKA TALANG
10
SIKU 50.50.5
JARAK 50 CM
4.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 8.00 4.00
104.00
18 32
RAFTER PIPA MEDIUM
GORDING CNP
(30,1 Kg/m) 150.65.20.2,8
+ 18.65
+ 9.00
+ 3.00
- 2.50
2.00 4.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 8.00 4.00 2.00
104.00
CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS
POTONGAN A - A
SKALA 1 : 300
WF 500x200x10x16
RIB SIRIP
WF 298 x 149 x 5,5 x 8
170
PL. t= 20MM
GAMBAR RIB PLATE
RIB t= 9 mm PL. t=16mm
170
PL. t=12mm
BASE PLATE
170
PL. t=20MM
BASE PLATE
170
PL. t=25MM
50 150 50
60 180 60
- Semua ukuran dalam milimeter
75
250
50 85 130 85
400
50
300 - Mutu Baja Profil : BJ37
- Tebal Pengelasan harus disesuaikan dengan POTONGAN A - A
DIMENSI PLAT 1000x400x25 mm 350x250x12 mm 350x250x20 mm tebal material yang akan dilas.
KOLOM WF 700x300x13x24 298x149x5,5x8 500x200x10x16
- Kawat las A.W.S. : E7016 / E7018
RIB PLAT t=20 mm PLAT t=12 mm PLAT t=12 mm
ANCHOR 1 : 300 STR BJ
19 32
PIPA MEDIUM GALVANIS
+ 18.65
GORDING CNP
150.65.20.2,8
PIPA MEDIUM GALVANIS
DET. B
DET. E (42,4 Kg/m)
+ 9.00 K5 K6 K5
- 1.50
- 2.50
4.00 6.00 6.00 6.00 6.00 12.00 6.00 6.00 6.00 6.00 4.00
30.00 30.00
60.00
CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS
1 2 3 4 5 6 7 8 9 10
POTONGAN B - B
SKALA 1 : 250
WF 500x200x10x16
RIB SIRIP
WF 298 x 149 x 5,5 x 8
170
PL. t= 20MM
GAMBAR RIB PLATE
RIB t= 9 mm PL. t=16mm
170
PL. t=12mm
BASE PLATE
170
PL. t=20MM
BASE PLATE
170
PL. t=25MM
50 150 50
60 180 60
- Semua ukuran dalam milimeter
75
250
50 85 130 85
400
50
300 - Mutu Baja Profil : BJ37
- Tebal Pengelasan harus disesuaikan dengan POTONGAN B - B
DIMENSI PLAT 1000x400x25 mm 350x250x12 mm 350x250x20 mm tebal material yang akan dilas.
KOLOM WF 700x300x13x24 298x149x5,5x8 500x200x10x16
- Kawat las A.W.S. : E7016 / E7018
RIB PLAT t=20 mm PLAT t=12 mm PLAT t=12 mm
ANCHOR 1 : 250 STR BJ
20 32
GORDING CNP
150.65.20.2,8
RIB t = 16 mm WF 700 x 300 x 13 x 24
REGEL 1/2 WF 298 x 149 x 5.5 x 8
WF 700 x 300 x 13 x 24
RIB SIRIP PL. t = 20 mm
BASE PLATE 1.20 PIPA MEDIUM GALVANIS
1000 x 400 x 25 mm 50.50.5
JARAK 50cm 1.20
PIPA MEDIUM GALVANIS
0.80
0.70
K K
PLAT LANTAI 0.30
tbl =15 cm
246
1.50
1000
KOLOM BETON
2.50
500
1200 x 500 x 2000 mm
1.70
1.50
PANJANG 1700MM PEJABAT PEMBUAT KOMITMEN
50
85 130 85
400
500
50
75 170 170 170 170 170 75
1000
1200
GORDING CNP
GORDING CNP 150.65.20.2,8
150.65.20.2,8 PIPA MEDIUM GALVANIS
PIPA MEDIUM GALVANIS
1.93
2.55
2.13
2.75
SLIP - ON
SLIP - ON
1.50 1.50
1.50 1.50
DETAIL KUDA - KUDA A, B, C, D
21 32
GORDING CNP
GORDING CNP
150.65.20.2,8
150.65.20.2,8 PIPA MEDIUM GALVANIS
PIPA MEDIUM GALVANIS
1.72
1.52
2.35
2.11
SLIP - ON SLIP - ON
1.30
3.00 GORDING CNP
1.30 150.65.20.2,8
1.20 1.30
PIPA MEDIUM GALVANIS PIPA MEDIUM GALVANIS CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS
GORDING CNP
150.65.20.2,8
1.20 1.20
PIPA MEDIUM GALVANIS
PIPA MEDIUM
100 100
X
6000
8000
130
140
90
200
200
60
23 32
REGEL WF 298 x 149 x 5.5 x 8
60.60.6
1
RK
6.00
2 (17,8 Kg/m)
6.00
RA
3
6.00
4
(30,1 Kg/m)
6.00
RA
5 IKATAN
6.00
60.00
6
6.00
RF 5
RA
7
RF 4
6.00
8
REGEL PIPA MEDIUM
6.00
RF 3
(17,8 Kg/m)
RA CV . PRAKTIRA KONSULTAN
9 KONSULTAN PERENCANA PENGAWAS
RF 2
6.00
10
REGEL WF 298 x 149 x 5.5 x 8
6.00
RF 1
60.60.6
RK
11
6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00
104.00
A B C D E F G H I J K L M N P Q R S
24 32
PIPA MEDIUM GALVANIS PIPA MEDIUM GALVANIS UNP 120.55.6 UNP 80.45.6 PLAT 1000.400.1,2
+ 18.65
+ 9.00
+ 1.00
CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS
104.00
A B C D E F G H I P Q
25 32
- Semua ukuran dalam milimeter
- Mutu Baja Profil : BJ37
- Tebal Pengelasan harus disesuaikan dengan
tebal material yang akan dilas. KOLOM WF 700 x 300 x 13 x 24
REGEL 1/2 WF
- Kawat las A.W.S. : E7016 / E7018 298 x 149 x 5.5 x 8 60.60.6
1.50
H I J
CV . PRAKTIRA KONSULTAN
1.39
SLIP - ON
26 32
Y
UNP 120.55.6 UNP 100.50.6 PLAT 900.400.2
5.93
0.97 1.00 1.00 1.00 1.00 0.97 PEJABAT PEMBUAT KOMITMEN
X X
0.94
0.94
0.12
Y
POT. Y
0.12
CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS
POT. X
27 32
1
3
30.00
5
60.00
8
30.00
CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS
10
11
6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00
1.50 1.50
104.00
A B C D E F G H I J K L M N P Q R S
28 32
GORDING CNP
150.65.20.2,8
+ 17.36
1.20
1.20
+ 9.00
K-5
K-6
K-5
1.20
+ 6.65
RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1
K-1
K-2
K-4
K-4
K-2
K-1
BJ-1
K-3
K-3
+ 4.80
KP
KP
KP
KP
KP
KP
KP
KP
RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1
- 1.50
- 2.50
PEJABAT PEMBUAT KOMITMEN
4.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 6.00 6.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 4.00
30.00 30.00
60.00
1 2 3 4 5 6 7 8 9 10
+ 9.00
CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS
+ 6.65
K-1
K-2
K-3
K-3
K-2
K-2
K-1
BJ-1
K-2
K-2
K-2
+ 4.80
B1
- 1.50
- 2.50
4.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 6.00 6.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 4.00
60.00
1 2 3 4 5 6 7 8 9 10
29 32
GORDING CNP
K5
K6
K5
150.65.20.2,8
+10.80 +10.80 +10.80
KUDA - KUDA
WF 298.149.5,5.8
WF 298.149.5,5.8
K5
WF 600.200.11.17
WF 500.200.10.16
K7
MUKA HALAMAN
- 0.60
- 0.60 - 0.60
A" A' A 5 6
POTONGAN A - A POTONGAN B - B
SKALA 1 : 200 SKALA 1 : 200
CONNECTION CONNECTION
PLATE PL. 20mm PLATE PL. 20mm
600
2.00 12.00
700
WF 500.200.10.16
P=400mm
WF 298.149.5,5.8
1.50
5 35 230 35 30 140 30
K7 K5 300 200
C C
POT. 1 - 1 POT. 1 - 1
K6" K6
75
WF 600.200.11.17 WF 500x200x10x16
RIB SIRIP
WF 298 x 149 x 5,5 x 8
170
PL. t= 20MM
GAMBAR RIB PLATE
RIB t= 9 mm PL. t=16mm
170
POTONGAN WF 700 x 300 x BASE PLATE
BASE PLATE 13 x24
1000
BJ2 BJ1
170
PL. t=12mm
BASE PLATE
170
PL. t=20MM
BASE PLATE
170
PL. t=25MM
50 150 50
60 180 60
75
250
K7 K5 50 85 130 85 50
300
400
6
1.50
A" A
D
POT. 2-2
30 32
"Y" CONNECTING PLATE "C4"
POT. "Y"~"Y"
"Y"
1 : 25 STR BJ
RANGKA LISPLANK H=1000
31 32
L 50.50.5 L 50.50.5
L 50.50.5 L 50.50.5
DETAIL
3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 6.00 6.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
60.00
1 2 3 4 5 6 7 8 9 10
RANGKA LISPLANK
SKALA 1 : 200
1000
UNP 100.50.5
CV . PRAKTIRA KONSULTAN
5862
0.5
KONSULTAN PERENCANA PENGAWAS
0.5
0.5
L 50.5
L5
0
L 50.50.5
8
900
13
30
14
PLATE 9t
30
14
220
10
80
3023 10 0.5
220
L 50.5
0.5
PLATE 9t 80 L 50.5
300
88
0
170 0.5
250
0.5
0
L5
L 50.50.5
200
1340
70
1070
15
UNP 100.50.5
00
13
L 50.50.5
152 215 200
970 1000 1000 662 1000 1000 1000 1000 1000
RANGKA LISPLANK dan DETAIL
DETAIL LISPLANK
SKALA 1 : 40 1 : 200 STR BJ
32 32
CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS
Pintu Mushalla
Area
K ios
Kio
s
Par
kira
Pasar Ikan n
Agrobisnis
Agrobisnis
Agrobisnis
Agrobisnis
Agrobisnis
Pos
Polisi Kantor
Terminal
UPTD wc Terminal
2
Luas Area Pasar = 13.763,71 M
LAY OUT PASAR KARAMAT LAY OUT E
1 : 700
01
Luas Area Pasar = 13.763,71 M
Pintu Mushalla
BAK SAMPAH
washtafel washtafel
-0.60 beton
-0.05 -0.05
beton
-0.05 -0.05
-0.45 -0.45
TOILET TEMPAT CUCI TOILET
AREA AREA
BONGKAR MUAT BONGKAR MUAT AREA
PEDAGANG TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO PEDAGANG PARKIR MOTOR
+0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15
SIRKULASI MOBIL BARANG DAN PENGUNJUNG
T. WUDHU
WANITA
GUDANG MUSHOLA
T. WUDHU
AREA PEDAGANG BUAH AREA PEDAGANG BUAH
PRIA
+0.15 +0.15
+0.15 +0.15
R. KOPERASI R. PENGELOLA
TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO
+0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15
SELASAR
-0.05
-0.25
JALAN ASPAL
-1.00
KAPASITAS :
TOKO : 42 BUAH @UKURAN 3 X 6
GROSIR IKAN BASAH : 44 BUAH @UKURAN 3,75 X 5 SITE PLAN
AREA LOS PEDAGANG BUAH : 2 BUAH @UKURAN 7,5 X 18 PASAR MODERN KARAMAT SITE PLAN
AREA PEDAGANG BUAH : 72 BUAH @UKURAN 2 X 1,5
AREA AGRO BISNIS : 120 BUAH @UKURAN 3 X 2,4 SKALA 1 : 700
PARKIR MOTOR : 210 BUAH 1 : 700
PARKIR TRUCK : 16 BUAH
02
washtafel washtafel
-0.60 beton
-0.05 -0.05 beton
-0.05 -0.05
-0.45 -0.45
TOILET TEMPAT CUCI TOILET
1
TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO
+0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15
SIRKULASI MOBIL BARANG DAN PENGUNJUNG
+0.15 +0.15
T. WUDHU
WANITA
GUDANG MUSHOLA
T. WUDHU
AREA PEDAGANG BUAH AREA PEDAGANG BUAH
PRIA
+0.15 +0.15
+0.15 +0.15
5
HALAMAN HALAMAN
-0.60 SIRKULASI MOBIL BARANG DAN PENGUNJUNG -0.60
R. KOPERASI R. PENGELOLA
TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO
+0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15
10
SELASAR
-0.05
-0.25
JALAN ASPAL
-1.00
A B C D E F G H I J K L M N P Q R S
DENAH DENAH
PASAR MODERN KARAMAT
SKALA 1 : 500 1 : 500
03
TAMPAK DEPAN
PASAR KARAMAT
SKALA 1 : 500
PENEBALAN DINDING
PASAR KARAMAT
04
A B
+ 18.65 + 18.65
KISI - KISI ANGIN
RANGKA ALUMINIUM
PLAFOND ACP
+ 9.00 + 9.00
LIST PLANK ACP ATAP MEMBRAN
RANGKA PIPA + 7.85
+ 6.00
+ 4.50
+ 4.00 LIST PLANK ACP
+ 2.90
+ 2.70 + 2.40
+ 1.00 + 1.00
- 2.50 - 2.50
1 10
POTONGAN A - A
PASAR KARAMAT
SKALA 1 : 500
C
+ 18.65
KISI - KISI ANGIN
RANGKA ALUMINIUM
+ 18.65
D
TWINLITE POLYCARBONAT TEBAL 5mm
WARNA CLEAR
PLAFOND ACP
ATAP POLYCARBONAT
+ 9.00 + 9.00
RANGKA HOLLOW
LIST PLANK ACP
+ 7.85
+ 6.00
+ 2.90
+ 2.40
+ 1.00 + 1.00
- 2.50
1 10
POTONGAN B - B
PASAR KARAMAT
SKALA 1 : 500
E
+ 18.65
PLAFOND ACP
PLAFOND ACP
+ 9.00
+ 6.85
+6.65
WF 500.200.10.16 WF 500.200.10.16
ACP ACP
+ 5.50 + 5.50 + 5.00
+ 4.80
SIKU 60.60.6 REGEL 1/2 WF
WF 500.200.10.16 350 x 175 SIKU 120.120.15 WF 700 x 300
LAPIS BATU ALAM
BATU ALAM
+ 1.00
MUKA HALAMAN
- 0.60
- 0.65 - 0.60 muka halaman
muka aspal / muka tanah asal - 1.15
- 1.00 muka aspal / muka tanah asal
- 2.50 - 2.50
POTONGAN A - A, POTONGAN B - B
DAN POTONGAN C - C
POTONGAN C - C
PASAR KARAMAT
SKALA 1 : 500
1 : 500
05
TWINLITE POLYCARBONAT TEBAL 5mm
WARNA CLEAR
ExLITE POLYCARBONAT TEBAL 4,5mm
WARNA CLEAR
PLAFOND ACP
+ 9.00
LIST PLANK ACP
+ 6.00
+ 1.00
- 0.05 + 0.15
muka halaman - 0.60
muka aspal / muka tanah asal - 1.00
- 2.50
DETAIL POTONGAN
DETAIL A POTONGAN
PASAR KARAMAT
1 : 100
SKALA 1 : 100
06
ExLITE POLYCARBONAT TEBAL 4,5mm
WARNA CLEAR
+ 9.00
ATAP MEMBRAN
RANGKA PIPA + 7.85
+ 4.50
+ 2.90
+ 2.40
+ 1.00
- 2.50
10
07
TWINLITE POLYCARBONAT TEBAL 5mm
WARNA CLEAR
EXLITE POLYCARBONAT TEBAL 4,5mm
WARNA CLEAR
ATAP POLYCARBONAT
+ 9.00
RANGKA HOLLOW
+ 6.00
+ 1.00
+ 0.15
- 0.15
muka halaman - 0.60
muka aspal / muka tanah asal - 1.00
- 2.50
DETAIL POTONGAN
DETAIL C POTONGAN
PASAR KARAMAT
1 : 100
SKALA 1 : 100
08
ExLITE POLYCARBONAT TEBAL 4,5mm
WARNA CLEAR
PLAFOND ACP
+ 9.00
LIST PLANK ACP
+ 7.85
+ 4.50
+ 2.90
+ 2.40
+ 1.00
- 0.05
- 0.60 muka halaman
- 1.00 muka aspal / muka tanah asal
10
DETAIL POTONGAN
DETAIL D POTONGAN
PASAR KARAMAT
1 : 100
SKALA 1 : 100
09
LISTPLANK ACP
PLAFOND ACP
GORDING CNP
150.65.20.2,8
+10.80
KUDA - KUDA
WF 298.149.5,5.8
+6.65
WF 500.200.10.16
ACP
+ 4.80
WF 500.200.10.16
LAPIS BATU ALAM
- 2.50
DETAIL POTONGAN
DETAIL E POTONGAN
PASAR KARAMAT A' A" A B 1 : 100
SKALA 1 : 100
10
1
HALAMAN
-0.60
10
A B C D E F G H I J K L M N P Q R S
11
DETAIL PLAFOND
1 : 10
12
DETAIL PLAFOND
1 : 10
13
-0.60
HOMOGENIOUS HOMOGENIOUS
UNPOLISH UNPOLISH
60 60 60 60
1
HOMOGENIOUS HOMOGENIOUS
UNPOLISH UNPOLISH
60 60 60 60
HOMOGENIOUS HOMOGENIOUS
UNPOLISH UNPOLISH
3 60 60 60 60
T. WUDHU
WANITA
HOMOGENIOUS HOMOGENIOUS HOMOGENIOUS
UNPOLISH UNPOLISH UNPOLISH
60 60 60 60 60 60
HOMOGENIOUS
T. WUDHU
PRIA
UNPOLISH
60 60
5
LANTAI COR
HALAMAN TEBAL 15 CM
-0.60
HOMOGENIOUS HOMOGENIOUS
UNPOLISH UNPOLISH
60 60 60 60
7
9
HOMOGENIOUS HOMOGENIOUS
UNPOLISH UNPOLISH
60 60 60 60
10
HOMOGENIOUS
SELASAR UNPOLISH
-0.15 60 60
A B C D E F G H I J K L M N P Q R S
14
washtafel washtafel
-0.60 RS1 beton
-0.25
-0.25 -0.25
-0.25 beton
RS1
P1 P1 P1 P1TOILET
-0.45
TEMPAT CUCI P1 P1 P1 P1
-0.45
TOILET
+0.15 +0.15
V1 V2
4 AREA PEDAGANG BUAH AREA PEDAGANG BUAH
+0.15 +0.15 PJ1
T. WUDHU
J2 J2
WANITA
AREA GROSIR IKAN BASAH AREA GROSIR IKAN BASAH
J1 J1
T. WUDHU
AREA PEDAGANG BUAH AREA PEDAGANG BUAH
PRIA
+0.15 +0.15
+0.15 +0.15
PJ1 PJ2
5
HALAMAN
-0.60
6
PJ2 PJ1
J1 J1
J2 J2
7 AREA AGRO BISNIS
+0.15
AREA AGRO BISNIS
+0.15
AREA AGRO BISNIS
+0.15
V1 V1
10
A B C D E F G H I J K L M N P Q R S
15
TYPE : PJ2
Jumlah : 2 bh
+ 2.70
0.04 0.04
0.51
C 0.04
0.04
1.07
0.04
1.00
Pot. A Pot. B
SKALA 1:50 SKALA 1:50
0.04 0.04
Pot. C
SKALA 1:50
0.04 0.04
DETAIL KUSEN
1 : 50
16
+ 2.70 + 2.70
0.04 0.04
1.92 1.92
+ 0.70 + 0.70
0.04 0.04
Pot. A Pot. A
SKALA 1:50 SKALA 1:50
Pot. B Pot. B
SKALA 1:50 SKALA 1:50
Kusen
Kaca
: Aluminium Finish Powder Coating 4"
: Kaca bening t = 5 mm
Kusen
Kaca
: Aluminium Finish Powder Coating 4"
: Kaca bening t = 5 mm
TYPE : RS1
Hardware & accesories Hardware & accesories
Jumlah : 2 bh
+ 2.70
0.04
0.92
+ 1.70 + 2.70
0.04 0.04
0.92
Pot. A
SKALA 1:50
+ 1.70
0.04 0.04 0.04 0.04 0.04 0.04
Pot. B
SKALA 1:50
Pot. A
Kusen : Aluminium Finish Powder Coating 4" SKALA 1:50
-0.25 -0.25
-0.45 -0.45
TOILET TEMPAT CUCI TOILET
-0.20 -0.30 -0.25 -0.30 -0.20
+0.15 +0.15
T. WUDHU
WANITA
AREA GROSIR IKAN BASAH AREA GROSIR IKAN BASAH
T. WUDHU
AREA PEDAGANG BUAH AREA PEDAGANG BUAH
PRIA
+0.15 +0.15
+0.15 +0.15
HALAMAN
-0.60
10
A B C D E F G H I J K L M N P Q R S
18
rabat beton
- 0.30
muka halaman
- 0.60
rabat beton
- 0.30
muka halaman
- 0.60
DETAIL SALURAN
DETAIL SALURAN 1 : 20 - 10
SKALA 1:20
19
1
10
11
6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 8.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00
1.50 1.50
104.00
A B C D E F G H I J K L M N P Q R S
20
0.60 1.75 3.15 1.75 0.60
0.60
0.65
0.60
-0.45 -0.45 5.75
5.00
0.60
TEMPAT CUCI
-0.30 -0.15 -0.30
0.60
0.60
0.85
1 : 50
21
1.50 5.00 1.50
2.35
2.00
0.60
2.35 2.35
2.15
2.30
POTONGAN
1 : 50
22
3.20
-0.05
1.50
0.75
shower washtafel
2.90
beton
1.50 -0.05 1.50
TOILET
2.00 1.20
0.70 0.65
1 : 50
23
1.50 1.50
0.85 0.85
1.25
1.40
0.30
0.60
0.60
0.20
1.50 1.50
0.85 0.85
1.40
2.20
0.60
0.20
POTONGAN
1 : 50
24
0.95
2.50 shower
2.90 washtafel
beton
-0.05 1.50
0.60
TOILET
1.20 2.00
0.70 0.65
1 : 50
25
1.50 1.50
0.85 0.85
1.25
1.40
0.30
0.60
0.60
0.20
1.50 1.50
0.85 0.85
1.40 1.40
0.60
0.80
0.20
POTONGAN
1 : 50
26
0.85
washtafel washtafel
beton beton
-0.05 -0.05
-0.05 -0.05
-0.45 -0.45
TOILET TEMPAT CUCI TOILET
SELASAR -0.30 -0.15 -0.30 SELASAR
0.80 -0.15 washtafel -0.05 -0.05 washtafel
-0.15
beton -0.05 -0.05 beton
0.40
0.55
1.90
GUDANG
0.40
2
R. KOPERASI R. PENGELOLA
2.50
A
0.40
0.55
0.85
0.70 SELASAR
-0.15
0.60 0.60
LAPIS ACP
DINDING BATA
LAPIS ACP
3.20 3.20
LAPIS ACP
LAPIS ACP
1 : 100
27
5.00 5.00 5.00
1.75
3.75
2.00
1 : 50
28
KERAMIK 30X30 KERAMIK 30X30
COR BETON BALOK 15/15 COR BETON BALOK 15/15
KOLOM 15/15 KOLOM 15/15
0.15 0.15
KERAMIK 30X30
COR BETON BALOK 15/15
KOLOM 15/15
0.10
0.70 0.95
0.15
2.00 1.75
POTONGAN
1 : 50
29
2.00 2.00 2.00
0.90
1.50
0.60
KERAMIK 30X30
COR BETON BALOK 15/15
KOLOM 15/15
0.10
0.80 0.70
0.15 0.15
1 : 50
30
1.30
3.70 3.70
2.40
0.80
T. WUDHU
WANITA
0.20
3.00 3.00
6.00
POTONGAN A
PASAR MODERN KARAMAT
SKALA 1 : 50
T. WUDHU
PRIA
1.30
3.70
2.40
0.80
0.40
DETAIL TEMPAT WUDHU 0.20
PASAR MODERN KARAMAT
SKALA 1 : 50
2.00
POTONGAN B
PASAR MODERN KARAMAT
1 : 50
SKALA 1 : 50
31
5.35
0.35
- 0.15 9.00
WC
2.00
2.00
- 0.05 R. JAGA
R. ISTIRAHAT
0.35
0.35
1.20 2.15 2.00 0.35
5.35
DENAH
POS JAGA (2 BUAH)
SKALA 1 : 100
1 : 100
32
A
POTONGAN A - A POTONGAN B - B
5
8
5.35 5.35
0.35
0.35
0.35
V PJ
1 1
PV
- 0.15
J
2.00
2.00
2.00
2.00
WC R. JAGA
- 0.05
R. ISTIRAHAT
1
P
1
V V
0.35
0.35
0.35
0.35
2 1
1.20 2.15 2.00 0.35 1.20 2.15 2.00 0.35
5.35 5.35
POTONGAN A - A, POTONGAN B - B
RENCANA LANTAI DAN KUSEN
1 : 100
33
PJ 1 V2 V1 PVC
DETAIL KUSEN
1 : 50
34
P1 J1
2 UNIT 2 UNIT
DETAIL KUSEN
1 : 50
35
5.35
0.35
0.35
Pipa PVC Vertikal Air Hujan 2" Pipa PVC Vertikal Air Hujan 2"
- 0.15
WC
2.00
2.00
- 0.05 R. JAGA
R. ISTIRAHAT
5.35
Pipa PVC Vertikal Air Hujan 2" Pipa PVC Vertikal Air Hujan 2"
0.35
0.35
1.20 2.15 2.00
1.20 2.15 2.00 0.35
Biofiil Resapan
2.00
2.00
TABEL INST. AIR
RENCANA SANITAIR
POS JAGA
SKALA 1 : 100
5.35
2.00
KETERANGAN
RENCANA PLAFOND
POS JAGA
SKALA 1 : 100
1 : 100
36
5.35 5.35
RINGBALK 15/ 25 RINGBALK 15/ 25 SLOOF 20/ 25 SLOOF 20/ 25 SLOOF 20/ 25
RINGBALK 15/ 25
RINGBALK 15/ 25
SLOOF 20/ 25
SLOOF 20/ 25
SLOOF 20/ 25
SLOOF 20/ 25
RINGBALK 15/ 25
RINGBALK 15/ 25
2.00
2.00
2.00
2.00
RINGBALK 15/ 25 RINGBALK 15/ 25 SLOOF 20/ 25 SLOOF 20/ 25 SLOOF 20/ 25
5.35
RD RD
PVH PVH
3.40
Pipa masukkan ke kolom Pipa masukkan ke kolom
2.00
2.00
PVH PVH
RD RD
6.75
1.20 2.15 2.00
RENCANA DAK
ROOF DRAIN
RD
POS JAGA
RENCANA PENULANGAN PIPA VERTIKAL AIR HUJAN
SKALA 1 : 100
POS JAGA PVH
SKALA 1 : 100
20 20 20
20 20
1 : 100
37
Ringbalk 15/25
Lapisan Waterproofing
1.20 + 3.10
+ 2.70
- 0.15
+ 2.10
WC
2.00
2.00
- 0.05
Rabatan t=5cm
Urugan Pasir t=10cm
+ 0.20
Tanah Urug
1.20
1.20
POTONGAN WC
POS JAGA
SKALA 1 : 100
DETAIL WC
1 : 100
38
PEJABAT PEMBUAT KOMITMEN
CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS
CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS
PENULANGAN PENUTUP
TANDON & ATAP R. POMPA
- Mutu Beton : K-225 Kg/cm2
: U - 24 (Polos) < 12
1 : 100 ARS
- Mutu Baja Tulangan D : U - 32 (Ulir) > 13
- Mutu Baja Profil : Bj - 37 Mpa
40 40
CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS
washtafel washtafel
-0.60 beton
-0.05 -0.05 beton
-0.05 -0.05
-0.45 -0.45
TOILET TEMPAT CUCI TOILET
1
TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO
+0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15
SIRKULASI MOBIL BARANG DAN PENGUNJUNG
T. WUDHU
WANITA
GUDANG MUSHOLA
T. WUDHU
PRIA
5
HALAMAN HALAMAN
-0.60 SIRKULASI MOBIL BARANG DAN PENGUNJUNG -0.60
R. KOPERASI R. PENGELOLA
TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO
+0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15
10
SELASAR
-0.05
-0.30
A B C D E F G H I JALAN ASPAL
-1.00 J K L M N P Q R S
NTS
01
+ PUMP ROOM
washtafel washtafel
-0.60 beton
-0.05 -0.05 beton
-0.05 -0.05
-0.45 -0.45
TOILET TEMPAT CUCI TOILET
1
TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO
+0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15
SIRKULASI MOBIL BARANG DAN PENGUNJUNG
T. WUDHU
WANITA
GUDANG MUSHOLA
T. WUDHU
PRIA
5
HALAMAN HALAMAN
-0.60 SIRKULASI MOBIL BARANG DAN PENGUNJUNG -0.60
R. KOPERASI R. PENGELOLA
TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO
+0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 +0.15
10
SELASAR
-0.05
-0.30
A B C D E F G H I JALAN ASPAL
-1.00 J K L M N P Q R S
NTS
02
washtafel washtafel
beton beton
TEMPAT CUCI
washtafel -0.15 washtafel
beton beton
washtafel washtafel
beton beton
CO 4"
TEMPAT CUCI
washtafel -0.15 washtafel
beton beton
1 : 100
RENCANA SALURAN AIR KOTOR DAN BEKAS
PASAR MODERN KARAMAT 03
BLOK DIAGRAM AIR BERSIH
NTS
04
+ PUMP ROOM
6.77
washtafel washtafel
beton beton
-0.05 -0.05
-0.05 -0.05
-0.45 -0.45
TOILET TEMPAT CUCI TOILET
AREA AREA
BONGKAR MUAT BONGKAR MUAT
PEDAGANG TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO PEDAGANG
GUDANG MUSHOLA
R. PENGELOLA
R. KOPERASI
SELASAR
-0.15
-0.30
RENCANA HYDRANT
PASAR MODERN KARAMAT
SKALA NTS RENCANA HYDRANT
NTS
05
BLOK DIAGRAM HYDRANT
NTS
06
GROUP
TKI 2 x 36
DOWN
LIGHT 13
DOWN
LIGHT 7
STOP
KONTAK
R S T
WATT WATT WATT 200 WATT
1 450
2 270
3 270
4 2 72
Cadangan 5
Cadangan 6
9 1 1 1 2 450 270
GROUP
TKI 2 x 36
DOWN
LIGHT 13
DOWN
LIGHT 7
STOP
KONTAK
R S T
WATT WATT WATT 200 WATT
1 360
2 270
3 270
4 2 72
Cadangan 5
Cadangan 6
8 1 1 1 2 360 270
01
PP-PASAR
JARINGAN PLN PANEL UTAMA
20 KV/380 V A Hz MCCB 80 A 3 ph
V 160 kVA
Q MCCB 20 A 3 ph
MCCB 20 A 3 ph
ACB 400-800 A 3ph
50 kA 4P MCCB 260 A 3 ph
MCCB 40 A 3 ph
CADANGAN
MCCB 40 A 3 ph
CADANGAN
ATS MCB 16 A 1Ph
CADANGAN
P-Hydrant
ACB 400-800 A
3ph 50 kA 4P SDP-POMPA
GENSET
200 BC 50 mm2 V A Hz Q
kVA
SPARE
SPARE
7,5 PK Transfer
Pump (5.595 VA)
7,5 PK Transfer
Pump (5.595 VA)
SPARE
SPARE
NTS
02
PP-P
GROUP
TKI 2 X
36 W
INDUSTRIAL INDUSTRIAL
LIGHT
120 WATT
LIGHT
80 WATT
STOP
KONTAK
16 A
AC 1.500
WATT
R S T
MCB 4 A 1 480
MCB 4 A 2 480
MCB 4 A 3 480
MCB 4 A 4 480
MCB 4 A 5 480
MCB 10 A 6 6 1.200
MCB 4 A 7 5 360
MCB 10 A 8 5 1.000
MCB 4 A 9 5 360
MCB 10 A 10 5 1.000
MCB 4 A 11 5 360
MCB 4 A 12 5 1.000
MCCB 100 A MCB 4 A 13 5 360
3ph 25 kA MCB 10 A 14 5 1.000
MCB 4 A 15 5 360
MCB 10 A 16 5 1.000
MCB 4 A 17 5 360
18
MCB 10 A 6 1.200
19
MCB 4 A 6 432
20
MCB 10 A 5 1.000
21
MCB 4 A 5 360
MCB 10 A 22 5 1.000
MCB 4 A 23 5 360
MCB 10 A 24 6 1.200
MCB 4 A 25 6 432
MCB 4 A 26 5 360
MCB 10 A 27 5 1.000
MCB 4 A 28 5
MCB 10 A 29 5 1.000
MCB 4 A 30 6 432
MCB 10 A 31 6 1.200
MCB 4 A 32 5 360
MCB 10 A 33 5 1.000
MCB 4 A 34 5 360
MCB 4 A 35 6 1.200
MCB 4 A 36 6 432
MCB 4 A 37 4 800
MCB 4 A 38 4 2 448
MCB 4 A 39 6 108
MCB 4 A 40 6 108
MCB 4 A 41 9 162
MCB 4 A 42 8 144
MCB 4 A 43 11 77
MCB 4 A 44 6 42
MCB 4 A 45 14 98
MCB 10 A
Spare 46 1 1500
MCB 4 A 47
Spare
BC 16 mm2
9.019
JUMLAH
03
KETERANGAN
TKI 2 x 28 W
pedestrian
INDUSTRIAL LIGHT LED 120 W
INDUSTRIAL LIGHT LED 100 W
GSM Watherproof 2 x 18 W
PEMASANGAN LAMPU DALAM PASAR Baret LHE 18 W
Down Light LHE 7 W
Great switch 6 gang
Stop kontak 1 ph 200 W
Saklar Engkel
Saklar double
SELASAR
SELASAR TEMPAT CUCI
-0.15
GUDANG MUSHOLA
MAIN ENTRANCE
MAIN ENTRANCE
R. PENGELOLA
R. KOPERASI
2
SELASAR
SELASAR
SELASAR
A B C D E F G H I J K L M N O P Q R
04
Luas Area Pasar = 13.763,71 M
washtafel washtafel
beton beton
-0.05 -0.05
-0.05 -0.05
-0.45 -0.45
TOILET TEMPAT CUCI TOILET
AREA AREA
BONGKAR MUAT BONGKAR MUAT
PEDAGANG TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO PEDAGANG
GUDANG MUSHOLA
R. KOPERASI R. PENGELOLA
TOKO
SELASAR
-0.15
-0.30
CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS
NTS EL
05 08
washtafel washtafel
beton beton
-0.05 -0.05
-0.05 -0.05
-0.45 -0.45
TOILET TEMPAT CUCI TOILET
AREA AREA
BONGKAR MUAT BONGKAR MUAT
PEDAGANG TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO TOKO PEDAGANG
GUDANG MUSHOLA
R. PENGELOLA
R. KOPERASI
TOKO
SELASAR
-0.15
-0.30
CV . PRAKTIRA KONSULTAN
KONSULTAN PERENCANA PENGAWAS
NTS EL
06 08
TEMPAT CUCI
KETERANGAN
TKI 2 x 28 W
INDUSTRIAL LIGHT LED 120 W
INDUSTRIAL LIGHT LED 100 W
GSM Watherproof 2 x 18 W
Baret LHE 18 W
Down Light LHE 7 W
Great switch 6 gang
Stop kontak 1 ph 200 W
Saklar Engkel
Saklar double
NTS
07
SPLITZEN dia 3/4"
KE GROUND
TAMPAK SAMPING
TAMPAK DEPAN
NTS
08