ETAP

Project: Example Page: 1


12.6.0H
Location: Irvine, California Date: 07-08-2018
Contract: OTI-12345678 SN:
Engineer: Operation Technology, Inc. Revision: Base
Study Case: LF Report
Filename: Example-ANSI Config.: Normal

This info is printed on every output report, 1st remark line. (120 characters)
Second line of remarks for "LF Report" study case.

Alert Summary Report

% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0

Cable 100.0 95.0

Reactor 100.0 95.0

Line 100.0 95.0

Transformer 100.0 95.0

Panel 100.0 95.0

Protective Device 100.0 85.0

Generator 100.0 95.0

Inverter/Charger 100.0 95.0

Bus Voltage
OverVoltage 105.0 101.0

UnderVoltage 95.0 98.0

Generator Excitation
OverExcited (Q Max.) 100.0 0.0

UnderExcited (Q Min.) 100.0

Critical Alerts Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

Sub3 Swgr Bus Overload 225.000 Amp 243.222 108.1 3-Phase

Marginal Alerts Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

Bus2 Bus Under Voltage 0.480 kV 0.461 96.0 3-Phase

Bus5 Bus Under Voltage 0.480 kV 0.467 97.4 3-Phase

Bus9 Bus Under Voltage 4.160 kV 4.069 97.8 3-Phase

Cable7 Cable Overload 63.992 Amp 63.571 99.3 3-Phase

LVBus Bus Under Voltage 0.480 kV 0.467 97.4 3-Phase

MCC1 Bus Over Voltage 0.480 kV 0.486 101.2 3-Phase

Sub22 Bus Under Voltage 3.450 kV 3.296 95.5 3-Phase