QA/QC Training: Doc No. M707-QMS-FRM-A-0004 Rev. No. 00 Rev. Date 07 JUL 2018

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

Doc No.

M707-QMS-FRM-A-0004
Rev. No. 00
QA/QC Training Rev. Date 07th JUL 2018

Training Topic : Hydraulic Cements and Typical Concrete Tests______________ Date: 13th JUL 2018

Time : 15 Min______ ________________________________________

Attendee : _____________________________________ Department: _____________________

1. Hydration of Ordinary Portland Cement (OPC) is a ___________ process


A) endothermic B) exothermic

2. Which cement type currently we are using in our project?


A) Type I B) Type V C) Type III

3. Thermal cracks occurs due to excessive ___________within a concrete structure.


A) Water B) temperature differences C) Cement

4. Which element is used in cement to retarder the setting time


A) Alumina B) Silica C) Gypsum

5. OPC - In general, about ________of the total strength is liberated in 7 days.


A) three-quarters B) one-half C) one-quarter

6. What type of test is generally performed in fresh concrete to determine the workability?
A) Air content test B) Density test C) Slump test

7. Collection of first and last portion of the fresh concrete sampling process to be
completed within_______
A) 10 Min B) 15 Min C) 5 Min

8. Our concrete test specimen diameter is _________


A) 300mm B) 150mm C) 75mm

9. What is the height of slump cone?


A) 300mm B) 100mm C) 200mm

10. According to SEC standard (70-TMSS-03, Rev.01) what is maximum limit of concrete
temperature during hot weather condition (May to October)?
A) 32*C B) 29*C C) 34*C

Page | 1