CLIENT‐ORGANIZATION (NAME): Kordestan Cement Co.
PHYSICAL LOCATION(s): 5th km Bijar Road, Bijar, Kordestan, Iran
Phase II Audit Date(s): Phase II : 20, 21 & 22 Oct 2015
Phase I Audit Date(s): Phase I : 15 Jun 2015
NAICS (or NACE) CODE 23.51
NAICS : North America Industry Classification System (if you operate within the EC you may use NACE)
ISO 9001 EXCLUSIONS: 7.3
Assessment objectives: Attesting requirements of EMS and QMS systems
have been met in client’s management system
ASSESSMENT TEAM INFORMATION
Assessment Team Leader, ATL Faezeh Ashoorzadeh
Assessor 2 Farhang Mohajer
Assessor 3 Bijan Rajabi
Assessor 4
Assessor 5
Assessor 6
Note: Adjusting the language within this form to the type of activity and nature of the organization is acceptable.
REFERENCE, AS
This Clause
APPLICABLE1
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
Reference Clause ATTENTION WILL BE REQUIRE please Tick
mark √
We pursuit to assure that client‐organization adheres to the protection of communities and consumers. This is to
1 follow the intent to the substitution of the word “identify” to the word “determine” as part of the importance to
the processes being capable of achieving desired outputs (including consumer’s well‐being).
Production of Cement including Type I (class 325, 425), Type II Portland , Portland Pozolani
2 Scope of activities
and special Portland Pozolani
BRSM requires that the organization’s legal obligations and regulatory
3 Legal status
are met as part of granting certification.
4 Quality Management System (QMS)
They have developed Monitoring and measuring procedures input items
PR22 / 17/02, Monitoring and measurement of the final product
General procedure PR22 / 19/02, Monitoring and measurement of product during
Requirements – processing procedure PR22 / 18/02, Operations control procedure PR12 /
4.1 What is the 03/02.
implementation / They have defined the processes, the outsourced activities such as
transition date? calibration, mine explosion have been determined. The interaction of
between processes has been defined in Objectives Registration form and
of executive management systems programs FR11.
Quality Manual QM: MN11/01/04, Document control procedure PR11 /
Documentation 01/03 have been developed; also the quality policy & quality objectives
indicating that organization is moving toward its policy ,strategic plans
4.2 Requirements
(includes records) and management strategic system. documents has been reviewed and
reported in BRSM Form 002 report
Control of documentation procedure
control procedure PR11 / 02/02 which are electronically available to all
units. Main list and distribution of documents (Master List) with code of
Li11 / 01, list of external documentation with code of Li11 / 02 were
observed.
PR11/01/03
4.2. The method for developing, approving and obsoleting documents have
Control of
Documents
been determined. obsolete documents are stamped on paper or omitted AR
from the electronic system. For example the Internal and external
communications procedure PR 11/09/01 has been developed by
mr.elyasvand (management representative) and signed by managing
director as approval of the document was checked.
Some documentation of organization have been not controlled such as the raw
material data sheet
FORM‐009_V4_en Issued: July 9, 2003 Revised: March 2013 Page 2 of 20
REFERENCE, AS
This Clause
APPLICABLE1
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
Reference Clause ATTENTION WILL BE REQUIRE please Tick
mark √
procedure PR11/02/03
Control of records
identifiable, retrievable, and the place for storage and the mean to
4.2. Control of Records protection and retrieval / Recovery has been considered electronically ,
4 – Are records… restoration time for physical files is 10 years and then dispose the paper.
AR
Some records of organization have been not found in the specific place
according to the procedure such as record of mix department pm
Identification and assessment of risks to safety and environmental aspects
Procedures is developed and implemented.
Safety Team has been determined and trained
Identification and risk assessment procedures PR12 / 01/02 was observed.
The audit observations are mentioned in this report.
In HSE unit risk assessment is done in accordance with identification and
assessment risk and environmental aspect PR1201. The assessment
evaluation method is combination of Villiam Fine , JSA models.
RPN
RPN>150: extreme, Not acceptable, Corrective action is needed to issue
Is there a the act as soon as possible and to reduce the risk control should be
procedure for increased.
identifying 100<RPN<=150: High, acceptable, Prompt Appropriate action must be
environmental taken
4.3
aspects relevant to RPN=<100<50: Medium, acceptable, Situations must be under control
the activities, through Control actions
processes, RPN=<50: Low, acceptable, The risk must be monitored and controlled.
products, and Name of Activity: Mining (Mining and mineral extraction)
Type: Normal
services of the
organization, et all Name facets: noise making
Source aspects: Dynamite Blast
considering risk?
Type consequences: noise pollution
Legal requirement: Yes
Occurrence : A, Severity: 2, Degree evaluation: 2A; Type of aspects:
Significant
Tolerance of the organization for environmental aspects: have been
required by law or in accordance with the attached table defines
corrective action if it is in red range; the defined control action are
determined according to W12/25/00. All aspects hve been reviewed in
March-15.
Identify and evaluate some other activities such as chemical storage,
crushing, wastewater treatment was observed.
FORM‐009_V4_en Issued: July 9, 2003 Revised: March 2013 Page 3 of 20
REFERENCE, AS
This Clause
APPLICABLE1
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
Reference Clause ATTENTION WILL BE REQUIRE please Tick
mark √
FORM‐009_V4_en Issued: July 9, 2003 Revised: March 2013 Page 4 of 20
REFERENCE, AS
This Clause
APPLICABLE1
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
Reference Clause ATTENTION WILL BE REQUIRE please Tick
mark √
Control of operational procedure PR12/03/03
Operational Handling of residual effluents or solids, inclusively storage, handling and
4.4.6
Control transport, and
AR
Relating to other processes and activities
items layout in some cases require modification, for example, storage of
waste oils, leading to loss of Soil pollution.
Refractory bricks layout situation is not suitable
MSDS of Lubricant (Behran Bordbar 220 Oil) in code of FR12/05/00 was
observed which coveres all required information.
Dispersion of waste materials in some parts of the area such as PM hall
need to be managed such as metal parts.
Severe loss, particularly in the grinding clinker.
Wastewater output in mill operators room is not connected to the main
sewage system
Some environmental aspects have been not controlled effective by organization
such as mining machinery , some oil flow in mix department
the organization has through documented procedure identified the
potential for emergencies deriving, minimum, from significant
environmental aspects. According to procedure LI12/06 the emergency
situations are defined Fire, Effluent residual from fire fighting, Spill,
Extreme meteorological conditions, Gaseous emissions / atmospheric
discharges, Loss of energy, mater, cooling, then the plan is established
then the emergency preparedness mock program is conducted according
Emergency1
to form FR12/06 the team members are; factory manager as commander
4.4.7 Preparedness and
in his absence senior engineer, to run the plan arrangements is done with
Response local authorities such as fire station,
The evaluation of last emergency preparedness drill was recorded in form
FR12/23 this drill was about collection of waste in 3 month before this
external assessment.
We checked the arrival of fire fighting team, we dialed the emergency
number and they arrived in 4 minutes, according to the determined
procedure they have to arrive to the dialed area less than 5 minutes.
4.5 Checking
1
Consider that in certain global regions other terms apply (e.g. contingency, accident)
FORM‐009_V4_en Issued: July 9, 2003 Revised: March 2013 Page 5 of 20
REFERENCE, AS
This Clause
APPLICABLE1
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
Reference Clause ATTENTION WILL BE REQUIRE please Tick
mark √
FORM‐009_V4_en Issued: July 9, 2003 Revised: March 2013 Page 6 of 20
REFERENCE, AS
This Clause
APPLICABLE1
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
Reference Clause ATTENTION WILL BE REQUIRE please Tick
mark √
APPLICABLE1
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
Reference Clause ATTENTION WILL BE REQUIRE please Tick
mark √
Customer Focus – customer requirements are determined thru contract review , To enhance
5.2 (may relate to customer satisfaction ;
7.2.1 and 8.2.1) refer to customer satisfaction measurement
FORM‐009_V4_en Issued: July 9, 2003 Revised: March 2013 Page 8 of 20
REFERENCE, AS
This Clause
APPLICABLE1
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
Reference Clause ATTENTION WILL BE REQUIRE please Tick
mark √
Management Mr. Eliasvand from the organization’s management team was assigned as
5.5.2
Representative
MR to establish, implement, and maintain the EMS QMS and to report
the performance of the QMS and promote awareness
6 Resource Management
Competence is based on Education, Training, Skills, and Experience
6.2.1 General Training evaluation records for Trading with industrial waste, balance
training techniques, optimizing the mine fire courses was observed
(FR20/01).training plan FR20/04 was observed. Training schedule has
been defined for a 6 months period.
Competence, Training evaluation records for Trading with industrial waste, balance
6.2.2 Awareness and training techniques, optimizing the mine fire courses was observed
Training (FR20/01 ). Record of conducting “standard test method principles” in
July-15 and training effectiveness average of 71.20 with accepted criteria
of 70% was observed.
6.2 Human Resources
FORM‐009_V4_en Issued: July 9, 2003 Revised: March 2013 Page 9 of 20
REFERENCE, AS
This Clause
APPLICABLE1
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
Reference Clause ATTENTION WILL BE REQUIRE please Tick
mark √
FORM‐009_V4_en Issued: July 9, 2003 Revised: March 2013 Page 10 of 20
REFERENCE, AS
This Clause
APPLICABLE1
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
Reference Clause ATTENTION WILL BE REQUIRE please Tick
mark √
7.2 Customer‐Related Processes
Sales and contract review procedure PR18 / 01/00 was observed. by
reviewing product-related requirements from client, before committing to
accept the order, the organization ensures that can meet the product
requirements, check any requirements differing from routine products ,
Review of through the process if any requirement is changed this is communicated
Requirements in written to managers/supervisors and then verbally to operational staff.
7.2.2
Related to the The records for contract between organization and “yaran construction
Product group” in Apr-15 was observed. All customer requirement have been
mentioned in contract; also this customer has changed the amount of its
order (from 200 tons to 160 tons) of cement type I; the record of
registering the changes and getting confirmation of the customer were
observed.
FORM‐009_V4_en Issued: July 9, 2003 Revised: March 2013 Page 11 of 20
REFERENCE, AS
This Clause
APPLICABLE1
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
Reference Clause ATTENTION WILL BE REQUIRE please Tick
mark √
Design and
7.3
Development
Excluded
7.4 Purchasing
purchasing procedure PR13 / 02/02 & Supplier evaluation procedure
7.4.1 Purchasing Process PR13 / 01/02 were observed.
purchased product meet specified requirements according to Records of
Purchasing
7.4.2
Information
request forms (code FR 13/06/00), permission purchases forms (code
FR13 / 07/00) inquiries forms( FR13 / 11/00)and application services
form (FR19 / 08/00) to determine mining Contractor was observed. The
results of purchased materials such as limestone as survey results in May-
15 confirm that the results of quality control and input materials was
observed. Also the record approving the purchased safety hat in June-15
was observed.
The method of determining purchase order starts from the storage which
PR13 / 02/02
is based on items order points.
Verification of
7.4.3 The list of acceptable suppliers with code Li13 / 02/00, unauthorized AR
Purchases
suppliers list with code Li13 / 03/00, introduced form suppliers, with code
FR13 / 01/00 was observed
FORM‐009_V4_en Issued: July 9, 2003 Revised: March 2013 Page 12 of 20
REFERENCE, AS
This Clause
APPLICABLE1
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
Reference Clause ATTENTION WILL BE REQUIRE please Tick
mark √
Production plan is defined annually then divided into intervals of a month Daily
Report of grinding (code FR 17/03/00), the daily report of the crusher with code
FR17 / 09/00 in March-15 and produce monthly reports with code FR17 / 14/00
of that month was observed. According to FR-17-01 (crusher report) the rate of
accumulated material in hoppers is easily available for evaluating at any moment.
And if both the crusher hopper capacity is completed with the announcement of
the mining crusher will stop (20-Oct t was stopped from 8 AM to 14 PM).
Stopping report with description of its causes in daily production report is
compatible with crusher daily report. Grinding material, from soil storage to
cement mill section is monitored. The output of cement mill at 9 AM test report
from the laboratory with its titration of 76.5 was observed and fully complies
with the required conditions. The mill control parameters are velocity, pressure
valves which were observed on desk control; Standard accepting limit on speed
and pressure are determined and if any parameter is higher than standard limit,
the software automatically warns. All reports are recorded on report form
grinding with code of FR-17-11 were checked. In pre-heater section, limit
moisture content is determined between 0.1 to 0.5; the record of moisture
(entering & exiting) in form of FR-17-12 was from 0.3 to 0.1; Sampling period
of furnace clinker is every hour; the rate of clinker can monitored from control
room; hopper (1) for cement type I, hopper (2) for cement type II and hopper (3)
for Pozzolanic cement. In Cement mill , input load and velocity are monitored.
Entrance load at 10 AM is 77 tons per hour at a speed of 175 and its output was
70 tons of clinker per hour that the mill situation is in accordance with cement
DATABASE and is appropriate by comparing the input & output. In the end,
there Silos for cement that the amount of cement is measured by statistic
department twice a day in silos daily report (FR-17-05); the record for current
Control of day was :Silo (1): 75%, Silo (2): 80%, Silo (3): 83%. According to production
7.5.1 Production and procedure (PR-17-01) when the silos are in 90% of their capacity, the statistic
Service Provision department inform production department to manage the production rate. The
mentioned process was asked from mr.malek mohammadi and he was aware of
the details. standards for cement production software regarding to the mixing
method were assessed in curing temperature and speed mill items in control desk
which was correct. Information describing product characteristics is available as
tables in Lab.
Quality control Laboratory:
In chemistry and physics units, required tests are done on semi-finished products
and finished products clinker cement type I and II .the specifications of the
control schemes have been developed in accordance with the standard ISIRI389.
Quality control of semi-finished products or clinker:
Liter weight of free lime: According to the liter weight test WI22 / 18, hour-liter
clinker weight were measured and recorded in the form of a laboratory report, the
control kiln room operator is informed by telephone. If the weight of produced
clinker is less than 1,100g/L is considered as nonconforming product.
Appropriate action will be taken against non-conforming items in accordance
with control of nonconforming product procedures. Based on measured free lime
instructions WI 22/51, every 2 hours (12 times in 24 hours) clinker output is
sampled and after testing and calculation based on the calculation of free lime
TB22 / 03and results filed in report form. Control of cement production:
Cement Softness : Based on samples taken per hour, Softness of cement
measured and calculated according to the national standard 390 No and
calculated according to Blaine table (TB22 / 04); And roughness of cement,
measured according to the Iranian National Standard No. 390
FORM‐009_V4_en Issued: July 9, 2003 Revised: March 2013 Page 13 of 20
REFERENCE, AS
This Clause
APPLICABLE1
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
Reference Clause ATTENTION WILL BE REQUIRE please Tick
mark √
FORM‐009_V4_en Issued: July 9, 2003 Revised: March 2013 Page 14 of 20
REFERENCE, AS
This Clause
APPLICABLE1
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
Reference Clause ATTENTION WILL BE REQUIRE please Tick
mark √
FORM‐009_V4_en Issued: July 9, 2003 Revised: March 2013 Page 15 of 20
REFERENCE, AS
This Clause
APPLICABLE1
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
Reference Clause ATTENTION WILL BE REQUIRE please Tick
mark √
FORM‐009_V4_en Issued: July 9, 2003 Revised: March 2013 Page 16 of 20
REFERENCE, AS
This Clause
APPLICABLE1
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
Reference Clause ATTENTION WILL BE REQUIRE please Tick
mark √
FORM‐009_V4_en Issued: July 9, 2003 Revised: March 2013 Page 17 of 20
REFERENCE, AS
This Clause
APPLICABLE1
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
Reference Clause ATTENTION WILL BE REQUIRE please Tick
mark √
FORM‐009_V4_en Issued: July 9, 2003 Revised: March 2013 Page 18 of 20
REFERENCE, AS
This Clause
APPLICABLE1
Has been
REFERENCE CRITERIA FOR GUIDANCE TO FOLLOW UPS – PLEASE WRITE ANNOTATION OR X TO INDICATE SPECIAL Verified,
Reference Clause ATTENTION WILL BE REQUIRE please Tick
mark √
8.5 Improvement
Through quality policy Quality objectives Analysis of data Corrective
Continual
8.5.1
Improvement
actions Preventive actions Management reviews the company improves
the system performance and output
Corrective and preventive action
procedure PR11/03/02
PR11 / 04/02 procedure, for all NCs from internal audit the corrective
8.5.2 Corrective Action action has been considered and closed. They have not issue corrective action AR
according to organization procedure
FORM‐009_V4_en Issued: July 9, 2003 Revised: March 2013 Page 19 of 20
By exception we indicate the specific Strengths and weakness of the organization in light of the management system of the management system, as we
perceive and seen through processes in reference to requirements of the criteria being ascribed as these apply and relate to the assessment plan and
planning of the assessment. This aspect relates to AVA™ as it does to the protection of consumers in the client-organization’s role within their respective
supply – chain.
Disclaimers: (1) herein, we reiterate that any suggestion or opinion that the assessment team expresses does not construe to be a contractual
requirement. (2) The degree of certainty in conclusions increases by the competence of the assessment team as well as the attestation within the
assessment protocol, values, mission and vision under which we operate for the protection of consumers, still remains a certain level of uncertainty.
Strength Weakness
Categorizing customers by the location and assigning sales Internal communication especially on quality policy
expert for each category
Quality objectives monitoring
---
action Request Type I Form-008 – as we indicate and that each of the RA addresses the basic four (4) questions
as seen in Form-008: N/A
action Request Type II Form-008 – as we indicate and that each of the AR addresses the basic four (4) questions
as seen in Form-008:
1- According to the waste plan the organization do not the Waste separation for example in site visit found some mercury
lamp in the paper trashcan and according to the objective program the metal waste would be needed in produce of slag
cement
2- Some documentation of organization have been not controlled such as the raw material data sheet
3- Some records of organization have been not found in the specific place according to the procedure such as record of mix
department pm
4- Some environmental aspects have been not controlled effective by organization such as mining machinery , some oil flow in
mix department
5- They have not issue corrective action according to organization procedure