ALLIANCE OF PEOPLE’S ORGANIZATION ALONG

MANGGAHAN FLOODWAY-PASIG
P E O P L E ’S P L A N
Presidential PNOY’s
Executive
Proclamation Covenant with
Order No.854
No.1160 S. 2006 the Urban Poor

Technical
People’s
Working Group
Planning
– Dec. 23, 2010
APOAMF - Pasig
Layunin: Nasakupan ng (3)
magkaroon ng Brgy. Partikular sa
Kasiguraduhan sa Lungsod ng Pasig; Eleven (11) Local
usapin ng pabahay 1. Brgy. Sta.Lucia Organization
at palupa lalo na Members
sa loob ng 2. Brgy. Maybunga
kalungsuran 3. Brgy. Rosario
PEOPLE’S PLAN PROCESS

In-City
Relocation

Undertakings

Other
Options
TARGET
CORE SITE
FOR IN-CITY

Bernal St. Brgy.


Rosario
Private Land MMDA DEPOT
3,000 sq.m. Along Eastbank
Floodway, Brgy. Sta.
Lucia
20, 000 sq. M.
Under PP No. 458 s.1994

Boulevard St.
Brgy. Rosario
DESIGN & COST
THE PERSPECTIVE DESIGN
24sq.m. Per floor
17 buildings = 5th floor/bldg
60 units/bldg
w/single loaded corridor
 Maximum Cost per Unit Php
505, 262.12
 Minimum Cost per Unit Php
438, 000.00
PRESENT ISSUE

APOAMF • Design – single loaded


corridor
People’s Plan • Php438T – Php505T

• Design – double loaded


NHA Plan corridor
• Php550T

MMDA • 30 Days Notice of


Plan Demolition

• Status of Land (Target Sites)


Other Issue • Validation of Master List
PLEASE SUPPORT OUR
PEOPLE’S PLAN !

MARAMING
SALAMAT PO !
APOAMF – Pasig