PLANT PROC-FC-CB/NASHPA/PROJ-1247/2015
METHOD STATEMENT
FOR
INSTRUMENT & UTILITY AIR SYSTEM TEST
1. SCOPE
Main purpose of this method statement is to describe the INSTRUMENT & UTILITY AIR SYSTEM
2. PURPOSE
According to the overall schedule, HBP/HH is planning to INSTRUMENT & UTILITY AIR SYSTEM
1) To start diesel generator Y4 as basic power source and to supply power to MDB system;
3) After MDB bus bar receive power, close AA17-6/12M switchgear, it is to supply power to
1). Procedural: Approved Standard Operating Procedure should be prepared / developed and
4). Equipment Safety: Direction or indication of live piping should be done to aware all workforce
5). Equipment Safety: Leakages of gas/diesel should be rectified and Missing bolts and screws
shall be installed
7). Personnel Safety: Work area should be well barricaded to avoid unauthorized entry
8). Personnel Safety: Proper grounding / earthling of equipment should be ensured and checked
as per standard
9). Personnel Safety: Warning sign/instruction sign shall be installed for graphical communication
11). Personnel Safety: Proper illumination should be ensured within the facility as per standard
guidelines
12). Personnel Safety: entrance slope should be prepared properly to avoid tripping hazards
13). Personnel Safety: Tagging of all valves should be done as per Standards