Professional Documents
Culture Documents
Maingate Structure BBS
Maingate Structure BBS
MAIN GATE
BAR BENDING SCHEDULE
DOCUMENT NO:
CONTRACTOR:
IHI-TOSHIBA-HYUNDAI CONSORTIUM
SUBCONTRACTOR:
00 MW
PROJECT
ev.A
50-Rev.A
TIUM
G JSC.
Status
For Information
BAR BENDING SCHEDULE
SUMMARY
NO SIZE UNIT WEIGHT(kgf/m) TOTAL LENGTH (m) TOTAL WEIGHT (kgf) REMARKS
1 T6 0.222 - -
2 T8 0.395 - -
4 T12 0.888 - -
5 T16 1.578 21 34
7 T25 3.853 - -
8 T32 6.313 - -
9 T40 9.864 - -
5/20
NDING SCHEDULE
PREPARED
CHECKED
APPROVED
REMARKS
6/20
BAR BENDING SCHEDULE
C1
(6EA)
7/20
8/20
BAR BENDING SCHEDULE
RB1, RB1A
(2EA)
9/20
BAR BENDING SCHEDULE
RB2
(1EA)
10/20
BAR BENDING SCHEDULE
RB3
(2EA)
11/20
BAR BENDING SCHEDULE
DATE 12/01/18
MAIN GATE HOUSE
TITLE
JIMAH EAST POWER 2X1000MW ROOF BEAM DETAILS REV. A
COAL FIRED POWER PLANT PROJECT
DWG NO JEP-HHC-B9-UXA-03003~03021 SHEET 7 of 20
RB4
(1EA)
12/20
BAR BENDING SCHEDULE
13/20
NDING SCHEDULE
PREPARED
CHECKED
APPROVED
TOTAL
LENGTH
56,490
41,250
31,250
36,250
14/20
15/20
NDING SCHEDULE
PREPARED
CHECKED
APPROVED
TOTAL
LENGTH
32,820
32,520
12,585
12,135
10,620
95,700
30,150
16/20
NDING SCHEDULE
PREPARED
CHECKED
APPROVED
TOTAL
LENGTH
32,370
32,370
97,150
17/20
NDING SCHEDULE
PREPARED
CHECKED
APPROVED
TOTAL
LENGTH
27,160
27,160
12,180
62,000
58,000
18/20
NDING SCHEDULE
PREPARED
CHECKED
APPROVED
TOTAL
LENGTH
27,160
27,160
12,180
62,000
58,000
19/20
NDING SCHEDULE
PREPARED
CHECKED
APPROVED
TOTAL
LENGTH
483,700
486,360
483,700
486,360
486,360
72,800
131,040
55,280
30,880
94,500
170,100
82,920
46,320
20/20