Professional Documents
Culture Documents
Water and Wastewater Project
Water and Wastewater Project
PROJECT
1ST SEM S.Y. 2018 – 2019
TYPE OF PROJECT: Design Project
TOPIC OF PROJECT: Redesign / Design of a Drainage System or Sewer System
NO. OF MEMBER PER GROUP: 6-7 Members per group
DEADLINE: to be announced
CONTENT:
I. Front Page
FORMAT:
TITLE
(PROPOSED 6 MTRS DRAINAGE LINE IN V.LUNA, QUEZON CITY)
Submitted To:
Date Submitted
II. Table of Contents
III. Introduction
IV. Statement of the Problem
V. Design Objective
VI. Significance of the Design
VII. Scope and Limitation of the Design
VIII. Methodology
IX. Site Inspection (include pictures)