Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

ANS-SMS Form No.

04
Risk Management
Date: DOCUMENT CONTROL NO.

Name of Facility:

Target
AMHS
System/equipment: To be filled-up by ANS-SSO

Description of
System Hardware Configuration Preparation
information:

Generic Hazard:
Old - New System Integration
(Top Level Hazard)
1. Serial connection for Ho Chi Minh circuit from AMHS interfaces to the service
provider room not available.
Specific Components of
the Hazard:

Risk Risk
Hazard-related Consequences Risk Tolerability
Probability Severity
1.1. Existing AFTN operations would be interrupted. 3 C Tolerable
1.2. AMHS connection would not be operational. 3 C Tolerable
1.3. AMHS operators would not be able to use the circuit. 3 D Tolerable
1.4. Manila ACC & other recipients would not be able to
3 C Tolerable
receive AFTN messages from Ho Chi Minh.

Remarks:
Mitigation Strategy: (action to reduce effect of safety risk)
1.1. Revert to old circuit. 2E, Acceptable
1.2. Use other international circuit for an alternate route. 2E, Acceptable

Attached Documents:

Prepared by: Recommend Approval: Approved:

You might also like