In this case, BSC should set up a new link with new BTS and
assign a TCH in the new cell for MS.
2008? 4? 11? ? ? ? ? ? ? ? ? ? ? ? ? ? 7
ZTE University univ.zte.com.cn
The information contained in the file is solely property of ZTE corporation. Any kind of disclosing without permission is prohibited.
Hand-over between Different BSC
MSC/VLR
BSC M
S
1. The old BSC make a hand-over request to MSC which then establish new
link with new BSC and new BTS, and retain an idle TCH in the new cell for
MS.
2. MSC is responsible for releasing the old link.
3. After the call is completed, MS should originate location updating because
of the change of LAI.
7
MSCA 7
1 BSC M
5 A 5 S Old Link
5 New Link
2 3 4 4 6
3 5
MSCB BSC M
3
6 B S
CH ACT
CH ACT ACK
HO CMD
HO CMD
HO ACCESS
HO DET
PHY INFO
SABM
EST IND
UA
HO COM
HO COM
HO PERF
RF CH REL
RF CH REL ACK
(Min(MS_TXPWR_MAX(n),P)- RXLEV_NCELL(n))
˜ RXLEV_NCELL(n)—RXLEV_DL
( 5) Interference strip
BSS averages interference ( using INTAVE) on idle
time-slots and maps to five classes called strips.
BSS selects from all adjacent cells that both meets equation (1)
and (2) and queue them from large PBGT to small ones and serves
as candidate adjacent cells.
• Save power
63
Fast power control zone
High
Upper limit
Normal
Lower limit
Low
Fast power control zone
0
0
Fast power control
zone
Low
Upper limit
Normal
Lower
limit
High
Fast power control zone
7
0 2 INCREASE
1 0 STAY
1 1 STAY
1 2 INCREASE
2 0 DECREASE
2 1 DECREASE
2 2 INCREASE