Abstract- This paper concerns the supply of electricity using mainly renewable resources, by considering the regions, which
are rich in solar radiation and wind resources. The set-up scenario investigated cost- effectiveness of using a wind turbine
added to the PV-generator system. This work is done based on the process used to plan, design, and implement an on-grid
electrical system for few houses located in rural areas of eastern India. The economic analysis and optimization of the hybrid
renewable energy model is done to find out feasibility of hybrid systems in these regions.
Loads (July-October)
The maximum demand of power per day is taken as
5KW during the month of July to October as shown
in Figure: 1
Economics Analysis And Optimization Of Solar- Wind- Battery Connected On-Grid Hybrid Energy System In Eastern India Region Climate Conditions
21
International Journal Of Electrical, Electronics And Data Communication, ISSN: 2320-2084 Volume-4, Issue-1, Jan.-2016
Solar insolation and diesel. For continuous supply of The maximum solar radiation is found for the
power during non availability of sun and wind flow month of May and June with daily radiation of
a diesel generator is taken. Hence the components 5.786kWh/m2/day, whereas minimum radiation was
considered for the system are: found during the month of August with daily
1. Solar Photovoltaic system radiation 4.048kWh/m2/day .The average radiation
2. Wind Turbine throughout the year was 5.1758kWh/m2/day.
3. Diesel Generator
4. Storage device DIESEL GENERATOR
STORAGE DEVICE
Table 2: Solar radiation throughout the year IV. INPUT UNIT COST OF EQUIPMENT’S
Economics Analysis And Optimization Of Solar- Wind- Battery Connected On-Grid Hybrid Energy System In Eastern India Region Climate Conditions
22
International Journal Of Electrical, Electronics And Data Communication, ISSN: 2320-2084 Volume-4, Issue-1, Jan.-2016
The HOMER software is used to simulated peak The cost summary of hybrid system and net Present
demand of primary load, which is found to be 6.2kW cost of component size and cost type obtained after
and total energy consumption is found as simulation is given below in Figure 6 and Figure 7
31kWh/day, calculated peak demand is found as 6 respectively.
kW and total energy consumption is 37.1kWh/day.
Economics Analysis And Optimization Of Solar- Wind- Battery Connected On-Grid Hybrid Energy System In Eastern India Region Climate Conditions
23
International Journal Of Electrical, Electronics And Data Communication, ISSN: 2320-2084 Volume-4, Issue-1, Jan.-2016
The economics of hybrid system is represented above But, the renewable hybrid system is still considered
where the overall costs associated with the system is as expensive and difficult to combine various energy
given in individual manner of each participating sources together. Initially the scheme may be costly
scheme as well as the overall system considered as a but, commercial use with the more customers of such
whole. The costs associated with hybrid system is systems can decrease the cost of technology and
given in both component type and cost type. become economical for consumers. The expense is
only for one time with a life span of about 20-25
VII. SUMMARIZED RESULT years. The simulated hybrid system can be used in
any off grid areas for electrification anywhere in the
The hybrid system consisting of Wind, solar PV and country, as radiation of sun is used as primary source
Diesel generator was modeled separately by of energy which is abundantly available throughout.
defining real input parameters for each of the
components. The economics analysis and feasibility REFERENCE
of the hybrid system is done with respect to cost of
[1] S. Bogdan and M. Salameh, “Methodology for Optimally
energy (COE) produced by the hybrid system and
Sizing the Combination of a Battery Bank and PV Array in
its affordability for the people living in the region. a Wind/PV Hybrid System,” IEEE Transactions on Energy
The simulation result of HOMER obtained for Conversion, Vol. 11, No. 2, 1996, pp. 367-375.
minimum per kWh cost (COE) of Hybrid system is doi:10.1109/60.507648
Rs. 19.198. [2] M. M. Mahmoud and I. H. Ibrik, “Techno-Economic
Feasibility of Energy Supply of Remote Villages in
Here, Total Net Present Cost (NPC): Rs. 27, 93,315 Palestine by PV-Systems, Diesel Generators and Electric
Levelized Cost of Energy (COE): Rs 19.198 /kWh Grid,” Renewable and Sustainable Energy Reviews, Vol.
Operating cost: Rs 84,692/yr 10, No. 2, 2006, pp. 128-138.
doi:10.1016/j.rser.2004.09.001
[3] Economic Analysis of Hybrid Renewable Model for
If the loan is taken for the capital amount from a bank Subtropical ClimateInt. J. of Thermal & Environmental
with interest rate then cost will be, Engineering2010, GMShafiullah*, a, Amanullah M.T.
Initial Capital cost of the system = Rs 17, 10,667 Ooa, ABM Shawkat Ali b, Dennis Jarvis b, Peter Wolfs c
[4] M. Kolhe, “Techno-Economic Optimum Sizing of a Stand-
Alone Solar Photovoltaic System,” IEEE Transaction on
At 6% interest rate (low interest rate for renewable Energy Conversion, Vol. 24, No. 2, 2009, pp. 511-519.
energy), system fixed capital cost = Rs. 1,02640 doi:10.1109/TEC.2008.2001455
[5] D. K. Khatod, V. Pant and J. Sharma, “Analytical
Total initial capital cost of the system = Approach for Well-Being Assessment of Small
Autonomous Power Systems with Solar and Wind Energy
Rs. 18, 13,307 Sources,” IEEE Transaction on Energy Conversion, Vol.
25, No. 2, 2010, pp. 535-545.
VIII. PAYBACKS PERIOD ANALYSIS doi:10.1109/TEC.2009.2033881
[6] D. B. Nelson, M. H. Nehrir and C. Wang, “Unit Sizing and
Cost Analysis of Stand-Alone Hybrid Wind/PV/Fuel Cell
Payback period is the number of years required to Power Generation Systems,” Renewable Energy, Vol. 31,
recover the cost of the investment and cost benefit No. 10, 2006, pp. 1641-1656.
analysis of our system. Different rate of per kW hour doi:10.1016/j.renene.2005.08.031
[7] K. Y. Lau, M. F. M. Yousof, S. N. M. Arshad, M. Anwari
as the fuel price as well as the electricity price is and H. M. Yatim, “Performance Analysis of Hybrid
increased day by day is also need to be considered. Photovoltaic/Diesel Energy System under Malaysian
Conditions,” Energy, Vol. 35, No. 8, 2010, pp. 3245-3255.
a) Considering 1kWh = Rs 12 doi:10.1016/j.energy.2010.04.008
[8] A. Chaurey and T. C. Kandpal, “Assessment and
Evaluation of PV Based Decentralized Rural
Total capital cost of the hybrid system = Rs. 17, Electrification: An Overview,” Renewable and Sustainable
10,667 Energy Reviews, Vol. 14, No. 8, 2010, pp. 2266-2278.
Annual income = Rs 175245.84 doi:10.1016/j.rser.2010.04.005
[9] N. Kaushika, N. K. Gautam and K. Kaushik, “Simulation
As annual consumption of electricity = 14603.82kWh
Model for Sizing of Standalone Solar PV System with
So, payback period in year = = 9.76 ≈ 8 years Interconnected Array,” Solar Energy Materials and Solar
Cells, Vol. 85, No. 4, 2005, pp. 499-519.
b) Considering 1kWh = Rs 15 doi:10.1016/j.solmat.2004.05.024
[10] Optimization of Operational Energy Cost in
a Hybrid Distributed Generation System Sharma,
Total cost of the hybrid system = Rs 17, 10,667 P.; Agarwal, V. Industrial and Information Systems, 2008.
Annual income = Rs 219057.3 ICIIS 2008. IEEE Region 10 and the Third international
So, payback period in year = 7.8 ≈ 8 years Conference on Year: 2008; Pages: 1 -
6, DOI: 10.1109/ICIINFS.2008.4798462
[11] M. M. Mahmoud and I. H. Ibrik, “Field Experience on
CONCLUSION Solar Electric Power Systems and Their Potential in
Palestine,” Renewable and Sustainable Energy Reviews,
The hybrid system has been optimized for optimum Vol. 7, No. 6, 2003, pp. 531-543. doi:10.1016/S1364-
0321(03)00070-4
performance, economic analysis and payback period
[12] P. Arun, R. Banerjee and S. Bandyopadhyay, “Optimum
of the system using results from HOMER software. Sizing of Photovoltaic Battery Systems Incorporating
Economics Analysis And Optimization Of Solar- Wind- Battery Connected On-Grid Hybrid Energy System In Eastern India Region Climate Conditions
24
International Journal Of Electrical, Electronics And Data Communication, ISSN: 2320-2084 Volume-4, Issue-1, Jan.-2016
Uncertainty through Design Space Approach,” Solar Egypt,” Renewable Energy, Vol. 34, No. 10, 2009, pp.
Energy, Vol. 83, No. 7, 2009, pp. 1013-1025. 2187-2196. doi:10.1016/j.renene.2009.01.010
doi:10.1016/j.solener.2009.01.003 [16] I. Ashraf, A. Chandra and M. S. Sodha, “Techno-
[13] J. L. Bernal-Agustin and R. Dufo-Lopez, “Economical and Economic and Environmental Analysis for Grid
Environmental Analysis of Grid Connected Photovoltaic Interactive Solar Photovoltaic Power System of
Systems in Spain,” Renewable Energy, Vol. 31, No. 8, Lakshadweep Islands,” International Journal of
2006, pp. 1107-1128. doi:10.1016/j.renene.2005.06.004 Engineering Research, Vol. 28, 2008, pp. 1033-1042.
[14] M. Kolhe, S. Kolhea and J. C. Joshi, “Economic Viability [17] Hessami, M.-A., H. Campbell, and C. Sanguinetti. 2011. A
of Stand-Alone Solar Photovoltaic System in Comparison feasibility study of hybrid wind power systems for remote
with Diesel-Powered System for India,” Energy communities.Energy Pol. 39:877–886.
Economics, Vol. 24, No. 2, 2002, pp. 155-165. [18] Nandi, S. K., and H. R. Ghosh. 2010. Prospect of wind–
doi:10.1016/S0140-9883(01)00095-0 PV-battery hybrid power system as an alternative to grid
[15] M. EL-Shimy, “Viability Analysis of PV Power Plants in extension in Bangladesh. Energy 35:3040–3047.
Economics Analysis And Optimization Of Solar- Wind- Battery Connected On-Grid Hybrid Energy System In Eastern India Region Climate Conditions
25