Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 261

HSD.Pus Air.

DAFTAR HARGA UPAH TENAGA KERJA , BAHAN DAN SEWA ALAT


HARGA SATUAN DASAR
KOTA BANDUNG - JAWA BARAT TAHUN 2012

Harga
No Uraian Satuan Kode Satuan Dasar Ket
( Rp. )
1 2 3 4 5 6

I UPAH TENAGA KERJA


1 Pekerja OH L.01 50,000.00
2 Tukang Gali OH L.02 60,000.00
3 Kepala Tukang batu/tembok OH L.03 70,000.00
4 Tukang batu/tembok OH L.04 60,000.00
5 Kepala Tukang kayu OH L.05 70,000.00
6 Tukang kayu OH L.06 60,000.00
7 Kepala Tukang besi/besi beton OH L.07 70,000.00
8 Tukang besi/besi beton OH L.08 60,000.00
9 Kepala Tukang cat/pelitur OH L.09 70,000.00
10 Tukang cat/pelitur OH L.10 60,000.00
11 Tukang pipa/operator pompa OH L.11 60,000.00
12 Tukang penganyam bronjong OH L.12 60,000.00
13 Tukang tebas OH L.13 60,000.00
14 Tukang las OH L.14 60,000.00
15 Mandor OH L.15 75,000.00
16 Juru Ukur OH L.16 100,000.00
17 Pembantu Juru Ukur OH L.17 50,000.00
18 Akhli alat berat OH L.18 400,000.00
19 Operator Alat Berat OH L.19 125,000.00
20 Pembantu operator / mekanik OH L.20 85,000.00
21 Supir truck OH L.21 70,000.00
22 Kenek truck OH L.22 50,000.00
23 Penjaga malam OH L.23 65,000.00
24 Drafter CAD/manual OH L.24 100,000.00
25 Desain Engineer OH L.25 400,000.00
26 Operator printer/ploter OH L.26 50,000.00

II BAHAN / MATERIAL
A KELOMPOK AIR, TANAH, BATU DAN CEMENT

1 Air m3 M.01 3,075.00


2 Tanah liat m3 M.02 75,350.00
3 Tanah urug m3 M.03 45,000.00
4 Lempengan rumput m3 M.04 2,000.00
5 Pasir urug m3 M.05 100,000.00
6 Sirtu m3 M.06 124,300.00
7 Pasir teras m3 M.07 124,300.00
8 Pasir pasang kali/gunung m3 M.08 90,000.00
HSD.Pus Air.2
Harga
No Uraian Satuan Kode Satuan Dasar Ket
( Rp. )
1 2 3 4 5 6

9 Pasir beton m3 M.09 140,000.00


10 Abu Batu m3 M.10 150,000.00
11 Batu kali / belah m3 M.11 95,000.00
12 Batu Brojol (Untuk bronjong) m3 M.12 118,250.00
13 Batu bata / merah bakar kw biasa bh M.13 450.00
14 Batu bata / merah bakar pres bh M.14 650.00
HSD.Pus Air.3
Harga
No Uraian Satuan Kode Satuan Dasar Ket
( Rp. )
1 2 3 4 5 6

15 Batu bata / merah bakar kelas I bh M.15 6,325.00


16 Batu bata / merah bakar kelas II bh M.16 8,305.00
17 Batu bata / merah oven (Klingker) bh M.17 13,750.00
18 Kerikil./Koral/Agregat Beton m3 M.18 140,000.00
19 Portland Cement (PC 50 kg / zak) zak M.19 62,000.00
20 Beton Ready Mixed K-175 m3 M.20 710,000.00
21 Beton Ready Mixed K-200 m3 M.21 730,000.00
22 Beton Ready Mixed K-225 m3 M.22 750,000.00
23 Beton Ready Mixed K-250 m3 M.23 765,000.00
24 Beton Ready Mixed K-275 m3 M.24 775,000.00
25 Beton Ready Mixed K-300 m3 M.25 800,000.00
26 Beton Ready Mixed K-325 m3 M.26 817,500.00
27 Beton Ready Mixed K-350 m3 M.27 834,000.00
28 Kapur m3 M.28 80,000.00
29 Strorox - 100 L M.29 30,000.00
30 Bahan Aditif L M.30 35,000.00
31 Tiang pancang beton dia 20 cm m M.31 100,000.00
32 Tiang pancang beton dia 30 cm m M.32 150,000.00
33 Tiang pancang beton ukuran 30x30 cm m M.33 230,000.00
34 Tiang pancang beton ukuran 40x40 cm m M.34 400,000.00
35 Turap beton pre-cast ukuran 30x12 cm m M.35 100,000.00
36 Turap beton pre-cast ukuran 40x20 cm m M.36 180,000.00
37 Tiang Pancang beton tulang 30x30 cm m M.37 290,000.00
38 Tiang Pancang beton tulang 40x40 cm m M.38 504,000.00
39 Batu muka m2 M.39 100,000.00
40 Batu Candi m2 M.40 140,500.00
41 Turap beton tulang pre-cast 30x12 cm m M.41 200,000.00
42 Turap beton tulang pre-cast 40x15 cm m M.42 300,000.00
43 Buis Beton dia 30 cm tanpa tulang bh M.43 41,250.00
44 Buis Beton dia 40 cm tanpa tulang bh M.44 65,450.00
45 Buis Beton dia 50 cm tanpa tulang bh M.45 96,800.00
46 Buis Beton dia 60 cm tanpa tulang bh M.46 115,500.00

B KELOMPOK KAYU

1 Kayu papan klas 2 (Kamper Banjar) m3 M.50 8,635,000.00


2 Kayu papan klas 2 (Kamper Samarinda) m3 M.51 8,375,000.00
3 Kayu papan klas 2 (Kamper Medan/Borneo Super) m3 M.52 7,048,250.00
4 Kayu papan klas 3 (Albasia) m3 M.53 4,174,500.00
5 Kayu balok klas 2 (Kamper Banjar) m3 M.54 7,205,000.00
6 Kayu balok klas 2 (Kamper Samarinda) m3 M.55 7,975,000.00
7 Kayu balok klas 2 (Kamper Medan/Borneo Super) m3 M.56 6,178,150.00
8 Kayu balok klas 3 (Albasia) m3 M.57 4,000,000.00
9 Kayu usuk/kaso klas 2 (Kamper Medan/Borneo Super) m3 M.58 5,870,000.00
HSD.Pus Air.4
Harga
No Uraian Satuan Kode Satuan Dasar Ket
( Rp. )
1 2 3 4 5 6

10 Kayu usuk/kaso klas 3 (Albasia) m3 M.59 4,000,000.00


11 Kayu papan bekisting kelas 3 m3 M.60 1,200,000.00
12 Kayu untuk cerucuk dia 2" bt M.61 10,000.00
HSD.Pus Air.5
Harga
No Uraian Satuan Kode Satuan Dasar Ket
( Rp. )
1 2 3 4 5 6

13 Kayu untuk cerucuk dia 3" bt M.62 12,100.00


14 Kayu untuk cerucuk dia 4" bt M.63 16,500.00
15 Kayu untuk cerucuk dia 6" bt M.64 19,800.00
16 Dolken kayu galam dia 8 cm, pjg 3m btg M.65 70,250.00
17 Dolken kayu galam dia 10 cm, pjg 3m btg M.66 115,000.00
18 Kayu gelondongan diameter 20cm m' M.67 350,000.00
19 Triflex t=3mm lbr M.68 1,275,000.00
20 Triflex t=4mm lbr M.69 45,000.00
21 Multiplek tebal 0,6 cm lbr M.70 55,000.00
22 Multiplek tebal 0,9 cm lbr M.71 80,000.00
23 Multiplek tebal 1,2 cm lbr M.72 125,000.00
24 Multiplek tebal 1,8 cm lbr M.73 135,000.00
25 Teakwood 3mm 120 x 240 lbr M.74 200,000.00
26 Teakwood 4mm 120 x 240 lbr M.75 112,000.00
27 Teakwood 3mm uk. Pintu lbr M.76 125,000.00
28 Teakwood 4mm uk. Pintu lbr M.77 67,500.00
29 Bambu bt M.78 80,000.00
30 Ijuk tebal 5 cm kg M.79 10,000.00
31 Tiang Pancang kayu dia 8-10 cm m M.80 11,550.00
32 Tusuk bambu bh M.80 7,500,000.00

C KELOMPOK LOGAM
1 Besi beton biasa/polos kg M.90 10,000.00
2 Besi beton biasa 10 mm kg M.91 6,356.00
3 Besi beton biasa 12 mm kg M.92 5,353.00
4 Besi beton ulir 10 mm kg M.93 8,628.00
5 Kabel prestress kg M.94 36,500.00
6 Baja Profil kg M.95 12,100.00
7 Besi siku L 40.40.4 m' M.96 16,667.75
8 Besi siku L 50.50.5 m' M.97 28,335.00
9 Kawat beton / Bendrat kg M.98 15,000.00
10 Paku biasa 1 cm - 3 cm kg M.99 23,100.00
11 Paku biasa 4 cm - 7 cm kg M.100 12,500.00
12 Paku seng gelombang kg M.101 14,500.00
13 Kawat seng 3mm kg M.102 25,000.00
14 Seng gelombang uk. 0,9 x 1,8, t=0,05 lbr M.103 60,200.00
15 Seng gelombang uk. 0,9 x 1,8, t=0,03 lbr M.104 50,000.00
16 Seng gelombang uk. 0,9 x 1,8, t=0,025 lbr M.105 50,000.00
17 Seng gelombang uk. 0,9 x 1,8, t=0,02 lbr M.106 36,000.00
18 Seng pelat lebar 0,9 m' t=0,05 m' M.107 35,000.00
19 Seng pelat lebar 0,9 m' t=0,04 m' M.108 29,000.00
20 Seng pelat lebar 0,9 m' t=0,03 m' M.109 29,000.00
21 Seng pelat lebar 0,9 m' t=0,025 m' M.110 26,250.00
22 Seng pelat lebar 0,9 m' t=0,02 m' M.111 22,000.00
23 Seng pelat BJLS-30 lebar 0,6 m' m' M.112 30,000.00
HSD.Pus Air.6
Harga
No Uraian Satuan Kode Satuan Dasar Ket
( Rp. )
1 2 3 4 5 6

24 Seng pelat BJLS-30 lebar 0,9 m' m' M.113 45,000.00


25 Kawat las listrik kg M.114 24,750.00
26 Kawat bronjong dia 3 mm kg M.115 19,350.00
27 Kawat bronjong dia 4 mm kg M.116 19,350.00
28 Wiremesh utk bronjong dia 6 mm (buatan pabrik) kg M.117 26,350.00
29 Wiremesh utk bronjong dia 8 mm (buatan pabrik) kg M.118 26,350.00
30 Wiremesh utk bronjong dia 10 mm (buatan pabrik) kg M.119 26,350.00
31 Wiremesh untuk pelat lantai beton kg M.120 24,750.00
32 Kabel baja kg M.121 30,000.00
33 Dynabolt/raamset dia 8 mm panjang 4-5 cm bh M.125 5,000.00
HSD.Pus Air.7
Harga
No Uraian Satuan Kode Satuan Dasar Ket
( Rp. )
1 2 3 4 5 6

34 Tiang Pancang Baja dia 30 cm m M.126 500,000.00


35 Tiang Pancang baja kotak 30 x 30 cm m M.127 575,000.00
36 Besi beton biasa dia 10 mm m M.128 6,356.00
37 Turap baja profi larsen lebar 350 mm m M.129 140,000.00
38 Baja Pelat tebal 3 mm m2 M.130 105,000.00
39 Ulir kasar diameter 16 mm kg M.131 50,000.00
40 Stang ulir diameter 16 mm bh M.132 125,000.00
41 Stang ulir diameter 16 mm + gear bh M.133 175,000.00
42 Ulir halus diameter 20 mm kg M.134 200,000.00
43 Stang ulir diameter 20 mm + gear bh M.135 300,000.00
44 Baut dia 12 mm panjang 2 cm bh M.136 2,200.00

III KELOMPOK PERALATAN DAN ALAT BANTU

1 Keranjang/pengki bh E.01 11,500.00


2 Kereta dorong unit E.02 8,000.00
3 Jack hammer unit E.03 135,000.00
4 Pemadat timbunan (vibro roller kecil/stamper) Hari-sewa E.04 15,000.00
5 Timbris Hari-sewa E.05 15,000.00
6 Tang / alat pemotong kawat bh E.06 12,000.00
7 Palu/godam pemecah batu bh E.07 100,000.00
8 Molen (Concrete Mixer 0.3 m3) Hari-sewa E.08 400,000.00
9 Molen (Concrete Mixer 0.125 m3) Hari-sewa E.09 134,750.00
10 Vibrator Hari-sewa E.10 134,750.00
11 Kotak adukan bh E.11 25,000.00
12 Ember bh E.12 5,000.00
13 Gergaji besi bh E.13 45,000.00
14 Gunting pemotong baja bh E.14 25,000.00
15 Kunci pembelok tulangan bh E.15 5,000.00
16 Catok bh E.16 3,000.00
17 Kuas bh E.17 1,500.00
18 Linggis bh E.18 51,150.00
19 Kayu pemikul + tampar unit E.19 12,000.00
20 Bodem bh E.20 52,250.00
21 Steel whell roller Hari-sewa E.21 400,000.00
22 Tandem roller Hari-sewa E.22 400,000.00
23 Alat pelancip bh E.23 15,000.00
24 Tusuk bambu bh E.24 10,000.00
25 Kayu Kasut bh E.25 5,000.00
26 Chainsaw jam E.26 20,000.00
27 Bulldozer jam E.27 168,000.00
28 Exsavator jam E.28 168,000.00
29 Pick up Hari-sewa E.29 136,500.00
30 Dump truck 3,5 ton Hari-sewa E.30 470,800.00
31 Dump truck 5 ton Hari-sewa E.31 539,000.00
HSD.Pus Air.8
Harga
No Uraian Satuan Kode Satuan Dasar Ket
( Rp. )
1 2 3 4 5 6

32 Mesin las listrik Hari-sewa E.32 203,500.00


33 Mesin pompa air 3" Hari-sewa E.33 134,750.00
34 Waterpass Hari-sewa E.34 200,000.00
35 Jack Stressing Hari-sewa E.35 135,000.00
36 Pompa dan Conveyon Beton Hari-sewa E.36 200,000.00
37 Pahat Beton bh E.37 225,000.00
38 Bor listrik Hari-sewa E.38 20,000.00
39 Tripod tinggi 5 m Hari-sewa E.39 325,000.00
40 Alat pancang tipe Hammer 2 ton Hari-sewa E.40 442,000.00
41 Alat pancang tipe Hammer 1 ton Hari-sewa E.41 300,000.00
42 Crane kecil Hari-sewa E.42 730,000.00
43 Crane besar Hari-sewa E.43 935,000.00
44 Las listrik 250 A diesel Hari-sewa E.44 235,000.00
45 Mesin pancang tenaga uap 8 ton Hari-sewa E.45 735,000.00
46 Mesin pancang tenaga diesel 8 ton Hari-sewa E.46 850,000.00
47 Mesin pancang kompresor udara 8 ton Hari-sewa E.47 750,000.00
48 Alat penyambung tiang pancang bh E.48 200,000.00
49 Alat penyambung tiang pancang dolken bh E.49 25,000.00
50 Pompa air diesel 5 KW Hari-sewa E.50 225,000.00
51 Pompa air diesel 10 KW Hari-sewa E.51 442,000.00
52 Pompa air diesel 20 KW Hari-sewa E.52 830,000.00
53 Theodolit Hari-sewa E.53 250,000.00
54 Loader Hari-sewa E.54 168,000.00
55 Water Tank Hari-sewa E.55 203,500.00
56 Peneumatic Roller Hari-sewa E.56 382,800.00
57 Lift sampai dengan tinggi maksimum 12m Hari-sewa E.57 2,382,800.00
HSD.Pus Air.9
Harga
No Uraian Satuan Kode Satuan Dasar Ket
( Rp. )
1 2 3 4 5 6

IV LAIN-LAIN
1 Perlengkapan ruang jaga meja kursi set M.150 1,000,000.00
2 Sewa Komputer utk drafting CAD sewa-bulan M.151 1,000,000.00
3 Sewa Scaner A4 sewa-bulan M.152 250,000.00
4 Polyfelt TS 50 m M.153 100,000.00
5 Cat kayu kg M.154 37,450.00
6 Aspal Panas kg M.155 9,130.00
7 Karung plastik / bagor bh M.156 7,500.00
8 Tali rapia / plastik m' M.157 500.00
9 Asbes gelombang kecil uk. 80 x 180, 4mm lbr M.158 40,000.00
10 Asbes gelombang besar uk. 105 x 180, 5mm lbr M.159 50,000.00
11 Asbes uk 1 x 1 m2 lbr M.160 7,500.00
12 Bensin/Premiun non subsidi ltr M.161 9,700.00
13 Solar non subsidi ltr M.162 10,800.00
14 Minyak tanah ltr M.163 7,150.00
15 Olie mesin (Mesran 40 SAE) ltr M.164 30,250.00
16 Minyak bekisting ltr M.165 4,500.00
17 Cuka Bibit ltr M.166 25,000.00
18 Laburan meni / ter / solinem m2 M.167 7,500.00
19 Reduksi kalkir dari A1 ke A2 lbr M.168 12,500.00
20 Reduksi kalkir A2 ke kertas A4 lbr M.169 16,500.00
21 Foto copy kertas Letter, Legal, A4 lbr M.170 250.00
22 Foto copy kalkir A1 ke kalkir lbr M.171 6,500.00
23 Blue/black print uk A1 lbr M.172 2,600.00
24 Blue/black print uk A2 lbr M.173 2,000.00
25 Blue/black print uk A3 lbr M.174 1,250.00
26 Menjilid pakai kertas di lakban A4 bh M.175 7,500.00
27 Menjilid pakai kertas langsung A4 bh M.176 10,000.00
28 Menjilid pakai kertas langsung A4 + laminasi bh M.177 13,500.00
29 Menjilid uk A1 bh M.176 17,500.00
30 Menjilid uk A2 bh M.177 11,500.00
31 Menjilid uk A3 bh M.178 6,750.00
32 Waterstop PVC.150 m M.179 75,000.00
33 Waterstop PVC.200 m M.180 90,000.00
34 Waterstop PVC.270 m M.181 115,000.00
35 Waterstop Rubber lebar 150mm - 200mm m M.182 125,000.00
36 Motor 2 KW 1350 rpm + pengkabelan bh M.183 10,000,000.00
HSD.Pus Air.10

Harga dr CV. Gwan Building


Harga dr CV. Gwan Building
AHSP.Pus Air.11

A. UMUM
A.1 PEKERJAAN TANAH (T.xx)
A.1.1 Secara manual menggunakan tenaga manusia
Analisa harga satuan pekerjaan pembersihan dan pengupasan permukaan tanah
T.01 Pembersihan dan striping/kosrekan (1 m2)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.009 50,000.00
2 Tukang tebas L.13 OH 0.003 60,000.00
3 Mandor L.15 OH 0.001 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
1 Chainsaw E.26 jam 0.020 20,000.00
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15 % x D
F Harga Satuan Pekerjaan per - m2 (D+E)

T.02 Tebas tebang berupa memotong dan membersihkan lokasi dari tanaman/ tumbuhan (1 m2)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.016 50,000.00
2 Tukang tebas L.13 OH 0.004 60,000.00
3 Mandor L.15 OH 0.001 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Minyak tanah M.163 L 0.01 7150
Jumlah Harga Bahan
C Peralatan
1 Chainsaw E.26 jam 0.032 20,000.00
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m2 (D+E)

T.03 Cabut tunggul tanaman keras minimum diameter 15 cm dengan membuang sisa tunggul kayu dan
AHSP.Pus Air.12

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.008 50,000.00
2 Tukang tebas L.13 OH 0.024 60,000.00
3 Mandor L.15 OH 0.001 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
1 Chainsaw E.26 jam 0.011 20,000.00
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m2 (D+E)

Analisa harga satuan pekerjaan galian tanah


T.04 Uitzet trase saluran pembawa dan pembuang (1 m1)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.007 50,000.00
2 Pembantu Juru Ukur L.17 OH 0.002 50,000.00
3 Juru Ukur L.16 OH 0.002 100,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
1 Waterpass E.34 bh 0.002 200,000.00
2 Theodolith E.53 bh 0.002 250,000.00
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m1 (D+E)
AHSP.Pus Air.13

T.05 Pasang profil melintang galian tanah jarak 50 m pada ruas saluran yang lurus (1 m')

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.050 50,000.00
2 Tukang kayu L.06 OH 0.050 60,000.00
3 Kepala Tukang kayu L.05 OH 0.050 70,000.00
4 Mandor L.15 OH 0.005 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Kaso 4/6 cm M.58 m3 0.005 5,870,000.00
2 Papan 2/20 M.53 m3 0.005 4,174,500.00
3 Paku M.100 kg 0.200 12,500.00
Jumlah Harga Bahan
C Peralatan
1 Waterpass E.34 bh 0.001 200,000.00
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m1 (D+E)

T.06 Pasang profil melintang galian tanah jarak 25 m pada ruas saluran tikungan (1 m')

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.100 50,000.00
2 Tukang kayu L.06 OH 0.100 60,000.00
3 Kepala Tukang kayu L.05 OH 0.100 70,000.00
4 Mandor L.15 OH 0.010 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Kaso 4/6 cm M.58 m3 0.010 5,870,000.00
2 Papan 2/20 M.53 m3 0.010 4,174,500.00
3 Paku M.100 kg 0.400 12,500.00
Jumlah Harga Bahan
C Peralatan
1 Waterpass E.34 bh 0.001 200,000.00
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
AHSP.Pus Air.14

F Harga Satuan Pekerjaan per - m1 (D+E)


AHSP.Pus Air.15

Pekerjaan Galian Tanah

T.07 Pekerjaan Galian Tanah Biasa


a)
Galian tanah biasa pada saluran sedalam lebih kecil sama dengan 1 m dan membuang hasi
ketempat pembuangan dengan jarak angkut lebih kecil atau sama dengan 3 m termasuk perata
perapihan (1 m3)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Tukang gali L.02 OH 0.563 60,000.00
2 Mandor L.15 OH 0.019 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

b) Galian tanah biasa pada saluran sedalam lebih besar 1m sampai dengan 2 m dan membuang has
ketempat pembuangan dengan jarak angkut lebih kecil atau sama dengan 3 m termasuk perata
perapihan (1 m3)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Tukang gali L.02 OH 0.675 60,000.00
2 Mandor L.15 OH 0.023 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)
AHSP.Pus Air.16

c) Mengangkut hasil galian ketempat pembuangan dengan jarak angkut lebih besar 3 m sampai leb
atau sama dengan 10 m termasuk perataan dan perapihan (1 m3)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.248 50,000.00
2 Mandor L.15 OH 0.008 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

d) Mengangkut hasil galian ketempat pembuangan dengan jarak angkut lebih besar 10 m sampai leb
atau sama dengan 50 m termasuk perataan dan perapihan (1 m3)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.720 50,000.00
2 Mandor L.15 OH 0.024 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)
AHSP.Pus Air.17

e)
Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut setiap 100 m termasuk perata
perapihan (1 m3)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 1.250 50,000.00
2 Mandor L.15 OH 0.060 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

T.08 Galian Tanah Keras


a) Galian tanah keras dengan bantuan alat pemecah pada saluran sedalam lebih kecil sama dengan 1
membuang hasil galian ke tempat pembuangan dengan jarak angkut lebih kecil atau sama deng
termasuk perataan dan perapihan (1 m3)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Tukang gali L.02 OH 0.752 60,000.00
2 Mandor L.15 OH 0.025 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
1 Jack Hammer E.03 bh 0.100 135,000.00
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)
AHSP.Pus Air.18

b) Galian tanah keras dengan bantuan alat pemecah pada saluran sedalam lebih besar 1 m sampai de
m dan membuang hasil galian ketempat pembuangan dengan jarak angkut lebih kecil atau sama de
m termasuk perataan dan perapihan (1 m3)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Tukang gali L.02 OH 0.775 60,000.00
2 Mandor L.15 OH 0.070 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
1 Jack hammer E.03 bh 0.010 135,000.00
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

c) Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut lebih besar 3 m sampai leb
atau sama dengan 10 m termasuk perataan dan perapihan (1 m3)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.330 50,000.00
2 Mandor L.15 OH 0.010 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)
AHSP.Pus Air.19

d)
Mengangkut hasil galian tempat pembuangan dengan jarak angkut lebih besar 10 m sampai lebih ke
sama dengan 50 m termasuk perataan dan perapihan (1 m3)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.516 50,000.00
2 Mandor L.15 OH 0.050 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

e) Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut setiap 100 m termasuk perata
perapihan (1 m3)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 1.250 50,000.00
2 Mandor L.15 OH 0.060 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)
AHSP.Pus Air.20

T.09 Galian Tanah Berbatu


a)
Galian tanah berbatu pada saluran sedalam lebih kecil sama dengan 1 m dan membuang hasil ga
tempat pembuangan dengan jarak angkut lebih kecil atau sama dengan 3 m termasuk perata
perapihan (1 m3)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Tukang gali L.01 OH 1.351 50,000.00
2 Mandor L.15 OH 0.045 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

b) Galian tanah berbatu pada saluran sedalam lebih besar 1 m sampai dengan 2 m dan membuan
galian ke tempat pembuangan dengan jarak angkut lebih kecil atau sama dengan 3 m termasuk p
dan perapihan (1 m3)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Tukang gali L.01 OH 1.351 50,000.00
2 Mandor L.15 OH 0.045 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)
AHSP.Pus Air.21

c) Mengangkut hasil galian ketempat pembuangan dengan jarak angkut lebih besar 3 m sampai leb
atau sama dengan 10 m termasuk perataan dan perapihan (1 m3)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.330 50,000.00
2 Mandor L.15 OH 0.010 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

d) Menggangkut hasil galian ketempat pembuangan dengan jarak angkut lebih besar 10 m sampai leb
atau sama dengan 50 m termasuk perataan dan perapihan (1 m3)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.516 50,000.00
2 Mandor L.15 OH 0.050 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)
AHSP.Pus Air.22

e) Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut setiap 100 m termasuk perata
perapihan (1 m3)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 1.250 50,000.00
2 Mandor L.15 OH 0.060 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

T.10 Galian Tanah Lumpur


a) Galian tanah lumpur pada saluran sedalam lebih kecil sama dengan 1 m dan membuang hasi
ketempat pembuangan dengan jarak angkut lebih kecil atau sama dengan 3 m termasuk perata
perapihan (1 m3)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Tukang gali L.02 OH 0.833 60,000.00
2 Mandor L.15 OH 0.083 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)
AHSP.Pus Air.23

b) Galian tanah lumpur pada saluran sedalam lebih besar 1 m sampai dengan 2 m dan membuang has
ketempat pembuangan dengan jarak angkut lebih kecil atau sama dengan 3 m termasuk perata
perapihan (1 m3)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Tukang gali L.02 OH 1.083 60,000.00
2 Mandor L.15 OH 0.108 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

c) Menggangkut hasil galian ke tempat pembuangan dengan jarak angkut lebih besar 3 m sampai leb
atau sama dengan 10 m termasuk perataan dan perapihan (1 m3)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.330 50,000.00
2 Mandor L.15 OH 0.010 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15 % x D
F Harga Satuan Pekerjaan per - m3 (D+E)
AHSP.Pus Air.24

d) Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut lebih besar 10 m sampai leb
atau sama dengan 50 m termasuk perataan dan perapihan (1 m3)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.516 50,000.00
2 Mandor L.15 OH 0.050 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

e) Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut setiap 100 m termasuk perata
perapihan (1 m3)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 1.250 50,000.00
2 Mandor L.15 OH 0.060 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)
AHSP.Pus Air.25

T.11 Galian Tanah Cadas


a) Galian tanah cadas dengan bantuan alat pemecah pada saluran sedalam lebih kecil sama dengan 1
membuang hasil galian ketempat pembuangan dengan jarak angkut lebih kecil atau sama deng
termasuk perataan dan perapihan (1 m3)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Tukang gali L.02 OH 1.250 60,000.00
2 Mandor L.15 OH 0.125 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

b) Galian tanah cadas dengan bantuan alat pemecah pada saluran sedalam lebih besar 1 m sampai de
m dan membuang hasil galian ketempat pembuangan dengan jarak angkut lebih kecil atau sama de
m termasuk perataan dan perapihan (1 m3)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Tukang gali L.02 OH 1.392 60,000.00
2 Mandor L.15 OH 0.055 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

c) Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut lebih besar 3 m sampai leb
atau sama dengan 10 m termasuk perataan dan perapihan (1 m3)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
AHSP.Pus Air.26

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.330 50,000.00
2 Mandor L.15 OH 0.010 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

d) Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut lebih besar 10 m sampai leb
atau sama dengan 50 m termasuk perataan dan perapihan (1 m3)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.516 50,000.00
2 Mandor L.15 OH 0.050 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

e) Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut setiap 100 m termasuk perata
perapihan (1 m3)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 1.250 50,000.00
2 Mandor L.15 OH 0.060 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
AHSP.Pus Air.27

C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

T.12 Galian pasir untuk fondasi bangunan sedalam lebih kecil sama dengan 1 m dan membuang hasil galian ke
pembuangan dengan jarak angkut lebih kecil atau sama dengan 3 m termasuk perataan dan perapihan (1

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.663 50,000.00
2 Mandor L.15 OH 0.063 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

T.13 Peledakan batuan

Pelaksanaan peledakan batuan biasanya harus dilakukan oleh suatu badan yang berwenang atau peru
yang telah mempunyai izin resmi misalnya PT. Dahana, Tasikmalaya, Indonesia. Perhitungan biaya untuk c
sangat ditentukan oleh tingkat kekerasan atau jenis batuannya, posisi lokasi dan dimensi batuannya
keperluan harga satuan diperlukan deskripsi kondisi-kondisi tersebut yang kemudian akan dapat dihitung
satuannya dari pelaksana peledakannya

Analisa harga satuan pekerjaan timbunan tanah

T.14 Timbunan dan Pemadatan


a) Timbunan tanah (1 m3)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.330 50,000.00
2 Mandor L.15 OH 0.012 75,000.00
Jumlah Harga Tenaga Kerja
AHSP.Pus Air.28

B Bahan
Jumlah Harga Bahan
C Peralatan
1 Pemadat Timbunan (Stamper) E.04 unit/m3 0.050 15,000.00
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

b) Pemadatan tanah (1 m3)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.500 50,000.00
2 Mandor L.15 OH 0.050 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
1 Pemadat Timbunan (Stamper) E.04 Hari-sewa 0.050 15,000.00
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

c) Timbunan pasir sebagai bahan pengisi (1 m3)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.400 50,000.00
2 Mandor L.15 OH 0.040 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Pasir pasang M.08 m3 1.200 90,000.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)
AHSP.Pus Air.29

d) Pemadatan pasir sebagai bahan pengisi (1 m3)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.100 50,000.00
2 Mandor L.15 OH 0.010 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
1 Pemadat Timbunan (Stamper) E.04 Hari-sewa 0.100 15,000.00
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

A.1.2 Secara mekanisasi menggunakan alat-alat berat


Contoh ini berdasarkan Contoh Perhitungan RAB Pembuatan Saluran (Cara Mekanis) pada halaman
203 dari 339 dari Pedoman AHSP Bidang Pekerjaan Umum, edisi 20 November 2012 (edisi pertama)
Volume galian: 197.336 m3B, dengan rincian kegiatan sebagai berikut:
1. Striping Topsoil dengan 2 unit Buldozer
2. Galian Tanah dengan 6 unit Back Hoe atau Exavator
3. Pembuangan hasil galian dengan 18 unit Dumptruck

T.15 Timbunan tanah menggunakan buldozer


Timbunan dan perataan tanah dengan kapasitas produksi : 154,20 m3B/jam/unit

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Operator L.19 OH 1.000 125,000.00
2 Mekanik L.20 OH 0.500 85,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Solar non subsidi M.162 Liter 20 10,800.00
Jumlah Harga Bahan
C Peralatan
1 Buldozer E.27 Unit/jam 1.000 168,000.00
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
AHSP.Pus Air.30

E Overhead + Profit 15% x D


F Harga Satuan Pekerjaan per - jam (D+E)
Harga Satuan Pekerjaan per - m3 (F=D+E)

T.16 Galian tanah menggunakan Backhoe atau Excavator


Penggalian tanah untuk saluran dengan kapasitas produksi : 35,10 m3B/jam

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Operator L.19 OH 1.000 144,000.00
2 Mekanik L.20 OH 0.500 85,000.00
3 Penjaga malam L.23 OH 2.000 65,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Solar non subsidi M.162 Liter 15 10,800.00
Jumlah Harga Bahan
C Peralatan
1 Excavator E.28 Unit/jam 1.000 168,000.00
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - jam (D+E)
Harga Satuan Pekerjaan per - m3 (F=D+E)

T.17 Biaya operasioanal Dumptruck


Biaya operasional dumptruck untuk mengangkut material tanah dengan jarak angkut 1 km,
dengan kapasitas produksi: 61,28 m3B/jam

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Sopir L.21 OH 1.000 70,000.00
2 Kernet L.22 OH 1.000 50,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Solar non subsidi M.162 Liter 2.4 10,800.00
Jumlah Harga Bahan
C Peralatan
1 Sewa Dumptruck E.31 Unit/jam 1.000 539,000.00
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
AHSP.Pus Air.31

E Overhead + Profit 15% x D


F Harga Satuan Pekerjaan per - jam (D+E)
Harga Satuan Pekerjaan per - m3 (F=D+E)

T.18 Biaya operasional vibro roller


Pemadatan tanah timbunan dengan vibro roller dari Tabel C.7; halaman 202 dari 339 Pedoman AHSP-PU,2
dengan kapasitas produksi: 54,28 m3B/jam

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Operator L.19 OH 1.000 125,000.00
2 Mekanik L.20 OH 0.500 85,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Solar non subsidi M.162 Liter 20 10,800.00
Jumlah Harga Bahan
C Peralatan
1 Buldozer E.27 Unit/jam 1 168,000.00
Jumlah Harga Peralatan
D Jumlah Harga tenaga, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - jam (D+E)
Harga Satuan Pekerjaan per - m3 (F=D+E)
AHSP.Pus Air.32

Jumlah
(Rp)

450.00
180.00
75.00
705.00

400.00
400.00
1,105.00
165.75
1,270.75

umbuhan (1 m2)

Jumlah
(Rp)

800.00
240.00
75.00
1,115.00

71.50
71.50

640.00
640.00
1,826.50
273.98
2,100.48

g sisa tunggul kayu dan akar-


AHSP.Pus Air.33

Jumlah
(Rp)

400.00
1,440.00
75.00
1,915.00

220.00
220.00
2,135.00
320.25
2,455.25

Jumlah
(Rp)

350.00
100.00
200.00
650.00

400.00
500.00
500.00
1,150.00
172.50
1,322.50
AHSP.Pus Air.34

us (1 m')

Jumlah
(Rp)

2,500.00
3,000.00
3,500.00
375.00
9,375.00

29,350.00
20,872.50
2,500.00
52,722.50

200.00
200.00
62,297.50
9,344.63
71,642.13

n (1 m')

Jumlah
(Rp)

5,000.00
6,000.00
7,000.00
750.00
18,750.00

58,700.00
41,745.00
5,000.00
105,445.00

200.00
200.00
124,395.00
18,659.25
AHSP.Pus Air.35

143,054.25
AHSP.Pus Air.36

m dan membuang hasil galian


gan 3 m termasuk perataan dan

Jumlah
(Rp)

33,780.00
1,425.00
35,205.00

-
35,205.00
5,280.75
40,485.75

2 m dan membuang hasil galian


gan 3 m termasuk perataan dan

Jumlah
(Rp)

40,500.00
1,725.00
42,225.00

-
42,225.00
6,333.75
48,558.75
AHSP.Pus Air.37

bih besar 3 m sampai lebih kecil

Jumlah
(Rp)

12,400.00
600.00
13,000.00

-
13,000.00
1,950.00
14,950.00

bih besar 10 m sampai lebih kecil

Jumlah
(Rp)

36,000.00
1,800.00
37,800.00

-
37,800.00
5,670.00
43,470.00
AHSP.Pus Air.38

ap 100 m termasuk perataan dan

Jumlah
(Rp)

62,500.00
4,500.00
67,000.00

-
67,000.00
10,050.00
77,050.00

lebih kecil sama dengan 1 m dan


bih kecil atau sama dengan 3 m

Jumlah
(Rp)

45,120.00
1,875.00
46,995.00

13,500.00
13,500.00
60,495.00
9,074.25
69,569.25
AHSP.Pus Air.39

lebih besar 1 m sampai dengan 2


ut lebih kecil atau sama dengan 3

Jumlah
(Rp)

46,500.00
5,250.00
51,750.00

1,350.00
1,350.00
53,100.00
7,965.00
61,065.00

bih besar 3 m sampai lebih kecil

Jumlah
(Rp)

16,500.00
750.00
17,250.00

-
17,250.00
2,587.50
19,837.50
AHSP.Pus Air.40

esar 10 m sampai lebih kecil atau

Jumlah
(Rp)

25,800.00
3,750.00
29,550.00

-
29,550.00
4,432.50
33,982.50

ap 100 m termasuk perataan dan

Jumlah
(Rp)

62,500.00
4,500.00
67,000.00

-
67,000.00
10,050.00
77,050.00
AHSP.Pus Air.41

m dan membuang hasil galian ke


an 3 m termasuk perataan dan

Jumlah
(Rp)

67,550.00
3,375.00
70,925.00

-
70,925.00
10,638.75
81,563.75

engan 2 m dan membuang hasil


a dengan 3 m termasuk perataan

Jumlah
(Rp)

67,550.00
3,375.00
70,925.00

-
70,925.00
10,638.75
81,563.75
AHSP.Pus Air.42

bih besar 3 m sampai lebih kecil

Jumlah
(Rp)

16,500.00
750.00
17,250.00

-
17,250.00
2,587.50
19,837.50

bih besar 10 m sampai lebih kecil

Jumlah
(Rp)

25,800.00
3,750.00
29,550.00

-
29,550.00
4,432.50
33,982.50
AHSP.Pus Air.43

ap 100 m termasuk perataan dan

Jumlah
(Rp)

62,500.00
4,500.00
67,000.00

-
67,000.00
10,050.00
77,050.00

1 m dan membuang hasil galian


gan 3 m termasuk perataan dan

Jumlah
(Rp)

49,980.00
6,225.00
56,205.00

-
56,205.00
8,430.75
64,635.75
AHSP.Pus Air.44

n 2 m dan membuang hasil galian


gan 3 m termasuk perataan dan

Jumlah
(Rp)

64,980.00
8,100.00
73,080.00

-
73,080.00
10,962.00
84,042.00

ebih besar 3 m sampai lebih kecil

Jumlah
(Rp)

16,500.00
750.00
17,250.00

-
17,250.00
2,587.50
19,837.50
AHSP.Pus Air.45

bih besar 10 m sampai lebih kecil

Jumlah
(Rp)

25,800.00
3,750.00
29,550.00

-
29,550.00
4,432.50
33,982.50

ap 100 m termasuk perataan dan

Jumlah
(Rp)

62,500.00
4,500.00
67,000.00

-
67,000.00
10,050.00
77,050.00
AHSP.Pus Air.46

lebih kecil sama dengan 1 m dan


bih kecil atau sama dengan 3 m

Jumlah
(Rp)

75,000.00
9,375.00
84,375.00

-
84,375.00
12,656.25
97,031.25

lebih besar 1 m sampai dengan 2


ut lebih kecil atau sama dengan 3

Jumlah
(Rp)

83,520.00
4,125.00
87,645.00

-
87,645.00
13,146.75
100,791.75

bih besar 3 m sampai lebih kecil

Jumlah
(Rp)
AHSP.Pus Air.47

16,500.00
750.00
17,250.00

-
17,250.00
2,587.50
19,837.50

bih besar 10 m sampai lebih kecil

Jumlah
(Rp)

25,800.00
3,750.00
29,550.00

-
29,550.00
4,432.50
33,982.50

ap 100 m termasuk perataan dan

Jumlah
(Rp)

62,500.00
4,500.00
67,000.00

-
AHSP.Pus Air.48

-
67,000.00
10,050.00
77,050.00

membuang hasil galian ke tempat


erataan dan perapihan (1 m3)

Jumlah
(Rp)

33,150.00
4,725.00
37,875.00

-
37,875.00
5,681.25
43,556.25

ang berwenang atau perusahaan


Perhitungan biaya untuk cara ini,
i dan dimensi batuannya. Untuk
mudian akan dapat dihitung harga

Jumlah
(Rp)

16,500.00
900.00
17,400.00
AHSP.Pus Air.49

750.00
750.00
18,150.00
2,722.50
20,872.50

Jumlah
(Rp)

25,000.00
3,750.00
28,750.00

750.00
750.00
29,500.00
4,425.00
33,925.00

Jumlah
(Rp)

20,000.00
3,000.00
23,000.00

108,000.00
108,000.00

-
131,000.00
19,650.00
150,650.00
AHSP.Pus Air.50

Jumlah
(Rp)

5,000.00
750.00
5,750.00

1,500.00
1,500.00
7,250.00
1,087.50
8,337.50

ra Mekanis) pada halaman


mber 2012 (edisi pertama)

Jumlah
(Rp)

125,000.00
42,500.00
167,500.00

216,000.00
216,000.00

168,000.00
168,000.00
551,500.00
AHSP.Pus Air.51

82,725.00
634,225.00
4,113.00

Jumlah
(Rp)

144,000.00
42,500.00
130,000.00
172,500.00

162,000.00
162,000.00

168,000.00
168,000.00
502,500.00
75,375.00
577,875.00
16,463.68

Jumlah
(Rp)

70,000.00
50,000.00
120,000.00

25,920.00
25,920.00

539,000.00
539,000.00
684,920.00
AHSP.Pus Air.52

102,738.00
787,658.00
12,853.43

339 Pedoman AHSP-PU,2012

Jumlah
(Rp)

125,000.00
42,500.00
167,500.00

216,000.00
216,000.00

168,000.00
168,000.00
551,500.00
82,725.00
634,225.00
11,684.32
A.2 PEKERJAAN PASANGAN (P.xx)
P.01 Pasangan batu dengan mortar jenis PC-PP (1 m3)
a) Mortar tipe M (untuk mutu PP tertentu setara dengan campuran 1 PC:2 PP)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 2.703 50,000.00
2 Tukang batu L.04 OH 0.900 60,000.00
3 Kepala Tukang L.03 OH 0.090 70,000.00
4 Mandor L.15 OH 0.135 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Batu M.11 m3 1.200 95,000.00
2 Pasir Pasang M.08 m3 0.440 90,000.00
3 Portland Cement M.19 kg 252 1,240.00
Jumlah Harga Bahan
C Peralatan
1 Molen E.08 unit/hari 0.167 400,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

b) Mortar tipe S (untuk mutu PP tertentu setara dengan campuran 1 PC:3 PP)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 2.703 50,000.00
2 Tukang batu L.04 OH 0.900 60,000.00
3 Kepala Tukang L.03 OH 0.090 70,000.00
4 Mandor L.15 OH 0.135 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Batu M.11 m3 1.200 95,000.00
2 Pasir Pasang M.08 m3 0.485 90,000.00
3 Portland Cement M.19 kg 202 1,240.00
Jumlah Harga Bahan
C Peralatan
1 Molen E.08 unit/hari 0.167 400,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

c) Mortar tipe N (untuk mutu PP tertentu setara dengan campuran 1 PC:4 PP)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 2.703 50,000.00
2 Tukang batu L.04 OH 0.900 60,000.00
3 Kepala Tukang L.03 OH 0.090 70,000.00
4 Mandor L.15 OH 0.135 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Batu kali M.11 m3 1.200 95,000.00
2 Pasir Pasang M.08 m3 0.520 90,000.00
3 Portland Cement M.19 kg 163.000 1,240.00
Jumlah Harga Bahan
C Peralatan
1 Molen E.08 unit/hari 0.167 400,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

d) Mortar tipe O (untuk mutu PP tertentu setara dengan campuran 1 PC:5 PP)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 2.703 50,000.00
2 Tukang batu L.04 OH 0.900 60,000.00
3 Kepala Tukang L.03 OH 0.090 70,000.00
4 Mandor L.15 OH 0.135 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Batu kali M.11 m3 1.200 95,000.00
2 Pasir Pasang M.08 m3 0.544 90,000.00
3 Portland Cement M.19 kg 135.000 1,240.00
Jumlah Harga Bahan
C Peralatan
1 Molen E.08 unit/hari 0.167 400,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

P.02 Pekerjaan siaran dengan mortar jenis PC-PP (1 m2)


a) Siaran dengan mortar jenis PC-PP tipe M (untuk mutu PP tertentu setara dengan campuran 1 PC:2

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.300 50,000.00
2 Tukang batu L.04 OH 0.150 60,000.00
3 Kepala Tukang L.03 OH 0.015 70,000.00
4 Mandor L.15 OH 0.015 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Pasir Pasang M.08 m3 0.012 90,000.00
2 Portland Cement M.19 kg 6.340 1,240.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m2 (D+E)

b) Siaran dengan mortar jenis PC-PP tipe S (untuk mutu PP tertentu setara dengan campuran 1 PC:3 P

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.300 50,000.00
2 Tukang batu L.04 OH 0.150 60,000.00
3 Kepala Tukang L.03 OH 0.015 70,000.00
4 Mandor L.15 OH 0.015 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Pasir Pasang M.08 m3 0.018 90,000.00
2 Portland Cement M.19 kg 4.840 1,240.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m2 (D+E)
P.03 Pekerjaan plesteran dengan mortar jenis PC-PP (1 m2)
a) Trasraam tebal 1 cm, dengan mortar jenis PC-PP tipe M (untuk mutu PP tertentu setara dengan ca
PC:2 PP)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.300 50,000.00
2 Tukang batu L.04 OH 0.150 60,000.00
3 Kepala Tukang L.03 OH 0.015 70,000.00
4 Mandor L.15 OH 0.015 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Pasir Pasang M.08 m3 0.014 90,000.00
2 Portland Cement M.19 kg 7.240 1,240.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m2 (D+E)

b) Plesteral tebal 1 cm, dengan mortar jenis PC-PP tipe S (untuk mutu PP tertentu setara dengan ca
PC:3 PP)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.300 50,000.00
2 Tukang batu L.04 OH 0.150 60,000.00
3 Kepala Tukang L.03 OH 0.015 70,000.00
4 Mandor L.15 OH 0.015 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Pasir Pasang M.08 m3 0.016 90,000.00
2 Portland Cement M.19 kg 5.840 1,240.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m2 (D+E)
c) Plesteran tebal 1 cm, dengan mortar jenis PC-PP tipe N (untuk mutu PP tertentu setara dengan ca
PC:4 PP)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.300 50,000.00
2 Tukang batu L.04 OH 0.150 60,000.00
3 Kepala Tukang L.03 OH 0.015 70,000.00
4 Mandor L.15 OH 0.015 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Pasir Pasang M.08 m3 0.018 90,000.00
2 Portland Cement M.19 kg 4.450 1,240.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m2 (D+E)

d) Trasraam tebal 1,5 cm, dengan mortar jenis PC-PP tipe M (untuk mutu PP tertentu setara dengan
1 PC:2 PP)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.384 50,000.00
2 Tukang batu L.04 OH 0.190 60,000.00
3 Kepala Tukang L.03 OH 0.019 70,000.00
4 Mandor L.15 OH 0.019 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Pasir Pasang M.08 m3 0.020 90,000.00
2 Portland Cement M.19 kg 10.224 1,240.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m2 (D+E)

e) Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (untuk mutu PP tertentu setara dengan
1 PC:3 PP)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.384 50,000.00
2 Tukang batu L.04 OH 0.190 60,000.00
3 Kepala Tukang L.03 OH 0.019 70,000.00
4 Mandor L.15 OH 0.019 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Pasir Pasang M.08 m3 0.030 90,000.00
2 Portland Cement M.19 kg 7.776 1,240.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m2 (D+E)

f) Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe N (untuk mutu PP tertentu setara dengan c
1 PC:4 PP)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.384 50,000.00
2 Tukang batu L.04 OH 0.190 60,000.00
3 Kepala Tukang L.03 OH 0.019 70,000.00
4 Mandor L.15 OH 0.019 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Pasir Pasang M.08 m3 0.024 90,000.00
2 Portland Cement M.19 kg 6.280 1,240.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m2 (D+E)

P.04 Pasangan Batu Kosong (1 m3)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 1.000 50,000.00
2 Tukang batu L.04 OH 0.400 60,000.00
3 Kepala Tukang L.03 OH 0.040 70,000.00
4 Mandor L.15 OH 0.040 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Batu/batu belah M.11 m3 1.200 95,000.00
2 Pasir Pasang M.08 m3 0.432 90,000.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

P.05 Pasangan batu bronjong kawat


a) Bronjong kawat uk. B=1,0 m x L=3,0 m x T=0,5 m berisi batu kali/belah sesuai dengan Pd T-0
Pembuatan Bendung Bronjong dengan Sekat Semi Kedap Air pada Irigasi Desa. Kawat bronjong
heksagonal, diagonal lubang 15 cm, jenis kawat digalvanis, anyaman tiga lilitan.
1) Menggunakan kawat f 3mm

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja Penganyam L.01 OH 0.585 50,000.00
2 Tukang Penganyam L.12 OH 0.500 60,000.00
3 Kepala Tukang Penganyam L.07 OH 0.050 70,000.00
4 Pekerja Pengisi Batu L.01 OH 0.100 50,000.00
5 Mandor L.15 OH 0.015 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Batu / batu belah M.12 m3 1.800 118,250.00
2 Kawat Bronjong dia 3 mm M.115 kg 2.850 19,350.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - bh (D+E)

2) Menggunakan kawat f 4mm

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja Penganyam L.01 OH 0.675 50,000.00
2 Tukang Penganyam L.12 OH 0.600 60,000.00
3 Kepala Tukang Penganyam L.07 OH 0.060 70,000.00
4 Pekerja Pengisi Batu L.01 OH 0.100 50,000.00
5 Mandor L.15 OH 0.015 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Batu / batu belah M.12 m3 1.800 118,250.00
2 Kawat Bronjong dia 4 mm M.116 kg 7.680 19,350.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - bh (D+E)

b) Bronjong kawat uk. B=1,0 m x L=3,0 m x T=0,5 m berisi batu kali/belah, Kawat bronjong anyaman he
diagonal lubang 15 cm, jenis kawat digalvanis, anyaman tiga lilitan serta menggunakan rangka b
diameter 10 - 12 mm.

1) Menggunakan kawat f 3mm

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja Penganyam L.01 OH 0.750 50,000.00
2 Tukang Penganyam L.12 OH 0.300 60,000.00
3 Kepala Tukang Penganyam L.07 OH 0.060 70,000.00
4 Pekerja Pengisi Batu L.01 OH 0.100 50,000.00
5 Mandor L.15 OH 0.015 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Batu / batu belah M.12 m3 1.800 118,250.00
2 Kawat Bronjong dia 3 mm M.115 kg 4.320 19,350.00
3 Besi beton dia 10 mm M.91 kg 24.500 6,356.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - bh (D+E)

2) Menggunakan kawat f 4mm

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja Penganyam L.01 OH 0.850 50,000.00
2 Tukang Penganyam L.12 OH 0.300 60,000.00
3 Kepala Tukang Penganyam L.07 OH 0.060 70,000.00
4 Pekerja Pengisi Batu L.01 OH 0.100 50,000.00
5 Mandor L.15 OH 0.015 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Batu / batu belah M.12 m3 1.800 118,250.00
2 Kawat Bronjong dia 4 mm M.116 kg 7.680 19,350.00
3 Besi beton dia 12 mm M.92 kg 35.300 5,353.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - bh (D+E)

c) Bronjong kawat uk. B=1,0 m x L=3,0 m x T=0,5 m berisi batu kali/belah, Kawat bronjong anyaman he
diagonal lubang 15 cm, jenis kawat digalvanis di las satu sama lain dibuat di pabrik serta men
pengikat/penyambung dengan kawat bronjong diameter 4 mm.
1) Menggunakan kawat f 6mm

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja Penganyam L.01 OH 0.150 50,000.00
2 Tukang Penganyam L.12 OH 0.050 60,000.00
3 Kepala Tukang Penganyam L.07 OH 0.010 70,000.00
4 Pekerja Pengisi Batu L.01 OH 0.100 50,000.00
5 Mandor L.15 OH 0.010 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Batu / batu belah M.12 m3 1.800 118,250.00
2 Wiremesh utk Bronjong dia 6 mm M.117 kg 4.320 26,350.00
3 Kawat bronjong dia 4 mm M.116 kg 4.500 19,350.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - bh (D+E)

2) Menggunakan kawat f 8mm

Harga Satuan
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja Penganyam L.01 OH 0.200 50,000.00
2 Tukang Penganyam L.12 OH 0.060 60,000.00
3 Kepala Tukang Penganyam L.07 OH 0.012 70,000.00
4 Pekerja Pengisi Batu L.01 OH 0.100 50,000.00
5 Mandor L.15 OH 0.010 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Batu / batu belah M.12 m3 1.800 118,250.00
2 Wiremesh utk Bronjong dia 8 mm M.118 kg 7.680 26,350.00
3 Kawat bronjong dia 4 mm M.116 kg 7.500 19,350.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - bh (D+E)

3) Menggunakan kawat f 10mm

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja Penganyam L.01 OH 0.250 50,000.00
2 Tukang Penganyam L.12 OH 0.100 60,000.00
3 Kepala Tukang Penganyam L.07 OH 0.010 70,000.00
4 Pekerja Pengisi L.01 OH 0.100 50,000.00
5 Mandor L.15 OH 0.010 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Batu / batu belah M.12 m3 1.800 118,250.00
2 Wiremesh utk Bronjong dia 10 mm M.119 kg 11.000 26,350.00
3 Kawat bronjong dia 4 mm M.116 kg 10.000 19,350.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - bh (D+E)

d) Fondasi cerucuk untuk beronjong, HSP 1 m panjang cerucuk kayu/bambu diameter 8 cm – 10 cm


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.030 50,000.00
2 Tukang batu L.04 OH 0.010 60,000.00
3 Kepala Tukang L.03 OH 0.005 70,000.00
4 Mandor L.15 OH 0.001 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Kayu / bambu dia 8 - 10 M.63 m 1.150 5,500.00
2 Laburan meni / ter M.167 m2 0.020 7,500.00
Jumlah Harga Bahan
C Peralatan
1 Alat pancang manual M.80 Hari-sewa 0.025 11,550.00
(Tripod tinggi 5m, berat tumbuk 5kg)
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - 1 m (D+E)

e) Pemasangan modul 1 m3 bronjong kawat menjadi struktur krib

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.120 50,000.00
2 Mandor L.15 OH 0.010 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Lapisan ijuk 5 cm (hanya untuk bronjong M.79 m2 1.150 10,000.00
yang menempel dengan tanah)

Jumlah Harga Bahan


C Peralatan
1 Crane daya angkat 5 ton, panjang lengan E.42 Hari-sewa 0.01 730,000.00
15 m’
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

P.06 Pasangan batu muka (1 m2)

Harga Satuan
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.240 50,000.00
2 Tukang batu L.04 OH 0.120 60,000.00
3 Kepala Tukang L.03 OH 0.010 70,000.00
4 Mandor L.15 OH 0.012 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Batu muka M.39 m2 1.250 100,000.00
2 Pasir Pasang M.08 m3 0.025 90,000.00
3 Portland Cement M.19 kg 5.000 1,240.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m2 (D+E)

P.07 Pasangan batu candi (1 m2)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.240 50,000.00
2 Tukang batu L.04 OH 0.120 60,000.00
3 Kepala Tukang L.03 OH 0.010 70,000.00
4 Mandor L.15 OH 0.012 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Batu candi M.40 m2 1.200 140,500.00
2 Pasir Pasang M.08 m3 0.025 90,000.00
3 Portland Cement M.19 kg 5.000 1,240.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m2 (D+E)

P.08 Pemasangan Geotekstil (1 m2)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.050 50,000.00
2 Mandor L.15 OH 0.005 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Polyfelt TS 50 M.153 m2 1.050 100,000.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m2 (D+E)

Pasangan Bar Screen (saringan kasar) Bangunan Intake, Pengukur, dan Pengatur

P.09 Pasangan Bar Screen/saringan kasar (1 buah)


Saringan kasar terbuat dari besi beton sesuai dengan kebutuhan, misalnya menggunakan besi beton diame
berjarak as ke as satu sama lain 3,5 cm dihitung dalam m2, AHSP-nya sebagai berikut:

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.750 50,000.00
2 Tukang batu L.04 OH 0.300 60,000.00
3 Kepala Tukang batu L.03 OH 0.060 70,000.00
4 Mandor L.15 OH 0.015 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Besi beton dia 12 mm M.92 m 30.000 5,353.00
2 Baja profil L.40.40.4 M.96 m 4.000 16,667.75
Jumlah Harga Bahan
C Peralatan
1 Alat las listrik atau las diesel E.44 Hari-sewa 0.150 235,000.00
2 Bor listrik E.38 Hari-sewa 0.020 20,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - buah (D+E)

P.10 Pasangan I buah ambang ukur pada bangunan pengukur dan/atau pengatur

Bangunan pengukur dapat terbuat dari beton atau pasangan batu kali diplester/batu muka yang dilengkap
ukur. Ada berbagai tipe ambang ukur yaitu diantaranya tipe Rechbox, Cipolleti dan V-note. Ambang ukur d
baja profil L.40.40.4 dan pemasangannya pakai dynabolt atau raamset setiap 20 cm. Masing-masing ti
dengan bentuk bangunannya, maka AHSP ambang ukur dapat dihitung sebagai berikut
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.250 50,000.00
2 Tukang batu L.04 OH 0.150 60,000.00
3 Kepala Tukang batu L.03 OH 0.060 70,000.00
4 Mandor L.15 OH 0.010 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Dynabolt / raamset dia 8 mm M.125 bh 5.000 5,000.00
panjamg 4 - 5 cm
2 Baja profil L.40.40.4 M.96 m 4.000 16,667.75
Jumlah Harga Bahan
C Peralatan
1 Alat las listrik atau las diesel E.44 Hari-sewa 0.050 235,000.00
2 Bor listrik E.38 Hari-sewa 0.060 20,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - buah (D+E)

P.11 Buis beton diangkut < 30 m dan dipasang untuk konstruksi pengaman pantai (1 buah)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.200 50,000.00
2 Mandor L.15 OH 0.010 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - buah (D+E)

P.12 Pengecoran 1 buah buis beton diameter 1 m' dengan campuran beton f'c= 7,4MPa(K-100)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 OH 1.150 50,000.00
2 Tukang batu L.04 OH 0.200 60,000.00
3 Kepala tukang L.03 OH 0.020 70,000.00
4 Mandor L.15 OH 0.060 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 PC / Portland Cement M.19 kg 247.000 1,240.00
2 PB / Pasir Beton M.09 kg 869.000 100.00
3 Kr / Krikil M.18 kg 999.000 103.70
4 Air M.01 ltr 215.000 3.08
Jumlah Harga Bahan
C Peralatan
1 Molen E.08 Hari-sewa 0.200 400,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - buah (D+E)
Jumlah
(Rp)

135,150.00
54,000.00
6,300.00
10,125.00
205,575.00

114,000.00
39,600.00
312,480.00
466,080.00

66,800.00
66,800.00
738,455.00
110,768.25
849,223.25

Jumlah
(Rp)

135,150.00
54,000.00
6,300.00
10,125.00
205,575.00

114,000.00
43,650.00
250,480.00
408,130.00

66,800.00
66,800.00
680,505.00
102,075.75
782,580.75

Jumlah
(Rp)

135,150.00
54,000.00
6,300.00
10,125.00
205,575.00

114,000.00
46,800.00
202,120.00
362,920.00

66,800.00
66,800.00
635,295.00
95,294.25
730,589.25

Jumlah
(Rp)

135,150.00
54,000.00
6,300.00
10,125.00
205,575.00

114,000.00
48,960.00
167,400.00
330,360.00

66,800.00
66,800.00
602,735.00
90,410.25
693,145.25

an campuran 1 PC:2 PP)

Jumlah
(Rp)

15,000.00
9,000.00
1,050.00
1,125.00
26,175.00

1,080.00
7,861.60
8,941.60

-
35,116.60
5,267.49
40,384.09
#REF!
n campuran 1 PC:3 PP)

Jumlah
(Rp)

15,000.00
9,000.00
1,050.00
1,125.00
26,175.00

1,620.00
6,001.60
7,621.60

-
33,796.60
5,069.49
38,866.09
ntu setara dengan campuran 1

Jumlah
(Rp)

15,000.00
9,000.00
1,050.00
1,125.00
26,175.00

1,260.00
8,977.60
10,237.60

-
36,412.60
5,461.89
41,874.49

ntu setara dengan campuran 1

Jumlah
(Rp)

15,000.00
9,000.00
1,050.00
1,125.00
26,175.00

1,440.00
7,241.60
8,681.60

-
34,856.60
5,228.49
40,085.09
ntu setara dengan campuran 1

Jumlah
(Rp)

15,000.00
9,000.00
1,050.00
1,125.00
26,175.00

1,620.00
5,518.00
7,138.00

-
33,313.00
4,996.95
38,309.95

tentu setara dengan campuran

Jumlah
(Rp)

19,200.00
11,400.00
1,330.00
1,425.00
33,355.00

1,800.00
12,677.76
14,477.76

-
47,832.76
7,174.91
55,007.67

tentu setara dengan campuran


Jumlah
(Rp)

19,200.00
11,400.00
1,330.00
1,425.00
33,355.00

2,700.00
9,642.24
12,342.24

-
45,697.24
6,854.59
52,551.83

entu setara dengan campuran

Jumlah
(Rp)

19,200.00
11,400.00
1,330.00
1,425.00
33,355.00

2,160.00
7,787.20
9,947.20

-
43,302.20
6,495.33
49,797.53

Jumlah
(Rp)
7

50,000.00
24,000.00
2,800.00
3,000.00
79,800.00

114,000.00
38,880.00
152,880.00

-
232,680.00
34,902.00
267,582.00

suai dengan Pd T-04-2004-A,


sa. Kawat bronjong anyaman

Jumlah
(Rp)

29,250.00
30,000.00
3,500.00
5,000.00
1,125.00
68,875.00 #REF!

212,850.00
55,147.50
267,997.50

-
336,872.50
50,530.88
387,403.38

Jumlah
(Rp)
7

33,750.00
36,000.00
4,200.00
5,000.00
1,125.00
80,075.00

212,850.00
148,608.00
361,458.00

-
441,533.00
66,229.95
507,762.95

ronjong anyaman heksagonal,


nggunakan rangka besi beton

Jumlah
(Rp)

37,500.00
18,000.00
4,200.00
5,000.00
1,125.00
65,825.00

212,850.00
83,592.00
155,722.00
452,164.00

-
517,989.00
77,698.35
595,687.35

Jumlah
(Rp)
7

42,500.00
18,000.00
4,200.00
5,000.00
1,125.00
70,825.00

212,850.00
148,608.00
188,960.90
550,418.90

-
621,243.90
93,186.59
714,430.49

ronjong anyaman heksagonal,


di pabrik serta menggunakan

Jumlah
(Rp)

7,500.00
3,000.00
700.00
5,000.00
750.00
16,950.00

212,850.00
113,832.00
87,075.00
413,757.00

-
430,707.00
64,606.05
495,313.05

Jumlah
Jumlah
(Rp)

10,000.00
3,600.00
840.00
5,000.00
750.00
20,190.00

212,850.00
202,368.00
145,125.00
560,343.00

-
580,533.00
87,079.95
667,612.95

Jumlah
(Rp)

12,500.00
6,000.00
700.00
5,000.00
750.00
24,950.00

212,850.00
289,850.00
193,500.00
696,200.00

-
721,150.00
108,172.50
829,322.50

er 8 cm – 10 cm
Jumlah
(Rp)

1,500.00
600.00
350.00
75.00
2,525.00

6,325.00
150.00
6,475.00

288.75

288.75
9,288.75
1,393.31
10,682.06

Jumlah
(Rp)

6,000.00
750.00
6,750.00

11,500.00

11,500.00

7,300.00

7,300.00
25,550.00
3,832.50
29,382.50

Jumlah
Jumlah
(Rp)

12,000.00
7,200.00
700.00
900.00
20,800.00

125,000.00
2,250.00
6,200.00
133,450.00

-
154,250.00
23,137.50
177,387.50

Jumlah
(Rp)

12,000.00
7,200.00
700.00
900.00
20,800.00

168,600.00
2,250.00
6,200.00
177,050.00

-
197,850.00
29,677.50
227,527.50

Jumlah
(Rp)
7

2,500.00
375.00
2,875.00

105,000.00
105,000.00

-
107,875.00
16,181.25
124,056.25

an besi beton diameter 12 mm

Jumlah
(Rp)

37,500.00
18,000.00
4,200.00
1,125.00
60,825.00

160,590.00
66,671.00
227,261.00

35,250.00
400.00
35,650.00
323,736.00
48,560.40
372,296.40

muka yang dilengkapi ambang


note. Ambang ukur dibuat dari
m. Masing-masing tipe sesuai
t
Jumlah
(Rp)

12,500.00
9,000.00
4,200.00
750.00
26,450.00

25,000.00

66,671.00
91,671.00

11,750.00
1,200.00
12,950.00
131,071.00
19,660.65
150,731.65

uah)

Jumlah
(Rp)

10,000.00
750.00
10,750.00

-
10,750.00
1,612.50
12,362.50

00)

Jumlah
(Rp)

7
57,500.00
12,000.00
1,400.00
4,500.00
75,400.00

306,280.00
86,900.00
103,600.00
661.13
497,441.13

80,000.00
80,000.00
652,841.13
97,926.17
750,767.29
AHSP.Pus Air.83

A.3 PEKERJAAN BETON (B.xx)


A.3.1 Koefisien untuk analisis harga satuan pekerjaan pembuatan beton
B.01 1 m3 beton untuk lantai kerja (bedding)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 OH 1.320 50,000.00
2 Tukang batu L.04 OH 0.250 60,000.00
3 Kepala tukang batu L.03 OH 0.020 70,000.00
4 Mandor L.15 OH 0.060 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 PC / Portland Cement M.19 kg 247.000 1,240.00
2 PB / Pasir Beton M.09 kg 869.000 100.00
3 Kr / Krikil M.18 kg 999.000 103.70
4 Air M.01 L 215.000 3.08
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

B.02 1 m3 beton mutu, f’c = 7,4 MPa (K100), slump (12±2) cm, w/c = 0,87
a) Manual

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 1.650 50,000.00
2 Tukang batu L.04 OH 0.275 60,000.00
3 Kepala tukang L.03 OH 0.028 70,000.00
4 Mandor L.15 OH 0.083 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 PC / Portland Cement M.19 kg 247.000 1,240.00
2 PB / Pasir Beton M.09 kg 869.000 100.00
3 Kr / Krikil M.18 kg 999.000 103.70
4 Air M.01 L 215.000 3.08
Jumlah Harga Bahan
C Peralatan
AHSP.Pus Air.84

Jumlah Harga Peralatan


D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

b) Menggunakan Molen

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 1.320 50,000.00
2 Tukang batu L.04 OH 0.250 60,000.00
3 Kepala tukang L.03 OH 0.020 70,000.00
4 Mandor L.15 OH 0.060 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 PC / Portland Cement M.19 kg 247.000 1,240.00
2 PB / Pasir Beton M.09 kg 869.000 100.00
3 Kr / Krikil M.18 kg 999.000 103.70
4 Air M.01 L 215.000 3.08
Jumlah Harga Bahan
C Peralatan
1 Molen 0,35 m3 E.08 Hari-sewa 0.200 400,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

B.03 1 m3 beton mutu, f’c = 9,8 MPa (K125), slump (12±2) cm, w/c = 0,78
a) Manual

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 1.650 50,000.00
2 Tukang batu L.04 OH 0.275 60,000.00
3 Kepala tukang L.03 OH 0.028 70,000.00
4 Mandor L.15 OH 0.083 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
AHSP.Pus Air.85

1 PC / Portland Cement M.19 kg 276.000 1,240.00


2 PB / Pasir Beton M.09 kg 828.000 100.00
3 Kr / Krikil M.18 kg 1012.000 103.70
4 Air M.01 L 215.000 3.08
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

b) Menggunakan Molen

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 1.320 50,000.00
2 Tukang batu L.04 OH 0.250 60,000.00
3 Kepala tukang L.03 OH 0.020 70,000.00
4 Mandor L.15 OH 0.060 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 PC / Portland Cement M.19 kg 276.000 1,240.00
2 PB / Pasir Beton M.09 kg 828.000 100.00
3 Kr / Krikil M.18 kg 1012.000 103.70
4 Air M.01 L 215.000 3.08
Jumlah Harga Bahan
C Peralatan
1 Molen E.08 Hari-sewa 0.200 400,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

B.04 1 m3 beton mutu f’c = 12,2 MPa (K150), slump (12±2) cm, w/c = 0,72
a) Manual

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
AHSP.Pus Air.86

1 Pekerja L.01 OH 1.650 50,000.00


2 Tukang batu L.04 OH 0.275 60,000.00
3 Kepala tukang L.03 OH 0.028 70,000.00
4 Mandor L.15 OH 0.083 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 PC / Portland Cement M.19 kg 299.000 1,240.00
2 PB / Pasir Beton M.09 kg 799.000 100.00
3 Kr / Krikil M.18 kg 1017.000 103.70
4 Air M.01 L 215.000 3.08
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

b) Menggunakan Molen

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 1.320 50,000.00
2 Tukang batu L.04 OH 0.250 60,000.00
3 Kepala tukang L.03 OH 0.020 70,000.00
4 Mandor L.15 OH 0.060 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 PC / Portland Cement M.19 kg 299.000 1,240.00
2 PB / Pasir Beton M.09 kg 799.000 100.00
3 Kr / Krikil M.18 kg 1017.000 103.70
4 Air M.01 L 215.000 3.08
Jumlah Harga Bahan
C Peralatan
1 Molen E.08 Hari-sewa 0.200 400,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

B.05 1 m3 beton mutu, f’c = 14,5 MPa (K175), slump (12±2) cm, w/c = 0,66
a) Manual
AHSP.Pus Air.87
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 1.650 50,000.00
2 Tukang batu L.04 OH 0.275 60,000.00
3 Kepala tukang L.03 OH 0.028 70,000.00
4 Mandor L.15 OH 0.083 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 PC / Portland Cement M.19 kg 326.000 1,240.00
2 PB / Pasir Beton M.09 kg 760.000 100.00
3 Kr / Krikil M.18 kg 1029.000 103.70
4 Air M.01 L 215.000 3.08
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

b) Menggunakan molen

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 1.320 50,000.00
2 Tukang batu L.04 OH 0.250 60,000.00
3 Kepala tukang L.03 OH 0.020 70,000.00
4 Mandor L.15 OH 0.060 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 PC / Portland Cement M.19 kg 326.000 1,240.00
2 PB / Pasir Beton M.09 kg 760.000 100.00
3 Kr / Krikil M.18 kg 1029.000 103.70
4 Air M.01 L 215.000 3.08
Jumlah Harga Bahan
C Peralatan
1 Molen E.08 Hari-sewa 0.200 400,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)
AHSP.Pus Air.88

c) Menggunakan R+P

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 1.000 50,000.00
2 Tukang batu L.04 OH 0.138 60,000.00
3 Kepala tukang L.03 OH 0.018 70,000.00
4 Mandor L.15 OH 0.050 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Campuran Beton Ready Mixed M.20 m3 1.000 710,000.00

Jumlah Harga Bahan


C Peralatan
1 Pompa dan conveyor beton E.36 Hari-sewa 0.120 200,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

B.06 1 m3 beton mutu, f’c = 16,9 MPa (K200), slump (12±2) cm, w/c = 0,61
a) Manual

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 1.650 50,000.00
2 Tukang batu L.04 OH 0.275 60,000.00
3 Kepala tukang L.03 OH 0.028 70,000.00
4 Mandor L.15 OH 0.083 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 PC / Portland Cement M.19 kg 352.000 1,240.00
2 PB / Pasir Beton M.09 kg 731.000 100.00
3 Kr / Krikil M.18 kg 1031.000 103.70
4 Air M.01 L 215.000 3.08
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
AHSP.Pus Air.89

D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

b) Menggunakan Molen

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 1.320 50,000.00
2 Tukang batu L.04 OH 0.250 60,000.00
3 Kepala tukang L.03 OH 0.020 70,000.00
4 Mandor L.15 OH 0.060 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 PC / Portland Cement M.19 kg 352.000 1,240.00
2 PB / Pasir Beton M.09 kg 731.000 100.00
3 Kr / Krikil M.18 kg 1031.000 103.70
4 Air M.01 L 215.000 3.08
Jumlah Harga Bahan
C Peralatan
1 Molen E.08 Hari-sewa 0.200 400,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

c) Menggunakan R+P

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 1.000 50,000.00
2 Tukang batu L.04 OH 0.138 60,000.00
3 Kepala tukang L.03 OH 0.018 70,000.00
4 Mandor L.15 OH 0.050 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Campuran Beton Ready Mixed M.21 m3 1.000 730,000.00
Jumlah Harga Bahan
C Peralatan
1 Pompa dan conveyor beton E.36 Hari-sewa 0.120 200,000.00
AHSP.Pus Air.90

Jumlah Harga Peralatan


D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)
Catatan : Bobot isi PB = 1.4 ton/m3, Bobot isi Kr = 1.35 ton/m3

B.07 1 m3 beton mutu, f’c = 19,3 MPa (K225), slump (12±2) cm, w/c = 0,58
a) Manual

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 1.650 50,000.00
2 Tukang batu L.04 OH 0.275 60,000.00
3 Kepala tukang L.03 OH 0.028 70,000.00
4 Mandor L.15 OH 0.083 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 PC / Portland Cement M.19 kg 371.000 1,240.00
2 PB / Pasir Beton M.09 kg 698.000 100.00
3 Kr / Krikil M.18 kg 1047.000 103.70
4 Air M.01 L 215.000 3.08
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

b) Menggunakan Molen

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 1.320 50,000.00
2 Tukang batu L.04 OH 0.250 60,000.00
3 Kepala tukang L.03 OH 0.020 70,000.00
4 Mandor L.15 OH 0.060 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 PC / Portland Cement M.19 kg 371.000 1,240.00
2 PB / Pasir Beton M.09 kg 698.000 100.00
AHSP.Pus Air.91

3 Kr / Krikil M.18 kg 1047.000 103.70


4 Air M.01 L 215.000 3.08
Jumlah Harga Bahan
C Peralatan
1 Molen E.08 Hari-sewa 0.200 400,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)
Catatan : Bobot isi PB = 1.4 ton/m3, Bobot isi Kr = 1.35 ton/m3

c) Menggunakan R+P

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 1.000 50,000.00
2 Tukang batu L.04 OH 0.138 60,000.00
3 Kepala tukang L.03 OH 0.018 70,000.00
4 Mandor L.15 OH 0.050 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Campuran Beton Ready Mixed M.22 m3 1.000 750,000.00
Jumlah Harga Bahan
C Peralatan
1 Pompa Beton E.36 Hari-sewa 0.120 200,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

B.08 1 m3 beton mutu, f’c = 21,7 MPa (K250), slump (12±2) cm, w/c = 0,56
a) Manual

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 1.650 50,000.00
2 Tukang batu L.04 OH 0.275 60,000.00
3 Kepala tukang L.03 OH 0.028 70,000.00
4 Mandor L.15 OH 0.083 75,000.00
Jumlah Harga Tenaga Kerja
AHSP.Pus Air.92

B Bahan
1 PC / Portland Cement M.19 kg 384.000 1,240.00
2 PB / Pasir Beton M.09 kg 692.000 100.00
3 Kr / Krikil M.18 kg 1039.000 103.70
4 Air M.01 L 215.000 3.08
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

b) Menggunakan Molen

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 1.320 50,000.00
2 Tukang batu L.04 OH 0.250 60,000.00
3 Kepala tukang L.03 OH 0.020 70,000.00
4 Mandor L.15 OH 0.060 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 PC / Portland Cement M.19 kg 384.000 1,240.00
2 PB / Pasir Beton M.09 kg 692.000 100.00
3 Kr / Krikil M.18 kg 1039.000 103.70
4 Air M.01 L 215.000 3.08
Jumlah Harga Bahan
C Peralatan
1 Molen E.08 Hari-sewa 0.200 400,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

c) Menggunakan R+P

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 1.000 50,000.00
2 Tukang batu L.04 OH 0.138 60,000.00
AHSP.Pus Air.93

3 Kepala tukang L.03 OH 0.018 70,000.00


4 Mandor L.15 OH 0.050 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Campuran Beton Ready Mixed M.23 m3 1.000 765,000.00
Jumlah Harga Bahan
C Peralatan
1 Pompa Beton E.36 Hari-sewa 0.120 200,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

B.09 1 m3 beton mutu, f’c = 24,0 MPa (K275), slump (12±2) cm, w/c = 0,53
a) Manual

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 1.650 50,000.00
2 Tukang batu L.04 OH 0.275 60,000.00
3 Kepala tukang L.03 OH 0.028 70,000.00
4 Mandor L.15 OH 0.083 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 PC / Portland Cement M.19 kg 406.000 1,240.00
2 PB / Pasir Beton M.09 kg 684.000 100.00
3 Kr / Krikil M.18 kg 1026.000 103.70
4 Air M.01 L 215.000 3.08
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

b) Menggunakan Molen

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 1.320 50,000.00
AHSP.Pus Air.94

2 Tukang batu L.04 OH 0.250 60,000.00


3 Kepala tukang L.03 OH 0.020 70,000.00
4 Mandor L.15 OH 0.060 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 PC / Portland Cement M.19 kg 406.000 1,240.00
2 PB / Pasir Beton M.09 kg 684.000 100.00
3 Kr / Krikil M.18 kg 1026.000 103.70
4 Air M.01 L 215.000 3.08
Jumlah Harga Bahan
C Peralatan
1 Molen E.08 Hari-sewa 0.200 400,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

c) Menggunakan R+P

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 1.000 50,000.00
2 Tukang batu L.04 OH 0.138 60,000.00
3 Kepala tukang L.03 OH 0.018 70,000.00
4 Mandor L.15 OH 0.050 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Campuran Beton Ready Mixed M.24 m3 1.000 775,000.00
Jumlah Harga Bahan
C Peralatan
1 Pompa dan conveyor beton E.36 Hari-sewa 0.120 200,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

B.10 1 m3 beton mutu, f’c = 26,4 MPa (K300), slump (12±2) cm, w/c = 0,52
a) Manual

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6
AHSP.Pus Air.95

A Tenaga Kerja
1 Pekerja L.01 OH 1.650 50,000.00
2 Tukang batu L.04 OH 0.275 60,000.00
3 Kepala tukang L.03 OH 0.028 70,000.00
4 Mandor L.15 OH 0.083 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 PC / Portland Cement M.19 kg 413.000 1,240.00
2 PB / Pasir Beton M.09 kg 681.000 100.00
3 Kr / Krikil M.18 kg 1021.000 103.70
4 Air M.01 L 215.000 3.08
5 Bahan aditif L 1.200 30,000.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m (D+E)
3

b) Menggunakan Molen

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 1.320 50,000.00
2 Tukang batu L.04 OH 0.250 60,000.00
3 Kepala tukang L.03 OH 0.020 70,000.00
4 Mandor L.15 OH 0.060 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 PC / Portland Cement M.19 kg 413.000 1,240.00
2 PB / Pasir Beton M.09 kg 681.000 100.00
3 Kr / Krikil M.18 kg 1021.000 103.70
4 Air M.01 L 215.000 3.08
5 Bahan aditif L 1.200 30,000.00
Jumlah Harga Bahan
C Peralatan
1 Molen E.08 Hari-sewa 0.200 400,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m (D+E)
3

c) Menggunakan R+P
AHSP.Pus Air.96

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 1.000 50,000.00
2 Tukang batu L.04 OH 0.138 60,000.00
3 Kepala tukang L.03 OH 0.018 70,000.00
4 Mandor L.15 OH 0.050 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Campuran Beton Ready Mixed M.25 m3 1.000 800,000.00
Jumlah Harga Bahan
C Peralatan
1 Pompa dan conveyor beton E.36 Hari-sewa 0.120 200,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

B.11 1 m3 beton mutu, f’c = 28,8 MPa, (K325), slump (12±2) cm, w/c = 0,49
a) Manual

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 2.100 50,000.00
2 Tukang batu L.04 OH 0.350 60,000.00
3 Kepala tukang L.03 OH 0.035 70,000.00
4 Mandor L.15 OH 0.105 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 PC / Portland Cement M.19 kg 439.000 1,240.00
2 PB / Pasir Beton M.09 kg 670.000 100.00
3 Kr / Krikil M.18 kg 1006.000 103.70
4 Air M.01 L 215.000 3.08
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)
AHSP.Pus Air.97

b) Menggunakan Molen

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 1.680 50,000.00
2 Tukang batu L.04 OH 0.263 60,000.00
3 Kepala tukang L.03 OH 0.025 70,000.00
4 Mandor L.15 OH 0.074 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 PC / Portland Cement M.19 kg 439.000 1,240.00
2 PB / Pasir Beton M.09 kg 670.000 100.00
3 Kr / Krikil M.18 kg 1006.000 103.70
4 Air M.01 L 215.000 3.08
Jumlah Harga Bahan
C Peralatan
1 Molen E.08 Hari-sewa 0.200 400,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

c) Menggunakan R+P

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 1.260 50,000.00
2 Tukang batu L.04 OH 0.175 60,000.00
3 Kepala tukang L.03 OH 0.021 70,000.00
4 Mandor L.15 OH 0.063 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Campuran Beton Ready Mixed M.26 m3 1.000 817,500.00
Jumlah Harga Bahan
C Peralatan
1 Pompa dan conveyor beton E.36 Hari-sewa 0.120 200,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)
AHSP.Pus Air.98

B.12 1 m3 beton mutu, f’c = 31,2 MPa, (K350), slump (12±2) cm, w/c = 0,48
a) Manual

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 2.100 50,000.00
2 Tukang batu L.04 OH 0.350 60,000.00
3 Kepala tukang L.03 OH 0.035 70,000.00
4 Mandor L.15 OH 0.105 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 PC / Portland Cement M.19 kg 448.000 1,240.00
2 PB / Pasir Beton M.09 kg 667.000 100.00
3 Kr / Krikil M.18 kg 1000.000 103.70
4 Air M.01 L 215.000 3.08
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

b) Menggunakan Molen

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 1.680 50,000.00
2 Tukang batu L.04 OH 0.263 60,000.00
3 Kepala tukang L.03 OH 0.025 70,000.00
4 Mandor L.15 OH 0.074 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 PC / Portland Cement M.19 kg 1.000 1,240.00
2 PB / Pasir Beton M.09 kg 667.000 100.00
3 Kr / Krikil M.18 kg 1000.000 103.70
4 Air M.01 L 215.000 3.08
Jumlah Harga Bahan
C Peralatan
AHSP.Pus Air.99

1 Molen E.08 Hari-sewa 0.200 400,000.00


Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

c) Menggunakan R+P

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 1.260 50,000.00
2 Tukang batu L.04 OH 0.175 60,000.00
3 Kepala tukang L.03 OH 0.021 70,000.00
4 Mandor L.15 OH 0.063 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Campuran Beton Ready Mixed M.27 m3 1.000 834,000.00
Jumlah Harga Bahan
C Peralatan
1 Pompa dan conveyor beton E.36 Hari-sewa 0.120 200,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

A.3.2 Penambahan koefisien Tenaga Kerja dan Peralatan untuk mengangkut/menaikan campuran beton
kenaikan vertikal 4 m dan jarak horizontal setiap 25 m ke tapak pemasangan

B.13 1 m3 beton dicorkan pada tapak berjarak < 25 m dengan ketinggian/kedalaman < 1 m
a) Tenaga Kerja Manual

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.410 50,000.00
2 Mandor L.15 OH 0.020 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
AHSP.Pus Air.100

D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

b) Vibrator

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.250 50,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
1 Vibrator E.10 Hari-sewa 0.100 134,750.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

c) Tenaga Kerja manual + Vibrator

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.500 50,000.00
2 Mandor L.15 OH 0.025 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
1 Vibrator E.10 Hari-sewa 0.100 134,750.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

B.14 1 m3 beton dicorkan pada tapak berjarak setiap tamBahan jarak 25 m (horizontal)
a) Tenaga Kerja manual, maka upah kerja angkut dan cor, diperlukan:

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
AHSP.Pus Air.101

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.500 50,000.00
2 Mandor L.15 OH 0.025 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

b) Menggunakan Peralatan pompa beton:

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.200 50,000.00
2 Mandor L.15 OH 0.010 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
1 Pompa dan Conveyor beton E.36 Hari-sewa 0.120 200,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

B.15 1 m3 beton dicorkan pada tapak setiap kenaikan 3 m - 4 m (vertikal)


a) Tenaga Kerja manual, maka upah kerja angkut dan cor, diperlukan:

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.250 50,000.00
2 Mandor L.15 OH 0.010 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
AHSP.Pus Air.102

C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

b) Menggunakan perlatan pompa beton:

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.200 50,000.00
2 Mandor L.15 OH 0.010 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
1 Pompa dan conveyor beton E.36 Hari-sewa 0.120 200,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

A.3.3 Koefisien untuk analisa harga satuan pekerjaan pembesian beton


B.17 Pembesian 100 kg dengan besi polos atau ulir

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.700 50,000.00
2 Tukang besi L.08 OH 0.700 60,000.00
3 Kepala tukang L.07 OH 0.070 70,000.00
4 Mandor L.15 OH 0.040 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Besi Beton (polos/ulir) M.90 kg 105.000 10,000.00
2 Kawat Ikat M.98 kg 1.500 15,000.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
AHSP.Pus Air.103

F Harga Satuan Pekerjaan per - 100kg (D+E)

B.18 Pembesian 100 kg jaring kawat (wire mesh)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.250 50,000.00
2 Tukang besi L.08 OH 0.250 60,000.00
3 Kepala tukang L.07 OH 0.020 70,000.00
4 Mandor L.15 OH 0.010 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Wiremesh M.120 kg 102.000 24,750.00
2 Kawat Ikat M.98 kg 0.500 15,000.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - 100kg (D+E)

B.19 Penambahan koefisien Tenaga Kerja dan Peralatan untuk mengangkut/menaikkan 100 kg tulangan
kenaikan vertikal 4m atau jarak horizontal setiap 25 m ke tapak pemasangan
a) Manual (kenaikan 4m)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.300 50,000.00
2 Tukang besi L.08 OH 0.100 60,000.00
3 Mandor L.15 OH 0.020 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan

Jumlah Harga Bahan


C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - 100kg (D+E)
Catatan : * termasuk operator dan Bahan bakar
AHSP.Pus Air.104

b) Mekanis (penambahan jarak horizontal 10m s.d 25m)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.200 50,000.00
2 Tukang besi L.08 OH 0.040 60,000.00
3 Mandor L.15 OH 0.020 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan

Jumlah Harga Bahan


C Peralatan
1 Crane* E.43 Hari-sewa 0.025 935000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - 100kg (D+E)
Catatan : * termasuk operator dan Bahan bakar

c) Mekanis (penambahan jarak horizontal 25m)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.300 50,000.00
2 Tukang besi L.08 OH 0.100 60,000.00
3 Mandor L.15 OH 0.020 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan

Jumlah Harga Bahan


C Peralatan
1 Crane* E.43 Hari-sewa 0.025 935,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - 100kg (D+E)
Catatan : * termasuk operator dan Bahan bakar

d) Mekanis (kenaikan setiap 4m)


AHSP.Pus Air.105

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.300 50,000.00
2 Tukang besi L.08 OH 0.100 60,000.00
3 Mandor L.15 OH 0.020 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan

Jumlah Harga Bahan


C Peralatan
1 Lift* E.57 Hari-sewa 0.025 2,382,800.0
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - 100kg (D+E)
Catatan : * termasuk operator dan Bahan bakar

B.20 Pembesian 100 kg kabel prestressed polos/strand

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.500 50,000.00
2 Tukang besi L.08 OH 0.500 60,000.00
3 Kepala Tukang besi L.07 OH 0.050 70,000.00
4 Mandor L.15 OH 0.030 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Kabel prestres M.94 kg 105.0 36,500.00
2 Besi beton M.90 kg 12.5 10,000.00
3 Kawat beton M.98 kg 1.0 15,000.00
Jumlah Harga Bahan
C Peralatan
1 Jack Tension/stressing E.35 Hari-sewa 0.150 135,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - 100kg (D+E)

A.3.4 Koefisien untuk analisa harga satuan pekerjaan pembuatan/penyediaan bekisting beton
AHSP.Pus Air.106

B.21 1 m2 Bekisting untuk permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.200 50,000.00
2 Tukang kayu L.06 OH 0.500 60,000.00
3 Kepala tukang L.05 OH 0.050 70,000.00
4 Mandor L.15 OH 0.010 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Multiflex 18 mm M.73 lbr 0.350 135,000.00
2 Kaso 5/7 cm M.58 m3 0.020 5,870,000.00
3 Paku 5 cm dan 7 cm M.100 kg 0.250 12,500.00
4 Minyak bekisting M.165 L 0.200 4,500.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m (D+E)
2

CATATAN: *Dapat digunakan lebih dari 1 (satu) kali misal 2 kali maka koefisien menjadi 0,20 (Mult

B.22 1 m2 Bekisting untuk permukaan beton biasa dengan papan ukuran 3/20 cm (tanpa perancah)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.660 50,000.00
2 Tukang kayu L.06 OH 0.330 60,000.00
3 Kepala tukang L.05 OH 0.033 70,000.00
4 Mandor L.15 OH 0.033 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Papan 3/20 cm kayu kelas II M.52 m3 0.040 7,048,250.00
2 Kaso 5/7 cm M.58 m3 0.020 5,870,000.00
3 Paku 5 cm dan 7 cm M.100 kg 0.400 12,500.00
4 Minyak bekisting M.165 L 0.200 4,500.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
AHSP.Pus Air.107

E Overhead + Profit 15% x D


F Harga Satuan Pekerjaan per - m2 (D+E)
CATATAN: *Dapat digunakan lebih dari 1 (satu) kali misal 2 kali maka koefisien menjadi 0,025 (pap

B.23 1 m2 bekisting untuk permukaan beton expose dengan multiflex 12 mm atau 18 mm - kaso 5/7 cm

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.250 50,000.00
2 Tukang kayu L.06 OH 0.600 60,000.00
3 Kepala tukang L.05 OH 0.060 70,000.00
4 Mandor L.15 OH 0.010 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Multiflex 18 mm M.73 lbr 0.350 135,000.00
2 Kaso 5/7 cm M.58 m3 0.020 5,870,000.00
3 Paku 5 cm dan 7 cm M.100 kg 0.350 12,500.00
4 Minyak bekisting M.165 L 1.600 4,500.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m2 (D+E)
CATATAN: *Dapat digunakan lebih dari 1 (satu) kali misal 2 kali maka koefisien menjadi 0,20 (Mult

B.24 1 m2 perancah bekisting kaso 5/7 cm tinggi 4 m*

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.250 50,000.00
2 Tukang kayu L.06 OH 0.600 60,000.00
3 Kepala tukang L.05 OH 0.060 70,000.00
4 Mandor L.15 OH 0.012 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Kaso 5/7 cm M.58 m3 0.100 5,870,000.00
2 Paku 5 cm dan 7 cm M.100 kg 0.350 12,500.00
Jumlah Harga Bahan
C Peralatan
AHSP.Pus Air.108

Jumlah Harga Peralatan


D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m2 (D+E)
CATATAN: *Dapat digunakan lebih dari 1 (satu) kali misal 2 kali maka koefisien menjadi 0,06 (Kaso

B.25 1 m2 perancah bekisting kayu dolken diameter 8 cm – 10 cm tinggi 4 m **

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.250 50,000.00
2 Tukang kayu L.06 OH 0.600 60,000.00
3 Kepala tukang L.05 OH 0.060 70,000.00
4 Mandor L.15 OH 0.012 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan

1 *Kayu dolken diameter 8 cm -10 cm,


panjang 4 m M.66 btg 6.000 115,000.00
2 Paku 5 cm dan 7 cm M.100 kg 0.350 12,500.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m2 (D+E)

B.26 Bekisting balok beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.200 50,000.00
2 Tukang kayu L.06 OH 0.500 60,000.00
3 Kepala tukang L.05 OH 0.050 70,000.00
4 Mandor L.15 OH 0.010 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Multiflex 18 mm M.73 lbr 0.350 135,000.00
2 Kaso 5/7 cm M.58 m3 0.140 5,870,000.00
3 Perancah tinggi 4m' B.25 m2 1.000 860,171.25
4 Paku 5 cm dan 7 cm M.100 kg 0.350 12,500.00
AHSP.Pus Air.109

5 Minyak bekisting M.165 L 1.600 4,500.00


Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m2 (D+E)

B.27 Perancah Bekisting balok dengan Kaso 5/7 tinggi 4 m

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.250 50,000.00
2 Tukang kayu L.06 OH 0.600 60,000.00
3 Kepala tukang L.05 OH 0.060 70,000.00
4 Mandor L.15 OH 0.012 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Kaso 5/7 cm M.58 m3 0.140 5,870,000.00
2 Paku 5 cm dan 7 cm M.100 kg 0.350 12,500.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m2 (D+E)

B.28 Perancah Bekisting balok dengan Kayu dolken diameter 8 cm tinggi 4 m

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.250 50,000.00
2 Tukang kayu L.06 OH 0.600 60,000.00
3 Kepala tukang L.05 OH 0.060 70,000.00
4 Mandor L.15 OH 0.012 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 *Kayu dolken diameter 8 cm -10 cm,
panjang 4 m M.66 btg 6.000 115,000.00
2 Paku 5 cm dan 7 cm M.100 kg 0.350 12,500.00
AHSP.Pus Air.110

Jumlah Harga Bahan


C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m2 (D+E)

B.29 Bekisting kolom beton biasa dengan multiflex 12 mm atau 18 mm

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.200 50,000.00
2 Tukang kayu L.06 OH 0.500 60,000.00
3 Kepala tukang L.05 OH 0.050 70,000.00
4 Mandor L.15 OH 0.010 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Multiflex 18 mm M.73 lbr 0.350 135,000.00
2 Kaso 5/7 cm M.58 m3 0.140 5,870,000.00
3 Paku 5 cm dan 7 cm M.100 kg 0.250 12,500.00
4 Minyak bekisting M.165 L 0.200 4,500.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m2 (D+E)

B.30 Bekisting kolom beton biasa dengan papan ukuran 3/20 cm

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.660 50,000.00
2 Tukang kayu L.06 OH 0.330 60,000.00
3 Kepala tukang L.05 OH 0.033 70,000.00
4 Mandor L.15 OH 0.033 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Papan 3/20 cm kayu kelas II M.53 m3 0.040 4,174,500.00
2 Kaso 5/7 cm M.58 m3 0.180 5,870,000.00
AHSP.Pus Air.111

3 Paku 5 cm dan 7 cm M.100 kg 0.400 12,500.00


4 Minyak bekisting M.165 L 0.200 4,500.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m2 (D+E)

B.31 Bekisting dinding beton biasa dengan multiflex 12 mm atau 18 mm

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.200 50,000.00
2 Tukang kayu L.06 OH 0.500 60,000.00
3 Kepala tukang L.05 OH 0.050 70,000.00
4 Mandor L.15 OH 0.010 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Multiflex 18 mm M.73 lbr 0.350 135,000.00
2 Kaso 5/7 cm M.58 m3 0.140 5,870,000.00
3 Paku 5 cm dan 7 cm M.100 kg 0.250 12,500.00
4 Minyak bekisting M.165 L 0.200 4,500.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m2 (D+E)

B.32 Bekisting dinding beton biasa dengan papan ukuran 3/20 cm

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.660 50,000.00
2 Tukang kayu L.06 OH 0.330 60,000.00
3 Kepala tukang L.05 OH 0.033 70,000.00
4 Mandor L.15 OH 0.033 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
AHSP.Pus Air.112

1 Papan 3/20 cm kayu kelas II M.106 m3 0.040 36,000.00


2 Kaso 5/7 cm M.58 m3 0.180 5,870,000.00
3 Paku 5 cm dan 7 cm M.100 kg 0.400 12,500.00
4 Minyak bekisting M.165 L 0.200 4,500.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m2 (D+E)

B.33 Bekisting fondasi dan sloof beton biasa dengan multiflex 12 mm/18 mm

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.200 50,000.00
2 Tukang kayu L.06 OH 0.500 60,000.00
3 Kepala tukang L.05 OH 0.050 70,000.00
4 Mandor L.15 OH 0.010 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Multiflex 18 mm M.73 lbr 0.350 135,000.00
2 Kaso 5/7 cm M.58 m3 0.140 5,870,000.00
3 Paku 5 cm dan 7 cm M.100 kg 0.250 12,500.00
4 Minyak bekisting M.165 L 0.200 4,500.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m2 (D+E)

B.34 Bekisting fondasi dan sloof beton biasa dengan papan ukuran 3/20 cm

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.660 50,000.00
2 Tukang kayu L.06 OH 0.330 60,000.00
3 Kepala tukang L.05 OH 0.033 70,000.00
4 Mandor L.15 OH 0.033 75,000.00
AHSP.Pus Air.113

Jumlah Harga Tenaga Kerja


B Bahan
1 Papan 3/20 cm kayu kelas II E.14 m3 0.040 25,000.00
2 Kaso 5/7 cm M.58 m3 0.180 5,870,000.00
3 Paku 5 cm dan 7 cm M.100 kg 0.400 12,500.00
4 Minyak bekisting M.165 L 0.200 4,500.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m2 (D+E)

B.35 Bongkar 1 m2 bekisting secara biasa

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.600 50,000.00
2 Mandor L.15 OH 0.030 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m2 (D+E)

B.36 Bongkar 1 m2 bekisting secara hati-hati

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.600 50,000.00
2 Mandor L.15 OH 0.030 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
AHSP.Pus Air.114

E Overhead + Profit 15% x D


F Harga Satuan Pekerjaan per - m2 (D+E)

B.37 Menggenangi air 100 m2 permukaan beton

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.800 50,000.00
2 Mandor L.15 OH 0.040 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m2 (D+E)

B.38 Menyirami air 100 m2 permukaan beton


a) Memasang 100 m2 terpal/karung goni basah

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.800 50,000.00
2 Mandor L.15 OH 0.040 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Terpal/karung goni
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m2 (D+E)

b) Menyirami m2 Terpal/Karung Goni dengan air selama 4 hari

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6
AHSP.Pus Air.115

A Tenaga Kerja
1 Pekerja L.01 OH 0.800 50,000.00
2 Mandor L.15 OH 0.040 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m2 (D+E)

A.3.6 Pembongkaran konstruksi beton dalam rangka renovasi


B.39 Bongkar 1 m3 beton secara konvensional

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 2.000 50,000.00
2 Mandor L.15 OH 0.050 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
Cuka Bibit M.166 L 1.200 25,000.00
Jumlah Harga Bahan
C Peralatan
1 Palu / Godam E.07 bh 0.100 100,000.00
2 Gergaji Besi E.13 bh 0.200 45,000.00
3 Pahat Beton (Baja keras) E.37 bh 0.500 225,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m2 (D+E)

B.40 Bongkar 1 m2 beton dengan Jack Hammer

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.600 50,000.00
2 Mandor L.15 OH 0.030 75,000.00
Jumlah Harga Tenaga Kerja
AHSP.Pus Air.116

B Bahan
Jumlah Harga Bahan
C Peralatan
1 Jack Hammer E.03 Hari-sewa 0.16 135,000.00
2 Palu / Godam E.07 bh 0.050 100,000.00
3 Gergaji Besi E.13 bh 0.100 45,000.00
4 Pahat Beton (Baja keras) E.37 bh 0.200 225,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m2 (D+E)

B.41 Pemasangan Water Stop


Memasang 1 m water stop PVC lebar 150 mm

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.050 50,000.00
2 Tukang batu/kayu/pipa L.06 OH 0.030 60,000.00
3 Kepala Tukang L.05 OH 0.003 70,000.00
4 Mandor L.15 OH 0.003 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Water Stop PVC lebar 150 mm M.179 m 1.05 75,000.00
2 Kawat Beton M.98 kg 0.01 15,000.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

B.42 Memasang 1 m water stop PVC lebar 200 mm

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.055 50,000.00
2 Tukang batu/kayu/pipa L.06 OH 0.035 60,000.00
3 Kepala Tukang L.05 OH 0.0040 70,000.00
4 Mandor L.15 OH 0.0040 75,000.00
AHSP.Pus Air.117

Jumlah Harga Tenaga Kerja


B Bahan
1 Water Stop PVC lebar 200 mm M.180 m 1.05 90,000.00
2 Kawat Beton M.98 kg 0.01 15,000.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

B.43 Memasang water stop 1 m PVC lebar 230 mm – 320 mm

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.055 50,000.00
2 Tukang batu/kayu/pipa L.06 OH 0.040 60,000.00
3 Kepala Tukang L.05 OH 0.0040 70,000.00
4 Mandor L.15 OH 0.0040 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Water Stop PVC lebar 230-320 mm M.181 m 1.05 115,000.00
2 Kawat Beton M.98 kg 0.01 15,000.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)

B.44 Pemasangan water stop 1m Rubber lebar 150 mm – 200 mm

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.060 50,000.00
2 Tukang batu/kayu/pipa L.06 OH 0.050 60,000.00
3 Kepala Tukang L.05 OH 0.0050 70,000.00
4 Mandor L.15 OH 0.0050 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
AHSP.Pus Air.118

1 Water Stop Rubber lebar 150-200 mm M.182 m 1.05 125,000.00


2 Kawat Beton M.98 kg 0.02 15,000.00
Jumlah Harga Bahan
C Peralatan
AHSP.Pus Air.119

Jumlah Harga Peralatan


D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m3 (D+E)
AHSP.Pus Air.120

#REF!
AHSP.Pus Air.121

Jumlah
(Rp)

66,000.00
15,000.00
1,400.00
4,500.00
86,900.00

306,280.00
86,900.00
103,600.00
661.13
497,441.13

584,341.13
87,651.17
671,992.29

Jumlah
(Rp)

82,500.00
16,500.00
1,960.00
6,225.00
107,185.00

306,280.00
86,900.00
103,600.00
661.13
497,441.13
AHSP.Pus Air.122

604,626.13
90,693.92
695,320.04

Jumlah
(Rp)

66,000.00
15,000.00
1,400.00
4,500.00
86,900.00

306,280.00
86,900.00
103,600.00
661.13
497,441.13

80,000.00
80,000.00
664,341.13
99,651.17
763,992.29

Jumlah
(Rp)

82,500.00
16,500.00
1,960.00
6,225.00
107,185.00
AHSP.Pus Air.123

342,240.00
82,800.00
104,948.15
661.13
530,649.27

637,834.27
95,675.14
733,509.41

Jumlah
(Rp)

66,000.00
15,000.00
1,400.00
4,500.00
86,900.00

342,240.00
82,800.00
104,948.15
661.13
530,649.27

80,000.00
80,000.00
697,549.27
104,632.39
802,181.66

Jumlah
(Rp)

7
AHSP.Pus Air.124

82,500.00
16,500.00
1,960.00
6,225.00
107,185.00

370,760.00
79,900.00
105,466.67
661.13
556,787.79

663,972.79
99,595.92
763,568.71

Jumlah
(Rp)

66,000.00
15,000.00
1,400.00
4,500.00
86,900.00

370,760.00
79,900.00
105,466.67
661.13
556,787.79

80,000.00
80,000.00
723,687.79
108,553.17
832,240.96
AHSP.Pus Air.125
Jumlah
(Rp)

82,500.00
16,500.00
1,960.00
6,225.00
107,185.00

404,240.00
76,000.00
106,711.11
661.13
587,612.24

694,797.24
104,219.59
799,016.82

Jumlah
(Rp)

66,000.00
15,000.00
1,400.00
4,500.00
86,900.00

404,240.00
76,000.00
106,711.11
661.13
587,612.24

80,000.00
80,000.00
754,512.24
113,176.84
867,689.07
AHSP.Pus Air.126

Jumlah
(Rp)

50,000.00
8,280.00
1,260.00
3,750.00
63,290.00

710,000.00

710,000.00

24,000.00
24,000.00
797,290.00
119,593.50
916,883.50

Jumlah
(Rp)

82,500.00
16,500.00
1,960.00
6,225.00
107,185.00

436,480.00
73,100.00
106,918.52
661.13
617,159.64
AHSP.Pus Air.127

724,344.64
108,651.70
832,996.34

Jumlah
(Rp)

66,000.00
15,000.00
1,400.00
4,500.00
86,900.00

436,480.00
73,100.00
106,918.52
661.13
617,159.64

80,000.00
80,000.00
784,059.64
117,608.95
901,668.59

Jumlah
(Rp)

50,000.00
8,280.00
1,260.00
3,750.00
63,290.00

730,000.00
730,000.00

24,000.00
AHSP.Pus Air.128

24,000.00
817,290.00
122,593.50
939,883.50

Jumlah
(Rp)

82,500.00
16,500.00
1,960.00
6,225.00
107,185.00

460,040.00
69,800.00
108,577.78
661.13
639,078.90

746,263.90
111,939.59
858,203.49

Jumlah
(Rp)

66,000.00
15,000.00
1,400.00
4,500.00
86,900.00

460,040.00
69,800.00
AHSP.Pus Air.129

108,577.78
661.13
639,078.90

80,000.00
80,000.00
805,978.90
120,896.84
926,875.74

Jumlah
(Rp)

50,000.00
8,280.00
1,260.00
3,750.00
63,290.00

750,000.00
750,000.00

24,000.00
24,000.00
837,290.00
125,593.50
962,883.50

Jumlah
(Rp)

82,500.00
16,500.00
1,960.00
6,225.00
107,185.00
AHSP.Pus Air.130

476,160.00
69,200.00
107,748.15
661.13
653,769.27

760,954.27
114,143.14
875,097.41

Jumlah
(Rp)

66,000.00
15,000.00
1,400.00
4,500.00
86,900.00

476,160.00
69,200.00
107,748.15
661.13
653,769.27

80,000.00
80,000.00
820,669.27
123,100.39
943,769.66

Jumlah
(Rp)

50,000.00
8,280.00
AHSP.Pus Air.131

1,260.00
3,750.00
63,290.00

765,000.00
765,000.00

24,000.00
24,000.00
852,290.00
127,843.50
980,133.50

Jumlah
(Rp)

82,500.00
16,500.00
1,960.00
6,225.00
107,185.00

503,440.00
68,400.00
106,400.00
661.13
678,901.13

786,086.13
117,912.92
903,999.04

Jumlah
(Rp)

66,000.00
AHSP.Pus Air.132

15,000.00
1,400.00
4,500.00
86,900.00

503,440.00
68,400.00
106,400.00
661.13
678,901.13

80,000.00
80,000.00
845,801.13
126,870.17
972,671.29

Jumlah
(Rp)

50,000.00
8,280.00
1,260.00
3,750.00
63,290.00

775,000.00
775,000.00

24,000.00
24,000.00
862,290.00
129,343.50
991,633.50

Jumlah
(Rp)

7
AHSP.Pus Air.133

82,500.00
16,500.00
1,960.00
6,225.00
107,185.00

512,120.00
68,100.00
105,881.48
661.13
36,000.00
722,762.61

829,947.61
124,492.14
954,439.75

Jumlah
(Rp)

66,000.00
15,000.00
1,400.00
4,500.00
86,900.00

512,120.00
68,100.00
105,881.48
661.13
36,000.00
722,762.61

80,000.00
80,000.00
889,662.61
133,449.39
1,023,112.00
AHSP.Pus Air.134

Jumlah
(Rp)

50,000.00
8,280.00
1,260.00
3,750.00
63,290.00

800,000.00
800,000.00

24,000.00
24,000.00
887,290.00
133,093.50
1,020,383.50

Jumlah
(Rp)

105,000.00
21,000.00
2,450.00
7,875.00
136,325.00

544,360.00
67,000.00
104,325.93
661.13
716,347.05

852,672.05
127,900.81
980,572.86
AHSP.Pus Air.135

Jumlah
(Rp)

84,000.00
15,780.00
1,750.00
5,550.00
107,080.00

544,360.00
67,000.00
104,325.93
661.13
716,347.05

80,000.00
80,000.00
903,427.05
135,514.06
1,038,941.11

Jumlah
(Rp)

63,000.00
10,500.00
1,470.00
4,725.00
79,695.00

817,500.00
817,500.00

24,000.00
24,000.00
921,195.00
138,179.25
1,059,374.25
AHSP.Pus Air.136

Jumlah
(Rp)

105,000.00
21,000.00
2,450.00
7,875.00
136,325.00

555,520.00
66,700.00
103,703.70
661.13
726,584.83

862,909.83
129,436.47
992,346.30

Jumlah
(Rp)

84,000.00
15,780.00
1,750.00
5,550.00
107,080.00

1,240.00
66,700.00
103,703.70
661.13
172,304.83
AHSP.Pus Air.137

80,000.00
80,000.00
359,384.83
53,907.72
413,292.55

Jumlah
(Rp)

63,000.00
10,500.00
1,470.00
4,725.00
79,695.00

834,000.00
834,000.00

24,000.00
24,000.00
937,695.00
140,654.25
1,078,349.25

ikan campuran beton setiap

Jumlah
(Rp)

20,500.00
1,500.00
22,000.00
AHSP.Pus Air.138

22,000.00
3,300.00
25,300.00

Jumlah
(Rp)

12,500.00
12,500.00

13,475.00
13,475.00
25,975.00
3,896.25
29,871.25

Jumlah
(Rp)

25,000.00
1,875.00
26,875.00

13,475.00
13,475.00
40,350.00
6,052.50
46,402.50

Jumlah
(Rp)
AHSP.Pus Air.139

25,000.00
1,875.00
26,875.00

26,875.00
4,031.25
30,906.25

Jumlah
(Rp)

10,000.00
750.00
10,750.00

24,000.00
24,000.00
34,750.00
5,212.50
39,962.50

Jumlah
(Rp)

12,500.00
750.00
13,250.00
AHSP.Pus Air.140

13,250.00
1,987.50
15,237.50

Jumlah
(Rp)

10,000.00
750.00
10,750.00

24,000.00
24,000.00
34,750.00
5,212.50
39,962.50

Jumlah
(Rp)

35,000.00
42,000.00
4,900.00
3,000.00
84,900.00

1,050,000.00
22,500.00
1,072,500.00

1,157,400.00
173,610.00
AHSP.Pus Air.141

1,331,010.00

Jumlah
(Rp)

12,500.00
15,000.00
1,400.00
750.00
29,650.00

2,524,500.00
7,500.00
2,532,000.00

2,561,650.00
384,247.50
2,945,897.50

ikkan 100 kg tulangan setiap


n

Jumlah
(Rp)

15,000.00
6,000.00
1,500.00
22,500.00

22,500.00
3,375.00
25,875.00
AHSP.Pus Air.142

Jumlah
(Rp)

10,000.00
2,400.00
1,500.00
13,900.00

23,375.00
23,375.00
37,275.00
5,591.25
42,866.25

Jumlah
(Rp)

15,000.00
6,000.00
1,500.00
22,500.00

23,375.00
23,375.00
45,875.00
6,881.25
52,756.25
AHSP.Pus Air.143

Jumlah
(Rp)

15,000.00
6,000.00
1,500.00
22,500.00

59,570.00
59,570.00
82,070.00
12,310.50
94,380.50

Jumlah
(Rp)

25,000.00
30,000.00
3,500.00
2,250.00
60,750.00

3,832,500.00
125,000.00
15,000.00
3,972,500.00

20,250.00
20,250.00
4,053,500.00
608,025.00
4,661,525.00

sting beton
AHSP.Pus Air.144

8 mm (tanpa perancah)

Jumlah
(Rp)

10,000.00
30,000.00
3,500.00
750.00
44,250.00

47,250.00
117,400.00
3,125.00
900.00
168,675.00

212,925.00
31,938.75
244,863.75
ien menjadi 0,20 (Multiflex) dan 0,015 (Kaso)

(tanpa perancah)

Jumlah
(Rp)

33,000.00
19,800.00
2,310.00
2,475.00
57,585.00

281,930.00
117,400.00
5,000.00
900.00
405,230.00

462,815.00
AHSP.Pus Air.145

69,422.25
532,237.25
ien menjadi 0,025 (papan) dan 0,015 (Kaso)

18 mm - kaso 5/7 cm (tanpa perancah)

Jumlah
(Rp)

12,500.00
36,000.00
4,200.00
750.00
53,450.00

47,250.00
117,400.00
4,375.00
7,200.00
176,225.00

229,675.00
34,451.25
264,126.25
ien menjadi 0,20 (Multiflex) dan 0,015 (Kaso)

Jumlah
(Rp)

12,500.00
36,000.00
4,200.00
900.00
53,600.00

587,000.00
4,375.00
644,975.00
AHSP.Pus Air.146

698,575.00
104,786.25
803,361.25
ien menjadi 0,06 (Kaso)

Jumlah
(Rp)

12,500.00
36,000.00
4,200.00
900.00
53,600.00

690,000.00
4,375.00
694,375.00

747,975.00
112,196.25
860,171.25

Jumlah
(Rp)

10,000.00
30,000.00
3,500.00
750.00
44,250.00

47,250.00
821,800.00
860,171.25
4,375.00
AHSP.Pus Air.147

7,200.00
1,740,796.25

1,785,046.25
267,756.94
2,052,803.19

Jumlah
(Rp)

12,500.00
36,000.00
4,200.00
900.00
53,600.00

821,800.00
4,375.00
826,175.00

879,775.00
131,966.25
1,011,741.25

Jumlah
(Rp)

12,500.00
36,000.00
4,200.00
900.00
53,600.00

690,000.00
4,375.00
AHSP.Pus Air.148

694,375.00

747,975.00
112,196.25
860,171.25

Jumlah
(Rp)

10,000.00
30,000.00
3,500.00
750.00
44,250.00

47,250.00
821,800.00
3,125.00
900.00
873,075.00

917,325.00
137,598.75
1,054,923.75

Jumlah
(Rp)

33,000.00
19,800.00
2,310.00
2,475.00
57,585.00

166,980.00
1,056,600.00
AHSP.Pus Air.149

5,000.00
900.00
1,229,480.00

1,287,065.00
193,059.75
1,480,124.75

Jumlah
(Rp)

10,000.00
30,000.00
3,500.00
750.00
44,250.00

47,250.00
821,800.00
3,125.00
900.00
873,075.00

917,325.00
137,598.75
1,054,923.75

Jumlah
(Rp)

33,000.00
19,800.00
2,310.00
2,475.00
57,585.00
AHSP.Pus Air.150

1,440.00
1,056,600.00
5,000.00
900.00
1,063,940.00

1,121,525.00
168,228.75
1,289,753.75

Jumlah
(Rp)

10,000.00
30,000.00
3,500.00
750.00
44,250.00

47,250.00
821,800.00
3,125.00
900.00
873,075.00

917,325.00
137,598.75
1,054,923.75

Jumlah
(Rp)

33,000.00
19,800.00
2,310.00
2,475.00
AHSP.Pus Air.151

57,585.00

1,000.00
1,056,600.00
5,000.00
900.00
1,063,500.00

1,121,085.00
168,162.75
1,289,247.75

Jumlah
(Rp)

30,000.00
2,250.00
32,250.00

32,250.00
4,837.50
37,087.50

Jumlah
(Rp)

30,000.00
2,250.00
32,250.00

32,250.00
AHSP.Pus Air.152

4,837.50
37,087.50

Jumlah
(Rp)

40,000.00
3,000.00
43,000.00

43,000.00
6,450.00
49,450.00

Jumlah
(Rp)

40,000.00
3,000.00
43,000.00

43,000.00
6,450.00
49,450.00

Jumlah
(Rp)

7
AHSP.Pus Air.153

40,000.00
3,000.00
43,000.00

43,000.00
6,450.00
49,450.00

Jumlah
(Rp)

100,000.00
3,750.00
103,750.00

30,000.00
30,000.00

10,000.00
9,000.00
112,500.00
131,500.00
265,250.00
39,787.50
305,037.50

Jumlah
(Rp)

30,000.00
2,250.00
32,250.00
AHSP.Pus Air.154

21,600.00
5,000.00
4,500.00
45,000.00
76,100.00
108,350.00
16,252.50
124,602.50

Jumlah
(Rp)

2,500.00
1,800.00
210.00
225.00
4,735.00

78,750.00
150.00
78,900.00

83,635.00
12,545.25
96,180.25

Jumlah
(Rp)

2,750.00
2,100.00
280.00
300.00
AHSP.Pus Air.155

5,430.00

94,500.00
150.00
94,650.00

100,080.00
15,012.00
115,092.00

Jumlah
(Rp)

2,750.00
2,400.00
280.00
300.00
5,730.00

120,750.00
150.00
120,900.00

126,630.00
18,994.50
145,624.50

Jumlah
(Rp)

3,000.00
3,000.00
350.00
375.00
6,725.00
AHSP.Pus Air.156

131,250.00
300.00
131,550.00
AHSP.Pus Air.157

138,275.00
20,741.25
159,016.25
A.4 PEKERJAAN PEMANCANGAN (F.xx)

A.4.1 Analisis koefisien satuan pekerjaan pemancangan dengan Hammer tanpa mesin

F.01 Tiang Pancang Kayu Gelondongan

Per-m' panjang tiang pancang kayu gelondongan diameter 20 cm untuk sampai dengan per-satuan 2,5
dukung tiang pancang beban normal dan untuk maksimum 1,5 m’ jarak antar tiang dalam satu group tiang pa

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.016 50,000.00
2 Mandor L.15 OH 0.008 75,000.00
3 Operator Crane L.19 OH 0.016 125,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Tiang Pancang kayu dia 20 cm M.67 m 1.050 350,000.00
Jumlah Harga Bahan
C Peralatan
1 Tripod tinggi 5 m E.39 Hari-sewa 0.020 325,000.00
2 Alat pancang Hammer 2 ton E.40 Hari-sewa 0.020 442,000.00
3 Alat penyambung tiang pancang E.48 bh 0.250 200,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m' (D+E)

F.02 Tiang Panjang Baja Pipa


Per-m’ panjang tiang pancang baja pipa diameter 30 cm ukuran 30 x 30 cm untuk sampai dengan per-satu
daya dukung tiang pancang beban normal dan untuk maksimum 1,5 m’ jarak antar tiang dalam satu gr
pancang

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.025 50,000.00
2 Mandor L.15 OH 0.010 75,000.00
3 Operator Crane L.19 OH 0.025 125,000.00
4 Tukang las listrik L.14 OH 0.025 60,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Tiang Pancang baja dia 30 cm M.126 m 1.01 500,000.00
2 Kawat las listrik M.114 kg 0.15 24,750.00
Jumlah Harga Bahan
C Peralatan
1 Crane kecil E.42 Hari-sewa 0.025 730,000.00
2 Alat pancang Hammer 2 ton E.40 Hari-sewa 0.025 442,000.00
3 Las listrik diesel (termasuk solar) E.44 Hari-sewa 0.025 235,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m' (D+E)

F.03 Tiang Pancang Baja Kotak


Per-m' panjang tiang pancang baja kotak diameter 30 cm ukuran 30 x 30 cm untuk sampai dengan per-satu
daya dukung tiang pancang beban normal dan untuk maksimum 1,5 m’ jarak antar tiang dalam satu gr
pancang

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.025 50,000.00
2 Mandor L.15 OH 0.010 75,000.00
3 Operator Crane L.19 OH 0.025 125,000.00
4 Tukang las listrik L.14 OH 0.025 60,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Tiang Pancang baja kotak 30 x 30 cm M.127 m 1.01 575,000.00
2 Kawat las listrik M.114 kg 0.15 24,750.00
Jumlah Harga Bahan
C Peralatan
1 Crane kecil E.42 Hari-sewa 0.025 730,000.00
2 Alat pancang Hammer 2 ton E.40 Hari-sewa 0.025 442,000.00
3 Las listrik diesel (termasuk solar) E.44 Hari-sewa 0.025 235,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m' (D+E)

F.04 Tiang Baja Beton Bertulang (30 x 30 cm)

Per-m' panjang tiang pancang beton bertulang ukuran 30 x 30 cm untuk sampai dengan per-satuan 2,5
dukung tiang pancang beban normal dan untuk maksimum 1,5 m’ jarak antar tiang dalam satu group tiang pa

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.035 50,000.00
2 Mandor L.15 OH 0.005 75,000.00
3 Operator Crane L.19 OH 0.035 125,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Tiang Pancang beton tulang 30x30 cm M.33 m 1.03 230,000.00
Jumlah Harga Bahan
C Peralatan
1 Crane kecil E.42 Hari-sewa 0.035 730,000.00
2 Alat pancang Hammer 2 ton E.40 Hari-sewa 0.035 442,000.00
3 Alat penyambung tiang pancang E.48 bh 0.250 200,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m' (D+E)

F.05 Tiang Pancang Beton Bertulang (40 x 40 cm)

Per-m' panjang tiang pancang beton bertulang ukuran 40 x 40 cm untuk sampai dengan per-satuan 2,5
dukung tiang pancang beban normal dan untuk maksimum 1,5 m’ jarak antar tiang dalam satu group tiang pa

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.050 50,000.00
2 Mandor L.15 OH 0.005 75,000.00
3 Operator Crane L.19 OH 0.050 125,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Tiang Pancang beton tulang 40x40 cm M.34 m 1.03 400,000.00
Jumlah Harga Bahan
C Peralatan
1 Crane besar E.43 Hari-sewa 0.050 935,000.00
2 Alat pancang Hammer 2 ton E.40 Hari-sewa 0.050 442,000.00
3 Alat penyambung tiang pancang E.48 bh 0.250 200,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m' (D+E)

F.06 Turap Kayu Dolken


Per-m' panjang pemancangan turap kayu dolken diameter 8-10 cm untuk sampai dengan per-satuan 1
dukung per-tiang beban normal

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja L.01 OH 0.025 50,000.00
2 Mandor L.15 OH 0.005 75,000.00
3 Operator Crane L.19 OH 0.025 125,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Kayu dolken dia 8 - 10 cm M.66 m 1.05 38,333.33
Jumlah Harga Bahan
C Peralatan
1 Tripod tinggi 5 m E.39 Hari-sewa 0.025 325,000.00
2 Alat pancang Hammer 1 ton E.40 Hari-sewa 0.025 442,000.00
3 Alat penyambung tiang pancang E.48 bh 0.250 200,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m' (D+E)

F.07 Turap Baja Profil Larsen


Per-m' panjang pemancangan turap baja profil Larsen lebar 350 mm untuk sampai dengan per-satuan 1
dukung per-tiang beban normal

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.035 50,000.00
2 Mandor L.15 OH 0.005 75,000.00
3 Operator Crane L.19 OH 0.035 125,000.00
4 Tukang las listrik L.14 OH 0.035 60,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Turap baja profi larsen lebar 350 mm M.129 m 1.05 140,000.00
Jumlah Harga Bahan
C Peralatan
1 Crane kecil E.42 Hari-sewa 0.035 730,000.00
2 Alat pancang Hammer 1 ton E.40 Hari-sewa 0.035 442,000.00
3 Las listrik diesel (termasuk solar) E.44 Hari-sewa 0.025 235,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m' (D+E)

F.08 Turap beton Bertulang Precast (30 x 12 cm)


Per-m' panjang pemancangan turap beton bertulang pre-cast lebar 30 cm dan tebal 12 cm untuk sampai de
satuan 1 ton daya dukung tiang pancang beban normal
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.050 50,000.00
2 Mandor L.15 OH 0.005 75,000.00
3 Operator Crane L.19 OH 0.050 125,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Turap beton tulang pre-cast 30x12 cm M.41 m 1.030 200,000.00
Jumlah Harga Bahan
C Peralatan
1 Crane kecil E.42 Hari-sewa 0.050 730,000.00
2 Alat pancang Hammer 1 ton E.40 Hari-sewa 0.050 442,000.00
3 Alat penyambung tiang pancang E.48 bh 0.350 200,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m' (D+E)

F.09 Turap Beton Bertulang Pre-cast (40 x 15 cm)


Per-m' panjang pemancangan turap beton bertulang pre-cast lebar 40 cm dan tebal 15 cm untuk sampai de
satuan 1 ton daya dukung tiang pancang beban normal

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.065 50,000.00
2 Mandor L.15 OH 0.005 75,000.00
3 Operator Crane L.19 OH 0.065 125,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Turap beton tulang pre-cast 40x15 cm M.42 m 1.030 300,000.00
Jumlah Harga Bahan
C Peralatan
1 Crane kecil E.42 Hari-sewa 0.065 730,000.00
2 Alat pancang Hammer 1 ton E.40 Hari-sewa 0.065 442,000.00
3 Alat penyambung tiang pancang E.48 bh 0.350 200,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m' (D+E)

A.4.2 Analisis koefisien satuan pekerjaan pemancangan dengan mesin Tenaga Uap
F.10 Tiang Pancang Kayu Gelondongan

Per-m' panjang tiang pancang kayu gelondongan diameter 20 cm untuk sampai dengan per-satuan 2,5
dukung tiang pancang beban normal dan untuk maksimum 1 m’ jarak antar tiang dalam satu group tiang pan

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.016 50,000.00
2 Mandor L.15 OH 0.008 75,000.00
3 Operator Crane L.19 OH 0.016 125,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Tiang Pancang kayu dia 20 cm M.67 m 1.050 350,000.00
Jumlah Harga Bahan
C Peralatan
1 Crane kecil E.39 Hari-sewa 0.020 325,000.00
2 Alat pancang tenaga uap 8 ton E.40 Hari-sewa 0.020 442,000.00
3 Alat penyambung tiang pancang E.48 bh 0.250 200,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m' (D+E)

F.11 Tiang Pancang Baja Pipa (30 x 30 cm)


Per-m' panjang tiang pancang baja pipa diameter 30 cm atau ukuran 30 x 30 cm untuk sampai dengan per-s
ton daya dukung tiang pancang beban normal dan untuk maksimum 1 m’ jarak antar tiang dalam satu gr
pancang

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.025 50,000.00
2 Mandor L.15 OH 0.010 75,000.00
3 Operator Crane L.19 OH 0.025 125,000.00
4 Tukang las listrik L.14 OH 0.025 60,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Tiang Pancang baja dia 30 cm M.126 m 1.010 500,000.00
2 Kawat las listrik M.114 kg 0.150 24,750.00
Jumlah Harga Bahan
C Peralatan
1 Crane besar E.43 Hari-sewa 0.025 730,000.00
2 Alat pancang tenaga uap 8 ton E.40 Hari-sewa 0.025 442,000.00
3 Las listrik diesel (termasuk solar) E.44 Hari-sewa 0.025 235,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m' (D+E)

F.12 Tiang Pancang baja Kotak (30 x 30 cm)


Per-m' panjang tiang pancang baja kotak diameter 30 cm atau ukuran 30 x 30 cm untuk sampai dengan p
2,5 ton daya dukung tiang pancang beban normal dan untuk maksimum 1 m’ jarak antar tiang dalam satu g
pancang

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.025 50,000.00
2 Mandor L.15 OH 0.010 75,000.00
3 Operator Crane L.19 OH 0.025 125,000.00
4 Tukang las listrik L.14 OH 0.025 60,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Tiang Pancang baja kotak 30 x 30 cm M.126 m 1.010 500,000.00
2 Kawat las listrik M.114 kg 0.150 24,750.00
Jumlah Harga Bahan
C Peralatan
1 Crane besar E.43 Hari-sewa 0.025 935,000.00
2 Alat pancang tenaga uap 8 ton E.40 Hari-sewa 0.025 442,000.00
3 Las listrik diesel (termasuk solar) E.44 Hari-sewa 0.025 235,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m' (D+E)

F.13 Tiang Pancang Beton Bertulang (30 x 30 cm)


Per-m' panjang tiang pancang beton bertulang ukuran 30 x 30 cm untuk sampai dengan per-satuan 2,5
dukung tiang pancang beban normal dan untuk maksimum 1 m’ jarak antar tiang dalam satu group tiang pan

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.035 50,000.00
2 Mandor L.15 OH 0.005 75,000.00
3 Operator Crane L.19 OH 0.035 125,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Tiang Pancang beton tulang 30x30 cm M.33 m 1.030 230,000.00
Jumlah Harga Bahan
C Peralatan
1 Crane besar E.43 Hari-sewa 0.035 935,000.00
2 Alat pancang tenaga uap 8 ton E.40 Hari-sewa 0.035 442,000.00
3 Alat penyambung tiang pancang E.44 bh 0.250 235,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m' (D+E)

F.14 Tiang Pancang Beton Bertulang (40 x 40 cm)


Per-m' panjang tiang pancang beton bertulang ukuran 40 x 40 cm untuk sampai dengan per-satuan 2,5
dukung tiang pancang beban normal dan untuk maksimum 1 m’ jarak antar tiang dalam satu group tiang pan

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.050 50,000.00
2 Mandor L.15 OH 0.005 75,000.00
3 Operator Crane L.19 OH 0.050 125,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Tiang Pancang beton tulang 40x40 cm M.38 m 1.030 504,000.00
Jumlah Harga Bahan
C Peralatan
1 Crane besar E.43 Hari-sewa 0.050 935,000.00
2 Alat pancang tenaga uap 8 ton E.40 Hari-sewa 0.050 442,000.00
3 Alat penyambung tiang pancang E.44 bh 0.250 235,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m' (D+E)

F.15 Turap Kayu Dolken


Per-m' panjang pemancangan turap kayu dolken diameter 10-12 cm untuk sampai dengan per-satuan 1
dukung per-tiang beban normal

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.025 50,000.00
2 Mandor L.15 OH 0.005 75,000.00
3 Operator Crane L.19 OH 0.025 125,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Kayu dolken dia 8 - 10 cm M.66 m 1.050 115,000.00
Jumlah Harga Bahan
C Peralatan
1 Crane besar E.43 Hari-sewa 0.025 935,000.00
2 Alat pancang tenaga uap 8 ton E.40 Hari-sewa 0.025 442,000.00
3 Alat penyambung tiang pancang E.44 bh 0.250 235,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m' (D+E)

F.16 Turap Baja Profil Larsen


Per-m' panjang pemancangan turap baja profil Larsen lebar 350 mm untuk sampai dengan per-satuan 1
dukung per-tiang beban normal

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.035 50,000.00
2 Mandor L.15 OH 0.005 75,000.00
3 Operator Crane L.19 OH 0.035 125,000.00
4 Tukang las listrik L.14 OH 0.035 60,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Turap baja profi larsen lebar 350 mm M.129 m 1.050 140,000.00
Jumlah Harga Bahan
C Peralatan
1 Crane besar E.43 Hari-sewa 0.035 935,000.00
2 Alat pancang tenaga uap 8 ton E.40 Hari-sewa 0.035 442,000.00
3 Las listrik diesel (termasuk solar) E.44 Hari-sewa 0.025 235,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m' (D+E)

F.17 Turap Beton Bertulang Pre-cast (30 x 12 cm)


Per-m' panjang pemancangan turap beton bertulang pre-cast lebar 30 cm dan tebal 12 cm untuk sampai de
satuan 1 ton daya dukung tiang pancang beban normal

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.050 50,000.00
2 Mandor L.15 OH 0.005 75,000.00
3 Operator Crane L.19 OH 0.050 125,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Turap beton tulang pre-cast 30x12 cm M.41 m 1.030 200,000.00
Jumlah Harga Bahan
C Peralatan
1 Crane besar E.43 Hari-sewa 0.050 935,000.00
2 Alat pancang tenaga uap 8 ton E.40 Hari-sewa 0.050 442,000.00
3 Alat penyambung tiang pancang E.48 bh 0.350 200,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m' (D+E)

F.18 Turap Beton Bertulang Pre-cast (40 x 15 cm)


Per-m' panjang pemancangan turap beton bertulang pre-cast lebar 40 cm dan tebal 15 cm untuk samp
per-1 ton daya dukung tiang pancang beban normal

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.065 50,000.00
2 Mandor L.15 OH 0.005 75,000.00
3 Operator Crane L.19 OH 0.065 125,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Turap beton tulang pre-cast 40x15 cm M.42 m 1.030 300,000.00
Jumlah Harga Bahan
C Peralatan
1 Crane besar E.43 Hari-sewa 0.065 935,000.00
2 Alat pancang tenaga uap 8 ton E.40 Hari-sewa 0.065 442,000.00
3 Alat penyambung tiang pancang E.44 bh 0.350 235,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m' (D+E)

A.4.3 Analisis koefisien satuan pekerjaan pemancangan dengan mesin tenaga diesel
F.19 Tiang Pancang Kayu Gelondongan
Per-m' panjang tiang pancang kayu gelondongan diameter 20 cm untuk sampai dengan per-satuan 2,5
dukung tiang pancang beban normal dan untuk maksimum 1 m’ jarak antar tiang dalam satu group tiang pan

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.016 50,000.00
2 Mandor L.15 OH 0.008 75,000.00
3 Operator Crane L.19 OH 0.016 125,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Tiang Pancang kayu dia 20 cm M.67 m 1.050 350,000.00
Jumlah Harga Bahan
C Peralatan
1 Crane kecil E.42 Hari-sewa 0.020 730,000.00
2 Alat pancang tenaga diesel 8 ton E.46 Hari-sewa 0.020 850,000.00
3 Alat penyambung tiang pancang E.48 bh 0.250 200,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m' (D+E)

F.20 Tiang Pancang Baja Pipa diameter 30 cm


Per-m' panjang tiang pancang baja pipa diameter 30 cm atau ukuran 30 x 30 cm untuk sampai dengan per-s
ton daya dukung tiang pancang beban normal dan untuk maksimum 1 m’ jarak antar tiang dalam satu gr
pancang

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.025 50,000.00
2 Mandor L.15 OH 0.010 75,000.00
3 Operator Crane L.19 OH 0.025 125,000.00
4 Tukang las listrik L.14 OH 0.025 60,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Tiang Pancang baja dia 30 cm M.126 m 1.010 500,000.00
2 Kawat las listrik M.114 kg 0.150 24,750.00
Jumlah Harga Bahan
C Peralatan
1 Crane besar E.42 Hari-sewa 0.025 730,000.00
2 Alat pancang tenaga diesel 8 ton E.40 Hari-sewa 0.025 442,000.00
3 Las listrik diesel (termasuk solar) E.44 Hari-sewa 0.025 235,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m' (D+E)

F.21 Tiang Pancang Baja Kotak (30 x 30 cm)


Per-m' panjang tiang pancang baja kotak diameter 30 cm atau ukuran 30 x 30 cm untuk sampai dengan p
2,5 ton daya dukung tiang pancang beban normal dan untuk maksimum 1 m’ jarak antar tiang dalam satu g
pancang

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.025 50,000.00
2 Mandor L.15 OH 0.010 75,000.00
3 Operator Crane L.19 OH 0.025 125,000.00
4 Tukang las listrik L.14 OH 0.025 60,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Tiang Pancang baja kotak 30 x 30 cm M.127 m 1.010 575,000.00
2 Kawat las listrik M.114 kg 0.150 24,750.00
Jumlah Harga Bahan
C Peralatan
1 Crane besar E.42 Hari-sewa 0.025 730,000.00
2 Alat pancang tenaga diesel 8 ton E.40 Hari-sewa 0.025 442,000.00
3 Las listrik diesel (termasuk solar) E.44 Hari-sewa 0.025 235,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m' (D+E)

F.22 Tiang Pancang Beton Bertulang (30 x 30 cm)


Per-m' panjang tiang pancang beton bertulang ukuran 30 x 30 cm untuk sampai dengan per-satuan 2,5
dukung tiang pancang beban normal dan untuk maksimum 1 m’ jarak antar tiang dalam satu group tiang pan

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.035 50,000.00
2 Mandor L.15 OH 0.005 75,000.00
3 Operator Crane L.19 OH 0.035 125,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Tiang Pancang beton tulang 30x30 cm M.37 m 1.030 290,000.00
Jumlah Harga Bahan
C Peralatan
1 Crane besar E.42 Hari-sewa 0.035 730,000.00
2 Alat pancang tenaga diesel 8 ton E.40 Hari-sewa 0.035 442,000.00
3 Alat penyambung tiang pancang E.44 bh 0.250 235,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m' (D+E)

F.23 Tiang Pancang Beton Bertulang (40 x 40 cm)


Per-m' panjang tiang pancang beton bertulang ukuran 40 x 40 cm untuk sampai dengan per-satuan 2,5
dukung tiang pancang beban normal dan untuk maksimum 1 m’ jarak antar tiang dalam satu group tiang pan

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.050 50,000.00
2 Mandor L.15 OH 0.005 75,000.00
3 Operator Crane L.19 OH 0.050 125,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Tiang Pancang beton tulang 40x40 cm M.38 m 1.030 504,000.00
Jumlah Harga Bahan
C Peralatan
1 Crane besar E.42 Hari-sewa 0.050 730,000.00
2 Alat pancang tenaga diesel 8 ton E.40 Hari-sewa 0.050 442,000.00
3 Alat penyambung tiang pancang E.44 bh 0.250 235,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m' (D+E)

F.24 Turap Kayu Dolken


Per-m' panjang pemancangan turap kayu dolken diameter 10-12 cm untuk sampai dengan per-satuan 1
dukung per-tiang beban normal

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.025 50,000.00
2 Mandor L.15 OH 0.005 75,000.00
3 Operator Crane L.19 OH 0.025 125,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Kayu dolken dia 8 - 10 cm M.66 m 1.050 38,333.33
Jumlah Harga Bahan
C Peralatan
1 Crane kecil E.39 Hari-sewa 0.025 325,000.00
2 Alat pancang tenaga diesel 8 ton E.40 Hari-sewa 0.025 442,000.00
3 Alat penyambung tiang pancang E.49 bh 0.250 25,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m' (D+E)

F.25 Turap Baja Profil Larsen


Per-m' panjang pemancangan turap baja profil Larsen lebar 350 mm untuk sampai dengan per-satuan 1
dukung per-tiang beban normal

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.035 50,000.00
2 Mandor L.15 OH 0.005 75,000.00
3 Operator Crane L.19 OH 0.035 125,000.00
4 Tukang las listrik L.14 OH 0.035 60,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Turap baja profi larsen lebar 350 mm M.129 m 1.050 140,000.00
Jumlah Harga Bahan
C Peralatan
1 Crane besar E.40 Hari-sewa 0.035 442,000.00
2 Alat pancang tenaga diesel 8 ton E.40 Hari-sewa 0.035 442,000.00
3 Las listrik diesel (termasuk solar) E.44 Hari-sewa 0.025 235,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m' (D+E)

F.26 Turap Beton Bertulang Pre-cast (30 x 12 cm)


Per-m' panjang pemancangan turap beton bertulang pre-cast lebar 30 cm dan tebal 12 cm untuk sampai d
1 ton daya dukung tiang pancang beban normal

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.050 50,000.00
2 Mandor L.15 OH 0.005 75,000.00
3 Operator Crane L.19 OH 0.050 125,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Turap beton tulang pre-cast 30x12 cm M.41 m 1.030 200,000.00
Jumlah Harga Bahan
C Peralatan
1 Crane besar E.40 Hari-sewa 0.050 442,000.00
2 Alat pancang tenaga diesel 8 ton E.40 Hari-sewa 0.050 442,000.00
3 Alat penyambung tiang pancang E.48 bh 0.350 200,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m' (D+E)

F.27 Turap Beton Bertulang Pre-cast (40 x 15 cm)


Per-m' panjang pemancangan turap beton bertulang pre-cast lebar 40 cm dan tebal 15 cm untuk sampai de
satuan 1 ton daya dukung tiang pancang beban normal

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.065 50,000.00
2 Mandor L.15 OH 0.005 75,000.00
3 Operator Crane L.19 OH 0.065 125,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Turap beton tulang pre-cast 40x20 cm M.36 m 1.030 180,000.00
Jumlah Harga Bahan
C Peralatan
1 Crane besar E.40 Hari-sewa 0.065 442,000.00
2 Alat pancang tenaga diesel 8 ton E.40 Hari-sewa 0.065 442,000.00
3 Alat penyambung tiang pancang E.48 bh 0.350 200,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m' (D+E)

A.4.4 Analisis koefisien satuan pekerjaan pemancangan dengan kompresor udara

F.28 Tiang Pancang Kayu Gelondongan


Per-m' panjang tiang pancang kayu gelondongan diameter 20 cm untuk sampai dengan per-satuan 2,5
dukung tiang pancang beban normal dan untuk maksimum 1 m’ jarak antar tiang dalam satu group tiang pan

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.016 50,000.00
2 Mandor L.15 OH 0.008 75,000.00
3 Operator Crane L.19 OH 0.016 125,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Tiang Pancang kayu dia 20 cm M.67 m 1.050 350,000.00
Jumlah Harga Bahan
C Peralatan
1 Crane kecil E.42 Hari-sewa 0.020 730,000.00
2 Alat pancang Kompresor Udara 8 ton E.40 Hari-sewa 0.020 442,000.00
3 Alat penyambung tiang pancang E.48 bh 0.250 200,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m' (D+E)

F.29 Tiang Pancang Baja Pipa (30 x 30 cm)


Per-m' panjang tiang pancang baja pipa diameter 30 cm atau ukuran 30 x 30 cm untuk sampai dengan per-s
ton daya dukung tiang pancang beban normal dan untuk maksimum 1 m’ jarak antar tiang dalam satu gr
pancang

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.025 50,000.00
2 Mandor L.15 OH 0.010 75,000.00
3 Operator Crane L.19 OH 0.025 125,000.00
4 Tukang las listrik L.14 OH 0.025 60,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Tiang Pancang baja dia 30 cm M.126 m 1.010 500,000.00
2 Kawat las listrik M.114 kg 0.150 24,750.00
Jumlah Harga Bahan
C Peralatan
1 Crane besar E.43 Hari-sewa 0.025 935,000.00
2 Alat pancang Kompresor Udara 8 ton E.47 Hari-sewa 0.025 750,000.00
3 Las listrik diesel (termasuk solar) E.44 Hari-sewa 0.025 235,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m' (D+E)
F.30 Tiang Pancang Baja Kotak (30 x 30 cm)
Per-m' panjang tiang pancang baja kotak diameter 30 cm atau ukuran 30 x 30 cm untuk sampai dengan p
2,5 ton daya dukung tiang pancang beban normal dan untuk maksimum 1 m’ jarak antar tiang dalam satu g
pancang

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.025 50,000.00
2 Mandor L.15 OH 0.010 75,000.00
3 Operator Crane L.19 OH 0.025 125,000.00
4 Tukang las listrik L.14 OH 0.025 60,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Tiang Pancang baja kotak 30 x 30 cm M.127 m 1.010 575,000.00
2 Kawat las listrik M.114 kg 0.150 24,750.00
Jumlah Harga Bahan
C Peralatan
1 Crane besar E.43 Hari-sewa 0.025 935,000.00
2 Alat pancang Kompresor Udara 8 ton E.40 Hari-sewa 0.025 442,000.00
3 Las listrik diesel (termasuk solar) E.44 Hari-sewa 0.025 235,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m' (D+E)

F.31 Tiang Pancang Beton Bertulang (30 x 30 cm)


Per-m' panjang tiang pancang beton bertulang ukuran 30 x 30 cm untuk sampai dengan per-satuan 2,5
dukung tiang pancang beban normal dan untuk maksimum 1 m’ jarak antar tiang dalam satu group tiang pan

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.035 50,000.00
2 Mandor L.15 OH 0.005 75,000.00
3 Operator Crane L.19 OH 0.035 125,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Tiang Pancang beton tulang 30x30 cm M.37 m 1.030 290,000.00
Jumlah Harga Bahan
C Peralatan
1 Crane besar E.42 Hari-sewa 0.035 730,000.00
2 Alat pancang Kompresor Udara 8 ton E.40 Hari-sewa 0.035 442,000.00
3 Alat penyambung tiang pancang E.48 bh 0.250 200,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m' (D+E)

F.32 Tiang Pancang Beton Bertulang (40 x 40)


Per-m' panjang tiang pancang beton bertulang ukuran 40 x 40 cm untuk sampai dengan per-satuan 2,5
dukung tiang pancang beban normal dan untuk maksimum 1 m’ jarak antar tiang dalam satu group tiang pan

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.050 50,000.00
2 Mandor L.15 OH 0.005 75,000.00
3 Operator Crane L.19 OH 0.050 125,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Tiang Pancang beton tulang 40x40 cm M.38 m 1.030 504,000.00
Jumlah Harga Bahan
C Peralatan
1 Crane besar E.43 Hari-sewa 0.050 935,000.00
2 Alat pancang Kompresor Udara 8 ton E.40 Hari-sewa 0.050 442,000.00
3 Alat penyambung tiang pancang E.48 bh 0.250 200,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m' (D+E)

F.33 Turap Kayu Dolken


Per-m' panjang pemancangan turap kayu dolken diameter 8-10 cm untuk sampai dengan per-satuan 1
dukung per-tiang beban normal

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.025 50,000.00
2 Mandor L.15 OH 0.005 75,000.00
3 Operator Crane L.19 OH 0.025 125,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Kayu dolken dia 8 - 10 cm M.66 m 1.050 115,000.00
Jumlah Harga Bahan
C Peralatan
1 Crane kecil E.42 Hari-sewa 0.025 730,000.00
2 Alat pancang Kompresor Udara 8 ton E.40 Hari-sewa 0.025 442,000.00
3 Alat penyambung tiang pancang E.49 bh 0.250 25,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m' (D+E)

F.34 Turap Baja Profil Larsen


Per-m' panjang pemancangan turap baja profil Larsen lebar 350 mm untuk sampai dengan per-satuan 1
dukung per-tiang beban normal

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.035 50,000.00
2 Mandor L.15 OH 0.005 75,000.00
3 Operator Crane L.19 OH 0.035 125,000.00
4 Tukang las listrik L.14 OH 0.035 60,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Turap baja profi larsen lebar 350 mm M.129 m 1.050 140,000.00
Jumlah Harga Bahan
C Peralatan
1 Crane besar E.40 Hari-sewa 0.035 442,000.00
2 Alat pancang Kompresor Udara 8 ton E.40 Hari-sewa 0.035 442,000.00
3 Las listrik diesel (termasuk solar) E.44 Hari-sewa 0.025 235,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m' (D+E)

F.35 Turap Beton Bertulang Pre-cast (30 x 12 cm)


Per-m' panjang pemancangan turap beton bertulang pre-cast lebar 30 cm dan tebal 12 cm untuk sampai de
satuan 1 ton daya dukung tiang pancang beban normal

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.050 50,000.00
2 Mandor L.15 OH 0.005 75,000.00
3 Operator Crane L.19 OH 0.050 125,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Turap beton tulang pre-cast 30x12 cm M.35 m 1.030 100,000.00
Jumlah Harga Bahan
C Peralatan
1 Crane besar E.40 Hari-sewa 0.050 442,000.00
2 Alat pancang Kompresor Udara 8 ton E.40 Hari-sewa 0.050 442,000.00
3 Alat penyambung tiang pancang E.48 bh 0.350 200,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m' (D+E)

F.36 Turap Beton Bertulang Pre-cast (40 x 20)


Per-m' panjang pemancangan turap beton bertulang pre-cast lebar 40 cm dan tebal 20 cm untuk sampai de
1 ton daya dukung tiang pancang beban normal

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.065 50,000.00
2 Mandor L.15 OH 0.005 75,000.00
3 Operator Crane L.19 OH 0.065 125,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Turap beton tulang pre-cast 40x20 cm M.36 m 1.030 180,000.00
Jumlah Harga Bahan
C Peralatan
1 Crane besar E.42 Hari-sewa 0.065 730,000.00
2 Alat pancang Kompresor Udara 8 ton E.40 Hari-sewa 0.065 442,000.00
3 Alat penyambung tiang pancang E.48 bh 0.350 200,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m' (D+E)
ngan per-satuan 2,5 ton daya
m satu group tiang pancang

Jumlah
(Rp)

800.00
600.00
2,000.00
3,400.00

367,500.00
367,500.00

6,500.00
8,840.00
50,000.00
65,340.00
436,240.00
65,436.00
501,676.00

pai dengan per-satuan 2,5 ton


tiang dalam satu group tiang

Jumlah
(Rp)

1,250.00
750.00
3,125.00
1,500.00
6,625.00

505,000.00
3,712.50
508,712.50
18,250.00
11,050.00
5,875.00
35,175.00
550,512.50
82,576.88
633,089.38

mpai dengan per-satuan 2,5 ton


tiang dalam satu group tiang

Jumlah
(Rp)

1,250.00
750.00
3,125.00
1,500.00
6,625.00

580,750.00
3,712.50
584,462.50

18,250.00
11,050.00
5,875.00
35,175.00
626,262.50
93,939.38
720,201.88

ngan per-satuan 2,5 ton daya


m satu group tiang pancang

Jumlah
(Rp)

1,750.00
375.00
4,375.00
6,500.00

236,900.00
236,900.00

25,550.00
15,470.00
50,000.00
91,020.00
334,420.00
50,163.00
384,583.00

ngan per-satuan 2,5 ton daya


m satu group tiang pancang.

Jumlah
(Rp)

2,500.00
375.00
6,250.00
9,125.00

412,000.00
412,000.00

46,750.00
22,100.00
50,000.00
118,850.00
539,975.00
80,996.25
620,971.25

engan per-satuan 1 ton daya

Jumlah
(Rp)

7
1,250.00
375.00
3,125.00
4,750.00

40,250.00
40,250.00

8,125.00
11,050.00
50,000.00
69,175.00
114,175.00
17,126.25
131,301.25

dengan per-satuan 1 ton daya

Jumlah
(Rp)

1,750.00
375.00
4,375.00
2,100.00
8,600.00

147,000.00
147,000.00

25,550.00
15,470.00
5,875.00
46,895.00
202,495.00
30,374.25
232,869.25

cm untuk sampai dengan per-


Jumlah
(Rp)

2,500.00
375.00
6,250.00
9,125.00

206,000.00
206,000.00

36,500.00
22,100.00
70,000.00
128,600.00
343,725.00
51,558.75
395,283.75

cm untuk sampai dengan per-

Jumlah
(Rp)

3,250.00
375.00
8,125.00
11,750.00

309,000.00
309,000.00

47,450.00
28,730.00
70,000.00
146,180.00
466,930.00
70,039.50
536,969.50
ngan per-satuan 2,5 ton daya
satu group tiang pancang

Jumlah
(Rp)

800.00
600.00
2,000.00
3,400.00

367,500.00
367,500.00

6,500.00
8,840.00
50,000.00
65,340.00
436,240.00
65,436.00
501,676.00

sampai dengan per-satuan 2,5


tiang dalam satu group tiang

Jumlah
(Rp)

1,250.00
750.00
3,125.00
1,500.00
6,625.00

505,000.00
3,712.50
508,712.50

18,250.00
11,050.00
5,875.00
35,175.00
550,512.50
82,576.88
633,089.38

uk sampai dengan per-satuan


ar tiang dalam satu group tiang

Jumlah
(Rp)

1,250.00
750.00
3,125.00
1,500.00
6,625.00

505,000.00
3,712.50
508,712.50

23,375.00
11,050.00
5,875.00
40,300.00
555,637.50
83,345.63
638,983.13

ngan per-satuan 2,5 ton daya


satu group tiang pancang

Jumlah
(Rp)

1,750.00
375.00
4,375.00
6,500.00
236,900.00
236,900.00

32,725.00
15,470.00
58,750.00
106,945.00
350,345.00
52,551.75
402,896.75

ngan per-satuan 2,5 ton daya


satu group tiang pancang

Jumlah
(Rp)

2,500.00
375.00
6,250.00
9,125.00

519,120.00
519,120.00

46,750.00
22,100.00
58,750.00
127,600.00
655,845.00
98,376.75
754,221.75

dengan per-satuan 1 ton daya

Jumlah
(Rp)

1,250.00
375.00
3,125.00
4,750.00

120,750.00
120,750.00

23,375.00
11,050.00
58,750.00
93,175.00
218,675.00
32,801.25
251,476.25

dengan per-satuan 1 ton daya

Jumlah
(Rp)

1,750.00
375.00
4,375.00
2,100.00
8,600.00

147,000.00
147,000.00

32,725.00
15,470.00
5,875.00
54,070.00
209,670.00
31,450.50
241,120.50

cm untuk sampai dengan per-

Jumlah
(Rp)

7
2,500.00
375.00
6,250.00
9,125.00

206,000.00
206,000.00

46,750.00
22,100.00
70,000.00
138,850.00
353,975.00
53,096.25
407,071.25

15 cm untuk sampai dengan

Jumlah
(Rp)

3,250.00
375.00
8,125.00
11,750.00

309,000.00
309,000.00

60,775.00
28,730.00
82,250.00
171,755.00
492,505.00
73,875.75
566,380.75
ngan per-satuan 2,5 ton daya
satu group tiang pancang

Jumlah
(Rp)

800.00
600.00
2,000.00
3,400.00

367,500.00
367,500.00

14,600.00
17,000.00
50,000.00
81,600.00
452,500.00
67,875.00
520,375.00

sampai dengan per-satuan 2,5


tiang dalam satu group tiang

Jumlah
(Rp)

1,250.00
750.00
3,125.00
1,500.00
6,625.00

505,000.00
3,712.50
508,712.50

18,250.00
11,050.00
5,875.00
35,175.00
550,512.50
82,576.88
633,089.38

uk sampai dengan per-satuan


ar tiang dalam satu group tiang

Jumlah
(Rp)

1,250.00
750.00
3,125.00
1,500.00
6,625.00

580,750.00
3,712.50
584,462.50

18,250.00
11,050.00
5,875.00
35,175.00
626,262.50
93,939.38
720,201.88

ngan per-satuan 2,5 ton daya


satu group tiang pancang

Jumlah
(Rp)

1,750.00
375.00
4,375.00
6,500.00
298,700.00
298,700.00

25,550.00
15,470.00
58,750.00
99,770.00
404,970.00
60,745.50
465,715.50

ngan per-satuan 2,5 ton daya


satu group tiang pancang

Jumlah
(Rp)

2,500.00
375.00
6,250.00
9,125.00

519,120.00
519,120.00

36,500.00
22,100.00
58,750.00
117,350.00
645,595.00
96,839.25
742,434.25

dengan per-satuan 1 ton daya

Jumlah
(Rp)

1,250.00
375.00
3,125.00
4,750.00

40,250.00
40,250.00

8,125.00
11,050.00
6,250.00
25,425.00
70,425.00
10,563.75
80,988.75

dengan per-satuan 1 ton daya

Jumlah
(Rp)

1,750.00
375.00
4,375.00
2,100.00
8,600.00

147,000.00
147,000.00

15,470.00
15,470.00
5,875.00
36,815.00
192,415.00
28,862.25
221,277.25

2 cm untuk sampai dengan per

Jumlah
(Rp)

7
2,500.00
375.00
6,250.00
9,125.00

206,000.00
206,000.00

22,100.00
22,100.00
70,000.00
114,200.00
329,325.00
49,398.75
378,723.75

cm untuk sampai dengan per-

Jumlah
(Rp)

3,250.00
375.00
8,125.00
11,750.00

185,400.00
185,400.00

28,730.00
28,730.00
70,000.00
127,460.00
324,610.00
48,691.50
373,301.50

ngan per-satuan 2,5 ton daya


satu group tiang pancang

Jumlah
(Rp)
Jumlah
(Rp)

800.00
600.00
2,000.00
3,400.00

367,500.00
367,500.00

14,600.00
8,840.00
50,000.00
73,440.00
444,340.00
66,651.00
510,991.00

sampai dengan per-satuan 2,5


tiang dalam satu group tiang

Jumlah
(Rp)

1,250.00
750.00
3,125.00
1,500.00
6,625.00

505,000.00
3,712.50
508,712.50

23,375.00
18,750.00
5,875.00
48,000.00
563,337.50
84,500.63
647,838.13
uk sampai dengan per-satuan
ar tiang dalam satu group tiang

Jumlah
(Rp)

1,250.00
750.00
3,125.00
1,500.00
6,625.00

580,750.00
3,712.50
584,462.50

23,375.00
11,050.00
5,875.00
40,300.00
631,387.50
94,708.13
726,095.63

ngan per-satuan 2,5 ton daya


satu group tiang pancang

Jumlah
(Rp)

1,750.00
375.00
4,375.00
6,500.00

298,700.00
298,700.00

25,550.00
15,470.00
50,000.00
91,020.00
396,220.00
59,433.00
455,653.00

ngan per-satuan 2,5 ton daya


satu group tiang pancang

Jumlah
(Rp)

2,500.00
375.00
6,250.00
9,125.00

519,120.00
519,120.00

46,750.00
22,100.00
50,000.00
118,850.00
647,095.00
97,064.25
744,159.25

engan per-satuan 1 ton daya

Jumlah
(Rp)

1,250.00
375.00
3,125.00
4,750.00

120,750.00
120,750.00

18,250.00
11,050.00
6,250.00
35,550.00
161,050.00
24,157.50
185,207.50

dengan per-satuan 1 ton daya

Jumlah
(Rp)

1,750.00
375.00
4,375.00
2,100.00
8,600.00

147,000.00
147,000.00

15,470.00
15,470.00
5,875.00
36,815.00
192,415.00
28,862.25
221,277.25

cm untuk sampai dengan per-

Jumlah
(Rp)

2,500.00
375.00
6,250.00
9,125.00

103,000.00
103,000.00

22,100.00
22,100.00
70,000.00
114,200.00
226,325.00
33,948.75
260,273.75

cm untuk sampai dengan per-

Jumlah
(Rp)

3,250.00
375.00
8,125.00
11,750.00

185,400.00
185,400.00

47,450.00
28,730.00
70,000.00
146,180.00
343,330.00
51,499.50
394,829.50
AHSP.Pus Air.198

A.1 PEKERJAAN DEWATERING (D.xx)

D.01 Kistdam pasir/tanah dibungkus karung plastik bagor (sebesar karung beras 25 kg) uk. 43 cm x 6
buah)

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.020 50,000.00
2 Mandor L.15 OH 0.005 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Karung plastik / bagor M.156 bh 1.000 7,500.00
2 Tali rapia / plastik M.157 m 2.000 500.00
3 Sewa pasir (50% harga pasir) M.09 m3 0.070 70,000.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - buah (D+E)

D.02 Kerangka kayu untuk 1 m3 kistdam pasir/tanah uk. 23 cm x 65 cm


Diasumsikan karung plastik setelah diisi menjadi berukuran 16,5 cm x 30 cm x 50 cm atau untuk 36 bua
setiap m3. AHSP ini dihitung berdasarkan tinggi tumpukan kistdam 3 m dengan pemancangan kayu kaso
1 m ke dalam tanah

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.050 50,000.00
2 Tukang kayu L.06 OH 0.100 60,000.00
3 Mandor L.15 OH 0.005 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Kayu kaso ukuran 5/7 kelas II M.58 m3 0.075 5,870,000.00
2 Paku campuran 5 cm & 7 cm M.100 kg 0.650 12,500.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - 1 m3 (D+E)
AHSP.Pus Air.199

D.03 Kerangka baja profil L.40.40.4 atau profil union berlubang untuk 1 m3 kistdam pasir/tanah uk. 23
cm

Diasumsikan karung plastik setelah diisi menjadi berukuran 16,5 cm x 30 cm x 50 cm atau untuk 36 bua
setiap m3. AHSP ini dihitung berdasarkan tinggi tumpukan kistdam 3 m dengan pemancangan baja profil
1 m ke dalam tanah

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.050 50,000.00
2 Tukang besi L.08 OH 0.100 60,000.00
3 Mandor L.15 OH 0.005 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Baja profil L.40.40.4 M.96 m 20.400 16,667.75
(atau union profil berlubang)
2 Baut dia 12 mm panjang 2 cm M.136 bh 75.000 2,200.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - 1 m3 (D+E)

D.04 Pengoperasian per hari selama 24 jam pompa air diesel daya 5 kW dengan suction head max.
discharge head max. 20m (kapasitas 0,5 m3/s pada suction head 1m dan discharge head 10m)

Pengoperasian pompa diasumsikan akan beroperasi 24 jam dan disediakan 20% pompa cadangan (
untuk 5 buah pompa dioperasikan dan 1 cadangan), maka biaya operasi per 1 bh pompa:

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja (memantau mengalirnya air) L.01 OH 1.000 50,000.00
2 Operator pompa L.11 OH 3.000 60,000.00
3 Mandor L.15 OH 0.150 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Solar M.162 ltr 42.400 10,800.00
Jumlah Harga Bahan

C Peralatan
AHSP.Pus Air.200

1 Pompa air diesel 5 KW E.50 Hari-sewa 1.2 225,000.00


Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - 1 hari (D+E)

D.05 Pengoperasian per hari selama 24 jam pompa air diesel daya 10 kW dengan suction head max.
discharge head max. 20m (kapasitas 1 m3/s pada suction head 1m dan discharge head 10m)

Pengoperasian pompa diasumsikan akan beroperasi 24 jam dan disediakan 20% pompa cadangan (
untuk 5 buah pompa dioperasikan dan 1 cadangan), maka biaya operasi per 1 bh pompa:

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja (memantau mengalirnya air) L.01 OH 1.000 50,000.00
2 Operator pompa L.11 OH 3.000 60,000.00
3 Mandor L.15 OH 0.150 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Solar M.162 ltr 72.600 10,800.00
2 Oli M.164 ltr 0.300 30,250.00
Jumlah Harga Bahan
C Peralatan
1 Pompa air diesel 10 KW E.51 bh 1.2 442,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - 1 hari (D+E)

D.06 Pengoperasian per hari selama 24 jam pompa air diesel daya 20 kW dengan suction head max.
discharge head max. 20m (kapasitas 2 m3/s pada suction head 1m dan discharge head 10m)

Pengoperasian pompa diasumsikan akan beroperasi 24 jam dan disediakan 20% pompa cadangan (
untuk 5 buah pompa dioperasikan dan 1 cadangan), maka biaya operasi per 1 bh pompa:

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja (memantau mengalirnya air) L.01 OH 1.000 50,000.00
2 Operator pompa L.11 OH 4.000 60,000.00
3 Mandor L.15 OH 0.200 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
AHSP.Pus Air.201

1 Solar M.162 ltr 132.800 10,800.00


2 Oli M.164 ltr 0.500 30,250.00
Jumlah Harga Bahan
C Peralatan
1 Pompa air diesel 20 KW E.52 bh 1.2 830,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - 1 hari (D+E)
AHSP.Pus Air.202

25 kg) uk. 43 cm x 65 cm (1

Jumlah
(Rp)

1,000.00
375.00
1,375.00

7,500.00
1,000.00
4,900.00
13,400.00

-
14,775.00
2,216.25
16,991.25

cm atau untuk 36 buah karung


mancangan kayu kaso sedalam

Jumlah
(Rp)

2,500.00
6,000.00
375.00
8,875.00

440,250.00
8,125.00
448,375.00

-
457,250.00
68,587.50
525,837.50
AHSP.Pus Air.203

am pasir/tanah uk. 23 cm x 65

cm atau untuk 36 buah karung


emancangan baja profil sedalam

Jumlah
(Rp)

2,500.00
6,000.00
375.00
8,875.00

340,022.10

165,000.00
505,022.10

-
513,897.10
77,084.57
590,981.67

n suction head max. 3m dan


charge head 10m)

0% pompa cadangan (misalkan


pompa:

Jumlah
(Rp)

50,000.00
180,000.00
11,250.00
241,250.00

457,920.00
457,920.00
AHSP.Pus Air.204

270,000.00
270,000.00
969,170.00
145,375.50
1,114,545.50

an suction head max. 3m dan


arge head 10m)

0% pompa cadangan (misalkan


pompa:

Jumlah
(Rp)

50,000.00
180,000.00
11,250.00
241,250.00

784,080.00
9,075.00
793,155.00

530,400.00
530,400.00
1,564,805.00
234,720.75
1,799,525.75

an suction head max. 3m dan


arge head 10m)

0% pompa cadangan (misalkan


pompa:

Jumlah
(Rp)

50,000.00
240,000.00
15,000.00
305,000.00
AHSP.Pus Air.205

1,434,240.00
15,125.00
1,449,365.00

996,000.00
996,000.00
2,750,365.00
412,554.75
3,162,919.75
A.6 PEKERJAAN PINTU AIR DAN HIDROMEKANIK (H.xx)

H.01 Pintu Besi


a) 1 bh pintu uk. lebar 0,3 m dan tinggi 0,6 m, ulir tunggal

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 1.275 50,000.00
2 Tukang las L.14 OH 0.638 60,000.00
3 Kepala tukang L.07 OH 0.075 70,000.00
4 Mandor L.15 OH 0.004 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Baja L.40.40.4 M.96 m 5.400 16,667.75
2 Baja Pelat tebal 3 mm M.130 m2 0.270 105,000.00
3 Ulir kasar diameter 16 mm M.131 kg 4.000 50,000.00
4 Stang ulir diameter 16 mm M.132 bh 1.000 125,000.00
Jumlah Harga Bahan
C Peralatan
1 Mesin las listrik 250 A , diesel E.44 Hari-sewa 0.300 235,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - unit (D+E)

b) 1 bh pintu uk. lebar 0,4 m dan tinggi 0,6 m, ulir tunggal

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 1.700 50,000.00
2 Tukang las L.14 OH 0.850 60,000.00
3 Kepala tukang L.07 OH 0.100 70,000.00
4 Mandor L.15 OH 0.005 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Baja L.40.40.4 M.96 m 7.200 16,667.75
2 Baja Pelat tebal 3 mm M.130 m2 0.360 105,000.00
3 Ulir kasar diameter 16 mm M.131 kg 4.000 50,000.00
4 Stang ulir diameter 16 mm M.132 bh 1.000 125,000.00
Jumlah Harga Bahan
C Peralatan
1 Mesin las listrik 250 A , diesel E.44 Hari-sewa 0.400 235,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - unit (D+E)

c) 1 bh pintu uk. lebar 0,5 m dan tinggi 0,8 m, ulir tunggal

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 2.890 50,000.00
2 Tukang las L.14 OH 1.445 60,000.00
3 Kepala tukang L.07 OH 0.170 70,000.00
4 Mandor L.15 OH 0.009 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Baja L.40.40.4 M.96 m 12.240 16,667.75
2 Baja Pelat tebal 3 mm M.130 m2 0.612 105,000.00
3 Ulir kasar diameter 16 mm M.131 kg 4.500 50,000.00
4 Stang ulir diameter 16 mm M.132 bh 1.000 125,000.00
Jumlah Harga Bahan
C Peralatan
1 Mesin las listrik 250 A , diesel E.44 Hari-sewa 0.680 235,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - unit (D+E)

d) 1 bh pintu uk. lebar 0,8 m dan tinggi 1 m, ulir tunggal

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 5.780 50,000.00
2 Tukang las L.14 OH 2.890 60,000.00
3 Kepala tukang L.07 OH 0.340 70,000.00
4 Mandor L.15 OH 0.017 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Baja L.40.40.4 M.96 m 24.480 16,667.75
2 Baja Pelat tebal 3 mm M.130 m2 1.224 105,000.00
3 Ulir kasar diameter 16 mm M.131 kg 5.335 50,000.00
4 Stang ulir diameter 16 mm M.132 bh 1.000 125,000.00
Jumlah Harga Bahan
C Peralatan
1 Mesin las listrik 250 A , diesel E.44 Hari-sewa 1.360 235,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - unit (D+E)

H.02 Pintu Kayu Ranggka Besi


a) 1 bh pintu uk. lebar 1,2 m dan tinggi 1,4 m, ulir double

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 2.870 50,000.00
2 Tukang las L.14 OH 1.230 60,000.00
3 Kepala tukang L.07 OH 0.139 70,000.00
4 Mandor L.15 OH 0.026 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Baja L.50.50.5 M.97 m 7.954 28,335.00
2 Kayu kelas II (min) ukuran 10/15 M.54 m3 0.242 7,205,000.00
3 Ulir kasar diameter 16 mm M.131 kg 12.000 50,000.00
4 Stang ulir diameter 16 mm + gear M.133 set 2.000 175,000.00
Jumlah Harga Bahan
C Peralatan
1 Mesin las listrik 250 A , diesel E.44 Hari-sewa 0.279 235,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - unit (D+E)

b) 1 bh pintu uk. lebar 1 m dan tinggi 2 m, ulir double

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 5.000 50,000.00
2 Tukang las L.14 OH 1.500 60,000.00
3 Kepala tukang L.07 OH 0.200 70,000.00
4 Mandor L.15 OH 0.005 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Baja L.50.50.5 M.97 m 15.600 28,335.00
2 Kayu kelas II (min) ukuran 5/12 M.54 m3 0.144 7,205,000.00
3 Ulir kasar diameter 16 mm M.131 kg 17.500 50,000.00
4 Stang ulir diameter 16 mm + gear M.132 set 2.000 125,000.00
Jumlah Harga Bahan
C Peralatan
1 Mesin las listrik 250 A , diesel E.44 Hari-sewa 0.400 235,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - unit (D+E)

c) 1 bh pintu uk. lebar 1,4 m dan tinggi 2,5 m, ulir double

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 7.000 50,000.00
2 Tukang las L.14 OH 2.200 60,000.00
3 Kepala tukang L.07 OH 0.350 70,000.00
4 Mandor L.15 OH 0.070 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Baja L.50.50.5 M.97 m 19.200 28,335.00
2 Kayu kelas II (min) ukuran 8/12 M.54 m3 0.384 7,205,000.00
3 Ulir kasar diameter 16 mm M.131 kg 20.000 50,000.00
4 Stang ulir diameter 16 mm + gear M.132 set 2.000 125,000.00
Jumlah Harga Bahan
C Peralatan
1 Mesin las listrik 250 A , diesel E.44 Hari-sewa 0.500 235,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - unit (D+E)

d) 1 bh pintu uk. lebar 1,6 m dan tinggi 2,5 m, ulir double

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 7.000 50,000.00
2 Tukang las L.14 OH 2.500 60,000.00
3 Kepala tukang L.07 OH 0.350 70,000.00
4 Mandor L.15 OH 0.070 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Baja L.50.50.5 M.97 m 19.800 28,335.00
2 Kayu kelas II (min) ukuran 8/12 M.54 m3 0.432 7,205,000.00
3 Ulir kasar diameter 16 mm M.131 kg 23.748 50,000.00
4 Stang ulir diameter 16 mm + gear M.132 set 2.000 125,000.00
Jumlah Harga Bahan
C Peralatan
1 Mesin las listrik 250 A , diesel E.44 Hari-sewa 0.500 235,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - unit (D+E)

e) 1 bh pintu uk. lebar 1,8 m dan tinggi 2,5 m, ulir double

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 7.000 50,000.00
2 Tukang las L.14 OH 3.100 60,000.00
3 Kepala tukang L.07 OH 0.350 70,000.00
4 Mandor L.15 OH 0.070 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Baja L.50.50.5 M.97 m 20.400 28,335.00
2 Kayu kelas II (min) ukuran 10/15 M.54 m3 0.600 7,205,000.00
3 Ulir kasar diameter 16 mm M.131 kg 23.748 50,000.00
4 Stang ulir diameter 16 mm + gear M.132 set 2.000 125,000.00
Jumlah Harga Bahan
C Peralatan
1 Mesin las listrik 250 A , diesel E.44 Hari-sewa 0.720 235,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - unit (D+E)

f) 1 bh pintu uk. lebar 2 m dan tinggi 2,5 m, ulir double

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 7.000 50,000.00
2 Tukang las L.14 OH 3.100 60,000.00
3 Kepala tukang L.07 OH 0.350 70,000.00
4 Mandor L.15 OH 0.070 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Baja L.50.50.5 M.97 m 21.200 28,335.00
2 Kayu kelas II (min) ukuran 10/15 M.54 m3 0.660 7,205,000.00
3 Ulir kasar diameter 16 mm M.131 kg 23.748 50,000.00
4 Stang ulir diameter 16 mm + gear M.132 bh 2.000 125,000.00
Jumlah Harga Bahan
C Peralatan
1 Mesin las listrik 250 A , diesel E.44 Hari-sewa 0.800 235,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - unit (D+E)

H.03 Pintu Air Elektromekanik


a) Pintu Air
1) Pintu uk. lebar 2 m dan tinggi 2,5 m, ulir double pakai motor
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 7.000 50,000.00
2 Tukang las L.14 OH 3.500 60,000.00
3 Kepala tukang L.07 OH 0.350 70,000.00
4 Mandor L.15 OH 0.070 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Baja L.50.50.5 M.97 m 25.200 28,335.00
2 Kayu kelas II (min) ukuran 10/15 M.54 m3 0.660 7,205,000.00
3 Ulir halus diameter 20 mm M.134 bh 32.750 200,000.00
Jumlah Harga Bahan
C Peralatan
1 Mesin las listrik 250 A , diesel E.44 Hari-sewa 0.800 235,000.00
2 Stang ulir diameter 20 mm + gear M.135 set 2.000 300,000.00
3 Motor 2 KW 1350 rpm + pengkabelan M.183 set 1.000 10,000,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - unit (D+E)

2) Pintu uk. lebar 2,5 m dan tinggi 3,5 m, ulir double pakai motor
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 9.000 50,000.00
2 Tukang las L.14 OH 4.500 60,000.00
3 Kepala tukang L.07 OH 0.450 70,000.00
4 Mandor L.15 OH 0.100 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Baja L.50.50.5 M.97 m 25.200 28,335.00
2 Kayu kelas II (min) ukuran 10/15 M.54 m3 0.875 7,205,000.00
3 Ulir halus diameter 20 mm M.134 bh 42.500 200,000.00
Jumlah Harga Bahan
C Peralatan
1 Mesin las listrik 250 A , diesel E.44 Hari-sewa 1.200 235,000.00
2 Stang ulir diameter 20 mm + gear E.21 set 2.000 400,000.00
3 Motor 2 KW 1350 rpm + pengkabelan M.183 set 1.000 10,000,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - unit (D+E)

3) Pintu uk. lebar 3 m dan tinggi 3,5 m, ulir double pakai motor
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 10.800 50,000.00
2 Tukang las L.14 OH 5.400 60,000.00
3 Kepala tukang L.07 OH 0.540 70,000.00
4 Mandor L.15 OH 0.120 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Baja L.50.50.5 M.97 m 35.200 28,335.00
2 Kayu kelas II (min) ukuran 10/15 M.54 m3 1.050 7,205,000.00
3 Ulir halus diameter 20 mm M.134 bh 42.500 200,000.00
Jumlah Harga Bahan
C Peralatan
1 Mesin las listrik 250 A , diesel E.44 Hari-sewa 1.500 235,000.00
2 Stang ulir diameter 20 mm + gear E.47 set 2.000 750,000.00
3 Motor 2 KW 1350 rpm + pengkabelan M.183 set 1.000 10,000,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - unit (D+E)

4) Pintu uk. lebar 3,5 m dan tinggi 4,5 m, ulir double pakai motor
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 14.800 50,000.00
2 Tukang las L.14 OH 7.400 60,000.00
3 Kepala tukang L.07 OH 0.740 70,000.00
4 Mandor L.15 OH 0.150 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Baja L.50.50.5 M.97 m 51.200 28,335.00
2 Kayu kelas II (min) ukuran 10/15 M.54 m3 1.350 7,205,000.00
3 Ulir halus diameter 20 mm M.134 bh 57.500 200,000.00
Jumlah Harga Bahan
C Peralatan
1 Mesin las listrik 250 A , diesel E.44 Hari-sewa 1.500 235,000.00
2 Stang ulir diameter 20 mm + gear M.160 bh 1.000 7,500.00
3 Motor 2 KW 1350 rpm + pengkabelan M.183 bh 1.000 10,000,000.00
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - unit (D+E)

b) Ruang kontrol pintu air


Ruang kontrol adalah untuk mengoperasikan seluruh sistem pengoperasian pintu air elektromekanik
atas:
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6

A Tenaga Kerja
Pengawas bulan 2.5 3,500,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Bangunan bertingkat uk. 2 @3 x 5 m m2 30.000 3,250,000.00
(konstruksi atap beton bertulang; lantai
keramik, 4 pintu dan 4 jendela kaca mati).
Jumlah Harga Bahan

C Peralatan
1 Mimic Panel untuk 6 channel pintu air set 1.000 120,000,000.00
termasuk pengkabelan sistem sensor)
2 Perlengkapan ruang jaga: meja&kursi set 1.000 12,500,000.00
Jumlah Harga Peralatan

D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)


E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - unit (D+E)
Jumlah
(Rp)

63,750.00
38,280.00
5,250.00
300.00
107,580.00

90,005.85
28,350.00
200,000.00
125,000.00
443,355.85

70,500.00
70,500.00
621,435.85
93,215.38
714,651.23

Jumlah
(Rp)

85,000.00
51,000.00
7,000.00
375.00
143,375.00

120,007.80
37,800.00
200,000.00
125,000.00
482,807.80

94,000.00
94,000.00
720,182.80
108,027.42
828,210.22

Jumlah
(Rp)

144,500.00
86,700.00
11,900.00
675.00
243,775.00

204,013.26
64,260.00
225,000.00
125,000.00
618,273.26

159,800.00
159,800.00
1,021,848.26
153,277.24
1,175,125.50

Jumlah
(Rp)

289,000.00
173,400.00
23,800.00
1,275.00
487,475.00

408,026.52
128,520.00
266,750.00
125,000.00
928,296.52
319,600.00
319,600.00
1,735,371.52
260,305.73
1,995,677.25

Jumlah
(Rp)

143,500.00
73,800.00
9,730.00
1,950.00
228,980.00

225,376.59
1,743,610.00
600,000.00
350,000.00
2,918,986.59

65,565.00
65,565.00
3,213,531.59
482,029.74
3,695,561.33

Jumlah
(Rp)

250,000.00
90,000.00
14,000.00
375.00
354,375.00

442,026.00
1,037,520.00
875,000.00
250,000.00
2,604,546.00

94,000.00
94,000.00
3,052,921.00
457,938.15
3,510,859.15

Jumlah
(Rp)

350,000.00
132,000.00
24,500.00
5,250.00
511,750.00

544,032.00
2,766,720.00
1,000,000.00
250,000.00
4,560,752.00

117,500.00
117,500.00
5,190,002.00
778,500.30
5,968,502.30

Jumlah
(Rp)

350,000.00
150,000.00
24,500.00
5,250.00
529,750.00
561,033.00
3,112,560.00
1,187,400.00
250,000.00
5,110,993.00

117,500.00
117,500.00
5,758,243.00
863,736.45
6,621,979.45

Jumlah
(Rp)

350,000.00
186,000.00
24,500.00
5,250.00
565,750.00

578,034.00
4,323,000.00
1,187,400.00
250,000.00
6,338,434.00

169,200.00
169,200.00
7,073,384.00
1,061,007.60
8,134,391.60

Jumlah
(Rp)

350,000.00
186,000.00
24,500.00
5,250.00
565,750.00

600,702.00
4,755,300.00
1,187,400.00
250,000.00
6,793,402.00

188,000.00
188,000.00
7,547,152.00
1,132,072.80
8,679,224.80

Jumlah
(Rp)
7

350,000.00
210,000.00
24,500.00
5,250.00
589,750.00

714,042.00
4,755,300.00
6,550,000.00
12,019,342.00

188,000.00
600,000.00
10,000,000.00
10,788,000.00
23,397,092.00
3,509,563.80
26,906,655.80

Jumlah
(Rp)
7

450,000.00
270,000.00
31,500.00
7,500.00
759,000.00

714,042.00
6,304,375.00
8,500,000.00
15,518,417.00

282,000.00
800,000.00
10,000,000.00
11,082,000.00
27,359,417.00
4,103,912.55
31,463,329.55

Jumlah
(Rp)
7

540,000.00
324,000.00
37,800.00
9,000.00
910,800.00

997,392.00
7,565,250.00
8,500,000.00
17,062,642.00

352,500.00
1,500,000.00
10,000,000.00
11,852,500.00
29,825,942.00
4,473,891.30
34,299,833.30

Jumlah
(Rp)
7

740,000.00
444,000.00
51,800.00
11,250.00
1,247,050.00

1,450,752.00
9,726,750.00
11,500,000.00
22,677,502.00

352,500.00
7,500.00
10,000,000.00
10,360,000.00
34,284,552.00
5,142,682.80
39,427,234.80

air elektromekanik yang terdiri

Jumlah
(Rp)
7

8,750,000.00
8,750,000.00

97,500,000.00

97,500,000.00

120,000,000.00

12,500,000.00
132,500,000.00

238,750,000.00
35,812,500.00
274,562,500.00
AHSP.Pus Air.222

A.7 PEKERJAAN LIAN-LAIN (L.xx)

L.01 Pembersihan lapangan


a) Lihat T.01 Pembersihan dan striping/korsekan (1 m2) Rp.
b) Lihat T.02 Tebas tebang tanaman perdu (1 m2) Rp.
c) Lihat T.03 Cabut tunggul tanaman keras (1 pohon) Rp.

L.02 Pemagaran daerah kerja


1 m' pemagaran daerah kerja dengan seng gelombang BJLS-30, tinggi 1,8 m’ pakai rangka kayu atau ba
a) Rangka baja L.40.40.4

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.16 50,000.00
2 Tukang besi L.08 OH 0.10 60,000.00
3 Tukang tembok L.04 OH 0.10 60,000.00
3 Mandor L.15 OH 0.02 75,000.00
Jumlah Harga Tenaga Kerja
B Bahan
1 Seng Gelombang BJLS-30 (t=0,05) M.103 lbr 1.200 60,200.00
tinggi 1,8 m’ dan lebar 0,9m’
2 Baja L 40.40.4 M.96 m1 0.035 16,667.75
3 Kawat seng 3mm M.102 kg 0.300 25,000.00
4 PP M.08 m3 0.100 90,000.00
5 PC M.19 kg 12.000 1,240.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m2 (D+E)

b) Rangka Kayu

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A Tenaga Kerja
1 Pekerja L.01 OH 0.180 50,000.00
2 Tukang kayu L.06 OH 0.100 60,000.00
3 Tukang tembok L.04 OH 0.100 60,000.00
3 Mandor L.15 OH 0.001 75,000.00
Jumlah Harga Tenaga Kerja
AHSP.Pus Air.223

B Bahan
1 Seng Gelombang BJLS-30 (t=0,05) M.103 lbr 1.200 60,200.00
tinggi 1,8 m’ dan lebar 0,9m’
2 Kaso 5/7 kayu kelas II M.58 m3 0.035 5,870,000.00
3 Paku seng M.101 kg 0.300 14,500.00
4 Paku 7 cm M.100 kg 0.120 12,500.00
5 PP M.08 m3 0.100 90,000.00
6 PC M.19 kg 12.000 1,240.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C)
E Overhead + Profit 15% x D
F Harga Satuan Pekerjaan per - m (D+E)
2

L.03 Pembuatan direksi keet, los kerja dan gudang


1 m2 pembuatan direksi keet atap abses gelombang, dinding triplek, kaca nako.

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A. Tenaga Kerja
1 Pekerja L.01 OH 1.20 50,000.00
2 Tukang Tembok/batu L.04 OH 0.40 60,000.00
3 Kepala tukang batu L.03 OH 0.04 70,000.00
4 Mandor L.15 OH 0.05 75,000.00
Jumlah Harga Tenaga Kerja
B. Bahan
1 Kaso 5/7 M.58 m3 0.05 5,870,000.00
2 Dinding triplek 4mm M.69 lbr 0.60 45,000.00
3 Semen M.19 zak 0.52 62,000.00
4 Pasir pasang M.08 m3 0.10 90,000.00
5 Plafon asbes 3 mm M.160 lbr 1.00 7,500.00
6 Paku M.100 kg 0.75 12,500.00
7 Asbes gelombang M.159 lbr 0.30 50,000.00
8 Paku asbes M.99 kg 0.1 23,100.00
9 Floor lantai 1 : 3 : 5 m2 0.70 35,000.00
10 Pintu double teakwood rangka kayu m2 0.1 350,000.00
11 Jendela kaca nako daun 1.00 25,000.00
12 Cat dinding/plafon M.154 m2 1.00 9,362.50
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah harga tenaga, bahan dan peralatan ( A + B + C )
E Overhead & profit 15% x D
F Harga satuan pekerjaan ( D + E )
AHSP.Pus Air.224

L.04 Pembuatan papan nama pekerjaan


1 m2 papan nama proyek

Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)

1 2 3 4 5 6

A. Tenaga Kerja
1 Tukang kayu L.06 OH 0.50 60,000.00
2 Kepala tukang kayu L.05 OH 0.05 70,000.00
3 Pekerja L.01 OH 0.50 50,000.00
4 Mandor L.15 OH 0.01 75,000.00
Jumlah Harga Tenaga Kerja
B. Bahan
1 Multiplek tebal 12 mm M.72 Lbr 1.00 125,000.00
2 Paku campuran 5 cm dan 7cm M.100 Kg 0.25 12,500.00
3 Cat kayu M.154 kg 1.00 37,450.00
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan

D Jumlah harga tenaga, bahan dan peralatan ( A + B + C )


E Overhead & profit 15% x D
F Harga satuan pekerjaan ( D + E )

L.05 Mobilisasi alat berat

a) Investigasi Lapangan
Lokasi tempat peralatan mempunyai tingkat kesulitan sedang dengan tersedianya akses jalan kecil
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6

A. Tenaga Kerja
1 Akhli alat berat L.18 OH 2 400,000.00
2 Pelaksana kegiatan (Kontraktor) OH 3 400,000.00
3 Staf (Kontraktor) OH 4 400,000.00
Jumlah Harga Tenaga Kerja
B. Bahan

Jumlah Harga Bahan


C Peralatan
Jumlah Harga Peralatan

D Jumlah harga tenaga, bahan dan peralatan ( A + B + C )


E Overhead & profit 15% x D
F Harga satuan pekerjaan ( D + E )
*) disesuaikan dengan waktu pencapaian ke lokasi pekerjaan, transportasi oleh kontraktor
AHSP.Pus Air.225

b) Sewa Lahan
Lahan yang diperlukan untuk base camp dan tempat alat berat diperlukan luas 1,5 ha di daerah pe
lama waktu penyewaan diperkirakan sekitar 2 tahun, maka diperhitungkan selama 26 bulan
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6

A. Tenaga Kerja
Jumlah Harga Tenaga Kerja
B. Bahan

Jumlah Harga Bahan


C Peralatan
1 Sewa lahan ha/bulan 39 2,000,000.00
Jumlah Harga Peralatan

D Jumlah harga tenaga, bahan dan peralatan ( A + B + C )


E Overhead & profit 15% x D
F Harga satuan pekerjaan ( D + E )

c) Fasilitas
Berdasarkan asumsi kemudahan dalam pelaksanaan pekerjaan diperlukan luas berbagai fasilitas s
pada koefisien berikut ini.
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6

A. Tenaga Kerja

Jumlah Harga Tenaga Kerja


B. Bahan
1 Base Camp m2 100 580,337.50
2 Kantor m2 40 580,337.50
3 Barak m2 40 580,337.50
4 Bengkel m2 40 580,337.50
5 Gudang, dan lain-lain m2 80 580,337.50
Ruang Laboratorium (sesuai
7 m2 20 580,337.50
Gambar)

Jumlah Harga Bahan


C Peralatan
1 Peralatan laboratorium set 1.00 120,000,000.00
2 Perabotan & layanan set 1.00 25,000,000.00
Jumlah Harga Peralatan

D Jumlah harga tenaga, bahan dan peralatan ( A + B + C )


E Overhead & profit 15% x D
AHSP.Pus Air.226

F Harga satuan pekerjaan ( D + E )

d) Kebutuhan lain-lain
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6

A. Tenaga Kerja

Jumlah Harga Tenaga Kerja


B. Bahan
1 Perkuatan jalan yang dilalui - LS 25,000,000.00
2 Perkuatan jembatan yang dilalui - LS 42,000,000.00
3 Biaya pengaturan lalu lintas - LS 6,750,000.00
4 Alat dan biaya komunikasi - LS 12,500,000.00

Jumlah Harga Bahan


C Peralatan
Jumlah Harga Peralatan

D Jumlah harga tenaga, bahan dan peralatan ( A + B + C )


E Overhead & profit 15% x D
F Harga satuan pekerjaan ( D + E )

L.06 Foto dokumentasi


a) 1 Set foto dokumentasi menggunakan Camera Konvensional pakai Film
Jika menggunakan Camera dengan isi film selulosa
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6

A. Tenaga Kerja
Tukang foto dg kamera OH 0.01 250,000.00
Jumlah Harga Tenaga Kerja
B. Bahan
1 Film isi 36 roll 3 35,000.00
2 Cuci film roll 3 35,000.00
3 Cetak foto lbr 300 1,500.00
4 Album foto bh 6 52,000.00

Jumlah Harga Bahan


C Peralatan
Jumlah Harga Peralatan

D Jumlah harga tenaga, bahan dan peralatan ( A + B + C )


E Overhead & profit 15% x D
F Harga satuan pekerjaan ( D + E )

b) 1 Set foto dokumentasi menggunakan Camera Digital tanpa Film


AHSP.Pus Air.227

Menggunakan camera digital, untuk dokumentasinya dg CD dan album foto


Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6

A. Tenaga Kerja

Jumlah Harga Tenaga Kerja


B. Bahan
1 CD copy soft file foto image bh 3 10,000.00
2 Cetak Foto lbr 300 1,500.00
3 Album foto bh 6 52,000.00

Jumlah Harga Bahan


C Peralatan
Jumlah Harga Peralatan

D Jumlah harga tenaga, bahan dan peralatan ( A + B + C )


E Overhead & profit 15% x D
F Harga satuan pekerjaan ( D + E )

L.07 Test bahan dan pengujian mutu pekerjaan

L.08 Penggambaran
a) Peta situasi atau peta steak out bangunan
b) Penggambaran dengan CAD untuk 1 bh gambar (file autocad) layout, tampak potongan dan detail
kondisi tidak rumit dan banyak bentuk-bentuk duplikasi ukuran A1
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6

A. Tenaga Kerja
1 Drafter CAD L.24 OH 1.00 100,000.00
2 Desain engineer L.25 OH 0.05 400,000.00
Jumlah Harga Tenaga Kerja
B. Bahan

Jumlah Harga Bahan


C Peralatan
sewa-
1 Sewa komputer M.151 0.01 1,000,000.00
bulan
sewa-
2 Sewa scanner ukuran A4 M.152 0.01 250,000.00
bulan
Jumlah Harga Peralatan

D Jumlah harga tenaga, bahan dan peralatan ( A + B + C )


E Overhead & profit 15% x D
F Harga satuan pekerjaan ( D + E )
AHSP.Pus Air.228

c) Penggambaran secara manual untuk 1 buah gambar layout, tampak, potongan dan detail untuk ko
rumit dan banyak duplikasi bentuk gambar ukuran A1
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6

A. Tenaga Kerja
1 Drafter L.24 OH 1.25 100,000.00
2 Desain engineer L.25 OH 0.15 400,000.00
Jumlah Harga Tenaga Kerja
B. Bahan
1 Kertas HVS atau kalkir m2 0.3 7800
2 Tinta Rapido bh 0.05 12500
3 Pena Rapido bh 0.002 125000
Jumlah Harga Bahan
C Peralatan

Jumlah Harga Peralatan

D Jumlah harga tenaga, bahan dan peralatan ( A + B + C )


E Overhead & profit 15% x D
F Harga satuan pekerjaan ( D + E )

d) Pencetakan 1 buah gambar layout, tampak, potongan dan detail untuk kondisi tidak rumit ukuran A
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6

A. Tenaga Kerja
1 Operator printer L.26 OH 0.08 50,000.00
Jumlah Harga Tenaga Kerja
B. Bahan
1 Kertas HVS atau kalkir m2 0.3 7,800.00
2 Tinta hitam set 0.05 30,000.00
Jumlah Harga Bahan
C Peralatan
sewa-
1 Sewa komputer M.151 0.001 1,000,000.00
bulan
sewa-
2 Sewa scanner ukuran A4 M.152 0.01 250,000.00
bulan
Jumlah Harga Peralatan

D Jumlah harga tenaga, bahan dan peralatan ( A + B + C )


E Overhead & profit 15% x D
F Harga satuan pekerjaan ( D + E )

L.09 Copy atau penggandaan buku/kontrak/laporan


a) Fotocopy dan jilid
Harga Satuan
No Uraian Kode Satuan Koefisien
AHSP.Pus Air.229
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6

Lain-lain

Fotocopy kertas A4 M.170 halaman 30,000.00 250.00


Menjilid M.175 buah 200.00 7,500.00
A Jumlah
B Overhead & profit 15% x D
C Harga satuan pekerjaan ( D + E )

b) 1 set As built drawing (reduce dan copy kalkir serta blue/black print)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6

A Lain-lain
Copy kalkir Ac M.171 lembar 200 6,500.00
copy kalkir reduce z1% M.168 lembar 200 12,500.00
copy kalkir reduce z2% M.169 lembar 200 16,500.00
blue/black print Ac M.172 lembar 200 2,600.00
blue/black print A2 M.173 lembar 200 2,000.00
blue/black print A3 M.174 lembar 200 1,250.00
Menjilid A1 M.176 buah 20 17,500.00
Menjilid A2 M.177 buah 20 11,500.00
Menjilid A3 M.178 buah 20 6,750.00
A Jumlah
B Overhead & profit 15% x D
C Harga satuan pekerjaan ( D + E )

Ac adalah ukuran kertas gambar seperti A0, A1, A2.................dst


m Jumlah penggandaan contoh m = 20 kali
n Jumlah buku/jilid contoh n = 10 buah atau jilid
o Jumlah lembar
contohper o =buku/jilid
150 halaman, bisa saja tiap buku berbeda jumlah halamannya
z1 presentase reduksi ukuran contoh z1= 50% dari A1 ke A2
z2 presentase reduksi ukuran contoh z2= 25% dari A2 ke A4
AHSP.Pus Air.230

1,270.75
2,100.48
2,455.25

ai rangka kayu atau baja

Jumlah
(Rp)

8,000.00
6,000.00
6,000.00
1,500.00
21,500.00

72,240.00

583.37
7,500.00
9,000.00
14,880.00
104,203.37

-
125,703.37
18,855.51
144,558.88

Jumlah
(Rp)

9,000.00
6,000.00
6,000.00
75.00
21,075.00
AHSP.Pus Air.231

72,240.00
205,450.00
4,350.00
1,500.00
9,000.00
14,880.00
307,420.00

-
328,495.00
49,274.25
377,769.25

Jumlah
(Rp)

60,000.00
24,000.00
2,800.00
3,750.00
90,550.00

293,500.00
27,000.00
32,240.00
9,000.00
7,500.00
9,375.00
15,000.00
2,310.00
24,500.00
35,000.00
25,000.00
9,362.50
489,787.50

0
580,337.50
87,050.63
667,388.13
AHSP.Pus Air.232

Jumlah
(Rp)

30,000.00
3,500.00
25,000.00
750.00
59,250.00

125,000.00
3,125.00
37,450.00
165,575.00

224,825.00
33,723.75
258,548.75

ianya akses jalan kecil


Jumlah
(Rp)
7

800,000.00
1,200,000.00
1,600,000.00
3,600,000.00

3,600,000.00
540,000.00
4,140,000.00
AHSP.Pus Air.233

as 1,5 ha di daerah pedesaan


elama 26 bulan
Jumlah
(Rp)
7

78,000,000.00

78,000,000.00
11,700,000.00
89,700,000.00

uas berbagai fasilitas seperti

Jumlah
(Rp)
7

58,033,750.00
23,213,500.00
23,213,500.00
23,213,500.00
46,427,000.00

11,606,750.00

185,708,000.00

120,000,000.00
25,000,000.00
145,000,000.00

156,606,750.00
23,491,012.50
AHSP.Pus Air.234

180,097,762.50

Jumlah
(Rp)
7

25,000,000.00
42,000,000.00
6,750,000.00
12,500,000.00

86,250,000.00

86,250,000.00
12,937,500.00
99,187,500.00

Jumlah
(Rp)
7

2,500.00
2,500.00

105,000.00
105,000.00
450,000.00
312,000.00

972,000.00

974,500.00
97,450.00
1,071,950.00
AHSP.Pus Air.235

Jumlah
(Rp)
7

30,000.00
450,000.00
312,000.00

792,000.00

792,000.00
118,800.00
910,800.00

k potongan dan detail untuk

Jumlah
(Rp)
7

100,000.00
20,000.00
120,000.00

10,000.00

2,500.00
12,500.00

132,500.00
19,875.00
152,375.00
AHSP.Pus Air.236

an dan detail untuk kondisi tidak

Jumlah
(Rp)
7

125,000.00
60,000.00
185,000.00

2340
625
250
3215

188,215.00
28,232.25
216,447.25

si tidak rumit ukuran A1


Jumlah
(Rp)
7

4,000.00
4,000.00

2,340.00
1,500.00
3,840.00

1,000.00

2,500.00
3,500.00

11,340.00
1,701.00
13,041.00

Jumlah
AHSP.Pus Air.237
Jumlah
(Rp)
7

7,500,000.00
1,500,000.00
3,000,000.00
450,000.00
3,450,000.00

Jumlah
(Rp)
7

1,300,000.00
2,500,000.00
3,300,000.00
520,000.00
400,000.00
250,000.00
350,000.00
230,000.00
135,000.00
8,985,000.00
1,347,750.00
10,332,750.00
REKAPITULASI HARGA SATUAN PEKERJAAN
TAHUN 2011-2012
KOTA BANDUNG PROVINSI JAWA BARAT

No

1
A
1
1.1
1
2
3

1.2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

1.3
1
2
3
4
5
6
7
8

2
1
2
3
4
5
6
7
8
9
10
11
12
13
14

15

16

17
18
19
20
21
22
23
24
25

3
3.1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

3.2

1
2
3
4

3.3
1
2
3

3.4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

3.5
1
2
3
4
5
6

4
4.1
1

4.2
1

4.3
1

4.4
1

5
1
2
3
4

6
1
a)
b)
c)
d)
2
a)
b)
c)
d)
e)
f)

3
a)

b)

7
1

2
3
4

7
REKAPITULASI HARGA SATUAN PEKERJAAN
TAHUN 2011-2012
KOTA BANDUNG PROVINSI JAWA BARAT

Uraian

2
UMUM
PEKERJAAN TANAH (T.xx)
PEKERJAAN PEMBERSIHAN DAN PENGUPASAN PERMUKAAN TANAH
Pembersihan dan striping/kosrekan
Tebas tebang berupa memotong dan membersihkan lokasi dari tanaman/ tumbuhan
Cabut tunggul tanaman keras minimum diameter 15 cm dengan membuang sisa tunggul kayu dan akar-akar nya

PEKERJAAN GALIAN TANAH


Uitset trase saluran pembawa dan pembuang
Pasang profil melintang galian tanah jarak 50 m pada ruas saluran yang lurus
Pasang profil melintang galian tanah jarak 25 m pada ruas saluran tikungan
Pekerjaan Galian Tanah Biasa (Pada saluran sedalam < 1m, dibuang sejarak < 3 m, rata & rapi)
Pekerjaan Galian Tanah Biasa (Pada saluran sedalam 1 - 2 m, dibuang sejarak < 3 m, rata & rapi)
Pekerjaan Mengangkut Hasil Galian Tanah Biasa (Dibuang sejarak 3-10 m, rata & rapi)
Pekerjaan Mengangkut Hasil Galian Tanah Biasa (dibuang sejarak 10-50 m, rata & rapi)
Pekerjaan Mengangkut Hasil Galian Tanah Biasa (dibuang sejarak setiap 100 m, rata & rapi)
Pekerjaan Galian Tanah Keras (Pada saluran sedalam < 1m, dibuang sejarak < 3 m, rata & rapi)
Pekerjaan Galian Tanah Keras (Pada saluran sedalam 1 - 2 m, dibuang sejarak < 3 m, rata & rapi)
Pekerjaan Mengangkut Hasil Galian Tanah Keras (Dibuang sejarak 3-10 m, rata & rapi)
Pekerjaan Mengangkut Hasil Galian Tanah Keras (dibuang sejarak 10-50 m, rata & rapi)
Pekerjaan Mengangkut Hasil Galian Tanah Keras (dibuang sejarak setiap 100 m, rata & rapi)
Pekerjaan Galian Tanah Berbatu (Pada saluran sedalam < 1m, dibuang sejarak < 3 m, rata & rapi)
Pekerjaan Galian Tanah Berbatu (Pada saluran sedalam 1 - 2 m, dibuang sejarak < 3 m, rata & rapi)
Pekerjaan Mengangkut Hasil Galian Tanah Berbatu (Dibuang sejarak 3-10 m, rata & rapi)
Pekerjaan Mengangkut Hasil Galian Tanah Berbatu (dibuang sejarak 10-50 m, rata & rapi)
Pekerjaan Mengangkut Hasil Galian Tanah Berbatu (dibuang sejarak setiap 100 m, rata & rapi)
Pekerjaan Galian Tanah Lumpur (Pada saluran sedalam < 1m, dibuang sejarak < 3 m, rata & rapi)
Pekerjaan Galian Tanah Lumpur (Pada saluran sedalam 1 - 2 m, dibuang sejarak < 3 m, rata & rapi)
Pekerjaan Mengangkut Hasil Galian Tanah Lumpur (Dibuang sejarak 3-10 m, rata & rapi)
Pekerjaan Mengangkut Hasil Galian Tanah Lumpur (dibuang sejarak 10-50 m, rata & rapi)
Pekerjaan Mengangkut Hasil Galian Tanah Lumpur (dibuang sejarak setiap 100 m, rata & rapi)
Pekerjaan Galian Tanah Cadas (Pada saluran sedalam < 1m, dibuang sejarak < 3 m, rata & rapi)
Pekerjaan Galian Tanah Lumpur Cadas (Pada saluran sedalam 1 - 2 m, dibuang sejarak < 3 m, rata & rapi)
Pekerjaan Mengangkut Hasil Galian Tanah Cadas (Dibuang sejarak 3-10 m, rata & rapi)
Pekerjaan Mengangkut Hasil Galian Tanah Cadas(dibuang sejarak 10-50 m, rata & rapi)
Pekerjaan Mengangkut Hasil Galian Tanah Cadas (dibuang sejarak setiap 100 m, rata & rapi)
Pekerjaan Galian Pasir (Untuk fondasi bangunan sedalam < 1m, dibuang sejarak < 3 m, rata & rapi)

PEKERJAAN TIMBUNAN DAN PEMADATAN


Pekerjaan Timbunan tanah
Pekerjaan Pemadatan tanah
Pekerjaan Timbunan pasir sebagai bahan pengisi
Pekerjaan Pemadatan pasir sebagai bahan pengisi
Pekerjaan Timbunan tanah menggunakan buldozer
Pekerjaan Timbunan tanah menggunakan excavator atau Backhoe
Biaya operasioanal dump truck (mengangkut material tanah, jarak angkut 1 km)
Biaya operasional vibro roller

PEKERJAAN PASANGAN (P.xx)


Pekerjaan Pasangan batu dengan mortar jenis PC-PP (Mortar tipe M Campuran 1 PC : 2 Pasir)
Pekerjaan Pasangan batu dengan mortar jenis PC-PP (Mortar tipe S Campuran 1 PC : 3 Pasir)
Pekerjaan Pasangan batu dengan mortar jenis PC-PP (Mortar tipe N Campuran 1 PC : 4 Pasir)
Pekerjaan Pasangan batu dengan mortar jenis PC-PP (Mortar tipe O Campuran 1 PC : 5 Pasir)
Pekerjaan siaran dengan mortar jenis PC-PP (Mortar tipe M Campuran 1 PC : 2 Pasir)
Pekerjaan siaran dengan mortar jenis PC-PP (Mortar tipe S Campuran 1 PC : 3 Pasir)
Pekerjaan plesteran dengan mortar jenis PC-PP (Transram 1 cm, Mortar tipe M Campuran 1 PC : 2 Pasir)
Pekerjaan plesteran dengan mortar jenis PC-PP (Plesteran 1 cm, Mortar tipe S Campuran 1 PC : 3 Pasir)
Pekerjaan plesteran dengan mortar jenis PC-PP (Plesteran 1 cm, Mortar tipe N Campuran 1 PC : 4 Pasir)
Pekerjaan plesteran dengan mortar jenis PC-PP (Transram 1,5 cm, Mortar tipe M Campuran 1 PC : 2 Pasir)
Pekerjaan plesteran dengan mortar jenis PC-PP (Plesteran 1,5 cm, Mortar tipe S Campuran 1 PC : 3 Pasir)
Pekerjaan plesteran dengan mortar jenis PC-PP (Plesteran 1,5 cm, Mortar tipe N Campuran 1 PC : 4 Pasir)
Pekerjaan Pasangan Batu Kosong
Bronjong kawat uk. B=1,0 m x L=3,0 m x T=0,5 m berisi batu kali/belah sesuai dengan Pd T-04-2004-A, Pembuatan Bendu
Bronjong dengan Sekat Semi Kedap Air pada Irigasi Desa. Kawat bronjong anyaman heksagonal, diagonal lubang 15 cm, j
kawat digalvanis, anyaman tiga lilitan.
Menggunakan kawat f 3mm
2) Menggunakan kawat f 4mm
Bronjong kawat uk. B=1,0 m x L=3,0 m x T=0,5 m berisi batu kali/belah, Kawat bronjong anyaman heksagonal, diagonal lub
cm, jenis kawat digalvanis, anyaman tiga lilitan serta menggunakan rangka besi beton diameter 10 - 12 mm.
1) Menggunakan kawat f 3mm
2) Menggunakan kawat f 4mm
Bronjong kawat uk. B=1,0 m x L=3,0 m x T=0,5 m berisi batu kali/belah, Kawat bronjong anyaman heksagonal, diagonal lub
cm, jenis kawat digalvanis di las satu sama lain dibuat di pabrik serta menggunakan pengikat/penyambung dengan kawat b
diameter 4 mm. 1)
Menggunakan kawat f 6mm
2) Menggunakan kawat f 8mm
3) Menggunakan kawat f 10mm
Fondasi cerucuk untuk beronjong, HSP 1 m panjang cerucuk kayu/bambu diameter 8 cm – 10 cm
Pekerjaan Pemasangan modul 1 m3 bronjong kawat menjadi struktur krib
Pekerjaan Pasangan batu muka
Pekerjaan Pasangan batu candi
Pekerjaan Pemasangan Geotekstil
Pekerjaan Pasangan Bar Screen/saringan kasar (besi beton dia 12mm jarak 3,5cm)
Pekerjaan Pasangan bangunan pengukur dan pengatur (Rechbox / Cipoleti / V-note) Dengan besi siku L.40.40.4
Pekerjaan Buis beton diangkut < 30 m dan dipasang untuk konstruksi pengaman pantai
Pekerjaan Pengecoran buis beton diameter 1 m' dengan camputran beton f'c= 7,4MPa(K-100)

PEKERJAAN BETON (B.xx)


PEKERJAAN PEMBUATAN BETON
Pekerjaan 1 m3 beton untuk lantai kerja (bedding)
Pekerjaan 1 m3 beton mutu, f’c = 7,4 MPa (K100), slump (12±2) cm, w/c = 0,87 (Manual)
Pekerjaan 1 m3 beton mutu, f’c = 7,4 MPa (K100), slump (12±2) cm, w/c = 0,87 (Molen)
Pekerjaan 1 m3 beton mutu, f’c = 9,8 MPa (K125), slump (12±2) cm, w/c = 0,78 (Manual)
Pekerjaan 1 m3 beton mutu, f’c = 9,8 MPa (K125), slump (12±2) cm, w/c = 0,78 (Molen)
Pekerjaan 1 m3 beton mutu, f’c = 12,2 MPa (K150), slump (12±2) cm, w/c = 0,72 (Manual)
Pekerjaan 1 m3 beton mutu, f’c = 12,2 MPa (K150), slump (12±2) cm, w/c = 0,72 (Molen)
Pekerjaan 1 m3 beton mutu, f’c = 14,5 MPa (K175), slump (12±2) cm, w/c = 0,66 (Manual)
Pekerjaan 1 m3 beton mutu, f’c = 14,5 MPa (K175), slump (12±2) cm, w/c = 0,66 (Molen)
Pekerjaan 1 m3 beton mutu, f’c = 14,5 MPa (K175), slump (12±2) cm, w/c = 0,66 (R+P)
Pekerjaan 1 m3 beton mutu, f’c = 16,9 MPa (K200), slump (12±2) cm, w/c = 0,61 (Manual)
Pekerjaan 1 m3 beton mutu, f’c = 16,9 MPa (K200), slump (12±2) cm, w/c = 0,61 (Molen)
Pekerjaan 1 m3 beton mutu, f’c = 16,9 MPa (K200), slump (12±2) cm, w/c = 0,61 (R+P)
Pekerjaan 1 m3 beton mutu, f’c = 19,3 MPa (K225), slump (12±2) cm, w/c = 0,58 (Manual)
Pekerjaan 1 m3 beton mutu, f’c = 19,3 MPa (K225), slump (12±2) cm, w/c = 0,58 (Molen)
Pekerjaan 1 m3 beton mutu, f’c = 19,3 MPa (K225), slump (12±2) cm, w/c = 0,58 (R+P)
Pekerjaan 1 m3 beton mutu, f’c = 21,7 MPa (K250), slump (12±2) cm, w/c = 0,56 (Manual)
Pekerjaan 1 m3 beton mutu, f’c = 21,7 MPa (K250), slump (12±2) cm, w/c = 0,56 (Molen)
Pekerjaan 1 m3 beton mutu, f’c = 21,7 MPa (K250), slump (12±2) cm, w/c = 0,56 (R+P)
Pekerjaan 1 m3 beton mutu, f’c = 24,0 MPa (K275), slump (12±2) cm, w/c = 0,53 (Manual)
Pekerjaan 1 m3 beton mutu, f’c = 24,0 MPa (K275), slump (12±2) cm, w/c = 0,53 (Molen)
Pekerjaan 1 m3 beton mutu, f’c = 24,0 MPa (K275), slump (12±2) cm, w/c = 0,53 (R+P)
Pekerjaan 1 m3 beton mutu, f’c = 26,4 MPa (K300), slump (12±2) cm, w/c = 0,52 (Manual)
Pekerjaan 1 m3 beton mutu, f’c = 26,4 MPa (K300), slump (12±2) cm, w/c = 0,52 (Molen)
Pekerjaan 1 m3 beton mutu, f’c = 26,4 MPa (K300), slump (12±2) cm, w/c = 0,52 (R+P)
Pekerjaan 1 m3 beton mutu, f’c = 28,8 MPa, (K325), slump (12±2) cm, w/c = 0,49 (Manual)
Pekerjaan 1 m3 beton mutu, f’c = 28,8 MPa, (K325), slump (12±2) cm, w/c = 0,49 (Molen)
Pekerjaan 1 m3 beton mutu, f’c = 28,8 MPa, (K325), slump (12±2) cm, w/c = 0,49 (R+P)
Pekerjaan 1 m3 beton mutu, f’c = 31,2 MPa, (K350), slump (12±2) cm, w/c = 0,48 (Manual)
Pekerjaan 1 m3 beton mutu, f’c = 31,2 MPa, (K350), slump (12±2) cm, w/c = 0,48 (Molen)
Pekerjaan 1 m3 beton mutu, f’c = 31,2 MPa, (K350), slump (12±2) cm, w/c = 0,48 (R+P)

Penambahan koefisien tenaga kerja dan peralatan untuk mengangkut/menaikan campuran beton setiap kenaikan v
m dan jarak horizontal setiap 25 m ke tapak pemasangan
Pekerjaan 1 m3 beton dicorkan pada tapak berjarak < 25 m dengan ketinggian/kedalaman < 1 m (Manual)
Pekerjaan 1 m3 beton dicorkan pada tapak berjarak < 25 m dengan ketinggian/kedalaman < 1 m (Molen)
Pekerjaan 1 m3 beton dicorkan pada tapak berjarak < 25 m dengan ketinggian/kedalaman < 1 m (Tenaga manual + Vibrato
Pekerjaan 1 m3 beton dicorkan pada tapak berjarak setiap tambahan jarak 25 m (horizontal), menggunakan tenaga manua
upah kerja angkut dan cor
Pekerjaan 1 m3 beton dicorkan pada tapak berjarak setiap tambahan jarak 25 m (horizontal), menggunakan peralatan pom
beton
Pekerjaan 1 m3 beton dicorkan pada tapak setiap kenaikan 3 m - 4 m (vertikal), menggunakan tenaga manual, maka upah
angkut dan cor
Pekerjaan 1 m3 beton dicorkan pada tapak setiap kenaikan 3 m - 4 m (vertikal), menggunakan peralatan pompa beton

PEKERJAAN PEMBESIAN BETON


Pekerjaan Pembesian 100 kg dengan besi polos atau ulir
Pekerjaan Pembesian 100 kg jaring kawat (wire mesh)
Pekerjaan Penambahan koefisien tenaga kerja dan peralatan untuk mengangkut/menaikkan 100 kg tulangan setiap kenaik
vertikal 4m atau jarak horizontal setiap 25 m ke tapak pemasangan secara manual (kenaikan 4m)

Pekerjaan Penambahan koefisien tenaga kerja dan peralatan untuk mengangkut/menaikkan 100 kg tulangan setiap kenaik
vertikal 4m atau jarak horizontal setiap 25 m ke tapak pemasangan secara mekanis (penambahan jarak horizontal 10m s.d
Pekerjaan Penambahan koefisien tenaga kerja dan peralatan untuk mengangkut/menaikkan 100 kg tulangan setiap kenaik
vertikal 4m atau jarak horizontal setiap 25 m ke tapak pemasangan secara mekanis (penambahan jarak horizontal 25m)
Pekerjaan Pembesian 100 kg kabel prestressed polos/strand

PEKERJAAN PEMBUATAN/PENYEDIAAN BEKISTING BETON


Pekerjaan 1 m2 Bekisting untuk permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah)
Pekerjaan 1 m2 Bekisting untuk permukaan beton biasa dengan papan ukuran 3/20 cm (tanpa perancah)
Pekerjaan 1 m2 bekisting untuk permukaan beton expose dengan multiflex 12 mm atau 18 mm - kaso 5/7 cm (tanpa peran
Pekerjaan 1 m2 perancah bekisting kaso 5/7 cm tinggi 4 m*
Pekerjaan 1 m2 perancah bekisting kayu dolken diameter 8 cm – 10 cm tinggi 4 m **
Pekerjaan Bekisting balok beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah)
Pekerjaan Perancah Bekisting balok dengan Kaso 5/7 tinggi 4 m
Pekerjaan Perancah Bekisting balok dengan Kayu dolken diameter 8 cm tinggi 4 m
Pekerjaan Bekisting kolom beton biasa dengan multiflex 12 mm atau 18 mm
Pekerjaan Bekisting kolom beton biasa dengan papan ukuran 3/20 cm
Pekerjaan Bekisting dinding beton biasa dengan multiflex 12 mm atau 18 mm
Pekerjaan Bekisting dinding beton biasa dengan papan ukuran 3/20 cm
Pekerjaan Bekisting fondasi dan sloof beton biasa dengan multiflex 12 mm/18 mm
Pekerjaan Bekisting fondasi dan sloof beton biasa dengan papan ukuran 3/20 cm
Pekerjaan Bongkar 1 m2 bekisting secara biasa
Pekerjaan Bongkar 1 m2 bekisting secara hati-hati
Pekerjaan Menggenangi air 100 m2 permukaan beton
Pekerjaan Menyirami air 100 m2 permukaan beton (Memasang 100 m2 terpal/karung goni basah)
Pekerjaan Menyirami air 100 m2 permukaan beton (Menyirami m2 Terpal/Karung Goni dengan air selama 4 hari)

PEKERJAAN PEMBONGKARAN KONSTRUKSI BETON DALAM RANGKA RENOVASI


Pekerjaan Bongkar beton secara konvensional
Pekerjaan Bongkar beton dengan Jack Hammer
Pekerjaan Memasang 1m water stop PVC lebar 150 mm
Pekerjaan Memasang 1 m water stop PVC lebar 200 mm
Pekerjaan Memasang 1m water stop PVC lebar 230 mm – 320 mm
Pekerjaan Pemasangan water stop 1m Rubber lebar 150 mm – 200 mm

PEKERJAAN PEMANCANGAN (F.xx)

Analisis koefisien satuan pekerjaan pemancangan dengan Hammer tanpa mesin


Pemancangan tiang pancang kayu gelondongan diameter 20 cm untuk sampai dengan per-satuan 2,5 ton daya dukung tia
pancang beban normal dan untuk maksimum 1,5 m’ jarak antar tiang dalam satu group tiang pancang
Pemancangan tiang pancang baja pipa diameter 30 cm ukuran 30 x 30 cm untuk sampai dengan per-satuan 2,5 ton daya d
tiang pancang beban normal dan untuk maksimum 1,5 m’ jarak antar tiang dalam satu group tiang pancang
Pemancangan tiang pancang baja kotak diameter 30 cm ukuran 30 x 30 cm untuk sampai dengan per-satuan 2,5 ton daya
tiang pancang beban normal dan untuk maksimum 1,5 m’ jarak antar tiang dalam satu group tiang pancang
Pemancangan tiang pancang beton bertulang ukuran 30 x 30 cm untuk sampai dengan per-satuan 2,5 ton daya dukung tia
pancang beban normal dan untuk maksimum 1,5 m’ jarak antar tiang dalam satu group tiang pancang
Pemancangan tiang pancang beton bertulang ukuran 40 x 40 cm untuk sampai dengan per-satuan 2,5 ton daya dukung tia
pancang beban normal dan untuk maksimum 1,5 m’ jarak antar tiang dalam satu group tiang pancang.
Pemancangan turap kayu dolken diameter 8-10 cm untuk sampai dengan per-satuan 1 ton daya dukung per-tiang beban n

Pemancangan turap baja profil Larsen lebar 350 mm untuk sampai dengan per-satuan 1 ton daya dukung per-tiang beban

Pemancangan turap beton bertulang pre-cast lebar 30 cm dan tebal 12 cm untuk sampai dengan per-satuan 1 ton daya du
tiang pancang beban normal
Pemancangan turap beton bertulang pre-cast lebar 40 cm dan tebal 15 cm untuk sampai dengan per-satuan 1 ton daya du
tiang pancang beban normal

Analisis koefisien satuan pekerjaan pemancangan dengan mesin tenaga uap


Pemancangan tiang pancang kayu gelondongan diameter 20 cm untuk sampai dengan per-satuan 2,5 ton daya dukung tia
pancang beban normal dan untuk maksimum 1 m’ jarak antar tiang dalam satu group tiang pancang
Pemancangan tiang pancang baja pipa diameter 30 cm atau ukuran 30 x 30 cm untuk sampai dengan per-satuan 2,5 ton d
dukung tiang pancang beban normal dan untuk maksimum 1 m’ jarak antar tiang dalam satu group tiang pancang
Pemancangan tiang pancang baja kotak diameter 30 cm atau ukuran 30 x 30 cm untuk sampai dengan per-satuan 2,5 ton
dukung tiang pancang beban normal dan untuk maksimum 1 m’ jarak antar tiang dalam satu group tiang pancang
Pemancangan tiang pancang beton bertulang ukuran 30 x 30 cm untuk sampai dengan per-satuan 2,5 ton daya dukung tia
pancang beban normal dan untuk maksimum 1 m’ jarak antar tiang dalam satu group tiang pancang
Pemancangan tiang pancang beton bertulang ukuran 40 x 40 cm untuk sampai dengan per-satuan 2,5 ton daya dukung tia
pancang beban normal dan untuk maksimum 1 m’ jarak antar tiang dalam satu group tiang pancang
Pemancangan turap kayu dolken diameter 10-12 cm untuk sampai dengan per-satuan 1 ton daya dukung per-tiang beban

Pemancangan turap baja profil Larsen lebar 350 mm untuk sampai dengan per-satuan 1 ton daya dukung per-tiang beban

Ppemancangan turap beton bertulang pre-cast lebar 30 cm dan tebal 12 cm untuk sampai dengan per-satuan 1 ton daya d
tiang pancang beban normal
Pemancangan turap beton bertulang pre-cast lebar 40 cm dan tebal 15 cm untuk sampai dengan per-1 ton daya dukung
pancang beban normal

Analisis koefisien satuan pekerjaan pemancangan dengan mesin tenaga diesel


Pemancangan tiang pancang kayu gelondongan diameter 20 cm untuk sampai dengan per-satuan 2,5 ton daya dukung tia
pancang beban normal dan untuk maksimum 1 m’ jarak antar tiang dalam satu group tiang pancang
Pemancangan tiang pancang baja pipa diameter 30 cm atau ukuran 30 x 30 cm untuk sampai dengan per-satuan 2,5 ton d
dukung tiang pancang beban normal dan untuk maksimum 1 m’ jarak antar tiang dalam satu group tiang pancang
Pemancangan tiang pancang baja kotak diameter 30 cm atau ukuran 30 x 30 cm untuk sampai dengan per-satuan 2,5 ton
dukung tiang pancang beban normal dan untuk maksimum 1 m’ jarak antar tiang dalam satu group tiang pancang
Pemancangan tiang pancang beton bertulang ukuran 30 x 30 cm untuk sampai dengan per-satuan 2,5 ton daya dukung tia
pancang beban normal dan untuk maksimum 1 m’ jarak antar tiang dalam satu group tiang pancang
Pemancangan tiang pancang beton bertulang ukuran 40 x 40 cm untuk sampai dengan per-satuan 2,5 ton daya dukung tia
pancang beban normal dan untuk maksimum 1 m’ jarak antar tiang dalam satu group tiang pancang
Pemancangan turap kayu dolken diameter 10-12 cm untuk sampai dengan per-satuan 1 ton daya dukung per-tiang beban

Pemancangan turap baja profil Larsen lebar 350 mm untuk sampai dengan per-satuan 1 ton daya dukung per-tiang beban

Ppemancangan turap beton bertulang pre-cast lebar 30 cm dan tebal 12 cm untuk sampai dengan per-satuan 1 ton daya d
tiang pancang beban normal
Pemancangan turap beton bertulang pre-cast lebar 40 cm dan tebal 15 cm untuk sampai dengan per-1 ton daya dukung
pancang beban normal

Analisis koefisien satuan pekerjaan pemancangan dengan kompresor udara


Pemancangan tiang pancang kayu gelondongan diameter 20 cm untuk sampai dengan per-satuan 2,5 ton daya dukung tia
pancang beban normal dan untuk maksimum 1 m’ jarak antar tiang dalam satu group tiang pancang
Pemancangan tiang pancang baja pipa diameter 30 cm atau ukuran 30 x 30 cm untuk sampai dengan per-satuan 2,5 ton d
dukung tiang pancang beban normal dan untuk maksimum 1 m’ jarak antar tiang dalam satu group tiang pancang
Pemancangan tiang pancang baja kotak diameter 30 cm atau ukuran 30 x 30 cm untuk sampai dengan per-satuan 2,5 ton
dukung tiang pancang beban normal dan untuk maksimum 1 m’ jarak antar tiang dalam satu group tiang pancang
Pemancangan tiang pancang beton bertulang ukuran 30 x 30 cm untuk sampai dengan per-satuan 2,5 ton daya dukung tia
pancang beban normal dan untuk maksimum 1 m’ jarak antar tiang dalam satu group tiang pancang
Pemancangan tiang pancang beton bertulang ukuran 40 x 40 cm untuk sampai dengan per-satuan 2,5 ton daya dukung tia
pancang beban normal dan untuk maksimum 1 m’ jarak antar tiang dalam satu group tiang pancang
Pemancangan turap kayu dolken diameter 10-12 cm untuk sampai dengan per-satuan 1 ton daya dukung per-tiang beban

Pemancangan turap baja profil Larsen lebar 350 mm untuk sampai dengan per-satuan 1 ton daya dukung per-tiang beban

Ppemancangan turap beton bertulang pre-cast lebar 30 cm dan tebal 12 cm untuk sampai dengan per-satuan 1 ton daya d
tiang pancang beban normal
Pemancangan turap beton bertulang pre-cast lebar 40 cm dan tebal 15 cm untuk sampai dengan per-1 ton daya dukung
pancang beban normal

PEKERJAAN DEWATERING (D.xx)


Kistdam pasir/tanah dibungkus karung plastik bagor (sebesar karung beras 25 kg) uk. 43 cm x 65 cm
Kerangka kayu untuk 1 m3 kistdam pasir/tanah uk. 23 cm x 65 cm
Kerangka baja profil L.40.40.4 atau profil union berlubang untuk 1 m3 kistdam pasir/tanah uk. 23 cm x 65 cm
Pengoperasian per hari selama 24 jam pompa air diesel daya 5 kW dengan suction head max. 3m dan discharge head max
(kapasitas 0,5 m3/s pada suction head 1m dan discharge head 10m)
Pengoperasian per hari selama 24 jam pompa air diesel daya 10 kW dengan suction head max. 3m dan discharge head ma
(kapasitas 1 m3/s pada suction head 1m dan discharge head 10m)
Pengoperasian per hari selama 24 jam pompa air diesel daya 20 kW dengan suction head max. 3m dan discharge head ma
(kapasitas 2 m3/s pada suction head 1m dan discharge head 10m)

PEKERJAAN PINTU AIR DAN HIDROMEKANIK (H.xx)


Pintu besi
Pintu uk. lebar 0,3 m dan tinggi 0,6 m, ulir tunggal
Pintu uk. lebar 0,4 m dan tinggi 0,6 m, ulir tunggal
Pintu uk. lebar 0,5 m dan tinggi 0,8 m, ulir tunggal
Pintu uk. lebar 0,8 m dan tinggi 1 m, ulir tunggal
Pintu Kayu Rangka Besi
Pintu uk. lebar 1,2 m dan tinggi 1,4 m, ulir double
Pintu uk. lebar 1 m dan tinggi 2 m, ulir double
Pintu uk. lebar 1,4 m dan tinggi 2,5 m, ulir double
Pintu uk. lebar 1,6 m dan tinggi 2,5 m, ulir double
Pintu uk. lebar 1,8 m dan tinggi 2,5 m, ulir double
Pintu uk. lebar 2 m dan tinggi 2,5 m, ulir double

Pintu Air Elektromekanik


Pintu air
1) Pintu uk. lebar 2 m dan tinggi 2,5 m, ulir double pakai motor
2) Pintu uk. lebar 2,5 m dan tinggi 3,5 m, ulir double pakai motor
3) Pintu uk. lebar 3 m dan tinggi 3,5 m, ulir double pakai motor
4) Pintu uk. lebar 3,5 m dan tinggi 4,5 m, ulir double pakai motor

Ruang Kontrol Pintu Air

PEKERJAAN LIAN-LAIN (L.xx)


Pemagaran daerah kerja dengan seng gelombang BJLS-30, tinggi 1,8 m’: 1) dengan rangka baja
Pemagaran daerah kerja dengan seng gelombang BJLS-30, tinggi 1,8 m’: 2) dengan rangka kayu
Pembuatan direksi keet, los kerja dan gudang
Pembuatan papan nama pekerjaan
Mobilisasi alat berat: a) Investigasi Lapangan
Mobilisasi alat berat: b) Sewa lahan
Mobilisasi alat berat: c) Fasilitas
Mobilisasi alat berat: d) Kebutuhan Lain-lain
Foto Dokumentasi : a) 1 Set foto dokumentasi menggunakan Camera konvensional pakai film
Foto Dokumentasi : b) 1 Set foto dokumentasi menggunakan Camera Digital tanpa film
Penggambaran : a) Ukuran A1 dengan CAD
Penggambaran : b) Ukuran A1 dengan manual
Penggambaran : c) Pencetakan gambar ukuran A1
Copy atau penggandaan buku/kontrak/laporan: a) Fotocopy dan jilid
Copy atau penggandaan buku/kontrak/laporan: b) 1 set As Built Drawing
Sudah termasuk 15%
overhead+profit
Kode Harga Satuan Harga Satuan Harga Satuan Harga Satuan
Satuan (AHSP) Pekerjaan (HSP) Upah Kerja Bahan Alat
( Rp. ) (Rp) (Rp) (Rp)
3 4 5 6 7 8

/ 1m2 T.01 1,270.75 705.00 - 400.00


/ 1m2 T.02 2,100.48 1,115.00 71.50 640.00
/ 1phn T.03 2,455.25 1,915.00 - 220.00

/ 1m T.04 1,322.50 650.00 - 500.00


/ 1m T.05 71,642.13 9,375.00 52,722.50 200.00
/ 1m T.06 143,054.25 18,750.00 105,445.00 200.00
/ 1m3 T.07 a) 40,485.75 35,205.00 - -
/ 1m3 T.07 b) 48,558.75 42,225.00 - -
/ 1m3 T.07 c) 14,950.00 13,000.00 - -
/ 1m3 T.07 d) 43,470.00 37,800.00 - -
/ 1m3 T.07 e) 77,050.00 67,000.00 - -
/ 1m3 T.08 a) 69,569.25 46,995.00 - 13,500.00
/ 1m3 T.08 b) 61,065.00 51,750.00 - 1,350.00
/ 1m3 T.08 c) 19,837.50 17,250.00 - -
/ 1m3 T.08 d) 33,982.50 29,550.00 - -
/ 1m3 T.08 e) 77,050.00 67,000.00 - -
/ 1m3 T.09 a) 81,563.75 70,925.00 - -
/ 1m3 T.09 b) 81,563.75 70,925.00 - -
/ 1m3 T.09 c) 19,837.50 17,250.00 - -
/ 1m3 T.09 d) 33,982.50 29,550.00 - -
/ 1m3 T.09 e) 77,050.00 67,000.00 - -
/ 1m3 T.10 a) 64,635.75 56,205.00 - -
/ 1m3 T.10 b) 84,042.00 73,080.00 - -
/ 1m3 T.10 c) 19,837.50 17,250.00 - -
/ 1m3 T.10 d) 33,982.50 29,550.00 - -
/ 1m3 T.10 e) 77,050.00 67,000.00 - -
/ 1m3 T.11 a) 97,031.25 84,375.00 - -
/ 1m3 T.11 b) 100,791.75 87,645.00 - -
/ 1m3 T.11 c) 19,837.50 17,250.00 - -
/ 1m3 T.11 d) 33,982.50 29,550.00 - -
/ 1m3 T.11 e) 77,050.00 67,000.00 - -
/ 1m3 T.12 43,556.25 37,875.00 - -

/ 1m3 T.14 a) 20,872.50 17,400.00 - 750.00


/ 1m3 T.14 b) 33,925.00 28,750.00 - 750.00
/ 1m3 T.14 c) 150,650.00 23,000.00 108,000.00
/ 1m3 T.14 d) 8,337.50 5,750.00 - 1,500.00
/ 1m3 T.15 634,225.00 167,500.00 216,000.00 168,000.00
/ 1m3 T.16 577,875.00 172,500.00 162,000.00 168,000.00
/ 1m3 T.17 787,658.00 120,000.00 25,920.00 539,000.00
/ 1m3 T.18 634,225.00 167,500.00 216,000.00 168,000.00
/ 1m3 P.01 a) 849,223.25 205,575.00 466,080.00 66,800.00
/ 1m3 P.01 b) 782,580.75 205,575.00 408,130.00 66,800.00
/ 1m3 P.01 c) 730,589.25 205,575.00 362,920.00 66,800.00
/ 1m3 P.01 d) 693,145.25 205,575.00 330,360.00 66,800.00
/ 1m3 P.02 a) 40,384.09 26,175.00 8,941.60 #REF!
/ 1m3 P.02 b) 38,866.09 26,175.00 7,621.60 #REF!
/ 1m3 P.03 a) 41,874.49 26,175.00 10,237.60 #REF!
/ 1m3 P.03 b) 40,085.09 26,175.00 8,681.60 #REF!
/ 1m3 P.03 c) 38,309.95 26,175.00 7,138.00 #REF!
/ 1m3 P.03 d) 55,007.67 33,355.00 14,477.76 -
/ 1m3 P.03 e) 52,551.83 33,355.00 12,342.24 -
/ 1m3 P.03 f) 49,797.53 33,355.00 9,947.20 -
/ 1m3 P.04 267,582.00 79,800.00 152,880.00 -

/ 1m3 P.05 a) 1) 387,403.38 68,875.00 267,997.50 -


/ 1m3 P.05 a) 2) 507,762.95 80,075.00 361,458.00 -

/ 1m3 P.05 b) 1) 595,687.35 65,825.00 452,164.00 -


/ 1m3 P.05 b) 2) 714,430.49 70,825.00 550,418.90 -

/ bh P.05 c) 1) 495,313.05 16,950.00 413,757.00 -


/ bh P.05 c) 2) 667,612.95 20,190.00 560,343.00 -
/ bh P.05 c) 3) 829,322.50 24,950.00 696,200.00 -
/1m P.05 c) 10,682.06 2,525.00 6,475.00 288.75
/ 1m3 P.05 d) 29,382.50 6,750.00 11,500.00 7,300.00
/ 1m2 P.06 177,387.50 20,800.00 133,450.00
/ 1m2 P.07 227,527.50 20,800.00 177,050.00
/ 1m2 P.08 124,056.25 2,875.00 105,000.00
/ bh P.09 372,296.40 60,825.00 227,261.00 35,650.00
/ bh P.10 150,731.65 26,450.00 91,671.00 12,950.00
/ bh P.11 12,362.50 10,750.00 - -
/ 1m3 P.12 750,767.29 75,400.00 497,441.13 80,000.00

/ 1m3 B.01 671,992.29 86,900.00 497,441.13 -


/ 1m3 B.02 a) 695,320.04 107,185.00 497,441.13 -
/ 1m3 B.02 b) 763,992.29 86,900.00 497,441.13 80,000.00
/ 1m3 B.03 a) 733,509.41 107,185.00 530,649.27 -
/ 1m3 B.03 b) 802,181.66 86,900.00 530,649.27 80,000.00
/ 1m3 B.04 a) 763,568.71 107,185.00 556,787.79 -
/ 1m3 B.04 b) 832,240.96 86,900.00 556,787.79 80,000.00
/ 1m3 B.05 a) 799,016.82 107,185.00 587,612.24 -
/ 1m3 B.05 b) 867,689.07 86,900.00 587,612.24 80,000.00
/ 1m3 B.05 c) 916,883.50 63,290.00 710,000.00 24,000.00
/ 1m3 B.06 a) 832,996.34 107,185.00 617,159.64 -
/ 1m3 B.06 b) 901,668.59 86,900.00 617,159.64 80,000.00
/ 1m3 B.06 c) 939,883.50 63,290.00 730,000.00 24,000.00
/ 1m3 B.07 a) 858,203.49 107,185.00 639,078.90 -
/ 1m3 B.07 b) 926,875.74 86,900.00 639,078.90 80,000.00
/ 1m3 B.07 c) 962,883.50 63,290.00 750,000.00 24,000.00
/ 1m3 B.08 a) 875,097.41 107,185.00 653,769.27 -
/ 1m3 B.08 b) 943,769.66 86,900.00 653,769.27 80,000.00
/ 1m3 B.08 c) 980,133.50 63,290.00 765,000.00 24,000.00
/ 1m3 B.09 a) 903,999.04 107,185.00 678,901.13 -
/ 1m3 B.09 b) 972,671.29 86,900.00 678,901.13 80,000.00
/ 1m3 B.09 c) 991,633.50 63,290.00 775,000.00 24,000.00
/ 1m3 B.10 a) 954,439.75 107,185.00 722,762.61 -
/ 1m3 B.10 b) 1,023,112.00 86,900.00 722,762.61 80,000.00
/ 1m3 B.10 c) 1,020,383.50 63,290.00 800,000.00 24,000.00
/ 1m3 B.11 a) 980,572.86 136,325.00 716,347.05 -
/ 1m3 B.11 b) 1,038,941.11 107,080.00 716,347.05 80,000.00
/ 1m3 B.11 c) 1,059,374.25 79,695.00 817,500.00 24,000.00
/ 1m3 B.12 a) 992,346.30 136,325.00 726,584.83 -
/ 1m3 B.12 b) 413,292.55 107,080.00 172,304.83 80,000.00
/ 1m3 B.12 c) 1,078,349.25 79,695.00 834,000.00 24,000.00

/ 1m3 B.13 a) 25,300.00 22,000.00 - -


/ 1m3 B.13 b) 29,871.25 12,500.00 - 13,475.00
/ 1m3 B.13 c) 46,402.50 26,875.00 - 13,475.00
/ 1m3 B.14 a)
30,906.25 26,875.00 - -
/ 1m3 B.14 b)
39,962.50 10,750.00 - 24,000.00
/ 1m3 B.15 a)
15,237.50 13,250.00 - -
/ 1m3 B.15 b) 39,962.50 10,750.00 - 24,000.00

/ 1m2 B.17 1,331,010.00 84,900.00 1,072,500.00 -


/ 1m2 B.18 2,945,897.50 29,650.00 2,532,000.00 -
/ 1m2 B.19 a)
25,875.00 22,500.00 - -

/ 1m2 B.19 b)
42,866.25 13,900.00 - 23,375.00
/ 1m2 B.19 c)
52,756.25 22,500.00 - 23,375.00
/ 1m2 B.20 4,661,525.00 60,750.00 - 23,375.00

/ 1m2 B.21 244,863.75 44,250.00 168,675.00 -


/ 1m2 B.22 532,237.25 57,585.00 405,230.00 -
/ 1m2 B.23 264,126.25 53,450.00 176,225.00 -
/ 1m2 B.24 803,361.25 53,600.00 644,975.00 -
/ 1m2 B.25 860,171.25 53,600.00 694,375.00 -
/ 1m2 B.26 2,052,803.19 44,250.00 1,740,796.25 -
/ 1m2 B.27 1,011,741.25 53,600.00 826,175.00 -
/ 1m2 B.28 860,171.25 53,600.00 694,375.00 -
/ 1m2 B.29 1,054,923.75 44,250.00 873,075.00 -
/ 1m2 B.30 1,480,124.75 57,585.00 1,229,480.00 -
/ 1m2 B.31 1,054,923.75 44,250.00 873,075.00 -
/ 1m2 B.32 1,289,753.75 57,585.00 1,063,940.00 -
/ 1m2 B.33 1,054,923.75 44,250.00 873,075.00 -
/ 1m2 B.34 1,289,247.75 57,585.00 1,063,500.00 -
/ 1m2 B.35 37,087.50 32,250.00 - -
/ 1m2 B.36 37,087.50 32,250.00 - -
/ 1m2 B.37 49,450.00 43,000.00 - -
/ 1m2 B.38 a) 49,450.00 43,000.00 - -
/ 1m2 B.38 b) 49,450.00 43,000.00 - -

/ 1m2 B.39 305,037.50 103,750.00 30,000.00 131,500.00


/ 1m2 B.40 124,602.50 32,250.00 - 76,100.00
/ 1m B.41 96,180.25 4,735.00 78,900.00 -
/ 1m B.42 115,092.00 5,430.00 94,650.00 -
/ 1m B.43 145,624.50 5,730.00 120,900.00 -
/ 1m B.44 159,016.25 6,725.00 131,550.00 -

/m' F.01 501,676.00 3,400.00 367,500.00 65,340.00

/m' F.02 633,089.38 6,625.00 508,712.50 35,175.00

/m' F.03 720,201.88 6,625.00 584,462.50 35,175.00

/m' F.04 384,583.00 6,500.00 236,900.00 91,020.00

/m' F.05 620,971.25 9,125.00 412,000.00 118,850.00

/m' F.06 131,301.25 4,750.00 40,250.00 69,175.00

/m' F.07 232,869.25 8,600.00 147,000.00 46,895.00

/m' F.08 395,283.75 9,125.00 206,000.00 128,600.00

/m' F.09 536,969.50 11,750.00 309,000.00 146,180.00

/m' F.10 501,676.00 3,400.00 367,500.00 65,340.00

/m' F.11 633,089.38 6,625.00 508,712.50 35,175.00

/m' F.12 638,983.13 6,625.00 508,712.50 40,300.00

/m' F.13 402,896.75 6,500.00 236,900.00 106,945.00

/m' F.14 754,221.75 9,125.00 519,120.00 127,600.00

/m' F.15 251,476.25 4,750.00 120,750.00 93,175.00

/m' F.16 241,120.50 8,600.00 147,000.00 54,070.00

/m' F.17 407,071.25 9,125.00 206,000.00 138,850.00

/m' F.18 566,380.75 11,750.00 309,000.00 171,755.00


/m' F.19 520,375.00 3,400.00 367,500.00 81,600.00

/m' F.20 633,089.38 6,625.00 508,712.50 35,175.00

/m' F.21 720,201.88 6,625.00 584,462.50 35,175.00

/m' F.22 465,715.50 6,500.00 298,700.00 99,770.00

/m' F.23 742,434.25 9,125.00 519,120.00 117,350.00

/m' F.24 80,988.75 4,750.00 40,250.00 25,425.00

/m' F.25 221,277.25 8,600.00 147,000.00 36,815.00

/m' F.26 378,723.75 9,125.00 206,000.00 114,200.00

/m' F.27 373,301.50 11,750.00 185,400.00 127,460.00

/m' F.28 510,991.00 3,400.00 367,500.00 73,440.00

/m' F.29 647,838.13 6,625.00 508,712.50 48,000.00

/m' F.30 726,095.63 6,625.00 584,462.50 40,300.00

/m' F.31 455,653.00 6,500.00 298,700.00 91,020.00

/m' F.32 744,159.25 9,125.00 519,120.00 118,850.00

/m' F.33 185,207.50 4,750.00 120,750.00 35,550.00

/m' F.34 221,277.25 8,600.00 147,000.00 36,815.00

/m' F.35 260,273.75 9,125.00 103,000.00 114,200.00

/m' F.36 394,829.50 11,750.00 185,400.00 146,180.00

/1bh D.01 16,991.25 1,375.00 13,400.00 -


/m3 D.02 525,837.50 8,875.00 448,375.00 -
/m3 D.03 590,981.67 8,875.00 505,022.10 -
/hari D.04 1,114,545.50 241,250.00 457,920.00 270,000.00

/hari D.05 1,799,525.75 241,250.00 793,155.00 530,400.00

/hari D.06 3,162,919.75 305,000.00 1,449,365.00 996,000.00

/unit H.01 a) 714,651.23 107,580.00 443,355.85 714,651.23


/unit H.01 b) 828,210.22 143,375.00 482,807.80 828,210.22
/unit H.01 c) 1,175,125.50 243,775.00 618,273.26 159,800.00
/unit H.01 d) 1,995,677.25 487,475.00 928,296.52 319,600.00
/unit H.02 a) 3,695,561.33 228,980.00 2,918,986.59 65,565.00
/unit H.02 b) 3,510,859.15 354,375.00 2,604,546.00 94,000.00
/unit H.02 c) 5,968,502.30 511,750.00 4,560,752.00 117,500.00
/unit H.02 d) 6,621,979.45 529,750.00 5,110,993.00 117,500.00
/unit H.02 e) 8,134,391.60 565,750.00 6,338,434.00 169,200.00
/unit H.02 f) 8,679,224.80 565,750.00 6,793,402.00 188,000.00

/unit H.03a)1) 26,906,655.80 589,750.00 12,019,342.00 10,788,000.00


/unit H.03a)2) 31,463,329.55 759,000.00 15,518,417.00 11,082,000.00
/unit H.03a)3) 34,299,833.30 910,800.00 17,062,642.00 11,852,500.00
/unit H.03a)4) 39,427,234.80 1,247,050.00 22,677,502.00 10,360,000.00

/unit H.03 b) 274,562,500.00 8,750,000.00 97,500,000.00 132,500,000.00

/m2 L.02 a) 144,558.88 21,500.00 104,203.37 -


/m2 L.02 b) 377,769.25 21,075.00 307,420.00 -
/m2 L.03 667,388.13 90,550.00 489,787.50 -
/m2 L.04 258,548.75 59,250.00 165,575.00 -
/paket L.05 a) 4,140,000.00 3,600,000.00 - -
/paket L.05 b) 89,700,000.00 - - 78,000,000.00
/paket L.05 c) 180,097,762.50 - 185,708,000.00 145,000,000.00
/paket L.05 d) 99,187,500.00 - 86,250,000.00 -
/paket L.06 a) 1,071,950.00 2,500.00 972,000.00 -
/paket L.06 b) 910,800.00 - 792,000.00 -
lbr L.08 a) 152,375.00 120,000.00 - 12,500.00
lbr L.08 b) 216,447.25 185,000.00 3,215.00 -
lbr L.08 c) 13,041.00 4,000.00 3,840.00 3,500.00
jilid L.09 a) 3,450,000.00
set L.09 b) 10,332,750.00
Ket

You might also like