Perhitungan Kolom Tengah

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 59

Perhitungan Kolom Tengah

BU1

BU2 BU2

BU3

Data:
B = 700 mm
= 0.7 m
H = 700 mm
= 0.7 m
L Kolom = 4000 mm
= 4m
P = 40 mm
f'c = 30 Mpa
b1 = 0.85
fy = 400 Mpa
Ø Tul. Utama = 25 mm
Ø Tul. Sengkang = 13 mm
d = 634.5 mm
d' = 65.5 mm
As Tul Utama = 491.0714 mm2
As Tul Sengkang = 132.7857 mm2
Ec = 25742.9602
ρ = 1.3
SDS = 0.66
Dimensi Balok BU1
h = 600 mm
b = 400 mm
L = 9000 mm
Dimensi Balok BU2
h = 600 mm
b = 400 mm
L = 6000 mm
Dimensi Balok BU3
h = 300
b = 200
l = 3000

Kombinasi Atas
ATAS
NO KOMBINASI P M2 M3
kN kN-m kN-m
1 1,4D -3758.2602 58.0087 -11.2149
2 1,2D + 1,6L + 0,5R -4146.3307 71.942 -16.124
3 1,2D + 1,6R + 1,0Wka -3446.3236 177.9776 52.8027
4 1,2D + 1,6R + 1,0Wki -2996.7364 -78.534 -72.0284
5 1,2D + 1,0Wka + L + 0,5R -4249.0752 320.121 111.1488
6 1,2D + 1,0Wki + L + 0,5R -3349.901 -192.9022 -138.5134
7 1,2D + 1,0Ex + L -5897.164 461.6481 1071.6011
8 1,2D + 1,0Ey + L -5709.151 1013.9257 362.6113
9 0,9D + 1,0Wka -2865.6115 293.8029 117.6215
10 0,9D + 1,0Wki -1966.4373 -219.2203 -132.0406
11 0,9D + 1,0Ex -4513.7516 435.3301 1078.0738
12 0,9D + 1,0Ey -4325.7386 987.6076 369.084
NILAI MAKSIMUM 5897.164 1013.9257 1078.0738

Kombinasi Bawah
BAWAH
NO KOMBINASI P M2 M3
kN kN-m kN-m
1 1,4D -3702.2826 -88.1908 19.9923
2 1,2D + 1,6L + 0,5R -4098.3499 -105.4868 27.0667
3 1,2D + 1,6R + 1,0Wka -3398.3428 -47.3723 -0.0016
4 1,2D + 1,6R + 1,0Wki -2948.7556 -103.8116 34.275
5 1,2D + 1,0Wka + L + 0,5R -4201.0944 -37.837 -10.9338
6 1,2D + 1,0Wki + L + 0,5R -3301.9202 -150.7156 57.6194
7 1,2D + 1,0Ex + L -5849.1832 -24.4493 -92.3527
8 1,2D + 1,0Ey + L -5661.1702 170.3956 -82.4884
9 0,9D + 1,0Wka -2829.6259 -0.2548 -21.4244
10 0,9D + 1,0Wki -1930.4517 -113.1334 47.1288
11 0,9D + 1,0Ex -4477.766 13.133 -102.8432
12 0,9D + 1,0Ey -4289.753 207.9779 -92.9789
NILAI MAKSIMUM 5849.1832 207.9779 102.8432

2. Perhitungan Tulangan Utama


Cek Gaya Aksial Ultimit
Pu = 5849.1832
Pu > 0,1 x Ag x f'c
5849183.2 > 1470000 OK

Cek Dimensi Penampang


B > 300
700 > 300 OK
Cek Rasio Penampang
B/H > 0.4
1 > 0.4 OK

Cek Penampang Kolom Terhadap Panjang


Ig kolom = 0,7 x 1/12 x b x h³
= 14005833333 mm4
EI Kolom = Ec x Ig
= 3.6055161E+14
Ig BU1 = 0,35 x 1/12 x b x h³
= 2520000000 mm4
EI BU1 = Ec x Ig
= 6.487226E+13 mm4
Ig BU2 = 0,35 x 1/12 x b x h³
= 2520000000 mm4
EI BU2 = Ec x Ig
= 6.487226E+13 mm4
Ig BU3 = 0,35 x 1/12 x b x h³
= 157500000
EI BU3 = Ec x Ig
= 4054516231932
yA ƩEI kolom / L kolom
ƩEI balok / L balok
5.973
yB 1 Tumpuan Jepit
Maka,
K 1.75
r 0,3 x h
210 mm
Lu L Kolom - H Balok
3400 mm

Cek,
K x Lu / r > 22
28.33 > 22 Kolom Langsing

Perencanaan Tulangan Utama


r = 1.60%
As Perlu = rxbxd
= 7106 mm2
As D 25 = 1/4 x π x D²
= 491.0714286 m2
n = As perlu
= As D 25
= 14.47121455
dipakai = 20 buah
As terpasang n x As D 25
9821.428571 mm2
r As terpasang / ( b x d )
2.211286406 %
ρ min = 1%
ρ maks = 6%
Cek,
ρ min < r < ρ maks OK
Factored Loads and Moments with Corresponding Capacities:
Pu Phi Mn
NO
kN kN.m
1 3758.2602 1465.58
2 4146.3307 1374.08
3 3446.3236 1529.24
4 2996.7364 1609.04
5 4249.0752 1349.44
6 3349.901 1547.47
7 5897.164 1205.8
8 5709.151 1221.66
9 2865.6115 1615.68
10 1966.4373 1472.81
11 4513.7516 1307.74
12 4325.7386 1330.67
13 3702.2826 1477.62
14 4098.3499 1391.31
15 3398.3428 1538.35
16 2948.7556 1618.46
17 4201.0944 1361.03
18 3301.9202 1556.3
19 5849.1832 1209.89
20 5661.1702 1225.6
21 2829.6259 1610.63
22 1930.4517 1466.55
23 4477.766 1310.01
24 4289.753 1339.63

Dari Hasil Analisa diatas, didapat:


Mn max = 1205.75 KNm

3. Cek Kekuatan Kolom terhadap Balok


- Bawah Kiri
D n As
600 mm buah mm2
19 9 2550.465
- Bawah Kanan
D n As
400 mm buah mm2
19 9 2550.465

- Atas Kiri
D n As Sengkang d
mm buah mm2 mm mm
19 17 4817.545 10 540.5
- Atas Kanan
D n As Sengkang d
mm buah mm2 mm mm
19 17 4817.545 10 540.5

Kiri Kanan
Atas (-) 17D19 17D19
a (mm) 236.154 236.154
Mn (kN) 995.156 995.156

Kiri Kanan
Bawah (+) 9D19 9D19
a (mm) 125.023 125.023
Mn (kN) 583.535 583.535

Cek Kekuatan Kolom terhadap Balok


∑ Me = 2415.640
∑ Mg 1 = 1578.691
∑ Mg 2 = 1578.691
∑ Mg = 1578.691
(6/5) ∑ Mg = 1894.429

∑ Me > (6/5) ∑ Mg OKE

3. Perhitungan Tulangan Geser


Nilai Fy dikalikan dengan 1,25 maka :
Fy = 500 Mpa

Pu Phi Mprx
No
kN kN.m
1 3758.260 1418.54
2 4146.331 1383.33
3 3446.324 1517.62
4 2996.736 1637.14
5 4249.075 1378.25
6 3349.901 1544.9
7 5897.164 1277.76
8 5709.151 1292.88
9 2865.612 1667.8
10 1966.437 1647.25
11 4513.752 1346.83
12 4325.739 1374.45
13 3702.283 1437.81
14 4098.350 1385.67
15 3398.343 1531.29
16 2948.756 1648.66
17 4201.094 1380.63
18 3301.920 1557.84
19 5849.183 1281.69
20 5661.170 1296.35
21 2829.626 1675.81
22 1930.452 1641.32
23 4477.766 1366.7
24 4289.753 1376.26

Dari Hasil Analisa diatas, didapat


Mprx = 1277.76 kNm

Gaya Geser Rencana


å Mpr = 2 x Mpr
= 2555.52 kNm

Ve = å Mpr / Ln
= 751.624 kN
Vs = Ve / Ø
= 1002.165 kN

Jarak Tulangan Geser


-Tumpuan
Sengkang Tertutup (Sepanjang ℓ0 dari muka HBK)
ℓ0 = h Kolom = 700 mm
ℓ0 = 1/6 Ln = 566.6666667 mm
ℓ0 = 500 mm = 500 mm

Maka digunakan,
ℓ0 = 700 mm
Jarak Sengkang Minimum
S = 6D Tul = 150 mm
S = 1/4 h Kolom = 175 mm
S = 100 mm = 100 mm

Maka digunakan,
S = 100 mm

Av = Vs x S
fy x d
= 315.891 mm2

hc = h Kolom - 2.P - Dia. Skg


= 607 mm
bc = b Kolom - 2.P - Dia. Skg
= 607 mm
Ag = bxh
= 490000 mm2
Ae = bc x hc
= 368449 mm2

Ash 1 = 0.3 x ( S x hc x f'c / fyh ) x ((Ag/Ae) - 1)


= 450.560 mm2
Ash 2 = 0.09 x ( S x hc x f'c / fy )
= 409.725
Maka digunakan,
Ash = 450.560 mm2

Cek Av terhadap Ash untuk Penentuan Hoops


Av = 315.891 mm2
Ash = 450.560 mm2
Maka digunakan,
Av = 450.560 mm2
As Sengkang = 1/4 x π x D^2
= 132.786 mm2
Jumlah Kaki Sengkang,
n = Av / As Sengkang
= 3.393
= 4 buah

- Lapangan

V Vs Lap
s
ℓ0 Ln / 2
ℓ0 Ln / 2

Ln/2 - ℓ0 = Vs Lap
Ln/2 Vs
1000 = Vs Lap
1700 1002.165
Vs Lap = 589.509 kN
d lapangan = 0.85 mm

Jarak Tulangan
S1 = 48 x Dia. Skg = 624 mm
S2 = 15 x Dia. Tul = 375 mm
S3 = 300 mm = 300 mm
S4 = b Kolom = 700 mm

Maka digunakan,
S = 200 mm

As Sengkang = 1/4 x π x D2
= 132.786 mm2
Av Perlu = Vs x S
fy x d
= 464.546 mm2
Jumlah Kaki Sengkang,
n = Av Perlu
= Av Sengkang
= 3.498
= 4 buah

Rekapitulasi Penulangan Kolom Tepi


Tul. Utama 20 D 25
Sengkang
4 D 13 - 100
Tumpuan
Sengkang
4 D 13 - 200
Lapangan
TABLE: Column Forces
Story Column
Load Case/Combo
Station P V2 V3
Story1 C6 Comb1 0 -3758.26 -9.1621 42.8492
Story1 C6 Comb2 0 -4146.331 -12.6723 51.9813
Story1 C6 Comb3 0 -3446.324 15.0473 64.8544
Story1 C6 Comb4 0 -2996.736 -30.7541 8.6013
Story1 C6 Comb5 0 -4249.075 34.9363 102.5144
Story1 C6 Comb6 0 -3349.901 -56.6666 -9.9919
Story1 C6 Comb7 0 -5897.164 332.9276 138.8491
Story1 C6 Comb8 0 -5709.151 127.9479 238.0801
Story1 C6 Comb9 0 -2865.612 39.9115 83.799
Story1 C6 Comb10 0 -1966.437 -51.6914 -28.7072
Story1 C6 Comb11 0 -4513.752 337.9028 120.1337
Story1 C6 Comb12 0 -4325.739 132.9231 219.3648

Maks -1966.437 337.9028 238.0801


Min -5897.164 -56.6666 -28.7072

TABLE: Column Forces


Story Column
Load Case/Combo
Station P V2 V3
Story1 C6 Comb1 3.4 -3702.283 -9.1621 42.8492
Story1 C6 Comb2 3.4 -4098.35 -12.6723 51.9813
Story1 C6 Comb3 3.4 -3398.343 15.0473 64.8544
Story1 C6 Comb4 3.4 -2948.756 -30.7541 8.6013
Story1 C6 Comb5 3.4 -4201.094 34.9363 102.5144
Story1 C6 Comb6 3.4 -3301.92 -56.6666 -9.9919
Story1 C6 Comb7 3.4 -5849.183 332.9276 138.8491
Story1 C6 Comb8 3.4 -5661.17 127.9479 238.0801
Story1 C6 Comb9 3.4 -2829.626 39.9115 83.799
Story1 C6 Comb10 3.4 -1930.452 -51.6914 -28.7072
Story1 C6 Comb11 3.4 -4477.766 337.9028 120.1337
Story1 C6 Comb12 3.4 -4289.753 132.9231 219.3648

Maks -1930.452 337.9028 238.0801


Min -5849.183 -56.6666 -28.7072
tumpuan lapangan
T M2 M3
-0.1317 58.0087 -11.2149
-0.2383 71.942 -16.124
1.6194 177.9776 52.8027
-1.8451 -78.534 -72.0284
3.2733 320.121 111.1488
-3.6558 -192.9022 -138.5134
-0.3153 461.6481 1071.6011
29.6136 1013.9257 362.6113
3.3799 293.8029 117.6215
-3.5492 -219.2203 -132.0406
-0.2087 435.3301 1078.0738
29.7202 987.6076 369.084

29.7202 1013.9257 1078.0738


-3.6558 -219.2203 -138.5134

T M2 M3
-0.1317 -88.1908 19.9923
-0.2383 -105.4868 27.0667
1.6194 -47.3723 -0.0016
-1.8451 -103.8116 34.275
3.2733 -37.837 -10.9338
-3.6558 -150.7156 57.6194
-0.3153 -24.4493 -92.3527
29.6136 170.3956 -82.4884
3.3799 -0.2548 -21.4244
-3.5492 -113.1334 47.1288
-0.2087 13.133 -102.8432
29.7202 207.9779 -92.9789

29.7202 207.9779 57.6194


-3.6558 -150.7156 -102.8432
Perhitungan Kolom Tengah

BU2 BU2

BU1
Data:
B = 700 mm
= 0.7 m
H = 700 mm
= 0.7 m
L Kolom = 4000 mm
= 4m
P = 40 mm
f'c = 30 Mpa
b1 = 0.85
fy = 400 Mpa
Ø Tul. Utama = 25 mm
Ø Tul. Sengkang = 13 mm
d = 634.5 mm
d' = 65.5 mm
As Tul Utama = 491.0714 mm2
As Tul Sengkang = 132.7857 mm2
Ec = 25742.96
ρ = 1.3
SDS = 0.66
Dimensi Balok BU1
h = 600 mm
b = 400 mm
L = 9000 mm
Dimensi Balok BU2
h = 600 mm
b = 400 mm
L = 6000 mm

Kombinasi Atas
ATAS
NO KOMBINASI
NO KOMBINASI P M2 M3
kN kN-m kN-m
1 1,4D -4043.481 94.385 2.7177
2 1,2D + 1,6L + 0,5R -4412.924 116.6597 3.0106
3 1,2D + 1,6R + 1,0Wka -3553.113 234.8952 38.7663
4 1,2D + 1,6R + 1,0Wki -3378.918 -73.0921 -34.1072
5 1,2D + 1,0Wka + L + 0,5R -4231.983 411.2377 75.6287
6 1,2D + 1,0Wki + L + 0,5R -3883.593 -204.7369 -70.1183
7 1,2D + 1,0Ex + L -4339.971 464.4353 990.6566
8 1,2D + 1,0Ey + L -5017.47 1487.344 42.095
9 0,9D + 1,0Wka -2773.575 368.6633 74.6206
10 0,9D + 1,0Wki -2425.186 -247.3113 -71.1264
11 0,9D + 1,0Ex -2881.618 421.861 989.6485
12 0,9D + 1,0Ey -3559.117 1444.769 41.0869
NILAI MAKSIMUM 5017.47 1487.344 990.6566

Kombinasi Bawah
BAWAH
NO KOMBINASI P M2 M3
kN kN-m kN-m
1 1,4D -3987.503 -152.2874 -0.9045
2 1,2D + 1,6L + 0,5R -4364.943 -186.693 -0.7261
3 1,2D + 1,6R + 1,0Wka -3505.132 -84.4585 -2.4239
4 1,2D + 1,6R + 1,0Wki -3330.937 -176.6055 0.8735
5 1,2D + 1,0Wka + L + 0,5R -4184.002 -73.4856 -4.0418
6 1,2D + 1,0Wki + L + 0,5R -3835.612 -257.7796 2.5528
7 1,2D + 1,0Ex + L -4291.99 -39.3178 45.2917
8 1,2D + 1,0Ey + L -4969.489 322.4589 -21.0373
9 0,9D + 1,0Wka -2737.59 -5.7521 -3.8788
10 0,9D + 1,0Wki -2389.2 -190.046 2.7159
11 0,9D + 1,0Ex -2845.633 28.4158 45.4548
12 0,9D + 1,0Ey -3523.132 390.1925 -20.8742
NILAI MAKSIMUM 4969.489 390.1925 45.4548

2. Perhitungan Tulangan Utama


Cek Gaya Aksial Ultimit
Pu = 4969.4894
Pu > 0,1 x Ag x f'c
4969489.4 > 1470000 OK

Cek Dimensi Penampang


B > 300
700 > 300 OK
Cek Rasio Penampang
B/H > 0.4
1 > 0.4 OK

Cek Penampang Kolom Terhadap Panjang


Ig kolom = 0,7 x 1/12 x b x h³
= 14005833333.33 mm4
EI Kolom = Ec x Ig
= 3.6055161E+14
Ig BU1 = 0,35 x 1/12 x b x h³
= 2520000000 mm4
EI BU1 = Ec x Ig
= 64872259710912 mm4
Ig BU2 = 0,35 x 1/12 x b x h³
= 2520000000 mm4
EI BU2 = Ec x Ig
= 64872259710912 mm4
yA ƩEI kolom / L kolom
ƩEI balok / L balok
6.253
yB 1 Tumpuan Jepit

Maka,
K 1.78
r 0,3 x h
210 mm
Lu L Kolom - H Balok
3400 mm

Cek,
K x Lu / r > 22
28.82 > 22 Kolom Langsing

Perencanaan Tulangan Utama


r = 3.00%
As Perlu = rxbxd
= 13325 mm2
As D 25 = 1/4 x π x D²
= 491.0714 m2
n = As perlu
= As D 25
= 27.13353
dipakai = 32 buah
As terpasang n x As D 25
15714.29 mm2
r As terpasang / ( b x d )
3.538058 %
ρ min = 1%
ρ maks = 6%
Cek,
ρ min < r < ρ maks OK

P ( kN )
(P max) 14000 (P max)

fs=0 fs=0

fs=0.5fy fs=0.5fy

20 8
19
172 14 5 7
113618
415163 24 12
23
21 9 11
10
22

-2500 2500

Mx ( kN m)

(P min) -6000 (P min)

Factored Loads and Moments with Corresponding Capacities:


Pu Phi Mn
NO
NO
kN kN.m
1 4043.48 1819.59
2 4412.92 1725.25
3 3553.11 1940.32
4 3378.92 1979.45
5 4231.98 1772.32
6 3883.59 1858.34
7 4339.97 1744.5
8 5017.47 1625.77
9 2773.58 2103.92
10 2425.19 2099.75
11 2881.62 2081.58
12 3559.12 1939.02
13 3987.5 1833.35
14 4364.94 1737.92
15 3505.13 1951.13
16 3330.94 1989.95
17 4184 1784.47
18 3835.61 1876.6
19 4291.99 1756.93
20 4969.49 1630.64
21 2737.59 2111.5
22 2389.2 2095.21
23 2845.63 2088.49
24 3523.13 1947

Dari Hasil Analisa diatas, didapat:


Mn max = 1625.77 KNm

3. Cek Kekuatan Kolom terhadap Balok

- Bawah Kiri
D n As
600 mm buah mm2
19 9 2550.465
- Bawah Kanan
D n As
400 mm buah mm2
19 9 2550.465

- Atas Kiri
D n As Sengkang d
mm buah mm2 mm mm
19 17 4817.545 10 540.5
- Atas Kanan
D n As Sengkang d
mm buah mm2 mm mm
19 17 4817.545 10 540.5

Kiri Kanan
Atas (-) 17D19 17D19
a (mm) 236.154 236.154
Mn (kN) 995.156 995.156

Kiri Kanan
Bawah (+) 9D19 9D19
a (mm) 125.023 125.023
Mn (kN) 583.535 583.535

Cek Kekuatan Kolom terhadap Balok


∑ Me = 3256.410
∑ Mg 1 = 1578.691
∑ Mg 2 = 1578.691
∑ Mg = 1578.691
(6/5) ∑ Mg = 1894.429

∑ Me > (6/5) ∑ Mg OKE

3. Perhitungan Tulangan Geser


Nilai Fy dikalikan dengan 1,25 maka :
Fy = 500 Mpa

Pu Phi Mprx
No
kN kN.m
1 4043.48 1837.51
2 4412.92 1802.96
3 3553.11 2022.17
4 3378.92 2079.3
5 4231.98 1819.91
6 3883.59 1882.0
7 4339.97 1809.81
8 5017.47 1745.67
9 2773.58 2254.7
10 2425.19 2345.11
11 2881.62 2224.34
12 3559.12 2020.21
13 3987.5 1842.74
14 4364.94 1807.46
15 3505.13 2037.66
16 3330.94 2094.55
17 4184 1824.4
18 3835.61 1902.07
19 4291.99 1814.3
20 4969.49 1750.27
21 2737.59 2264.6
22 2389.2 2353.79
23 2845.63 2234.34
24 3523.13 2031.86

Dari Hasil Analisa diatas, didapat


Mprx = 1745.67 kNm

Gaya Geser Rencana


å Mpr = 2 x Mpr
= 3491.34 kNm

Ve = å Mpr / Ln
= 1026.865 kN
Vs = Ve / Ø
= 1369.153 kN

Jarak Tulangan Geser


-Tumpuan
Sengkang Tertutup (Sepanjang ℓ0 dari muka HBK)
ℓ0 = h Kolom = 700 mm
ℓ0 = 1/6 Ln = 566.6667 mm
ℓ0 = 500 mm = 500 mm

Maka digunakan,
ℓ0 = 700 mm

Jarak Sengkang Minimum


S = 6D Tul = 150 mm
S = 1/4 h Kolom = 175 mm
S = 100 mm = 100 mm

Maka digunakan,
S = 100 mm

Av = Vs x S
fy x d
= 431.569 mm2

hc = h Kolom - 2.P - Dia. Skg


= 607 mm
bc = b Kolom - 2.P - Dia. Skg
= 607 mm
Ag = bxh
= 490000 mm2
Ae = bc x hc
= 368449 mm2

Ash 1 = 0.3 x ( S x hc x f'c / fyh ) x ((Ag/Ae) - 1)


= 450.560 mm2
Ash 2 = 0.09 x ( S x hc x f'c / fy )
= 409.725
Maka digunakan,
Ash = 450.560 mm2

Cek Av terhadap Ash untuk Penentuan Hoops


Av = 431.569 mm2
Ash = 450.560 mm2
Maka digunakan,
Av = 450.560 mm2
As Sengkang = 1/4 x π x D^2
= 132.786 mm2
Jumlah Kaki Sengkang,
n = Av / As Sengkang
= 3.393
= 4 buah

- Lapangan

V Vs Lap
s
ℓ0 Ln / 2

Ln/2 - ℓ0 = Vs Lap
Ln/2 Vs
1000 = Vs Lap
1700 1369.153
Vs Lap = 805.384 kN
d lapangan = 0.85 mm

Jarak Tulangan
S1 = 48 x Dia. Skg = 624 mm
S2 = 15 x Dia. Tul = 375 mm
S3 = 300 mm = 300 mm
S4 = b Kolom = 700 mm

Maka digunakan,
S = 200 mm

As Sengkang = 1/4 x π x D2
= 132.786 mm2
Av Perlu = Vs x S
fy x d
= 634.660 mm2
Jumlah Kaki Sengkang,
n = Av Perlu
= Av Sengkang
= 4.780
= 5 buah

Rekapitulasi Penulangan Kolom Tepi


Tul. Utama 32 D 25

Sengkang
4 D 13 - 100
Tumpuan

Sengkang
5 D 13 - 200
Lapangan
TABLE: Column Forces
Story Column
Load Case/Combo
Station P V2 V3 T
Story1 C24 Comb1 0 -4043.48 1.0428 72.3284 -0.1317
Story1 C24 Comb2 0 -4412.92 1.0728 88.9396 -0.2383
Story1 C24 Comb3 0 -3553.11 11.7449 95.9694 1.6194
Story1 C24 Comb4 0 -3378.92 -9.9572 28.0222 -1.8451
Story1 C24 Comb5 0 -4231.98 22.7078 146.7829 3.2733
Story1 C24 Comb6 0 -3883.59 -20.6964 10.8884 -3.6558
Story1 C24 Comb7 0 -4339.97 268.1002 143.7793 -0.3153
Story1 C24 Comb8 0 -5017.47 18.252 326.4981 29.6136
Story1 C24 Comb9 0 -2773.58 22.3725 114.4441 3.3799
Story1 C24 Comb10 0 -2425.19 -21.0317 -21.4504 -3.5492
Story1 C24 Comb11 0 -2881.62 267.7649 111.4405 -0.2087
Story1 C24 Comb12 0 -3559.12 17.9167 294.1593 29.7202

Maks -2425.19 268.1002 326.4981 29.7202


Min -5017.47 -21.0317 -21.4504 -3.6558

TABLE: Column Forces


Story Column
Load Case/Combo
Station P V2 V3 T
Story1 C24 Comb1 3.4 -3987.5 1.0428 72.3284 -0.1317
Story1 C24 Comb2 3.4 -4364.94 1.0728 88.9396 -0.2383
Story1 C24 Comb3 3.4 -3505.13 11.7449 88.1154 1.6194
Story1 C24 Comb4 3.4 -3330.94 -9.9572 35.8762 -1.8451
Story1 C24 Comb5 3.4 -4184 22.7078 131.0749 3.2733
Story1 C24 Comb6 3.4 -3835.61 -20.6964 26.5964 -3.6558
Story1 C24 Comb7 3.4 -4291.99 268.1002 143.7793 -0.3153
Story1 C24 Comb8 3.4 -4969.49 18.252 326.4981 29.6136
Story1 C24 Comb9 3.4 -2737.59 22.3725 98.7361 3.3799
Story1 C24 Comb10 3.4 -2389.2 -21.0317 -5.7424 -3.5492
Story1 C24 Comb11 3.4 -2845.63 267.7649 111.4405 -0.2087
Story1 C24 Comb12 3.4 -3523.13 17.9167 294.1593 29.7202

Maks -2389.2 268.1002 326.4981 29.7202


Min -4969.49 -21.0317 -5.7424 -3.6558
M2 M3
94.385 2.7177
116.6597 3.0106
234.8952 38.7663
-73.0921 -34.1072
411.2377 75.6287
-204.737 -70.1183
464.4353 990.6566
1487.344 42.095
368.6633 74.6206
-247.311 -71.1264
421.861 989.6485
1444.769 41.0869

1487.344 990.6566
-247.311 -71.1264

M2 M3
-152.287 -0.9045
-186.693 -0.7261
-84.4585 -2.4239
-176.606 0.8735
-73.4856 -4.0418
-257.78 2.5528
-39.3178 45.2917
322.4589 -21.0373
-5.7521 -3.8788
-190.046 2.7159
28.4158 45.4548
390.1925 -20.8742

390.1925 45.4548
-257.78 -21.0373
Perhitungan Kolom Sudut

BU1

BU2
Data:
B = 700 mm
= 0.7 m
H = 700 mm
= 0.7 m
L Kolom = 4000 mm
= 4m
P = 40 mm
f'c = 30 Mpa
b1 = 0.85
fy = 400 Mpa
Ø Tul. Utama = 25 mm
Ø Tul. Sengkang = 13 mm
d = 634.5 mm
d' = 65.5 mm
As Tul Utama = 491.0714 mm2
As Tul Sengkang = 132.7857 mm2
Ec = 25742.960203
ρ = 1.3
SDS = 0.66
Dimensi Balok BU1
h = 600 mm
b = 400 mm
L = 9000 mm
Dimensi Balok BU2
h = 600 mm
b = 400 mm
L = 6000 mm

Kombinasi Atas
ATAS
NO KOMBINASI P M2 M3
NO KOMBINASI
kN kN-m kN-m
1 1,4D -2742.904 60.2716 28.192
2 1,2D + 1,6L + 0,5R -2845.565 67.8566 32.2668
3 1,2D + 1,6R + 1,0Wka -2471.387 225.8154 62.3674
4 1,2D + 1,6R + 1,0Wki -2230.913 -122.4924 -14.0379
5 1,2D + 1,0Wka + L + 0,5R -2900.61 410.0912 105.6338
6 1,2D + 1,0Wki + L + 0,5R -2419.662 -286.5244 -47.1768
7 1,2D + 1,0Ex + L -3915.995 419.5876 940.6108
8 1,2D + 1,0Ey + L -3786.615 1793.618 67.2645
9 0,9D + 1,0Wka -2003.769 387.0538 94.5287
10 0,9D + 1,0Wki -1522.821 -309.5618 -58.2819
11 0,9D + 1,0Ex -3019.182 396.5502 929.5058
12 0,9D + 1,0Ey -2889.802 1770.581 56.1594
NILAI MAKSIMUM 3915.995 1793.618 940.6108

Kombinasi Bawah
BAWAH
NO KOMBINASI P M2 M3
kN kN-m kN-m
1 1,4D -2686.926 -99.2784 -42.9368
2 1,2D + 1,6L + 0,5R -2797.584 -112.0045 -48.9979
3 1,2D + 1,6R + 1,0Wka -2423.406 -30.4895 -32.5262
4 1,2D + 1,6R + 1,0Wki -2182.932 -139.7018 -41.0799
5 1,2D + 1,0Wka + L + 0,5R -2852.629 7.2986 -35.8711
6 1,2D + 1,0Wki + L + 0,5R -2371.681 -211.126 -52.9785
7 1,2D + 1,0Ex + L -3868.014 28.8141 131.7315
8 1,2D + 1,0Ey + L -3738.634 526.0495 -62.4879
9 0,9D + 1,0Wka -1967.784 45.3905 -19.0485
10 0,9D + 1,0Wki -1486.836 -173.0341 -36.1559
11 0,9D + 1,0Ex -2983.196 66.906 148.5541
12 0,9D + 1,0Ey -2853.817 564.1414 -45.6653
NILAI MAKSIMUM 3868.014 564.1414 148.5541

2. Perhitungan Tulangan Utama


Cek Gaya Aksial Ultimit
Pu = 3868.014
Pu > 0,1 x Ag x f'c
3868014 > 1470000 OK

Cek Dimensi Penampang


B > 300
700 > 300 OK
Cek Rasio Penampang
B/H > 0.4
1 > 0.4 OK
Cek Penampang Kolom Terhadap Panjang
Ig kolom = 0,7 x 1/12 x b x h³
= 14005833333 mm4
EI Kolom = Ec x Ig
= 3.605516E+14
Ig BU1 = 0,35 x 1/12 x b x h³
= 2520000000 mm4
EI BU1 = Ec x Ig
= 6.487226E+13 mm4
Ig BU2 = 0,35 x 1/12 x b x h³
= 2520000000 mm4
EI BU2 = Ec x Ig
= 6.487226E+13 mm4
yA ƩEI kolom / L kolom
ƩEI balok / L balok
6.253
yB 1 Tumpuan Jepit

Maka,
K 1.78
r 0,3 x h
210 mm
Lu L Kolom - H Balok
3400 mm

Cek,
K x Lu / r > 22
28.82 > 22 Kolom Langsing

Perencanaan Tulangan Utama


r = 3.00%
As Perlu = rxbxd
= 13325 mm2
As D 25 = 1/4 x π x D²
= 491.07142857 m2
n = As perlu
= As D 25
= 27.133527273
dipakai = 32 buah
As terpasang n x As D 25
15714.285714 mm2
r As terpasang / ( b x d )
3.5380582493 %
ρ min = 1%
ρ maks = 6%
Cek,
ρ min < r < ρ maks OK

Factored Loads and Moments with Corresponding Capacities:


Pu Phi Mn
NO
NO
kN kN.m
1 2742.9 2110.39
2 2845.56 2088.51
3 2471.39 2105.56
4 2230.91 2074.99
5 2900.61 2077.93
6 2419.66 2099.06
7 3915.99 1850.6
8 3786.61 1887.99
9 2003.77 2045.39
10 1522.82 1973
11 3019.18 2054.72
12 2889.8 2080.01
13 2686.93 2122.03
14 2797.58 2098.82
15 2423.41 2099.53
16 2182.93 2068.79
17 2852.63 2087.11
18 2371.68 2093.0
19 3868.01 1862.03
20 3738.63 1898.99
21 1967.78 2040.65
22 1486.84 1967.08
23 2983.2 2061.84
24 2853.82 2086.89

Dari Hasil Analisa diatas, didapat:


Mn max = 1850.63 KNm

3. Cek Kekuatan Kolom terhadap Balok

- Bawah Kiri
D n As
600 mm buah mm2
19 9 2550.465
- Bawah Kanan
D n As
400 mm buah mm2
19 9 2550.465

- Atas Kiri
D n As Sengkang d
mm buah mm2 mm mm
19 17 4817.545 10 540.5
- Atas Kanan
D n As Sengkang d
mm buah mm2 mm mm
19 17 4817.545 10 540.5

Kiri Kanan
Atas (-) 17D19 17D19
a (mm) 236.154 236.154
Mn (kN) 995.156 995.156

Kiri Kanan
Bawah (+)9D19 9D19
a (mm) 125.023 125.023
Mn (kN) 583.535 583.535

Cek Kekuatan Kolom terhadap Balok


∑ Me = 3712.660
∑ Mg 1 = 1578.691
∑ Mg 2 = 1578.691
∑ Mg = 1578.691
(6/5) ∑ Mg = 1894.429

∑ Me > (6/5) ∑ Mg OKE

3. Perhitungan Tulangan Geser


Nilai Fy dikalikan dengan 1,25 maka :
Fy = 500 Mpa

Pu Phi Mprx
No
kN kN.m
1 2742.9 2263.14
2 2845.56 2088.51
3 2471.39 2333.8
4 2230.91 2365.6
5 2900.61 2219.26
6 2419.66 2346.45
7 3915.99 1868.3
8 3786.61 1922.13
9 2003.77 2341.39
10 1522.82 2272.99
11 3019.18 2186.85
12 2889.8 2222.16
13 2686.93 2278.33
14 2797.58 2247.97
15 2423.41 2345.54
16 2182.93 2360.31
17 2852.63 2232.34
18 2371.68 2358.0
19 3868.01 1888.59
20 3738.63 1941.41
21 1967.78 2337.21
22 1486.84 2267.69
23 2983.2 2196.83
24 2853.82 2231.99

Dari Hasil Analisa diatas, didapat


Mprx = 1868.28 kNm

Gaya Geser Rencana


å Mpr = 2 x Mpr
= 3736.56 kNm

Ve = å Mpr / Ln
= 1098.988 kN
Vs = Ve / Ø
= 1465.318 kN

Jarak Tulangan Geser


-Tumpuan
Sengkang Tertutup (Sepanjang ℓ0 dari muka HBK)
ℓ0 = h Kolom = 700 mm
ℓ0 = 1/6 Ln = 566.6667 mm
ℓ0 = 500 mm = 500 mm

Maka digunakan,
ℓ0 = 700 mm

Jarak Sengkang Minimum


S = 6D Tul = 150 mm
S = 1/4 h Kolom = 175 mm
S = 100 mm = 100 mm

Maka digunakan,
S = 100 mm

Av = Vs x S
fy x d
= 461.881 mm2

hc = h Kolom - 2.P - Dia. Skg


= 607 mm
bc = b Kolom - 2.P - Dia. Skg
= 607 mm
Ag = bxh
= 490000 mm2
Ae = bc x hc
= 368449 mm2

Ash 1 = 0.3 x ( S x hc x f'c / fyh ) x ((Ag/Ae) - 1)


= 450.560 mm2
Ash 2 = 0.09 x ( S x hc x f'c / fy )
= 409.725
Maka digunakan,
Ash = 450.560 mm2

Cek Av terhadap Ash untuk Penentuan Hoops


Av = 461.881 mm2
Ash = 450.560 mm2
Maka digunakan,
Av = 461.881 mm2
As Sengk = 1/4 x π x D^2
= 132.786 mm2
Jumlah Kaki Sengkang,
n = Av / As Sengkang
= 3.478
= 4 buah

- Lapangan

V Vs
s Lap
ℓ0 Ln /
2

Ln/2 - ℓ0 = Vs Lap
Ln/2 Vs
1000 = Vs Lap
1700 1465.318
Vs Lap = 861.952 kN
d lapanga = 0.85 mm

Jarak Tulangan
S1 = 48 x Dia. Skg = 624 mm
S2 = 15 x Dia. Tul = 375 mm
S3 = 300 mm = 300 mm
S4 = b Kolom = 700 mm

Maka digunakan,
S = 200 mm

As Sengk = 1/4 x π x D2
= 132.786 mm2
Av Perlu = Vs x S
fy x d
= 679.237 mm2
Jumlah Kaki Sengkang,
n = Av Perlu
= Av Sengkang
= 5.115
= 6 buah

Rekapitulasi Penulangan Kolom Tepi


Tul. Utam 32 D 25
Sengkan
g
4 D 13 - 100
Tumpua
n
Sengkan
g
6 D 13 - 200
Lapanga
n
TABLE: Column Forces
Story Column
Load Case/Combo
Station P V2 V3 T M2 M3
Story1 C36 Comb1 0 -2742.9 20.868 46.8377 -0.1317 60.2716 28.192
Story1 C36 Comb2 0 -2845.56 23.8411 52.8011 -0.2383 67.8566 32.2668
Story1 C36 Comb3 0 -2471.39 33.5251 77.9494 1.6194 225.8154 62.3674
Story1 C36 Comb4 0 -2230.91 2.2486 2.3438 -1.8451 -122.492 -14.0379
Story1 C36 Comb5 0 -2900.61 52.8847 123.6613 3.2733 410.0912 105.6338
Story1 C36 Comb6 0 -2419.66 -9.6682 -27.5499 -3.6558 -286.524 -47.1768
Story1 C36 Comb7 0 -3915.99 231.3486 112.1005 -0.3153 419.5876 940.6108
Story1 C36 Comb8 0 -3786.61 37.9148 359.4652 29.6136 1793.618 67.2645
Story1 C36 Comb9 0 -2003.77 44.6916 105.7156 3.3799 387.0538 94.5287
Story1 C36 Comb10 0 -1522.82 -17.8614 -45.4957 -3.5492 -309.562 -58.2819
Story1 C36 Comb11 0 -3019.18 223.1555 94.1548 -0.2087 396.5502 929.5058
Story1 C36 Comb12 0 -2889.8 29.7217 341.5194 29.7202 1770.581 56.1594

Maks -1522.82 231.3486 359.4652 29.7202 1793.618 940.6108


Min -3915.99 -17.8614 -45.4957 -3.6558 -309.562 -58.2819

TABLE: Column Forces


Story Column
Load Case/Combo
Station P V2 V3 T M2 M3
Story1 C36 Comb1 3.4 -2686.93 20.868 46.8377 -0.1317 -99.2784 -42.9368
Story1 C36 Comb2 3.4 -2797.58 23.8411 52.8011 -0.2383 -112.005 -48.9979
Story1 C36 Comb3 3.4 -2423.41 21.7441 70.0954 1.6194 -30.4895 -32.5262
Story1 C36 Comb4 3.4 -2182.93 14.0296 10.1978 -1.8451 -139.702 -41.0799
Story1 C36 Comb5 3.4 -2852.63 29.3227 107.9533 3.2733 7.2986 -35.8711
Story1 C36 Comb6 3.4 -2371.68 13.8938 -11.8419 -3.6558 -211.126 -52.9785
Story1 C36 Comb7 3.4 -3868.01 231.3486 112.1005 -0.3153 28.8141 131.7315
Story1 C36 Comb8 3.4 -3738.63 37.9148 359.4652 29.6136 526.0495 -62.4879
Story1 C36 Comb9 3.4 -1967.78 21.1296 90.0076 3.3799 45.3905 -19.0485
Story1 C36 Comb10 3.4 -1486.84 5.7006 -29.7877 -3.5492 -173.034 -36.1559
Story1 C36 Comb11 3.4 -2983.2 223.1555 94.1548 -0.2087 66.906 148.5541
Story1 C36 Comb12 3.4 -2853.82 29.7217 341.5194 29.7202 564.1414 -45.6653

Maks -1486.84 231.3486 359.4652 29.7202 564.1414 148.5541


Min -3868.01 5.7006 -29.7877 -3.6558 -211.126 -62.4879
P ( kN)
(P max) 14000 (P max)

fs=0 fs=0

fs=0.5fy fs=0.5fy

19 20 7 8
17 23
24
213
14 5 11 12
1
36
1541618
21 9
22 10

-2500 2500

Mx ( kNm)

(P min) -6000 (P min)


Perhitungan Kolom L

BL

BL
Data:
B = 700 mm
= 0.7 m
H = 700 mm
= 0.7 m
L Kolom = 4000 mm
= 4m
P = 40 mm
f'c = 30 Mpa
b1 = 0.85
fy = 400 Mpa
Ø Tul. Utama = 25 mm
Ø Tul. Sengkang = 13 mm
d = 634.5 mm
d' = 65.5 mm
As Tul Utama = 491.0714 mm2
As Tul Sengkang = 132.7857 mm2
Ec = 25742.96
ρ = 1.3
SDS = 0.66
Dimensi Balok BL
h = 400 mm
b = 250 mm
L = 3000 mm
Dimensi Balok BL
h = 400 mm
b = 250 mm
L = 3000 mm

Kombinasi Atas TABLE: Column Forces


ATAS Story
NO KOMBINASI P M2 M3 Story1
NO KOMBINASI
kN kN-m kN-m Story1
1 1,4D -1229.012 -3.393 2.395 Story1
2 1,2D + 1,6L + 0,5R -1357.363 -4.1097 3.8336 Story1
3 1,2D + 1,6R + 1,0Wka -1032.697 -43.1269 121.779 Story1
4 1,2D + 1,6R + 1,0Wki -1074.283 37.3103 -117.6731 Story1
5 1,2D + 1,0Wka + L + 0,5R -1201.812 -84.0964 242.6179 Story1
6 1,2D + 1,0Wki + L + 0,5R -1284.983 76.778 -236.2863 Story1
7 1,2D + 1,0Ex + L -1814.07 -721.5635 313.9241 Story1
8 1,2D + 1,0Ey + L -897.5716 -258.119 1081.481 Story1
9 0,9D + 1,0Wka -748.4932 -82.6184 240.9918 Story1
10 0,9D + 1,0Wki -831.6646 78.256 -237.9124 Story1
11 0,9D + 1,0Ex -1360.767 -720.0856 312.298
12 0,9D + 1,0Ey -444.269 -256.641 1079.855
NILAI MAKSIMUM 1814.07 721.5635 1081.481

Kombinasi Bawah TABLE: Column Forces


BAWAH Story
NO KOMBINASI P M2 M3 Story1
kN kN-m kN-m Story1
1 1,4D -1183.324 5.3825 -1.6221 Story1
2 1,2D + 1,6L + 0,5R -1318.203 7.6233 -2.2707 Story1
3 1,2D + 1,6R + 1,0Wka -993.5364 13.3226 -11.0455 Story1
4 1,2D + 1,6R + 1,0Wki -1035.122 -4.0957 8.2651 Story1
5 1,2D + 1,0Wka + L + 0,5R -1162.651 23.9129 -21.2511 Story1
6 1,2D + 1,0Wki + L + 0,5R -1245.823 -10.9236 17.37 Story1
7 1,2D + 1,0Ex + L -1774.909 101.6742 -44.4028 Story1
8 1,2D + 1,0Ey + L -858.4108 54.8838 -40.9882 Story1
9 0,9D + 1,0Wka -719.1226 20.8785 -20.3533 Story1
10 0,9D + 1,0Wki -802.294 -13.9581 18.2678 Story1
11 0,9D + 1,0Ex -1331.397 98.6397 -43.5049
12 0,9D + 1,0Ey -414.8984 51.8493 -40.0903
NILAI MAKSIMUM 1774.909 101.6742 44.4028

2. Perhitungan Tulangan Utama


Cek Gaya Aksial Ultimit
Pu = 1774.909
Pu > 0,1 x Ag x f'c
1774909 > 1470000 OK

Cek Dimensi Penampang


B > 300
700 > 300 OK
Cek Rasio Penampang
B/H > 0.4
1 > 0.4 OK
Cek Penampang Kolom Terhadap Panjang
Ig kolom = 0,7 x 1/12 x b x h³
= 1.4006E+10 mm4
EI Kolom = Ec x Ig
= 3.6055E+14
Ig BU1 = 0,35 x 1/12 x b x h³
= 466666667 mm4
EI BU1 = Ec x Ig
= 1.2013E+13 mm4
Ig BU2 = 0,35 x 1/12 x b x h³
= 466666667 mm4
EI BU2 = Ec x Ig
= 1.2013E+13 mm4
yA ƩEI kolom / L kolom
ƩEI balok / L balok
22.509
yB 1 Tumpuan Jepit
Maka,
K 2.16
r 0,3 x h
210 mm
Lu L Kolom - H Balok
3600 mm

Cek,
K x Lu / r > 22
37.03 > 22 Kolom Langsing

Perencanaan Tulangan Utama


r = 2.00%
As Perlu = rxbxd
= 8883 mm2
As D 25 = 1/4 x π x D²
= 491.0714 m2
n = As perlu
= As D 25
= 18.08902
dipakai = 24 buah
As terpasang n x As D 25
11785.71 mm2
r As terpasang / ( b x d )
2.653544 %
ρ min = 1%
ρ maks = 6%
Cek,
ρ min < r < ρ maks OK
Factored Loads and Moments with Corresponding Capacities:
Pu Phi Mn
NO
kN kN.m
1 1229.0117 1502.08
2 1357.3634 1526.79
3 1032.6972 1463.54
4 1074.2829 1471.8
5 1201.8119 1496.63
6 1284.9833 1512.73
7 1814.0698 1612.6
8 897.5716 1436.82
9 748.4932 1407.07
10 831.6646 1423.67
11 1360.7672 1527.37
12 444.269 1340.94
13 1183.3241 1493.13
14 1318.2026 1519.3
15 993.5364 1455.85
16 1035.1221 1464.13
17 1162.6511 1489.03
18 1245.8225 1505.2
19 1774.909 1605.31
20 858.4108 1429.06
21 719.1226 1401.25
22 802.294 1417.88
23 1331.3966 1521.8
24 414.8984 1334

Dari Hasil Analisa diatas, didapat:


Mn max = 1334 KNm

3. Cek Kekuatan Kolom terhadap Balok

- Bawah Kiri
D n As
400 mm buah mm2
19 5 1416.925
- Bawah Kanan
D n As
250 mm buah mm2
19 5 1416.925
- Atas Kiri
D n As Sengkang d
mm buah mm2 mm mm
19 10 2833.850 10 340.5
- Atas Kanan
D n As Sengkang d
mm buah mm2 mm mm
19 10 2833.850 10 340.5

Kiri Kanan
Atas (-) 10D19 10D19
a (mm) 157.616 157.616
Mn (kN) 629.899 629.899

Kiri Kanan
Bawah (+)5D19 5D19
a (mm) 78.808 78.808
Mn (kN) 337.283 337.283

Cek Kekuatan Kolom terhadap Balok


∑ Me = 2674.940
∑ Mg 1 = 967.182
∑ Mg 2 = 967.182
∑ Mg = 967.182
(6/5) ∑ Mg = 1160.618

∑ Me > (6/5) ∑ Mg OKE

3. Perhitungan Tulangan Geser


Nilai Fy dikalikan dengan 1,25 maka :
Fy = 500 Mpa

Pu Phi Mprx
No
kN kN.m
1 1229.012 1723.76
2 1357.363 1743.34
3 1032.697 1692.95
4 1074.283 1700.67
5 1201.812 1719.46
6 1284.983 1732.2
7 1814.070 1811.75
8 897.572 1667.5
9 748.493 1639.0
10 831.665 1654.94
11 1360.767 1743.8
12 444.269 1579.86
13 1183.324 1716.69
14 1318.203 1737.39
15 993.536 1685.63
16 1035.122 1693.51
17 1162.651 1713.45
18 1245.823 1726.22
19 1774.909 1805.87
20 858.411 1660.09
21 719.123 1633.45
22 802.294 1649.39
23 1331.397 1739.38
24 414.898 1573.94

Dari Hasil Analisa diatas, didapat


Mprx = 1573.94 kNm

Gaya Geser Rencana


å Mpr = 2 x Mpr
= 3147.88 kNm

Ve = å Mpr / Ln
= 874.411 kN
Vs = Ve / Ø
= 1165.881 kN

Jarak Tulangan Geser


-Tumpuan
Sengkang Tertutup (Sepanjang ℓ0 dari muka HBK)
ℓ0 = h Kolom = 700 mm
ℓ0 = 1/6 Ln = 600 mm
ℓ0 = 500 mm = 500 mm

Maka digunakan,
ℓ0 = 700 mm

Jarak Sengkang Minimum


S = 6D Tul = 150 mm
S = 1/4 h Kolom = 175 mm
S = 100 mm = 100 mm
Maka digunakan,
S = 100 mm

Av = Vs x S
fy x d
= 367.496 mm2

hc = h Kolom - 2.P - Dia. Skg


= 607 mm
bc = b Kolom - 2.P - Dia. Skg
= 607 mm
Ag = bxh
= 490000 mm2
Ae = bc x hc
= 368449 mm2

Ash 1 = 0.3 x ( S x hc x f'c / fyh ) x ((Ag/Ae) - 1)


= 450.560 mm2
Ash 2 = 0.09 x ( S x hc x f'c / fy )
= 409.725
Maka digunakan,
Ash = 450.560 mm2

Cek Av terhadap Ash untuk Penentuan Hoops


Av = 367.496 mm2
Ash = 450.560 mm2
Maka digunakan,
Av = 450.560 mm2
As Sengk = 1/4 x π x D^2
= 132.786 mm2
Jumlah Kaki Sengkang,
n = Av / As Sengkang
= 3.393
= 4 buah

- Lapangan

V Vs
s Lap
ℓ0 Ln /
2
Ln/2 - ℓ0 = Vs Lap
Ln/2 Vs
1100 = Vs Lap
1800 1165.881
Vs Lap = 712.483 kN
d lapanga = 0.85 mm

Jarak Tulangan
S1 = 48 x Dia. Sk = 624 mm
S2 = 15 x Dia. Tu = 375 mm
S3 = 300 mm = 300 mm
S4 = b Kolom = 700 mm

Maka digunakan,
S = 200 mm

As Sengk = 1/4 x π x D2
= 132.786 mm2
Av Perlu = Vs x S
fy x d
= 561.452 mm2
Jumlah Kaki Sengkang,
n = Av Perlu
= Av Sengkang
= 4.228
= 5 buah

Rekapitulasi Penulangan Kolom Tepi


Tul. Utam 24 D 25
Sengkan
g
4 D 13 - 100
Tumpua
n
Sengkan
g
5 D 13 - 200
Lapanga
n
TABLE: Column Forces
Column
Load Case/Combo
Station P V2 V3 T M2 M3
C50 Comb1 0 -1229.01 1.0781 -2.3679 -0.0441 -3.393 2.395
C50 Comb2 0 -1357.36 1.637 -3.1688 -0.0798 -4.1097 3.8336
C50 Comb3 0 -1032.7 35.3555 -15.0852 0.5426 -43.1269 121.779
C50 Comb4 0 -1074.28 -33.5074 11.026 -0.6182 37.3103 -117.673
C50 Comb5 0 -1201.81 70.2325 -28.8528 1.0967 -84.0964 242.6179
C50 Comb6 0 -1284.98 -67.4932 23.3696 -1.2249 76.778 -236.286
C50 Comb7 0 -1814.07 95.4807 -219.36 -0.1057 -721.564 313.9241
C50 Comb8 0 -897.572 298.4215 -83.5142 9.9223 -258.119 1081.481
C50 Comb9 0 -748.493 69.556 -27.6334 1.1325 -82.6184 240.9918
C50 Comb10 0 -831.665 -68.1698 24.589 -1.1892 78.256 -237.912
C50 Comb11 0 -1360.77 94.8041 -218.14 -0.0699 -720.086 312.298
C50 Comb12 0 -444.269 297.7449 -82.2948 9.958 -256.641 1079.855

Maks -444.269 298.4215 24.589 9.958 78.256 1081.481


Min -1814.07 -68.1698 -219.36 -1.2249 -721.564 -237.912

TABLE: Column Forces


Column
Load Case/Combo
Station P V2 V3 T M2 M3
C50 Comb1 3.7 -1183.32 1.0781 -2.3679 -0.0441 5.3825 -1.6221
C50 Comb2 3.7 -1318.2 1.637 -3.1688 -0.0798 7.6233 -2.2707
C50 Comb3 3.7 -993.536 35.3555 -15.0852 0.5426 13.3226 -11.0455
C50 Comb4 3.7 -1035.12 -33.5074 11.026 -0.6182 -4.0957 8.2651
C50 Comb5 3.7 -1162.65 70.2325 -28.8528 1.0967 23.9129 -21.2511
C50 Comb6 3.7 -1245.82 -67.4932 23.3696 -1.2249 -10.9236 17.37
C50 Comb7 3.7 -1774.91 95.4807 -219.36 -0.1057 101.6742 -44.4028
C50 Comb8 3.7 -858.411 298.4215 -83.5142 9.9223 54.8838 -40.9882
C50 Comb9 3.7 -719.123 69.556 -27.6334 1.1325 20.8785 -20.3533
C50 Comb10 3.7 -802.294 -68.1698 24.589 -1.1892 -13.9581 18.2678
C50 Comb11 3.7 -1331.4 94.8041 -218.14 -0.0699 98.6397 -43.5049
C50 Comb12 3.7 -414.898 297.7449 -82.2948 9.958 51.8493 -40.0903

Maks -414.898 298.4215 24.589 9.958 101.6742 18.2678


Min -1774.91 -68.1698 -219.36 -1.2249 -13.9581 -44.4028
Perhitungan Kolom T

BL BL

BL
Data:
B = 700 mm
= 0.7 m
H = 700 mm
= 0.7 m
L Kolom = 4000 mm
= 4m
P = 40 mm
f'c = 30 Mpa
b1 = 0.85
fy = 400 Mpa
Ø Tul. Utama = 25 mm
Ø Tul. Sengkang = 13 mm
d = 634.5 mm
d' = 65.5 mm
As Tul Utama = 491.0714 mm2
As Tul Sengkang = 132.7857 mm2
Ec = 25742.96
ρ = 1.3
SDS = 0.66
Dimensi Balok BU1
h = 400 mm
b = 250 mm
L = 3000 mm
Dimensi Balok BU2
h = 400 mm
b = 250 mm
L = 3000 mm

Kombinasi Atas TABLE: Column Forces


ATAS Story
NO KOMBINASI
NO KOMBINASI P M2 M3 Story1
kN kN-m kN-m Story1
1 1,4D -1568.085 1.6263 18.8699 Story1
2 1,2D + 1,6L + 0,5R -1748.009 2.8181 24.4241 Story1
3 1,2D + 1,6R + 1,0Wka -1306.468 89.7377 51.0434 Story1
4 1,2D + 1,6R + 1,0Wki -1381.792 -86.9496 -18.6947 Story1
5 1,2D + 1,0Wka + L + 0,5R -1521.215 178.9713 91.0685 Story1
6 1,2D + 1,0Wki + L + 0,5R -1671.864 -174.4032 -48.4078 Story1
7 1,2D + 1,0Ex + L -808.5475 226.9789 620.3911 Story1
8 1,2D + 1,0Ey + L -1265.404 781.0231 264.0085 Story1
9 0,9D + 1,0Wka -932.7307 177.7327 81.8688 Story1
10 0,9D + 1,0Wki -1083.379 -175.6417 -57.6075 Story1
11 0,9D + 1,0Ex -220.0804 225.7403 611.1914
12 0,9D + 1,0Ey -676.937 779.7845 254.8088
NILAI MAKSIMUM 1748.009 781.0231 620.3911

Kombinasi Bawah TABLE: Column Forces


BAWAH Story
NO KOMBINASI P M2 M3 Story1
kN kN-m kN-m Story1
1 1,4D -1523.633 -0.3252 -33.0586 Story1
2 1,2D + 1,6L + 0,5R -1709.906 -0.578 -44.1286 Story1
3 1,2D + 1,6R + 1,0Wka -1268.365 8.23 -21.3433 Story1
4 1,2D + 1,6R + 1,0Wki -1343.689 -8.7874 -35.3286 Story1
5 1,2D + 1,0Wka + L + 0,5R -1483.113 16.5516 -24.221 Story1
6 1,2D + 1,0Wki + L + 0,5R -1633.761 -17.4831 -52.1917 Story1
7 1,2D + 1,0Ex + L -770.4451 26.6067 98.7533 Story1
8 1,2D + 1,0Ey + L -1227.302 110.942 26.7197 Story1
9 0,9D + 1,0Wka -904.1539 16.8083 -7.2666 Story1
10 0,9D + 1,0Wki -1054.802 -17.2264 -35.2374 Story1
11 0,9D + 1,0Ex -191.5036 26.8635 115.7077
12 0,9D + 1,0Ey -648.3602 111.1987 43.6741
NILAI MAKSIMUM 1709.906 111.1987 115.7077

2. Perhitungan Tulangan Utama


Cek Gaya Aksial Ultimit
Pu = 1709.9064
Pu > 0,1 x Ag x f'c
1709906 > 1470000 OK

Cek Dimensi Penampang


B > 300
700 > 300 OK
Cek Rasio Penampang
B/H > 0.4
1 > 0.4 OK

Cek Penampang Kolom Terhadap Panjang


Ig kolom = 0,7 x 1/12 x b x h³
= 14005833333.33 mm4
EI Kolom = Ec x Ig
= 3.6055161E+14
Ig BU1 = 0,35 x 1/12 x b x h³
= 466666666.6667 mm4
EI BU1 = Ec x Ig
= 1.2013381E+13 mm4
Ig BU2 = 0,35 x 1/12 x b x h³
= 466666666.6667 mm4
EI BU2 = Ec x Ig
= 1.2013381E+13 mm4
yA ƩEI kolom / L kolom
ƩEI balok / L balok
15.006
yB 1 Tumpuan Jepit

Maka,
K 2
r 0,3 x h
210 mm
Lu L Kolom - H Balok
3600 mm

Cek,
K x Lu / r > 22
34.29 > 22 Kolom Langsing

Perencanaan Tulangan Utama


r = 1.60%
As Perlu = rxbxd
= 7106 mm2
As D 25 = 1/4 x π x D²
= 491.0714 m2
n = As perlu
= As D 25
= 14.47121
dipakai = 24 buah
As terpasang n x As D 25
11785.71 mm2
r As terpasang / ( b x d )
2.653544 %
ρ min = 1%
ρ maks = 6%
Cek,
ρ min < r < ρ maks OK

Factored Loads and Moments with Corresponding Capacities:


Pu Phi Mn
NO
kN kN.m
1 1568.0853 1566.94
2 1748.0088 1600.52
3 1306.4675 1516.98
4 1381.7916 1531.4
5 1521.2154 1558.07
6 1671.8637 1586.25
7 808.5475 1419.1
8 1265.4041 1509.06
9 932.7307 1443.77
10 1083.379 1473.57
11 220.0804 1288.66
12 676.937 1392.6
13 1523.6325 1558.45
14 1709.9064 1593.31
15 1268.3651 1509.64
16 1343.6892 1524.1
17 1483.113 1550.86
18 1633.7613 1579.2
19 770.4451 1411.48
20 1227.3017 1501.69
21 904.1539 1438.21
22 1054.8022 1467.87
23 191.5036 1281.83
24 648.3602 1386.96

Dari Hasil Analisa diatas, didapat:


Mn max = 1281.83 KNm

3. Cek Kekuatan Kolom terhadap Balok

- Bawah Kiri
D n As
400 mm buah mm2
19 5 1416.925
- Bawah Kanan
D n As
250 mm buah mm2
19 5 1416.925

- Atas Kiri
D n As Sengkang d
mm buah mm2 mm mm
19 10 2833.850 10 340.5
- Atas Kanan
D n As Sengkang d
mm buah mm2 mm mm
19 10 2833.850 10 340.5

Kiri Kanan
Atas (-) 10D19 10D19
a (mm) 157.616 157.616
Mn (kN) 629.899 629.899

Kiri Kanan
Bawah (+)8D22 8D22
a (mm) 78.808 78.808
Mn (kN) 337.283 337.283

Cek Kekuatan Kolom terhadap Balok


∑ Me = 2570.490
∑ Mg 1 = 967.182
∑ Mg 2 = 967.182
∑ Mg = 967.182
(6/5) ∑ Mg = 1160.618

∑ Me > (6/5) ∑ Mg OKE

3. Perhitungan Tulangan Geser


Nilai Fy dikalikan dengan 1,25 maka :
Fy = 500 Mpa

Pu Phi Mprx
No
kN kN.m
1 1568.085 1775.24
2 1748.009 1802.03
3 1306.468 1735.56
4 1381.792 1746.99
5 1521.215 1768.18
6 1671.864 1790.6
7 808.548 1650.54
8 1265.404 1729.28
9 932.731 1674.1
10 1083.379 1702.07
11 220.080 1535.42
12 676.937 1625.15
13 1523.633 1768.48
14 1709.906 1796.26
15 1268.365 1729.74
16 1343.689 1741.21
17 1483.113 1762.45
18 1633.761 1784.95
19 770.445 1643.26
20 1227.302 1723.45
21 904.154 1668.83
22 1054.802 1697.06
23 191.504 1529.63
24 648.360 1619.72

Dari Hasil Analisa diatas, didapat


Mprx = 1529.63 kNm

Gaya Geser Rencana


å Mpr = 2 x Mpr
= 3059.26 kNm

Ve = å Mpr / Ln
= 849.794 kN
Vs = Ve / Ø
= 1133.059 kN

Jarak Tulangan Geser


-Tumpuan
Sengkang Tertutup (Sepanjang ℓ0 dari muka HBK)
ℓ0 = h Kolom = 700 mm
ℓ0 = 1/6 Ln = 600 mm
ℓ0 = 500 mm = 500 mm

Maka digunakan,
ℓ0 = 700 mm

Jarak Sengkang Minimum


S = 6D Tul = 150 mm
S = 1/4 h Kolom = 175 mm
S = 100 mm = 100 mm

Maka digunakan,
S = 100 mm

Av = Vs x S
fy x d
= 357.150 mm2

hc = h Kolom - 2.P - Dia. Skg


= 607 mm
bc = b Kolom - 2.P - Dia. Skg
= 607 mm
Ag = bxh
= 490000 mm2
Ae = bc x hc
= 368449 mm2

Ash 1 = 0.3 x ( S x hc x f'c / fyh ) x ((Ag/Ae) - 1)


= 450.560 mm2
Ash 2 = 0.09 x ( S x hc x f'c / fy )
= 409.725
Maka digunakan,
Ash = 450.560 mm2

Cek Av terhadap Ash untuk Penentuan Hoops


Av = 357.150 mm2
Ash = 450.560 mm2
Maka digunakan,
Av = 450.560 mm2
As Sengk = 1/4 x π x D^2
= 132.786 mm2
Jumlah Kaki Sengkang,
n = Av / As Sengkang
= 3.393
= 4 buah

- Lapangan

V Vs
s Lap
ℓ0 Ln /
2

Ln/2 - ℓ0 = Vs Lap
Ln/2 Vs
1100 = Vs Lap
1800 1133.059
Vs Lap = 692.425 kN
d lapanga = 0.85 mm

Jarak Tulangan
S1 = 48 x Dia. Skg = 624 mm
S2 = 15 x Dia. Tul = 375 mm
S3 = 300 mm = 300 mm
S4 = b Kolom = 700 mm

Maka digunakan,
S = 200 mm

As Sengk = 1/4 x π x D2
= 132.786 mm2
Av Perlu = Vs x S
fy x d
= 545.646 mm2
Jumlah Kaki Sengkang,
n = Av Perlu
= Av Sengkang
= 4.109
= 5 buah

Rekapitulasi Penulangan Kolom Tepi


Tul. Utam 24 D 25
Sengkan
g
4 D 13 - 100
Tumpua
n
Sengkan
g
5 D 13 - 200
Lapanga
n
TABLE: Column Forces
Column
Load Case/Combo
Station P V2 V3 T M2 M3
C52 Comb1 0 -1568.09 14.406 0.5317 -0.0488 1.6263 18.8699
C52 Comb2 0 -1748.01 19.022 0.9253 -0.0883 2.8181 24.4241
C52 Comb3 0 -1306.47 19.8687 21.976 0.6001 89.7377 51.0434
C52 Comb4 0 -1381.79 4.8273 -21.0645 -0.6837 -86.9496 -18.6947
C52 Comb5 0 -1521.22 31.5606 43.7897 1.213 178.9713 91.0685
C52 Comb6 0 -1671.86 1.4779 -42.2913 -1.3547 -174.403 -48.4078
C52 Comb7 0 -808.548 141.0071 53.9569 -0.1168 226.9789 620.3911
C52 Comb8 0 -1265.4 64.2995 180.2107 10.9737 781.0231 264.0085
C52 Comb9 0 -932.731 24.3024 43.3823 1.2525 177.7327 81.8688
C52 Comb10 0 -1083.38 -5.7804 -42.6987 -1.3152 -175.642 -57.6075
C52 Comb11 0 -220.08 133.7488 53.5495 -0.0773 225.7403 611.1914
C52 Comb12 0 -676.937 57.0412 179.8032 11.0132 779.7845 254.8088

Maks -220.08 141.0071 180.2107 11.0132 781.0231 620.3911


Min -1748.01 -5.7804 -42.6987 -1.3547 -175.642 -57.6075

TABLE: Column Forces


Column
Load Case/Combo
Station P V2 V3 T M2 M3
C52 Comb1 3.6 -1523.63 14.406 0.5317 -0.0488 -0.3252 -33.0586
C52 Comb2 3.6 -1709.91 19.022 0.9253 -0.0883 -0.578 -44.1286
C52 Comb3 3.6 -1268.37 19.8687 21.976 0.6001 8.23 -21.3433
C52 Comb4 3.6 -1343.69 4.8273 -21.0645 -0.6837 -8.7874 -35.3286
C52 Comb5 3.6 -1483.11 31.5606 43.7897 1.213 16.5516 -24.221
C52 Comb6 3.6 -1633.76 1.4779 -42.2913 -1.3547 -17.4831 -52.1917
C52 Comb7 3.6 -770.445 141.0071 53.9569 -0.1168 26.6067 98.7533
C52 Comb8 3.6 -1227.3 64.2995 180.2107 10.9737 110.942 26.7197
C52 Comb9 3.6 -904.154 24.3024 43.3823 1.2525 16.8083 -7.2666
C52 Comb10 3.6 -1054.8 -5.7804 -42.6987 -1.3152 -17.2264 -35.2374
C52 Comb11 3.6 -191.504 133.7488 53.5495 -0.0773 26.8635 115.7077
C52 Comb12 3.6 -648.36 57.0412 179.8032 11.0132 111.1987 43.6741

Maks -191.504 141.0071 180.2107 11.0132 111.1987 115.7077


Min -1709.91 -5.7804 -42.6987 -1.3547 -17.4831 -52.1917