Data:
B = 700 mm
= 0.7 m
H = 700 mm
= 0.7 m
L Kolom = 4000 mm
= 4m
P = 40 mm
f'c = 30 Mpa
b1 = 0.85
fy = 400 Mpa
Ø Tul. Utama = 25 mm
Ø Tul. Sengkang = 13 mm
d = 634.5 mm
d' = 65.5 mm
As Tul Utama = 491.0714 mm2
As Tul Sengkang = 132.7857 mm2
Ec = 25742.9602
ρ = 1.3
SDS = 0.66
Dimensi Balok BU1
h = 600 mm
b = 400 mm
L = 9000 mm
Dimensi Balok BU2
h = 600 mm
b = 400 mm
L = 6000 mm
Dimensi Balok BU3
h = 300
b = 200
l = 3000
Kombinasi Atas
ATAS
NO KOMBINASI P M2 M3
kN kN-m kN-m
1 1,4D -3758.2602 58.0087 -11.2149
2 1,2D + 1,6L + 0,5R -4146.3307 71.942 -16.124
3 1,2D + 1,6R + 1,0Wka -3446.3236 177.9776 52.8027
4 1,2D + 1,6R + 1,0Wki -2996.7364 -78.534 -72.0284
5 1,2D + 1,0Wka + L + 0,5R -4249.0752 320.121 111.1488
6 1,2D + 1,0Wki + L + 0,5R -3349.901 -192.9022 -138.5134
7 1,2D + 1,0Ex + L -5897.164 461.6481 1071.6011
8 1,2D + 1,0Ey + L -5709.151 1013.9257 362.6113
9 0,9D + 1,0Wka -2865.6115 293.8029 117.6215
10 0,9D + 1,0Wki -1966.4373 -219.2203 -132.0406
11 0,9D + 1,0Ex -4513.7516 435.3301 1078.0738
12 0,9D + 1,0Ey -4325.7386 987.6076 369.084
NILAI MAKSIMUM 5897.164 1013.9257 1078.0738
Kombinasi Bawah
BAWAH
NO KOMBINASI P M2 M3
kN kN-m kN-m
1 1,4D -3702.2826 -88.1908 19.9923
2 1,2D + 1,6L + 0,5R -4098.3499 -105.4868 27.0667
3 1,2D + 1,6R + 1,0Wka -3398.3428 -47.3723 -0.0016
4 1,2D + 1,6R + 1,0Wki -2948.7556 -103.8116 34.275
5 1,2D + 1,0Wka + L + 0,5R -4201.0944 -37.837 -10.9338
6 1,2D + 1,0Wki + L + 0,5R -3301.9202 -150.7156 57.6194
7 1,2D + 1,0Ex + L -5849.1832 -24.4493 -92.3527
8 1,2D + 1,0Ey + L -5661.1702 170.3956 -82.4884
9 0,9D + 1,0Wka -2829.6259 -0.2548 -21.4244
10 0,9D + 1,0Wki -1930.4517 -113.1334 47.1288
11 0,9D + 1,0Ex -4477.766 13.133 -102.8432
12 0,9D + 1,0Ey -4289.753 207.9779 -92.9789
NILAI MAKSIMUM 5849.1832 207.9779 102.8432
Cek,
K x Lu / r > 22
28.33 > 22 Kolom Langsing
- Atas Kiri
D n As Sengkang d
mm buah mm2 mm mm
19 17 4817.545 10 540.5
- Atas Kanan
D n As Sengkang d
mm buah mm2 mm mm
19 17 4817.545 10 540.5
Kiri Kanan
Atas (-) 17D19 17D19
a (mm) 236.154 236.154
Mn (kN) 995.156 995.156
Kiri Kanan
Bawah (+) 9D19 9D19
a (mm) 125.023 125.023
Mn (kN) 583.535 583.535
Pu Phi Mprx
No
kN kN.m
1 3758.260 1418.54
2 4146.331 1383.33
3 3446.324 1517.62
4 2996.736 1637.14
5 4249.075 1378.25
6 3349.901 1544.9
7 5897.164 1277.76
8 5709.151 1292.88
9 2865.612 1667.8
10 1966.437 1647.25
11 4513.752 1346.83
12 4325.739 1374.45
13 3702.283 1437.81
14 4098.350 1385.67
15 3398.343 1531.29
16 2948.756 1648.66
17 4201.094 1380.63
18 3301.920 1557.84
19 5849.183 1281.69
20 5661.170 1296.35
21 2829.626 1675.81
22 1930.452 1641.32
23 4477.766 1366.7
24 4289.753 1376.26
Ve = å Mpr / Ln
= 751.624 kN
Vs = Ve / Ø
= 1002.165 kN
Maka digunakan,
ℓ0 = 700 mm
Jarak Sengkang Minimum
S = 6D Tul = 150 mm
S = 1/4 h Kolom = 175 mm
S = 100 mm = 100 mm
Maka digunakan,
S = 100 mm
Av = Vs x S
fy x d
= 315.891 mm2
- Lapangan
V Vs Lap
s
ℓ0 Ln / 2
ℓ0 Ln / 2
Ln/2 - ℓ0 = Vs Lap
Ln/2 Vs
1000 = Vs Lap
1700 1002.165
Vs Lap = 589.509 kN
d lapangan = 0.85 mm
Jarak Tulangan
S1 = 48 x Dia. Skg = 624 mm
S2 = 15 x Dia. Tul = 375 mm
S3 = 300 mm = 300 mm
S4 = b Kolom = 700 mm
Maka digunakan,
S = 200 mm
As Sengkang = 1/4 x π x D2
= 132.786 mm2
Av Perlu = Vs x S
fy x d
= 464.546 mm2
Jumlah Kaki Sengkang,
n = Av Perlu
= Av Sengkang
= 3.498
= 4 buah
T M2 M3
-0.1317 -88.1908 19.9923
-0.2383 -105.4868 27.0667
1.6194 -47.3723 -0.0016
-1.8451 -103.8116 34.275
3.2733 -37.837 -10.9338
-3.6558 -150.7156 57.6194
-0.3153 -24.4493 -92.3527
29.6136 170.3956 -82.4884
3.3799 -0.2548 -21.4244
-3.5492 -113.1334 47.1288
-0.2087 13.133 -102.8432
29.7202 207.9779 -92.9789
BU2 BU2
BU1
Data:
B = 700 mm
= 0.7 m
H = 700 mm
= 0.7 m
L Kolom = 4000 mm
= 4m
P = 40 mm
f'c = 30 Mpa
b1 = 0.85
fy = 400 Mpa
Ø Tul. Utama = 25 mm
Ø Tul. Sengkang = 13 mm
d = 634.5 mm
d' = 65.5 mm
As Tul Utama = 491.0714 mm2
As Tul Sengkang = 132.7857 mm2
Ec = 25742.96
ρ = 1.3
SDS = 0.66
Dimensi Balok BU1
h = 600 mm
b = 400 mm
L = 9000 mm
Dimensi Balok BU2
h = 600 mm
b = 400 mm
L = 6000 mm
Kombinasi Atas
ATAS
NO KOMBINASI
NO KOMBINASI P M2 M3
kN kN-m kN-m
1 1,4D -4043.481 94.385 2.7177
2 1,2D + 1,6L + 0,5R -4412.924 116.6597 3.0106
3 1,2D + 1,6R + 1,0Wka -3553.113 234.8952 38.7663
4 1,2D + 1,6R + 1,0Wki -3378.918 -73.0921 -34.1072
5 1,2D + 1,0Wka + L + 0,5R -4231.983 411.2377 75.6287
6 1,2D + 1,0Wki + L + 0,5R -3883.593 -204.7369 -70.1183
7 1,2D + 1,0Ex + L -4339.971 464.4353 990.6566
8 1,2D + 1,0Ey + L -5017.47 1487.344 42.095
9 0,9D + 1,0Wka -2773.575 368.6633 74.6206
10 0,9D + 1,0Wki -2425.186 -247.3113 -71.1264
11 0,9D + 1,0Ex -2881.618 421.861 989.6485
12 0,9D + 1,0Ey -3559.117 1444.769 41.0869
NILAI MAKSIMUM 5017.47 1487.344 990.6566
Kombinasi Bawah
BAWAH
NO KOMBINASI P M2 M3
kN kN-m kN-m
1 1,4D -3987.503 -152.2874 -0.9045
2 1,2D + 1,6L + 0,5R -4364.943 -186.693 -0.7261
3 1,2D + 1,6R + 1,0Wka -3505.132 -84.4585 -2.4239
4 1,2D + 1,6R + 1,0Wki -3330.937 -176.6055 0.8735
5 1,2D + 1,0Wka + L + 0,5R -4184.002 -73.4856 -4.0418
6 1,2D + 1,0Wki + L + 0,5R -3835.612 -257.7796 2.5528
7 1,2D + 1,0Ex + L -4291.99 -39.3178 45.2917
8 1,2D + 1,0Ey + L -4969.489 322.4589 -21.0373
9 0,9D + 1,0Wka -2737.59 -5.7521 -3.8788
10 0,9D + 1,0Wki -2389.2 -190.046 2.7159
11 0,9D + 1,0Ex -2845.633 28.4158 45.4548
12 0,9D + 1,0Ey -3523.132 390.1925 -20.8742
NILAI MAKSIMUM 4969.489 390.1925 45.4548
Maka,
K 1.78
r 0,3 x h
210 mm
Lu L Kolom - H Balok
3400 mm
Cek,
K x Lu / r > 22
28.82 > 22 Kolom Langsing
P ( kN )
(P max) 14000 (P max)
fs=0 fs=0
fs=0.5fy fs=0.5fy
20 8
19
172 14 5 7
113618
415163 24 12
23
21 9 11
10
22
-2500 2500
Mx ( kN m)
- Bawah Kiri
D n As
600 mm buah mm2
19 9 2550.465
- Bawah Kanan
D n As
400 mm buah mm2
19 9 2550.465
- Atas Kiri
D n As Sengkang d
mm buah mm2 mm mm
19 17 4817.545 10 540.5
- Atas Kanan
D n As Sengkang d
mm buah mm2 mm mm
19 17 4817.545 10 540.5
Kiri Kanan
Atas (-) 17D19 17D19
a (mm) 236.154 236.154
Mn (kN) 995.156 995.156
Kiri Kanan
Bawah (+) 9D19 9D19
a (mm) 125.023 125.023
Mn (kN) 583.535 583.535
Pu Phi Mprx
No
kN kN.m
1 4043.48 1837.51
2 4412.92 1802.96
3 3553.11 2022.17
4 3378.92 2079.3
5 4231.98 1819.91
6 3883.59 1882.0
7 4339.97 1809.81
8 5017.47 1745.67
9 2773.58 2254.7
10 2425.19 2345.11
11 2881.62 2224.34
12 3559.12 2020.21
13 3987.5 1842.74
14 4364.94 1807.46
15 3505.13 2037.66
16 3330.94 2094.55
17 4184 1824.4
18 3835.61 1902.07
19 4291.99 1814.3
20 4969.49 1750.27
21 2737.59 2264.6
22 2389.2 2353.79
23 2845.63 2234.34
24 3523.13 2031.86
Ve = å Mpr / Ln
= 1026.865 kN
Vs = Ve / Ø
= 1369.153 kN
Maka digunakan,
ℓ0 = 700 mm
Maka digunakan,
S = 100 mm
Av = Vs x S
fy x d
= 431.569 mm2
- Lapangan
V Vs Lap
s
ℓ0 Ln / 2
Ln/2 - ℓ0 = Vs Lap
Ln/2 Vs
1000 = Vs Lap
1700 1369.153
Vs Lap = 805.384 kN
d lapangan = 0.85 mm
Jarak Tulangan
S1 = 48 x Dia. Skg = 624 mm
S2 = 15 x Dia. Tul = 375 mm
S3 = 300 mm = 300 mm
S4 = b Kolom = 700 mm
Maka digunakan,
S = 200 mm
As Sengkang = 1/4 x π x D2
= 132.786 mm2
Av Perlu = Vs x S
fy x d
= 634.660 mm2
Jumlah Kaki Sengkang,
n = Av Perlu
= Av Sengkang
= 4.780
= 5 buah
Sengkang
4 D 13 - 100
Tumpuan
Sengkang
5 D 13 - 200
Lapangan
TABLE: Column Forces
Story Column
Load Case/Combo
Station P V2 V3 T
Story1 C24 Comb1 0 -4043.48 1.0428 72.3284 -0.1317
Story1 C24 Comb2 0 -4412.92 1.0728 88.9396 -0.2383
Story1 C24 Comb3 0 -3553.11 11.7449 95.9694 1.6194
Story1 C24 Comb4 0 -3378.92 -9.9572 28.0222 -1.8451
Story1 C24 Comb5 0 -4231.98 22.7078 146.7829 3.2733
Story1 C24 Comb6 0 -3883.59 -20.6964 10.8884 -3.6558
Story1 C24 Comb7 0 -4339.97 268.1002 143.7793 -0.3153
Story1 C24 Comb8 0 -5017.47 18.252 326.4981 29.6136
Story1 C24 Comb9 0 -2773.58 22.3725 114.4441 3.3799
Story1 C24 Comb10 0 -2425.19 -21.0317 -21.4504 -3.5492
Story1 C24 Comb11 0 -2881.62 267.7649 111.4405 -0.2087
Story1 C24 Comb12 0 -3559.12 17.9167 294.1593 29.7202
1487.344 990.6566
-247.311 -71.1264
M2 M3
-152.287 -0.9045
-186.693 -0.7261
-84.4585 -2.4239
-176.606 0.8735
-73.4856 -4.0418
-257.78 2.5528
-39.3178 45.2917
322.4589 -21.0373
-5.7521 -3.8788
-190.046 2.7159
28.4158 45.4548
390.1925 -20.8742
390.1925 45.4548
-257.78 -21.0373
Perhitungan Kolom Sudut
BU1
BU2
Data:
B = 700 mm
= 0.7 m
H = 700 mm
= 0.7 m
L Kolom = 4000 mm
= 4m
P = 40 mm
f'c = 30 Mpa
b1 = 0.85
fy = 400 Mpa
Ø Tul. Utama = 25 mm
Ø Tul. Sengkang = 13 mm
d = 634.5 mm
d' = 65.5 mm
As Tul Utama = 491.0714 mm2
As Tul Sengkang = 132.7857 mm2
Ec = 25742.960203
ρ = 1.3
SDS = 0.66
Dimensi Balok BU1
h = 600 mm
b = 400 mm
L = 9000 mm
Dimensi Balok BU2
h = 600 mm
b = 400 mm
L = 6000 mm
Kombinasi Atas
ATAS
NO KOMBINASI P M2 M3
NO KOMBINASI
kN kN-m kN-m
1 1,4D -2742.904 60.2716 28.192
2 1,2D + 1,6L + 0,5R -2845.565 67.8566 32.2668
3 1,2D + 1,6R + 1,0Wka -2471.387 225.8154 62.3674
4 1,2D + 1,6R + 1,0Wki -2230.913 -122.4924 -14.0379
5 1,2D + 1,0Wka + L + 0,5R -2900.61 410.0912 105.6338
6 1,2D + 1,0Wki + L + 0,5R -2419.662 -286.5244 -47.1768
7 1,2D + 1,0Ex + L -3915.995 419.5876 940.6108
8 1,2D + 1,0Ey + L -3786.615 1793.618 67.2645
9 0,9D + 1,0Wka -2003.769 387.0538 94.5287
10 0,9D + 1,0Wki -1522.821 -309.5618 -58.2819
11 0,9D + 1,0Ex -3019.182 396.5502 929.5058
12 0,9D + 1,0Ey -2889.802 1770.581 56.1594
NILAI MAKSIMUM 3915.995 1793.618 940.6108
Kombinasi Bawah
BAWAH
NO KOMBINASI P M2 M3
kN kN-m kN-m
1 1,4D -2686.926 -99.2784 -42.9368
2 1,2D + 1,6L + 0,5R -2797.584 -112.0045 -48.9979
3 1,2D + 1,6R + 1,0Wka -2423.406 -30.4895 -32.5262
4 1,2D + 1,6R + 1,0Wki -2182.932 -139.7018 -41.0799
5 1,2D + 1,0Wka + L + 0,5R -2852.629 7.2986 -35.8711
6 1,2D + 1,0Wki + L + 0,5R -2371.681 -211.126 -52.9785
7 1,2D + 1,0Ex + L -3868.014 28.8141 131.7315
8 1,2D + 1,0Ey + L -3738.634 526.0495 -62.4879
9 0,9D + 1,0Wka -1967.784 45.3905 -19.0485
10 0,9D + 1,0Wki -1486.836 -173.0341 -36.1559
11 0,9D + 1,0Ex -2983.196 66.906 148.5541
12 0,9D + 1,0Ey -2853.817 564.1414 -45.6653
NILAI MAKSIMUM 3868.014 564.1414 148.5541
Maka,
K 1.78
r 0,3 x h
210 mm
Lu L Kolom - H Balok
3400 mm
Cek,
K x Lu / r > 22
28.82 > 22 Kolom Langsing
- Bawah Kiri
D n As
600 mm buah mm2
19 9 2550.465
- Bawah Kanan
D n As
400 mm buah mm2
19 9 2550.465
- Atas Kiri
D n As Sengkang d
mm buah mm2 mm mm
19 17 4817.545 10 540.5
- Atas Kanan
D n As Sengkang d
mm buah mm2 mm mm
19 17 4817.545 10 540.5
Kiri Kanan
Atas (-) 17D19 17D19
a (mm) 236.154 236.154
Mn (kN) 995.156 995.156
Kiri Kanan
Bawah (+)9D19 9D19
a (mm) 125.023 125.023
Mn (kN) 583.535 583.535
Pu Phi Mprx
No
kN kN.m
1 2742.9 2263.14
2 2845.56 2088.51
3 2471.39 2333.8
4 2230.91 2365.6
5 2900.61 2219.26
6 2419.66 2346.45
7 3915.99 1868.3
8 3786.61 1922.13
9 2003.77 2341.39
10 1522.82 2272.99
11 3019.18 2186.85
12 2889.8 2222.16
13 2686.93 2278.33
14 2797.58 2247.97
15 2423.41 2345.54
16 2182.93 2360.31
17 2852.63 2232.34
18 2371.68 2358.0
19 3868.01 1888.59
20 3738.63 1941.41
21 1967.78 2337.21
22 1486.84 2267.69
23 2983.2 2196.83
24 2853.82 2231.99
Ve = å Mpr / Ln
= 1098.988 kN
Vs = Ve / Ø
= 1465.318 kN
Maka digunakan,
ℓ0 = 700 mm
Maka digunakan,
S = 100 mm
Av = Vs x S
fy x d
= 461.881 mm2
- Lapangan
V Vs
s Lap
ℓ0 Ln /
2
Ln/2 - ℓ0 = Vs Lap
Ln/2 Vs
1000 = Vs Lap
1700 1465.318
Vs Lap = 861.952 kN
d lapanga = 0.85 mm
Jarak Tulangan
S1 = 48 x Dia. Skg = 624 mm
S2 = 15 x Dia. Tul = 375 mm
S3 = 300 mm = 300 mm
S4 = b Kolom = 700 mm
Maka digunakan,
S = 200 mm
As Sengk = 1/4 x π x D2
= 132.786 mm2
Av Perlu = Vs x S
fy x d
= 679.237 mm2
Jumlah Kaki Sengkang,
n = Av Perlu
= Av Sengkang
= 5.115
= 6 buah
fs=0 fs=0
fs=0.5fy fs=0.5fy
19 20 7 8
17 23
24
213
14 5 11 12
1
36
1541618
21 9
22 10
-2500 2500
Mx ( kNm)
BL
BL
Data:
B = 700 mm
= 0.7 m
H = 700 mm
= 0.7 m
L Kolom = 4000 mm
= 4m
P = 40 mm
f'c = 30 Mpa
b1 = 0.85
fy = 400 Mpa
Ø Tul. Utama = 25 mm
Ø Tul. Sengkang = 13 mm
d = 634.5 mm
d' = 65.5 mm
As Tul Utama = 491.0714 mm2
As Tul Sengkang = 132.7857 mm2
Ec = 25742.96
ρ = 1.3
SDS = 0.66
Dimensi Balok BL
h = 400 mm
b = 250 mm
L = 3000 mm
Dimensi Balok BL
h = 400 mm
b = 250 mm
L = 3000 mm
Cek,
K x Lu / r > 22
37.03 > 22 Kolom Langsing
- Bawah Kiri
D n As
400 mm buah mm2
19 5 1416.925
- Bawah Kanan
D n As
250 mm buah mm2
19 5 1416.925
- Atas Kiri
D n As Sengkang d
mm buah mm2 mm mm
19 10 2833.850 10 340.5
- Atas Kanan
D n As Sengkang d
mm buah mm2 mm mm
19 10 2833.850 10 340.5
Kiri Kanan
Atas (-) 10D19 10D19
a (mm) 157.616 157.616
Mn (kN) 629.899 629.899
Kiri Kanan
Bawah (+)5D19 5D19
a (mm) 78.808 78.808
Mn (kN) 337.283 337.283
Pu Phi Mprx
No
kN kN.m
1 1229.012 1723.76
2 1357.363 1743.34
3 1032.697 1692.95
4 1074.283 1700.67
5 1201.812 1719.46
6 1284.983 1732.2
7 1814.070 1811.75
8 897.572 1667.5
9 748.493 1639.0
10 831.665 1654.94
11 1360.767 1743.8
12 444.269 1579.86
13 1183.324 1716.69
14 1318.203 1737.39
15 993.536 1685.63
16 1035.122 1693.51
17 1162.651 1713.45
18 1245.823 1726.22
19 1774.909 1805.87
20 858.411 1660.09
21 719.123 1633.45
22 802.294 1649.39
23 1331.397 1739.38
24 414.898 1573.94
Ve = å Mpr / Ln
= 874.411 kN
Vs = Ve / Ø
= 1165.881 kN
Maka digunakan,
ℓ0 = 700 mm
Av = Vs x S
fy x d
= 367.496 mm2
- Lapangan
V Vs
s Lap
ℓ0 Ln /
2
Ln/2 - ℓ0 = Vs Lap
Ln/2 Vs
1100 = Vs Lap
1800 1165.881
Vs Lap = 712.483 kN
d lapanga = 0.85 mm
Jarak Tulangan
S1 = 48 x Dia. Sk = 624 mm
S2 = 15 x Dia. Tu = 375 mm
S3 = 300 mm = 300 mm
S4 = b Kolom = 700 mm
Maka digunakan,
S = 200 mm
As Sengk = 1/4 x π x D2
= 132.786 mm2
Av Perlu = Vs x S
fy x d
= 561.452 mm2
Jumlah Kaki Sengkang,
n = Av Perlu
= Av Sengkang
= 4.228
= 5 buah
BL BL
BL
Data:
B = 700 mm
= 0.7 m
H = 700 mm
= 0.7 m
L Kolom = 4000 mm
= 4m
P = 40 mm
f'c = 30 Mpa
b1 = 0.85
fy = 400 Mpa
Ø Tul. Utama = 25 mm
Ø Tul. Sengkang = 13 mm
d = 634.5 mm
d' = 65.5 mm
As Tul Utama = 491.0714 mm2
As Tul Sengkang = 132.7857 mm2
Ec = 25742.96
ρ = 1.3
SDS = 0.66
Dimensi Balok BU1
h = 400 mm
b = 250 mm
L = 3000 mm
Dimensi Balok BU2
h = 400 mm
b = 250 mm
L = 3000 mm
Maka,
K 2
r 0,3 x h
210 mm
Lu L Kolom - H Balok
3600 mm
Cek,
K x Lu / r > 22
34.29 > 22 Kolom Langsing
- Bawah Kiri
D n As
400 mm buah mm2
19 5 1416.925
- Bawah Kanan
D n As
250 mm buah mm2
19 5 1416.925
- Atas Kiri
D n As Sengkang d
mm buah mm2 mm mm
19 10 2833.850 10 340.5
- Atas Kanan
D n As Sengkang d
mm buah mm2 mm mm
19 10 2833.850 10 340.5
Kiri Kanan
Atas (-) 10D19 10D19
a (mm) 157.616 157.616
Mn (kN) 629.899 629.899
Kiri Kanan
Bawah (+)8D22 8D22
a (mm) 78.808 78.808
Mn (kN) 337.283 337.283
Pu Phi Mprx
No
kN kN.m
1 1568.085 1775.24
2 1748.009 1802.03
3 1306.468 1735.56
4 1381.792 1746.99
5 1521.215 1768.18
6 1671.864 1790.6
7 808.548 1650.54
8 1265.404 1729.28
9 932.731 1674.1
10 1083.379 1702.07
11 220.080 1535.42
12 676.937 1625.15
13 1523.633 1768.48
14 1709.906 1796.26
15 1268.365 1729.74
16 1343.689 1741.21
17 1483.113 1762.45
18 1633.761 1784.95
19 770.445 1643.26
20 1227.302 1723.45
21 904.154 1668.83
22 1054.802 1697.06
23 191.504 1529.63
24 648.360 1619.72
Ve = å Mpr / Ln
= 849.794 kN
Vs = Ve / Ø
= 1133.059 kN
Maka digunakan,
ℓ0 = 700 mm
Maka digunakan,
S = 100 mm
Av = Vs x S
fy x d
= 357.150 mm2
- Lapangan
V Vs
s Lap
ℓ0 Ln /
2
Ln/2 - ℓ0 = Vs Lap
Ln/2 Vs
1100 = Vs Lap
1800 1133.059
Vs Lap = 692.425 kN
d lapanga = 0.85 mm
Jarak Tulangan
S1 = 48 x Dia. Skg = 624 mm
S2 = 15 x Dia. Tul = 375 mm
S3 = 300 mm = 300 mm
S4 = b Kolom = 700 mm
Maka digunakan,
S = 200 mm
As Sengk = 1/4 x π x D2
= 132.786 mm2
Av Perlu = Vs x S
fy x d
= 545.646 mm2
Jumlah Kaki Sengkang,
n = Av Perlu
= Av Sengkang
= 4.109