£8009 E, Dillon's Way, Scottsdale, AZ 85260,
(480) 948.9009 + Fax (480) 998-2786.
‘Technical Support 1-800-223-4570
Alignment Tool Instructions for RL 550B & XL 650 Loading Machines
‘The 580/680 agent ol has two
locating dlaeter The steamer
(spree 25 ea) and to alg he
S08 palm with he then. The second
ie
Sinner pp i a) ed =
{heen Plan the otha Wet
Sguwahlbe R00 prcdre
‘Alignment Procedure | |
forthe RL350B Machine: |
1 Rear ewes mite | |
Remove he teed ache
& Revove capt
4 Unre3/" Heemsch toromove he
coowners ]
$n yectrndion aioe cH
< pepsin | (
Sully pow ee inonse
ha 5/65 sent lio he
powder de
A yen are intaing a replcement plat
form, make sre thatthe tp of te match anal parts
sweden,
5 Move he operating handle othe down postion
4. Replace the platform and elie fe to 1/428
3/4 SECS screws
12 'As mentioned in lp 7th 50/650 align tool
‘Boul bein the ee The ise lamer sap tothe
fetesn the plato
13. Slowly move the operating handle up andl down, Sug
thetwo I/ 23/8 SHCS sere hand-ght Use your
[et hae to rtte the 80 plore and ight un no
opens ori
Now tighten the two 1/428 3/4" SHCS sees using
S506 Hee E
45. Test your smemly by moving the operating handle up
{nd down if you notice the igent eal hopping oe
‘hiting to oe sie you nee to do tops 132 1 apn
If. Nixt vena he camp primer eed system on 0
sour machine a ms
17 Alig the peimercup onthe preside with he hae
in the lator, ltl the sre tha teh the primer
ody tothe ame and tighten
18° Resonate ret sping an operating ro othe
{i Ts your aebly agin by moving the operating han
dieu at down
30, Now ntl the dete spring detent bal selplate
tne bt Remembers sh fe eh
aig the stn
2 Tighten the spate lt and bck it off no more han
{ofr tam and sore tin place withthe ster using
4178 Hex wrench Ceo fo oe ration ofthe sels
22 Bally renal he lend wh es IMPORTANT
NOTE: Looe these di and back tot wo fll ts
The nl thei de usng sired ease fst nd lock
heii place Ben
22 Test your asembly by proesing one ase
‘achine Check the lade oor lt measures OK, the
‘machines ead oben roadingAlignment Procedure
XL650 Machine:
1. Ramo the pine en coy
2 femove he ten am eae
i Ree tae 4
4 Remorse Back ce nt lcm from the lator
15/32" Allen wrench. 35 e
‘Remove he ptiorn wing 23/16 Hex yrechoreove the
two ea 9/4 sho sae, Py atin ola
Tum sping for then when ving te ptr
Semele
Gon your machin oh te,
5 Thelma ener plat must be enor yo re
tang erpacent ato pet nosed te
aac
EAST ent vt ty arent de
Liane
PES iSeentntin dept de ese
iy sean ee re ss
miehesore ther
Sinaeetrns et ie wh
1 Niger ne pnp
Lice
gE Tat pem serine
=a
Tie tephra ton
Ee etaelooescrateetoathe
Sa
Ser eee el rhs
Sea otra malonate,
iguaierveetnerg
Brattle nt
Sentatedes Misag aoe on
Seaieoies
SG AEE SS tothe
ed
Fg Team es
Fer oceicea eer teenie ae
Sotace Shei tape bento
othe givove on he pot onthe underside of he plan,
Remove the ng
1H, Raa the ier ster nd the complete primer eed sys
tem Tet your asombly aan by moving th operating handle up
1S: Rental he blip andthe index and detent ports
Remember to ighten the shpat bot and ten back tout 20
‘more than 1/4 ofa arn and sau wih test ee ng
1/8" Hex wrench Check he salt or fe tao.
2 Lube these alls ad install the ease Insert sie, ping ane
ost, Then inal he ck ea
$l ental the wolead wih les IMPORTANT NOTE:
ose the sie di nd eke ot alts, Then the
Se sing ewe foe ro ck he iin ae.
52 Ten your sembly by proce oe ease raph
‘machine Chock the faded ound ft measares OK, the machine
‘tea to begin lngNew Index Cam, Fig. 1
Ps
2. Fig. 5. Push he
ful stop. (NOTE
you dont hve an
inex alignment tool. dr
the cam unt you gto
How to use the Index Alignment
Tool: :
Fg ems ine a fia
retool oe the p
ih Emsore that the handleserra agaist fl at stop and
{atthe nex alguen tol
che al the nay own fhroogh the
Felipe and agaist the lator,
NOTE The inde signe tal has
INQ de he mide ster Poll
{Cone ends ger ha De ide
SFamnater tole onthe oer end. The
(Big end is fo ge primes punch
{S15 the smal ends fora smal
iene punch. Ns impor at you
fo the comet end.
EH Gh
fig.
4. NOTE Ensure that the handle
pushed agent ul af top Push
the index ca nly against he
index ring (13692) Fig. 8 While
ing 2, make sure the index cam
feraine sigh up and dow, ot
tied in any wy, 9.
5 While pushing the index cam rer
Svar agunt he inde ring. 8
Frmly tighten the two index cam
Screws Again, make Sue tha the
inex cam is tight up 2nd down,
Fig 9, and that he handle pushed
pint fll at stop. Once he bo
SEresartighened you ca release
the presen the handle
6 Test the adjustment of he index
am Todo sa ycle the machine, As
you bring the handle backup, apply
moderate resistance ta the rotating
Shella wth yur let and. Wile
holng pressure agaist ihe
Shalpite, continue to bing the har
dle al the way up ont is pushes
gant is fll atop. Alths pont
The paner punch wl be exendes
Uptivaugh the shelipate. With pre
Sure held agains the salle and
the hindle agnine ful stop
take 3 close lok atthe primer
punch if the primer punch i con
{acting the hole nthe help, then
you were nat pushing te cam hard
fnovgh again the inde cng while
Tightening the two screws, Fg 8
te peer punch centered in the
Shalt primer hae then your
djsiment is good
Installation of the new Station 2
Locator:
Changing out the Staton 2 locator
ismos easily accomplsted with he
primer sytem remaved om he
Frachie To remove the prey
tem seepage 4
fen
2. Using 25164" llen wrench,
femave te ad Son 2 sient
screw and replace withthe new
tne °19820, Todo his, insert the
den urench ithe hote on te
back side a the primer feed body.
Fig 1. opus sro nd
the other side, Fig 1. Install the new
se screw by ree
Fig 10
1. Using 2 1/8" Allen wrench,
remove the screw that hots the
ld Staion 2 locator tothe primer
System Fig, 10. Be sute not lose
the sping
ig 12
3. Place the sping inthe chanel,
top Fig. 12. To etal he new
Station 2 locaton tnt trap the sring