Professional Documents
Culture Documents
D1!10!00 Miguel Correia UK Vehicle Manufacturing Plant .1480344351
D1!10!00 Miguel Correia UK Vehicle Manufacturing Plant .1480344351
PAYBACK
NEXT-‐GENERATION
ROBOTS
Miguel
da
Silva
Correia
Birmingham
2016
1
Franz
Steiner
Contents
• Return
On
Investment
(ROI)
Of
Next-‐GeneraJon
RoboJc
Upgrade
• Efficiency
vs.
Expecta0ons
• Costs
vs.
benefits
• Key
Performance
Indicators
(KPI)
required
to
understand
benefits
• Strategies
to
secure
managerial
buy-‐in
to
drive
roboJc
projects
forward
2
Franz
Steiner
bmwi
ROI
of
Next-‐Genera0on
Robo0c
Methods
of
JusJficaJon:
-‐ Qualita:ve
methods;
-‐ Semi-‐quan:ta:ve
methods;
-‐ Quan:ta:ve
methods.
Technical
When
Decision
Monetary
Point
of
Strategic
What
RoboJc
Which
view
System
Cost
Where
jusJficaJon
Policy
Financial
decision
Manufacturing
Bosch
Engineering
3
Costs
vs.
benefits
Cost
of
a
RoboJc
System:
Benefits
of
a
RoboJc
System:
-‐ System
purchase
price;
-‐
Decreased
Produc:on
Costs;
-‐ Plant
Installa:on;
-‐
Shorter
Cycle
Times
and
lead
:me;
-‐ One
:me
cost;
-‐
Improved
Quality
and
Reliability;
-‐ Maintenance,
update
and
security;
-‐
BeOer
Floor
Space
U:liza:on;
-‐ Opera:ng
cost;
-‐
Reduced
Waste;
-‐ Deprecia:on;
-‐
Increased
Safety;
-‐ Cost
of
capital;
-‐
Employers
HS
Savings;
-‐ Cost
of
risk
investment;
-‐
Flexibility
in
mul:ple
Applica:ons;
-‐ Cost
of
human
capital.
-‐
Total
Effec:ve
Equipment
Performance;
Decision
4
Franz
Steiner
ROI
of
Next-‐Genera0on
Robo0c
ROI
limitaJons:
-‐ Disrup:ve
events
and
business
models;
-‐ Social
behaviour;
Impact
on
company
-‐ Individual
customer
requirements
-‐ Vola:le
markets;
Infrastructures
6
Franz
Steiner
Efficiency
vs.
Expecta0ons
Leaders
high
investment
business
growth
increase
in
opera:ng
costs.
Efficiency:
ExpectaJons:
𝑶𝒖𝒕𝒑𝒖𝒕𝒔/𝑰𝒏𝒑𝒖𝒕𝒔
+ ProducJvity:
Performance:
𝒇𝒇𝒊𝒄𝒊𝒆𝒏𝒄𝒚/𝑷𝒆𝒓𝒇𝒐𝒓𝒎𝒂𝒏𝒄𝒆
𝑬
𝒄𝒕𝒖𝒂𝒍 𝒔𝒑𝒆𝒆𝒅/𝑶𝒑𝒕𝒊𝒎𝒂𝒍 𝒔𝒑𝒆𝒆𝒅
𝑨
7
Franz
Steiner
KPI
metrics
required
to
understand
benefits
-‐
Repeatability;
-‐
Speed
(Performance);
-‐
Memory
capacity;
-‐
Precision
or
accuracy;
Quality
Availability
-‐
Programmability;
TEEP
-‐
Flexibility;
-‐
Workload
+
efficiency.
Performance
UJlizaJon
Mentality
change:
-‐
Self
control;
-‐
Self
organiza:on;
LimitaJon
-‐
Decentralized
algorithms;
-‐
Tight
integra:on;
-‐
Responsiveness.
“…humans
supplement
the
skills
of
robo:c
systems…”
Strategy:
-‐
Engage
as
early
as
possible;
-‐
Sell
the
concept
to
the
human
workforce;
-‐
Prepare
to
work
with
IT
in
new
ways;
-‐
Develop
skills
needed
to
run
a
Robo:cs
Shop;
-‐
Ensure
you
include
all
internal
stakeholders;
-‐
Speak
the
language
of
each
stakeholder
group;
-‐
Be
explicit
about
the
benefits;
-‐
Iden:fy
and
manage
risks;
-‐
Listen
and
communicate.
9
Boshc
Thank
you
for
your
:me
Miguel
da
Silva
Correia
migueldasilvacorreia@iol.pt
“The
world
of
the
future
will
be
an
even
more
demanding
struggle
against
the
limita:ons
of
our
intelligence…”
Norbert
Wiener
10