DOST REGIONAL OFFICE VI

PROJECTS PER DISTRICT

Province GUIMARAS
Congressman HON. JOAQUIN CARLOS RAHMAN A. NAVA
Provincial S&T Director LEA A. TABLIGAN

I. GRANTS-IN-AID PROJECTS

A. Upgrading of a Complementary Food Facility of Jordan LGU to Reduce Malnutrition in the Province
of Guimaras

Beneficiary : Rural Health Unit – LGU Jordan


Project Cost
DOST Regional GAA : 452.20 (in thousand Pesos)
Equity : 1,715.45
Total : 2,167.65
Project Description : The project aims to upgrade the production facilities of RHU-
Nutrition Production Center specifically in the production of
“complementary food” by providing relevant equipment to increase
the volume of production of high quality infant food supplement to
support the feeding program not only in the municipality of Jordan
but as well as to the four (4) remaining municipalities in the
province.

Status : The project fund was transferred to the Municipal LGU of Jordan last
March 17, 2014. Negotiation for the acquisition of the equipment in
the project is on-going thru the municipal BAC.

A site assessment and equipment inspection/inventory will be


conducted upon completion of equipment delivery and installation.
Moreover, a training will be conducted by DOST-FNRI on the
production of complementary food using the equipment under the
project.

1
DOST REGIONAL OFFICE VI
PROJECTS PER DISTRICT

Province GUIMARAS
Congressman HON. JOAQUIN CARLOS RAHMAN A. NAVA
Provincial S&T Director LEA A. TABLIGAN

2
DOST REGIONAL OFFICE VI
PROJECTS PER DISTRICT

Province GUIMARAS
Congressman HON. JOAQUIN CARLOS RAHMAN A. NAVA
Provincial S&T Director LEA A. TABLIGAN

B. Upgrading of a Community Based Salt Iodizing Facility for San Lorenzo Salt Producers

Beneficiary : San Lorenzo Salt Producers


Project Cost
DOST Regional GAA : 252.51(in thousand Pesos)
Equity : 341.66
Total : 594.17
Project Description : The project aims to upgrade the existing salt iodizing facility of San
Lorenzo salt producers specifically to increase volume of iodized salt
produced and improve salt quality in terms of iodine content.

Status : The salt-iodizing machine was already delivered to the beneficiary.


Acquisition of other items under the project is still on-going.

Trainings on Salt Iodization Processing and Equipment Operation &


Maintenance of the Salt-Iodizing Machine were conducted by DOST-
ITDI last June 10-11, 2014. It was participated by personnel of the
Municipal Health Office and Agricultural Office, likewise by the
different Salt Producers of the Municipality of San Lorenzo.

3
DOST REGIONAL OFFICE VI
PROJECTS PER DISTRICT

Province GUIMARAS
Congressman HON. JOAQUIN CARLOS RAHMAN A. NAVA
Provincial S&T Director LEA A. TABLIGAN

C. Upgrading of Production Facilities and Packaging Development for Miniature Boat Makers of Rizal,
Buenavista

Beneficiary : Guimaras Model Galleon Makers Assn., Inc.


Project Cost
DOST Regional GAA : 294.41(in thousand Pesos)
Equity : 496.30
Total : 790.71
Project Description : The project aims to upgrade production facility of Rizal miniature
boat makers to improve product quality and increase productivity.
Likewise, the project includes transport packaging development and
packaging materials to enhance product presentation and
marketability.

Status : All of the equipment have already been procured and delivered to
the beneficiary. However, negotiation for the acquisition of the
packaging materials included in the project is still on-going thru the
municipal BAC.

Equipment inspection was conducted and pertinent documents are


prepared for the liquidation of the project. Moreover, a training will
be conducted by DOST-ITDI on wood finishing techniques.

4
DOST REGIONAL OFFICE VI
PROJECTS PER DISTRICT

Province GUIMARAS
Congressman HON. JOAQUIN CARLOS RAHMAN A. NAVA
Provincial S&T Director LEA A. TABLIGAN

D. Improvement of Production and Processing Facilities for the Community –Based Seaweeds
(Eucheuma sp.) Processing Project in Sibunag, Guimaras.

Beneficiary : Sibunag Seaweeds Growers and Traders Inc.


Project Cost
DOST Regional GAA : 612.46 (in thousand Pesos)
Equity : 1,657.7
Total : 2,270.16
Project Description : The project aims to establish a moisture determination laboratory in
support to the seaweed industry of Sibunag, Guimaras and to
upgrade the existing seaweeds processing facility by providing key
equipment in processing particularly in food processing.

Status : The project is for termination.

The project is fully liquidated and pertinent documents for the


unexpended balance (Php 69.00) are being prepared.

All of the equipment have already been procured and delivered to


the beneficiary.

5
DOST REGIONAL OFFICE VI
PROJECTS PER DISTRICT

Province GUIMARAS
Congressman HON. JOAQUIN CARLOS RAHMAN A. NAVA
Provincial S&T Director LEA A. TABLIGAN

6
DOST REGIONAL OFFICE VI
PROJECTS PER DISTRICT

Province GUIMARAS
Congressman HON. JOAQUIN CARLOS RAHMAN A. NAVA
Provincial S&T Director LEA A. TABLIGAN

E. Operationalization of Guimaras Packaging Center

Beneficiary : Guimaras Producers and Processors Association


Project Cost
DOST Regional GAA : 340.85 (in thousand Pesos)
Equity : 1,036.6
Total : 1,377.45
Project Description : Among the project components are:
a. build up of inventory for SUP packaging needs;
b. printing of generic sando bag with Guimaras label
c. manpower compliment for 1 year
Status : Project completed

7
DOST REGIONAL OFFICE VI
PROJECTS PER DISTRICT

Province GUIMARAS
Congressman HON. JOAQUIN CARLOS RAHMAN A. NAVA
Provincial S&T Director LEA A. TABLIGAN

F. Packaging for Guimaras Fresh Mangoes

Beneficiary : Guimaras Mango Growers and Producers Development Cooperative


Project Cost
DOST Regional GAA : 186.96 (in thousand Pesos)
Equity :
Total :
Project Description : The project aimed to develop a corrugated box for Guimaras Fresh
Mangoes. It is a collaborative of DOST VI, Office of the Cong. Nava
and Office Cong Spouse Lucille Nava
Status : Project completed

You might also like