Professional Documents
Culture Documents
Farz CV
Farz CV
PROFESSIONAL QUALIFICATION:
SUMMARY
KEY RESPONSIBILITY
Also responsible for man hour budgeting, resource planning, timely delivery
and quality control for the project.
KEY SKILLS/ACHIEVEMENTS
Team Lead for AECOM GDC PHE team while working with AECOM Abu-
Dhabi office. The Tower Plot is located on Abu Dhabi and comprises of three
residential towers with two basement.
Responsible detail designing as well as authority submission. All the water
demands, pipe sizing, pump & equipment sizing, supply strategy, storm water
strategy, sewage disposal & space allocations for electro-mechanical
pumping stations, Hydrant System Sprinkler system, Fire Extinguishers etc
ANSAM PHASE-II, ABUDHABI
Team Lead for AECOM GDC PHE team while working with AECOM Abu-
Dhabi office. The Tower Plot is located on Abu Dhabi and comprises of six
residential towers , with combined basement.
Responsible schematics designing. All the water demands, pipe sizing, pump
& equipment sizing, supply strategy, storm water strategy, sewage disposal &
space allocations for electro-mechanical pumping stations, Hydrant System
Sprinkler system, Fire Extinguishers etc.
Project manager for Ramboll GEC PHE team while working with Ramboll Dubai
office. The Tower consisting of 4 basements and G+13 floor.
Responsible for detail designing of 50% Detail Design stage. Our Scope is
designing of water demands, pipe sizing, pump & equipment sizing, supply
strategy, storm water strategy, sewage disposal & space allocations for electro-
mechanical pumping stations etc.
TECOM, DUBAI
Project manager for Ramboll GEC PHE team while working with Ramboll Dubai
office & the renowned architect RMJM. The proposed development is located
off Sheikh Zayed Road in the TECOM district adjacent to Media City and
Knowledge Village, UAE. The site area is approximately 1.7 million sqft. The
development comprises of 12 individual buildings above grade of varying height,
size and geometrical proportions which share a common ground slab and a two
storey substructure basement.
Responsible for review & approving all the water demands, pipe sizing, pump &
equipment sizing, supply strategy, storm water strategy, sewage disposal &
space allocations for electro-mechanical pumping stations.
Project manager for Ramboll GEC PHE team while working with Ramboll UK
office. The project is a new 17 storey mixed use development, mainly consisting
of 15 floors of residential apartment’s c/w penthouse(s), car park, and three
shell and core offices..
Responsible for review & approving all the water demands, pipe sizing, pump &
equipment sizing, supply strategy, sewage disposal & space allocations for
electro-mechanical pumping stations.
Lead AECOM India PHE team while working with AECOM Qatar office. Qatar
Petroleum District (QPD) is being developed as the headquarters of M/s
QATAR PETROLEUM by the developer Barwa Real Estate Company –
Barwa Financial District L.L.C, housing various directorates and associated
functions of Qatar Petroleum in 9 office towers of varying floor capacities and
heights ranging from 17 to 44 floors. The site located west bay area of Doha,
Qatar.
Responsible for review & approving the water demands, pipe sizing, Sewage
Design & storm water strategy.
YISHUN MIXED USED DEVLOPMENT, SINGAPORE.
Lead AECOM India PHE team while working with AECOM Singapore office for
a mixed use project development. Building consisting residential apartment,
Retail and bus terminal. Building consisting residential apartment above second
floor, second floor consisting retail area, ground and first floor is divided in two
parts ,few area is bus terminal and few areas are retail shops. Responsible for
preparing detail designing.
ISS INTERNATIONAL SCHOOL, SINGAPORE.
Lead AECOM India PHE team while working with AECOM Singapore office for
International standard school. Responsible for review and preparing detail
designing.
DOMESTIC PROJECT
COMMERCIAL/RETAIL
Responsible for Designing all the water demands, treatment & supply strategy,
storm water strategy, sewage disposal & treatment, space allocations for
Plumbing pumping stations, drainage system and flood control schemes and
complete Fire Fighting system.
B2 OFFICE BUILDING, GUWAL PAHARI, GURGAON, INDIA.
Project engineer for MKG Consultant Plumbing & Fire Design team while
working with the renowned architect Design Plus. The project is being
developed by ASF infrastructure. This building is the part of ASF SEZ. The
development comprises of 2 basement and ground +15 storey green building.
Building has been design according to LEED India green building norms.
Responsible for Design all the water demands, treatment & supply strategy,
Culvert design, storm water strategy, sewage disposal & treatment, space
allocations for Plumbing pumping stations, drainage system and flood control
schemes complete Fire Fighting system.
Responsible for designing of all the water demands, treatment & supply
strategy, storm water strategy, sewage disposal & treatment, space allocations
for Plumbing pumping stations, drainage system and flood control schemes and
complete Fire Fighting system.
TRIL SHOPING MALL, AMRITSIR, PUNJAB, INDIA.
Project engineer for MKG Consultants Plumbing & Fire Design team while
working with the renowned architect SIKKA Associate. Responsible for designing
of all the water demands, treatment & supply strategy, storm water strategy,
sewage disposal & treatment, space allocations for electro-mechanical pumping
stations, drainage system and flood control schemes and complete Fire Fighting
system.
RESIDENTIAL
EMERALD GARDEN
Led AECOM India Plumbing & Fire Design team while working with renewed
Architect DP Architect PTE Ltd. and Design Forum. The site area is
approximately 8 acre. The development comprises of 5 individual buildings
above grade of varying height (G + 21 to G +29), size and geometrical
proportions which share a common ground slab and a two storey substructure
basement.
EDEN HEIGH, GURGAON, INDIA
Senior Project engineer for MKG Consultants Plumbing and Fire Fighting while
working for client GPL developer The site area is approximately 11 acre. The
development comprises of 10 individual buildings above grade of varying height
(G + 18 to G +21), size and geometrical proportions which share a common
ground slab and a two storey substructure basement.
SHANTIGRAM, AHMEDABAD.
Project engineer for MKG Consultants Plumbing and Fire Fighting team while
working for client Adani Group The site area is approximately 8 acre. The
development comprises of 10 individual towers above grade of height (G+ 18),
size and geometrical proportions which share a common ground slab and a two
storey substructure basemen.
TOWNSHIPS
JAPEE GREENS (1200 ACRE) NOIDA, INDIA.
Senior Project engineer for MKG consultants Design team while working with
well-known Architect ARCOP Associate on Engineering input to master planer
for a new .54 million population, 1200 ac city. Responsible for estimation &
analysing all the water demands, treatment & supply strategy , storm water
strategy, sewage disposal & treatment, space allocations for electro-mechanical
pumping stations, drainage system and flood control schemes.
IIT HYDERABAD, INDIA.
Senior Project engineer for MKG Consultants plumbing and Fire Fighting team
while working with Architect ARCOP Associate for design of new IIT campus
in Hyderabad. Responsible for estimation & analysing all the water demands,
treatment & supply strategy , storm water strategy, sewage disposal &
treatment, space allocations for mechanical pumping stations, drainage system
and flood control schemes. Also designing of plumbing & fire fighting scheme
for all the buildings which comes under the township.
SILVER GLADE, LUDHANA, INDIA.
Project engineer for MKG Consultants plumbing and Fire Fighting team while
working with Architect ARCOP Associate for design of 280 acres town ship in
ludhiana. Responsible for estimation & analysing all the water demands,
treatment & supply strategy , storm water strategy, sewage disposal &
treatment, space allocations for mechanical pumping stations, drainage system
and flood control schemes. Also designing of plumbing & firefighting scheme for
all the buildings which comes under the township.
Senior Project engineer for MKG Consultants Plumbing & Fire Design team while
working with well known Architect Design Plus. ASF SEZ Mixed use
development which comes in social economic zone. Project including
Residential Towers, , Offices, Commercials etc. Responsible for designing &
analysing all the water demands, treatment & supply strategy, storm water
strategy, sewage disposal & treatment, space allocations for mechanical
pumping stations.
HOTELS & RESORTS
JW MARRIOT HOTEL, KOLKATA, INDIA.
Led AECOM India Plumbing & Fire Design team while working with
International Architect H Architect (Singapore) for the client Fabworth
Promoters Pvt. Ltd. Project consisting 5star hotel and world best category of
service apartment in Kolkata. Responsible for estimation & analysing all the
water demands, treatment & supply strategy, storm water strategy, sewage
disposal & treatment, space allocations for electro-mechanical pumping
stations.
MARRIOT HOTEL, SILIGAURI, INDIA.
Led AECOM India Plumbing & Fire Design team while working with
International Architect H Architect (Singapore) for the client Fabworth
Promoters Pvt. Ltd. Project consisting 4 star hotel in Siligauri. Responsible for
estimation & analysing all the water demands, treatment & supply strategy,
storm water strategy, sewage disposal & treatment, space allocations for
electro-mechanical pumping stations.
ITC HOTEL, AMRITSAR, INDIA.
Led AECOM India Plumbing & Fire Design team while working with Architect
Pardeep Schdeva Associate for the client ITC . Project consisting 5 star hotel
in Amritsar. Major common area of the project is design in existing heritage
building. only new block developing for guest room. Responsible for estimation
& analysing all the water demands, treatment & supply strategy, storm water
strategy, sewage disposal & treatment, space allocations for electro-mechanical
pumping stations
ITC HOTEL, BHUBHANESWAR, INDIA.
Led AECOM India Plumbing & Fire Design team while working with Architect
Pardeep Schdeva Associate for the client ITC. Project consisting 5 star hotel in
Bhubaneswar.. Responsible for estimation & analysing all the water demands,
treatment & supply strategy, storm water strategy, sewage disposal & treatment,
space allocations for electro-mechanical pumping stations
RENOVATION OF SHANGRI-LA HOTEL, DELHI, INDIA.
Led AECOM India Plumbing & Fire Design team while working with client Eros
Group. Project consisting renovation of water supply s ystem.
HOSPITAL
GANGA RAM HOSPITAL, DELHI, INDIA.
Led AECOM India Plumbing & Fire Design team while working for the client
Ganga Ram Hospital. Ganga Ram hospital are already operating hospital
having approx. 8 Acre site area. Aecom PHE team was involved for design of
new 4 buildings blocks.
EMPLOYMENT HISTORY
AECOM, Gurgaon
Sept 2016 to till date – Senior Engineer - MEP
June 2011 to November 2014 – Senior Engineer/PHE Lead (Plumbing & Fire)
TRAINING/COURSES UNDERTAKEN
Technical
o NFPA Training Programme & Lecture on Fire Sprinkler, FSAI India.
o Green Plumbers of India.
ACHIEVMENTS/AWARDS
Green Plumber
IT Skills
Operating System: Windows 98/2000/XP/7/8, Internet
Software : Auto CAD, MS Office
Languages Known
Languages Read Write Speak
English Excellent Excellent Good
Hindi Excellent Excellent Excellent
Urdu Excellent Excellent Excellent
Personal Vitae
Phone : +91-8826794961
E-Mail : fozailrizvi@gmail.com
Father’s name : Md. Sohail Ahmad Rizvi
Date of Birth : 9th jan 1984
Sex : Male
Marital Status : Married
Nationality : Indian
Passport No. : M3140182
Residential Address : G48, 1st Floor, shahbuddin apartment, Abul fazal
Enclave-1, Jamia Nagar, Okhla Gaon,
New Delhi-110025
Certification
I, the Undersigned, certify that to the best of my knowledge and behalf, this Bio
Data correctly describes me, my qualifications, and my experience.
Date:
Place: New Delhi
[MD.FOZAIL AHMAD RIZVI]