This document is a testing report for lighting fixtures and systems at a refinery tank farm. It lists the tag descriptions, locations, ratings, and voltages of lighting components to be tested. Test procedures include verifying time switches, insulation resistance, lighting circuits, phase sequences, and calibration of testing equipment. Space is provided to record voltage test results, remarks, and inspector signatures and dates.
This document is a testing report for lighting fixtures and systems at a refinery tank farm. It lists the tag descriptions, locations, ratings, and voltages of lighting components to be tested. Test procedures include verifying time switches, insulation resistance, lighting circuits, phase sequences, and calibration of testing equipment. Space is provided to record voltage test results, remarks, and inspector signatures and dates.
This document is a testing report for lighting fixtures and systems at a refinery tank farm. It lists the tag descriptions, locations, ratings, and voltages of lighting components to be tested. Test procedures include verifying time switches, insulation resistance, lighting circuits, phase sequences, and calibration of testing equipment. Space is provided to record voltage test results, remarks, and inspector signatures and dates.
LIGHTING SYSTEM TAG DESCRIPTION: TAG NO: RATING LOCATION SYSTEM/DUTY: VOLTAGE ITEM
VOLTAGE CIRCUIT TEST
DESCRIPTION OF CHECK DATA PANEL NO. BRANCH CIRCUIT CIRCUIT NO. VOLTAGE RESULT REMARKS
RESULT: CALIBRATION DETAILS:
ACCEPTED REJECTED INSPECTION: Verify the following are in accordance CONTRACTOR IPMT with design documents 1 Test operation and setting of time switches photoelectric 3 Insulation resistance measurement see this form P0022-CS-E-003 4 Lighting circuit test 5 Inspect phase sequence of receptacle 6 Calibration details of equipment measuring tester C REMARKS/OBSERVATIONS: