Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 10

Republic of the Philippines

DEPARTMENT OF EDUCATION
Region XI
DEPARTMENT OF EDUCATION
Division of DAVAO DEL SUR

Individual Performance Commitment


Name of Employee : JEAN G. CAHILAP Name of Rater : WELLINGTON C. ALBISO
Position : Teacher I Position : Principal-1
Name of School : CORONON ELEMENTARY SCHOOL Name of Approving Authority: NANCY T. IYOG
Rating Period : MAY 2017- APRIL 2018 Position: Public Schools District Supervisor

MAJOR
KEY RESULT WEIGHT RATING
FINAL
AREAS MAJOR OUTPUTS TIMELINE PER PERFORMANCE INDICATORS ACTUAL RESULTS *SCORE REMARKS
OUTPUT KRA
(KRAs) Q E T Ave
(MFO)
Basic Teaching- 1. Daily Lesson Plans/ MAY 2017 5% 100% of the required number of daily 97% of the required number of
Education Learning Lesson Logs and to lesson plans/lesson logs submitted on daily lesson plans/lesson logs 2 5 3 3.333
Services Process Instructional Materials APRIL 2018 prescribed dates without lapses. submitted * without lapses *
(Elementary) Submitted on prescribed days.
100% of the required IMs appropriately 5 5 5 5
100% of the required IMs were
prepared/ developed within the rating
developed for the lesson without
period without lapses. lapses* Utilized within time frame 8.333/2
=4.167 0.208
2. Teaching Strategies MAY 2017 20% 100% of the total number of learners 96% & below of the total number
to achieved 75% mastery level in all of learners achieved 75% mastery 1 5 5 3.667 0.733
APRIL 2018 learning areas within the rating period level in all learning areas*100%-
85% Mastery*100%-85% Mastery
with at most 2 lapses.
within time frame
3. Class Rules and Well- MAY 2017 3% 100% of the students oriented with the 100% of the students were
Behaved Pupils to class rules during the opening of oriented with the class rules* 5 5 3 4.333
APRIL 2018 classes without lapses. without lapses *during the
opening of classes
Zero (0) violation of class rules within Zero (0) violation of class 5 5 5 5
the rating period. rules without lapses 0 violation
within rating period 9.333/2
=4.667

0.140

1
4. Positive/ Productive/ Safe MAY 2017 2% 100% of the characteristics of positive, 100% of the characteristics of
Learning Environment to productive and safe learning positive, productive and safe 5 5 5 5 0.100
APRIL 2018 environment complied with within the learning environment complied
rating period without lapses. without lapses maintained
within the rating period
Subtotal – KRA-1 30% 1.181
Pupils’ 1. Complete and Accurate MAY 2017 5% 100% of subjects/learning areas taught 100% of subjects/learning
Outcome Class Record to have complete and accurate class areas taught had complete and 5 5 5 5 0.250
APRIL 2018 record/s within the rating period without accurate class record/s without
lapses. lapses completeness and
accuracy within the rating
period
2. Remedial/ Enrichment MAY 2017 10% 100% of the students’ remedial/ 100% of the student’s
Programs to enrichment needs catered to within the remedial/enrichment needs 5 1 5 0.367 0.367
APRIL 2018 rating period without lapses. catered to 100% conducted
within time frame
3. Updated Pupils’/Students’ MAY 2017 5% 100% of the required school records of 100% of the required school
School Records to students updated within the rating records of students updated 5 5 5 5 0.250
APRIL 2018 period without error. without error and updated
within the rating period
4. Students’ Mastery of MAY 2017 10% 100% of the total number of students 96% and below of the total number
required Learning to achieved 75% mastery level within the of learners achieved 75% mastery 1 5 5 3.667 0.367
Competencies APRIL 2018 rating period. level in all learning area,
100%85%mastery*100%-85%
mastery within time frame
Sub-Total – KRA-2 30% 1.234
Community 1. PTA Meetings/Conferences MAY 2017 4% 100% of the required PTA meetings 100% of the required PTA
Involvement Organized to facilitated without lapses in a semester. meetings facilitated without 5 5 5 5 0.200
APRIL 2018 lapses organized and facilitated
2 days before prescribed dates
2. Stakeholder Involvement in MAY 2017 3% 75% of identified stakeholders 77% of identified stakeholders
Monitoring and Evaluation to engaged/ involved in monitoring and engaged/involved in monitoring
of Programs Implementation APRIL 2018 evaluation of programs implementation and evaluation of programs 5 5 5 5 0.150
within the rating period without lapses. implemented without lapses
85% within the time frame
3. Project/Events/Activities MAY 2017 3% One (1) project/event/activity on One (1) project/event/activity
Initiated or Undertaken to community involvement initiated/ on community involvement 5 5 3 4.333 0.130
APRIL 2018 undertaken within the rating period initiated/undertaken without
without lapses. lapses. Initiated and undertaken
2 days before the scheduled
dates
10%
Sub-Total – KRA-3
0.480

2
Professional 1. Action Research MAY 2017 4% One (1) action research conducted No action research conducted
Growth and to within the rating period without lapses. 1 1 1 1 0.040
Development APRIL 2018
2. Professional Membership MAY 2017 2% One (1) affiliation in recognized One (1) affiliation in recognized
and/or Community Linkages to organization within the rating period organization without deficiency 5 5 5 5 0.100
APRIL 2018 without deficiencies. affiliated ahead of time frame
3. Published Work MAY 2017 2% One (1) work/research published within
to the rating period without lapses. No work/ research published 1 1 1 1 0.020
APRIL 2018
4. Received special award/ MAY 2017 2% One (1) special award/ citation/ One(1) special award/citation/
citation/ recognition for to recognition for exemplary performance recognition for exemplary 5 5 5 5 0.100
exemplary performance APRIL 2018 received within the rating period without performance without lapses
lapses. received within the rating period
Sub-Total – KRA-4 10% 0.260
Other Support 1. Wearing of prescribed MAY 2017 4% 100 % compliance with dress code/ 100% compliance without
Requirements uniform to uniform policies on prescribed days lapses*99% and below of 5 5 2 4 0.160
APRIL 2018 without lapses required days
2. Attendance/ participation in MAY 2017 4% 100% of flag rites attended within the 97% attendance without lapses
Flag Rites to rating period without lapses arrived 15 minutes before the 2 5 5 4 0.160
APRIL 2018 scheduled time
3. Attendance in meetings/ MAY 2017 4% 100% of required meetings/ 97% attendance without lapses
conferences and related to conferences and other related activities arrived on the scheduled time 2 5 3 03.333 0.133
activities APRIL 2018 attended without lapses
4. Submission of required MAY 2017 4% 100% of required reports submitted on 100% of the required reports
reports to due dates with two (2) revisions without revision submitted 2 5 5 5 5 0.200
APRIL 2018 days advance
5. Accuracy and completeness MAY 2017 4% 100% of forms and reports 100% of forms and repots
in accomplishing forms and to accomplished with accuracy and accomplished with accuracy 5 5 5 5 0.200
reports APRIL 2018 completeness and completeness without
lapses submitted 2 days before
due dates
Sub-Total – KRA-4 20% 0.853
GRAND TOTAL 100% 4.008 VS

Prepared by: Recommending Approval: Approved:

JEAN G. CAHILAP WELLINGTON C ALBISO NANCY T. IYOG


Teacher-I Principal- I Public Schools District Supervisor
RATEE RATER

3
4
Standards for Rating Teacher I-III

Key Result Quantity Quality Timeliness


Performance Weight per
Area Major Output
Indicator MO & KRA Description Rating Description Rating Description Rating
(KRA)
Teaching- 1. Daily Lesson Plans/ 100% of the required 5% 100% of the required number of
Submitted 2 days before
Learning Lesson Logs number of daily daily lesson plans/lesson logs 5 without lapses 5 5
prescribed dates (weekly)
Process lesson plans/lesson submitted
(30%) logs submitted on 99% of the required number of
Submitted 1 day before
prescribed dates daily lesson plans/lesson logs 4 4
prescribed dates
without lapses. submitted
98% of the required number of
daily lesson plans/lesson logs 3 Submitted on prescribed days 3
submitted
97% of the required number of
Submitted 1 days after
daily lesson plans/lesson logs 2 with lapses 2 2
prescribed dates (weekly)
submitted
96 & below of the required
Submitted 2 or more days after
number of daily lesson 1 1
prescribed dates (weekly)
plans/lesson logs submitted
Instructional Materials 100% of the required 100% of the required IMs were
5 without lapses 5 Utilized within time frame 5
IMs appropriately developed for the lesson
prepared/ developed 99% of the required IMs were
4
within the rating developed for the lesson
period without lapses 98% of the required IMs were
3
developed for the lesson
97% of the required IMs were
2 with lapses 2
developed for the lesson
96% & below of the required IMs
1
were developed for the lesson
2. Teaching Strategies 100% of the total 30% 100% of the total number of
100% - 85 % Mastery within
number of learners learners achieved 75% mastery 5 100% - 85% Mastery 5 5
time frame
achieved 75% level in all learning areas
mastery level in all 99% of the total number of
100%-80% mastery within time
learning areas within learners achieved 75% mastery 4 100% - 80 % Mastery 4 4
frame
the rating period. level in all learning areas
98% of the total number of
100%-75% mastery within time
learners achieved 75% mastery 3 100 % - 75% Mastery 3 3
frame
level in all learning areas
97% of the total number of 2 100% - 70% Mastery 2 Less than 100% - less than 2

5
learners achieved 75% mastery 75% mastery beyond time
level in all learning areas frame
96% & below of the total number
Less than 100% - 65% mastery
of learners achieved 75% mastery 1 100% - 65% Mastery 1 1
beyond time frame
level in all learning areas
3. Class Rules and Well- 100% of the students 3% 100% of the students were 2 days before the opening of
5 without lapses 5 5
Behaved Pupils oriented with the oriented with the class rules classes
class rules during the 90% - 99% of the students were 1 day before the opening of
4 4
opening of classes oriented with the class rules classes
without lapses. 80% - 89% of the students were
3 During the opening of classes 3
oriented with the class rules
70% - 79% of the students were 1 day after the opening of
2 with lapses 2 2
oriented with the class rules classes
69% & below of the students were 2 days or more days after the
1 1
oriented with the class rules opening of classes
. Zero (0) violation of 0 violation of class rules 5 without lapses 5 0 violation within rating period 5
class rules within the 1 violation of class rules 4 with 1 lapse 4
rating period 2 violations of class rules 3 with 2 lapses 3
With violation within the rating
3 violations of class rules 2 with 3 lapses 2 2
period
4 violations of class rules 1 with 4 or more lapses 1
4. Positive/ Productive/ 100% of the 2% 100% of the characteristics of
Maintained within the rating
Safe Learning characteristics of positive, productive and safe 5 without lapses 5 5
period
Environment positive, productive learning environment complied
and safe learning 99% of the characteristics of
environment positive, productive and safe 4
complied with within learning environment complied
the rating period 98% of the characteristics of
without lapses. positive, productive and safe 3
learning environment complied
97% of the characteristics of
positive, productive and safe 2 with lapses 2
learning environment complied.
96 % & below of the
characteristics of positive,
1
productive and safe learning
environment complied
Pupils’ 1. Complete and Accurate 100% of 5% 100% of subjects/learning areas
completeness and accuracy
Outcome Class Record subjects/learning taught had complete and accurate 5 without lapses 5 5
within the rating period
(30%) areas taught have class record/s
complete and 99% of subjects/learning areas
accurate class taught had complete and accurate 4
record/s within the class record/s
6
rating period without 98% of subjects/learning areas
lapses. taught had complete and accurate 3
class record/s
97% of subjects/learning areas
taught had complete and accurate 2 with lapses 2
Complied with accuracy and
class record/s 2
completeness beyond rating
96% & below of subjects/learning
period or time frame
areas taught had complete and 1
accurate class record/s
2. Remedial/ Enrichment 100% of the students’ 10% 100% of the students’ remedial/ 100% conducted within time
5 without lapses 5 5
Programs remedial/ enrichment enrichment needs catered to frame
needs catered to 99% of the students’ remedial/
4
within the rating enrichment needs catered to
period without 98% of the students’ remedial/
lapses. 3
enrichment needs catered to
97% of the students’ remedial/
2 with lapses 2
enrichment needs catered to
96% & below of the students’
remedial/ enrichment needs 1
catered to
3. Updated 100% of the required 5% 100% of the required school
5 without error 5 Updated within the rating period 5
Pupils’/Students’ School school records of records of students updated
Records students updated 99% of the required school
4
. within the rating records of students updated
period without error. 98 % of the required school
3
records of students updated
97 % of the required school
2 with errors 2 Updated beyond time frame 2
records of students updated
96 % & below of the required
school records of students 1
updated
4. Students’ Mastery of 100% of the total
required Learning number of students
Competencies achieved 75% Refer to MIO on Teaching
mastery level within Strategies
the rating period.

Community 1. PTA Meetings/ 100% of the required 4% 100% of the required PTA Organized and facilitated 2
5 without lapses 5 5
Involvement Conferences Organized PTA meetings meetings facilitated days before prescribed dates
(10%) facilitated without 99% of the required PTA 4 Organized and facilitated 1 day 4
7
lapses in a semester. meetings facilitated before prescribed dates
98 % of the required PTA Organized and facilitated on
3 3
meetings facilitated prescribed dates
97 % of the required PTA Organized and facilitated 1day
2 with lapses 2 2
meetings facilitated after the prescribed dates
Organized and facilitated 2 or
96 % & below of the required PTA
1 more days after the prescribed 1
meetings facilitated
dates
2. Stakeholder Involvement 75% of identified 3% 77% of identified stakeholders
in Monitoring and stakeholders engaged/ involved in monitoring
5 without lapses 5 85% within time frame 5
Evaluation of Programs engaged/ involved in and evaluation of programs
Implementation monitoring and implementation
evaluation of 76% of identified stakeholders
programs engaged/ involved in monitoring
4 80 % within time frame 4
implementation within and evaluation of programs
the rating period implementation
without lapses. 75% of identified stakeholders
engaged/ involved in monitoring
3 75% -within time frame 3
and evaluation of programs
implementation
74% of identified stakeholders
engaged/ involved in monitoring
2 with lapses 2 75 beyond time frame 2
and evaluation of programs
implementation
73% & below of identified
stakeholders engaged/ involved in
1
monitoring and evaluation of
programs implementation
3. Project/Events/Activities One (1) 3% One (1) project/event/activity on
Initiated and undertaken 2 days
Initiated or Undertaken project/event/activity community involvement initiated/ 5 without lapses 5 5
before the scheduled dates
on community undertaken
involvement initiated/ Initiated and undertaken 1 day
- - 4
undertaken within the before the scheduled dates
rating period without Initiated and undertaken on
lapses. - - 3
scheduled dates
Initiated and undertaken 1 day
- - with lapses 2 2
after the scheduled dates
No project/event/activity on Initiated and undertaken 2 or
community involvement initiated/ 1 more days after the scheduled 1
undertaken dates
Professional 1. Action Research One (1) action 4% One (1)action research conducted 5 without lapses 5 Completed ahead of time frame 5
Growth and research conducted - -
Development within the rating - - Conducted/completed within 3

8
(10%) period without time frame
lapses. Conducted / completed beyond
- - with lapses 2 2
time frame
Noaction research conducted 1
2. Professional One (1) affiliation in 2% One (1) affiliation in recognized
5 without deficiency 5 Affiliated ahead of time frame 5
Membership and/or recognized organization
Community Linkages organization within - -
the rating period - - Affiliated within time frame 3
without deficiencies. - - with deficiencies 2 Affiliated beyond time frame 2
No affiliation in recognized
1 1
organization
3. Published Work One (1) 2% One (1) work/research published 5 without lapses 5 Published ahead of time frame 5
work/research - -
published within the - - Published within time frame 3
rating period without - - with lapses 2 Published beyond time frame 2
lapses.
No work/research published 1
4. Received special award/ One (1) special 2% One (1) special award/ citation/
Received within the rating
citation/ recognition for award/ citation/ recognition for exemplary 5 without lapses 5 5
period
exemplary performance recognition for performance
exemplary -
performance -
received within the - with lapses 2
rating period without No special award/ citation/
lapses. recognition for exemplary 1 None 1
performance
Other Support 1. Wearing of prescribed 100 % compliance 4% 100% compliance 5 Without lapses 5 100% of the required days 5
Requirements uniform with dress code/ 99% compliance 4
(20%) uniform policies on 98 % compliance 3
prescribed days 99% and below of required
without lapses 97 % compliance 2 With lapses 2 2
days
96% and below 1
2. Attendance/ participation 100% Flag Rites 4% Arrived 15 minutes before the
100% attendance 5 Without lapses 5 5
in Flag Rites attended/ participated scheduled time
within the rating Arrived 10 minutes before the
99% attendance 4 4
period without lapses scheduled time
98 % attendance 3 Arrived on the scheduled time 3
97 % attendance 2 With lapses 2 Arrived behind schedule 2
96% and below 1
3. Attendance in meetings/ 100% of required 4% Arrived 15 minutes before the
100% attendance 5 Without lapses 5 5
conferences and related meetings/ scheduled time
activities conferences and Arrived 10 minutes before the
99% attendance 4 4
related activities scheduled time
9
attended without 98 % attendance 3 Arrived on the scheduled time 3
lapses 97 % attendance 2 With lapses 2 Arrived behind schedule 2
96% and below 1
4. Submission of required 100% of required 4% 100% of the required reports 5 Without revision 5 Submitted 2 days advance 5
reports reports submitted on With 1 revision 4 Submitted 1 day advance 4
the scheduled dates With 2 revisions 3 Submitted on due date 3
with two revisions 99% and below of the required
2 With 3 revisions 2 Submitted 1 day late 2
reports not submitted
With 4 or more
1 Submitted 2 or more days late 1
revisions
5. Accuracy and 100% of required 4% 100% of forms and reports
Submitted 2 days before due
completeness in forms and reports accomplished with accuracy and 5 Without lapses 5 5
dates
accomplishing required accomplished with completeness
forms and reports accuracy and 99% of forms and reports
Submitted 1 day before due
completeness without accomplished with accuracy and 4 4
dates
lapses completeness
98 % of forms and reports
accomplished with accuracy and 3 Submitted on due dates 3
completeness
97% of forms and reports
Submitted 1 day after due
accomplished with accuracy and 2 With lapses 2 2
dates
completeness
Submitted 2 or more days after
96% and below 1 1
due dates
TOTAL 100%

10

You might also like