The document is a project proposal and itemized bill for improving the pipeline and installing a new water storage tank at CIT-U High School. It includes purchasing 2-inch galvanized iron pipes, elbows, water meters, valves, unions, and a 5.5HP submersible pump at a total cost of PHP 75,938.23 including VAT.
The document is a project proposal and itemized bill for improving the pipeline and installing a new water storage tank at CIT-U High School. It includes purchasing 2-inch galvanized iron pipes, elbows, water meters, valves, unions, and a 5.5HP submersible pump at a total cost of PHP 75,938.23 including VAT.
The document is a project proposal and itemized bill for improving the pipeline and installing a new water storage tank at CIT-U High School. It includes purchasing 2-inch galvanized iron pipes, elbows, water meters, valves, unions, and a 5.5HP submersible pump at a total cost of PHP 75,938.23 including VAT.