Download as pdf or txt
Download as pdf or txt
You are on page 1of 34

Welcome to ZTE University

ZTE University univ.zte.com.cn


The information contained in the file is solely property of ZTE corporation. Any kind of disclosing without permission is prohibited.
Hand-over &
Power Control

ZTE University univ.zte.com.cn


The information contained in the file is solely property of ZTE corporation. Any kind of disclosing without permission is prohibited.
Hand-over

Hand-over is a process that transfers a MS that is in


setting up or busy status to a new traffic channel.

Generally, hand-over will occur under the following two


conditions:

1. A busy MS which is moving from a cell into another;

2. A MS is making a call at overlapping area of two cells,


one of which is very busy in traffic. BSC notify MS to
measure signal strength and channel quality of adjacent
cells. This call will be handed over to the cell which is not
busy in traffic. This kind of hand-over is occurred to
balance inter-cell traffics.
ZTE University univ.zte.com.cn
The information contained in the file is solely property of ZTE corporation. Any kind of disclosing without permission is prohibited.
Causes Resulting Hand-over

1. Weak signal level.

2. Bad signal quality.

3. Severe interference, i.e., the channel a MS is


occupying is interfered suddenly and therefore is
forced to use another channel of the same cell.

4. The MS is far away from the BS.

5. A more appropriate cell exists. This hand-over is


based on the whole system consideration aiming to
reduce the overall system interference.

ZTE University univ.zte.com.cn


The information contained in the file is solely property of ZTE corporation. Any kind of disclosing without permission is prohibited.
Purpose of Hand-over

1. Save the calls in progress( bad quality).

2. Cell-boundary handing over to improve ongoing


calls (weak signal).

3. Intra-cell hand-over reducing interference within a


cell (severe interference)

4. Compelled hand-over to balance traffic distribution


of inter-cells.

ZTE University univ.zte.com.cn


The information contained in the file is solely property of ZTE corporation. Any kind of disclosing without permission is prohibited.
Types of Hand-over

1. Intra-cell hand-over: hand-over occurs in the same cell.


Controlled independently by the BSC the cell attached to.

2. Inter-cell hand-over of the same BSC: involving by MSC


is not needed.

3. Inter-BSC hand-over of same MSC: Before and after


hand-over, the two cells belong to different two BSCs which
are controlled by the same MSC. All the MSC and BSCs
are involved.

4. Inter-MSCs hand-over: Before and after hand-over, the


two cells belong to different two MSCs. All the relevant
MSCs and BSCs are involved.

ZTE University univ.zte.com.cn


The information contained in the file is solely property of ZTE corporation. Any kind of disclosing without permission is prohibited.
Hand-over inside BSC

M
BTS S
BSC

M
BTS S

In this case, BSC should set up a new link with new BTS and
assign a TCH in the new cell for MS.

2008? 4? 11? ? ? ? ? ? ? ? ? ? ? ? ? ? 7
ZTE University univ.zte.com.cn
The information contained in the file is solely property of ZTE corporation. Any kind of disclosing without permission is prohibited.
Hand-over between Different BSC

BSC Old Link


M
New Link
S

MSC/VLR

BSC M
S

1. The old BSC make a hand-over request to MSC which then establish new
link with new BSC and new BTS, and retain an idle TCH in the new cell for
MS.
2. MSC is responsible for releasing the old link.
3. After the call is completed, MS should originate location updating because
of the change of LAI.

ZTE University univ.zte.com.cn


The information contained in the file is solely property of ZTE corporation. Any kind of disclosing without permission is prohibited.
Inter-MSC Hand-over

7
MSCA 7
1 BSC M
5 A 5 S Old Link
5 New Link
2 3 4 4 6

3 5
MSCB BSC M
3
6 B S

ZTE University univ.zte.com.cn


The information contained in the file is solely property of ZTE corporation. Any kind of disclosing without permission is prohibited.
Hand-over Procedures

1. BSCA sends hand-over request to MSCA when deemed


necessary according to MS’s measurement report.
2. MSCA sends this request to MSCB which is responsible for
setting up links with BSCB and BTSB.
3. MSCB sends back radio channel acknowledgement to MSCA.
4. Communication links are established between MSCA and
MSCB according to Hand-over Number(HON).
5. MSCA send hand-over command to MS who then handed over
to a new TCH.
6. BSCB send to MSCB, then to MSCA the command of hand-
over completion.
7. MSCA controls BSCA and BTSA to release the old TCH.

ZTE University univ.zte.com.cn


The information contained in the file is solely property of ZTE corporation. Any kind of disclosing without permission is prohibited.
Hand-over Classification

( 1) Synchronous: MS use the same TA both in destination


and target cell. This usually applies to hand-over of same cell or
different sectors within the same cell. This is the hand-over with
highest speed.

( 2) Asynchronous: MS don’t know the TA to be used in


target cell. When either of the two cells doesn’t synchronize with
BSC, this mode should be used. The hand-over speed is low.

( 3) Pseudo-synchronous: MS is able to calculate out the TA


it should use in the target cell. When both cells have
synchronized with BSC, this mode may be used. The hand-over
speed is fast.

ZTE University univ.zte.com.cn


The information contained in the file is solely property of ZTE corporation. Any kind of disclosing without permission is prohibited.
Hand-over flow chart
MS BTS1 BTS2 BSC MSC
MEAS REP
MEAS RES

CH ACT
CH ACT ACK
HO CMD
HO CMD
HO ACCESS
HO DET
PHY INFO

SABM
EST IND
UA

HO COM
HO COM
HO PERF
RF CH REL
RF CH REL ACK

ZTE University univ.zte.com.cn


The information contained in the file is solely property of ZTE corporation. Any kind of disclosing without permission is prohibited.
Queuing and Forced Disconnection

1) Queuing: To increase the successful rate of hand-over,


when no radio resource is available, the applicant of hand-
over may be put into queuing and wait for release of radio
resources.

2 ) Forced disconnection: when in emergency and no


radio resource is available, some subscribers with lower
priority may be disconnected, or handed out forcibly to
ensure that the subscribers with higher priority could keep
their calls continuously.

ZTE University univ.zte.com.cn


The information contained in the file is solely property of ZTE corporation. Any kind of disclosing without permission is prohibited.
Base Station Pre-processing

• The base station receives the following meas_rpt:

( 1) Meas_rpts made by MS and reported from


SACCH
- Downlink RXLEV
- Downlink RXQUAL(BER)
- Other adjacent cells’ downlink RXLEV
( less than 6, designated by BA list)
- Interference strip

ZTE University univ.zte.com.cn


The information contained in the file is solely property of ZTE corporation. Any kind of disclosing without permission is prohibited.
( 2) Measurement report made by BTS
- Uplink RXLEV
- Uplink RXQUAL
- TA

ZTE University univ.zte.com.cn


The information contained in the file is solely property of ZTE corporation. Any kind of disclosing without permission is prohibited.
Base Station Pre-processing

• Processing of BTS measurement data

( 1) RXLEV_XX( XX= DL or UL)


For each connection, at least 32 sampling data are
retained and the average of RX level is calculated out
by MS in each SACCH period.

ZTE University univ.zte.com.cn


The information contained in the file is solely property of ZTE corporation. Any kind of disclosing without permission is prohibited.
( 2) Adjacent cells‘ BCCH carrier receiving level
RXLEV_NCELL(n))

For each connection and each cell, the latest 32


sampling data are stored by MS to calculate out the
adjacent cells’ BCCH carrier receiving level.

ZTE University univ.zte.com.cn


The information contained in the file is solely property of ZTE corporation. Any kind of disclosing without permission is prohibited.
( 3) Power Budget( PBGT)

For each connection and each allowable cell, BSS calculates


PBGT as follows:

PBGT(n) =(Min(MS_TXPWR_MAX,P)- RXLEV_DL- PWR_C_D)-

(Min(MS_TXPWR_MAX(n),P)- RXLEV_NCELL(n))

˜ RXLEV_NCELL(n)—RXLEV_DL

ZTE University univ.zte.com.cn


The information contained in the file is solely property of ZTE corporation. Any kind of disclosing without permission is prohibited.
Where,
RXLEV_NCELL(n) and RXLEV_DL are got by above
definitions.
PWR_C_D is the difference of cell-allowed downward
maximum power with actual power
MS_TXPWR_MAX (current traffic channel)
MS_TXPWR_MAX(n) (adjacent cell n traffic channel)
P is the maximum transmission power of MS

ZTE University univ.zte.com.cn


The information contained in the file is solely property of ZTE corporation. Any kind of disclosing without permission is prohibited.
( 4) TA
For each connection, BSS calculate the TA using
parameters Hreqt and Hreqave

( 5) Interference strip
BSS averages interference ( using INTAVE) on idle
time-slots and maps to five classes called strips.

ZTE University univ.zte.com.cn


The information contained in the file is solely property of ZTE corporation. Any kind of disclosing without permission is prohibited.
Parameters in connection with hand-over

( 1) UpLevTh, N, P) : upward level threshold;


( UpQualTh, N, P) : upward quality threshold;
2)
( DwLevTh, N, P) : downward level threshold;
3)
( DwQualTh, N, P) : downward quality threshold;
4)
( UpIntfTh, N, P) : upward interference threshold;
5)
( DwIntfTh, N, P) : downward interference threshold
6)
( MsDistTh, N, P) : distance threshold
7)
( same unit with TA)
( 8) HoMargin( n) : Adjacent cells’ hand-over margin

ZTE University univ.zte.com.cn


The information contained in the file is solely property of ZTE corporation. Any kind of disclosing without permission is prohibited.
Threshold Comparison

1. Hand-over will occur if at least P out of N upward


levels are lower than UpLevTh.

2. Hand-over will occur if at least P out of N downward


levels are lower than DwLevTh.

3. Hand-over will occur if at least P out of N upward levels


are higher than UpQualTh.

4. Hand-over will occur if at least P out of N downward


levels are higher than DwQualTh.

ZTE University univ.zte.com.cn


The information contained in the file is solely property of ZTE corporation. Any kind of disclosing without permission is prohibited.
5. Hand-over will occur if the latest P out of N upward
levels are higher than UpIntfTh and condition 3 is met at
the same time.

6. Hand-over will occur if the latest P out of N downward


levels are higher than DwIntfTh and condition 4 is met at
the same time.

7. Hand-over will occur if the latest P out of N TAs are


higher than MsDistTh.

8. Hand-over will occur if PBGT of some adjacent cell is


higher than its corresponding HoMargin.

ZTE University univ.zte.com.cn


The information contained in the file is solely property of ZTE corporation. Any kind of disclosing without permission is prohibited.
Hand-over Algorithm

The hand-over algorithm BSC adopts is based on the


following equation:

• RXLEV_NCELL(n) > RXLEV_MIN(n) + Max (0, Pa) (1)


where: Pa = (MS_TXPWR_MAX(n)- P)

• PBGT( n )- HO_MARGIN(n) > 0 (2)

BSS selects from all adjacent cells that both meets equation (1)
and (2) and queue them from large PBGT to small ones and serves
as candidate adjacent cells.

ZTE University univ.zte.com.cn


The information contained in the file is solely property of ZTE corporation. Any kind of disclosing without permission is prohibited.
Power Control

• Purpose of Power Control

• BTS Power Control Strategy

ZTE University univ.zte.com.cn


The information contained in the file is solely property of ZTE corporation. Any kind of disclosing without permission is prohibited.
Purpose of Power Control

• Lower interference within a cell

• Save power

• Premises: Call quality or data transmission


quality be guaranteed

ZTE University univ.zte.com.cn


The information contained in the file is solely property of ZTE corporation. Any kind of disclosing without permission is prohibited.
Power Control Procedures

Save measured data

Average measured data

Power control decision

Send power control command

Measured data correction

ZTE University univ.zte.com.cn


The information contained in the file is solely property of ZTE corporation. Any kind of disclosing without permission is prohibited.
Relation of Level and Power Control

63
Fast power control zone
High
Upper limit

Normal
Lower limit
Low
Fast power control zone
0

ZTE University univ.zte.com.cn


The information contained in the file is solely property of ZTE corporation. Any kind of disclosing without permission is prohibited.
Relation of BER with Power Control

0
Fast power control
zone
Low
Upper limit

Normal
Lower
limit
High
Fast power control zone
7

ZTE University univ.zte.com.cn


The information contained in the file is solely property of ZTE corporation. Any kind of disclosing without permission is prohibited.
BTS Power Control Strategy

•Keep current transmission power when received level is normal.


•Lower the transmission power when received level is high.
•Increase the transmission power when received level is low.
Keep current transmission power when BER is normal.
•Increase the transmission power when BER is high.
•Lower the transmission power when BER is low.

ZTE University univ.zte.com.cn


The information contained in the file is solely property of ZTE corporation. Any kind of disclosing without permission is prohibited.
Corresponding Relation between
RXQUAL and BER
RXQUAL BER (%) Typical(%)
0 BER<0.2 0.14
1 0.2<BER<0.4 0.28
2 0.4<BER<0.8 0.57
3 0.8<BER<1.6 1.13
4 1.6<BER<3.2 2.26
5 3.2<BER<6.4 4.53
6 6.4<BER<12.8 9.05
7 12.8<BER 18.10
ZTE University univ.zte.com.cn
The information contained in the file is solely property of ZTE corporation. Any kind of disclosing without permission is prohibited.
MS Power Control Strategy

Normal Level: LEVECAUSE = 0 Normal BER: QUALCAUSE = 0


Low Level: LEVELCAUSE = 1 Low BER: QUALCAUSE = 1
High Level: LEVECAUSE = 2 High BER: QUALCAUSE = 2

0 2 INCREASE
1 0 STAY
1 1 STAY
1 2 INCREASE
2 0 DECREASE
2 1 DECREASE
2 2 INCREASE

ZTE University univ.zte.com.cn


The information contained in the file is solely property of ZTE corporation. Any kind of disclosing without permission is prohibited.
Range of Power Control
1. BTS Power Control
BTS has 6 classes of static power configured by network, each class
has 15 levels of dynamic power which can be configured by network.
2. MS Power Control
GSM900 class A MS power capability 43dbm( 20W)
GSM900 class B MS power control 39dbm ( 8W)
GSM900 class C MS power capability 37dbm ( 5W)
GSM900 class D MS power capability 33dbm ( 2W)
GSM900 class E MS power capability 29dbm ( 0.8W)
GSM900 power control range of MS is 43dbm ~ 5dbm, at least 2dbm
one step
DCS1800 class A MS power control capability 30dbm( 1W)
DCS1800 class B MS power control capability 24dbm( 0.25W)
DCS1800 class C MS power control capability 36dbm( 4W)
DCS1800 class D MS power control range 36dbm ~ 0dbm, 2dbm one
step

ZTE University univ.zte.com.cn


The information contained in the file is solely property of ZTE corporation. Any kind of disclosing without permission is prohibited.
ZTE University univ.zte.com.cn
The information contained in the file is solely property of ZTE corporation. Any kind of disclosing without permission is prohibited.

You might also like