SUMMARY

PROJECT TITLE :
ITEM : GROUND BEAM

M³ G35 (M³) M² M² REINFORCEMENT BAR (KG)


ITEM Type of Ground Beam NO.
Excavation Concrete Formwork Lean Concrete R6 R10 T12 T16
1 GB1a 1 0.24 0.58 7.72 0.96 9.99 0.00 0.00 45.80
2 GB1b 1 0.16 0.39 5.15 0.64 6.76 0.00 0.00 32.29
3 GB1c 3 0.57 1.37 18.20 2.28 23.81 0.00 0.00 111.34
4 GB1d 3 0.64 1.53 20.40 2.55 26.45 0.00 0.00 122.92
5 GB1e 1 0.06 0.15 2.04 0.26 2.94 0.00 0.00 15.94
6 GB1f 1 0.20 0.48 6.43 0.80 8.23 0.00 0.00 39.05
7 GB2a 2 0.07 0.18 2.37 0.30 3.53 0.00 0.00 22.85
8 GB2b 5 0.87 2.09 27.88 3.49 36.74 0.00 0.00 172.65
9 GB2c 2 0.26 0.62 8.23 1.03 11.17 0.00 0.00 53.67
10 GB2d 3 0.37 0.88 11.78 1.47 15.87 0.00 0.00 77.54
11 GB2e 2 0.10 0.23 3.11 0.39 4.70 0.00 0.00 26.70
TOTAL 24 3.54 8.50 113.32 14.17 150.20 0.00 0.00 720.74
PROJECT TITLE : DRAWING NO. :
ITEM : GROUND BEAM CONCRETE COVER : 0.040
STRUCTURE : SLAB THICKNESS: : 0.150

TAKING OFF SHEET

Meter Concrete Grade (M³) Formwork Lean Concrete Excavation


Item Description
L W D No G 25 M² M² M³

1 GB1a 6.43 0.15 0.60 1.00 0.58 7.72 0.96 0.24

TOTAL QUANTITY 0.58 7.72 0.96 0.24

PROJECT : CONCRETE COVER : 0.040 HOOK : 0.024 dia


LAPPING : 40 dia
DESCRIPTION :

Bar No. of No. of Total A B C D E F Bar Length R6 R10 T12 T16 T20 T25 T32 T40
Member Bar Size Shape
Mark Mbrs bars bars (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
A
B C
GB1a BT 16 1 2 2 6.351 0.450 0.450 7.25 14.5

B C
BB 16 1 2 2 A 6.351 0.450 0.450 7.25 14.5

B
E
A C
LINK 6 1 34 34 0.520 0.070 0.520 0.070 0.144 1.32 45.0
D
B
Bar Ref: R6 R10 T12 T16 T20 T25 T32 T40
Total Length (m) 45.02 0.00 0.00 29.00 0.00 0.00 0.00 0.00
Kg/m 0.222 0.617 0.888 1.579 2.466 3.854 6.313 9.864
Total Weight (kg) 9.99 0.00 0.00 45.80 0.00 0.00 0.00 0.00
PROJECT TITLE : DRAWING NO. :
ITEM : GROUND BEAM CONCRETE COVER : 0.040
STRUCTURE : SLAB THICKNESS: : 0.150

TAKING OFF SHEET

Meter Concrete Grade (M³) Formwork Lean Concrete Excavation


Item Description
L W D No G 25 M² M² M³

1 GB1b 4.29 0.15 0.60 1.00 0.39 5.15 0.64 0.16

TOTAL QUANTITY 0.39 5.15 0.64 0.16

PROJECT : CONCRETE COVER : 0.040 HOOK : 0.024 dia


LAPPING : 40 dia
DESCRIPTION : dia

Bar No. of No. of Total A B C D E F Bar Length R6 R10 T12 T16 T20 T25 T32 T40
Member Bar Size Shape
Mark Mbrs bars bars (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
A
B C
GB1b BT 16 1 2 2 4.212 0.450 0.450 5.11 10.2

B C
BB 16 1 2 2 A 4.212 0.450 0.450 5.11 10.2

B
E
A C
LINK 6 1 23 23 0.520 0.070 0.520 0.070 0.144 1.32 30.5
D
B
Bar Ref: R6 R10 T12 T16 T20 T25 T32 T40
Total Length (m) 30.45 0.00 0.00 20.45 0.00 0.00 0.00 0.00
Kg/m 0.222 0.617 0.888 1.579 2.466 3.854 6.313 9.864
Total Weight (kg) 6.76 0.00 0.00 32.29 0.00 0.00 0.00 0.00
PROJECT TITLE : DRAWING NO. :
ITEM : GROUND BEAM CONCRETE COVER : 0.040
STRUCTURE : SLAB THICKNESS: : 0.150

TAKING OFF SHEET

Meter Concrete Grade (M³) Formwork Lean Concrete Excavation


Item Description
L W D No G 25 M² M² M³

1 GB1c 5.06 0.15 0.60 3.00 1.37 18.20 2.28 0.57

TOTAL QUANTITY 1.37 18.20 2.28 0.57

PROJECT : CONCRETE COVER : 0.040 HOOK : 0.024 dia


LAPPING : 40 dia
DESCRIPTION : dia

Bar No. of No. of Total A B C D E F Bar Length R6 R10 T12 T16 T20 T25 T32 T40
Member Bar Size Shape
Mark Mbrs bars bars (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
A
B C
GB1c BT 16 3 2 6 4.976 0.450 0.450 5.88 35.3

B C
BB 16 3 2 6 A 4.976 0.450 0.450 5.88 35.3

B
E
A C
LINK 6 3 27 81 0.520 0.070 0.520 0.070 0.144 1.32 107.2
D
B
Bar Ref: R6 R10 T12 T16 T20 T25 T32 T40
Total Length (m) 107.24 0.00 0.00 70.51 0.00 0.00 0.00 0.00
Kg/m 0.222 0.617 0.888 1.579 2.466 3.854 6.313 9.864
Total Weight (kg) 23.81 0.00 0.00 111.34 0.00 0.00 0.00 0.00
PROJECT TITLE : DRAWING NO. :
ITEM : GROUND BEAM CONCRETE COVER : 0.040
STRUCTURE : SLAB THICKNESS: : 0.150

TAKING OFF SHEET

Meter Concrete Grade (M³) Formwork Lean Concrete Excavation


Item Description
L W D No G 25 M² M² M³

1 GB1d 5.67 0.15 0.60 3.00 1.53 20.40 2.55 0.64

TOTAL QUANTITY 1.53 20.40 2.55 0.64

PROJECT : CONCRETE COVER : 0.040 HOOK : 0.024 dia


LAPPING : 40 dia
DESCRIPTION : dia

Bar No. of No. of Total A B C D E F Bar Length R6 R10 T12 T16 T20 T25 T32 T40
Member Bar Size Shape
Mark Mbrs bars bars (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
A
B C
GB1d BT 16 3 2 6 5.587 0.450 0.450 6.49 38.9

B C
BB 16 3 2 6 A 5.587 0.450 0.450 6.49 38.9

B
E
A C
LINK 6 3 30 90 0.520 0.070 0.520 0.070 0.144 1.32 119.2
D
B
Bar Ref: R6 R10 T12 T16 T20 T25 T32 T40
Total Length (m) 119.16 0.00 0.00 77.84 0.00 0.00 0.00 0.00
Kg/m 0.222 0.617 0.888 1.579 2.466 3.854 6.313 9.864
Total Weight (kg) 26.45 0.00 0.00 122.92 0.00 0.00 0.00 0.00
PROJECT TITLE : DRAWING NO. :
ITEM : GROUND BEAM CONCRETE COVER : 0.040
STRUCTURE : SLAB THICKNESS: : 0.150

TAKING OFF SHEET

Meter Concrete Grade (M³) Formwork Lean Concrete Excavation


Item Description
L W D No G 25 M² M² M³

1 GB1e 1.70 0.15 0.60 1.00 0.15 2.04 0.26 0.06

TOTAL QUANTITY 0.15 2.04 0.26 0.06

PROJECT : CONCRETE COVER : 0.040 HOOK : 0.024 dia


LAPPING : 40 dia
DESCRIPTION : dia

Bar No. of No. of Total A B C D E F Bar Length R6 R10 T12 T16 T20 T25 T32 T40
Member Bar Size Shape
Mark Mbrs bars bars (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
A
B C
GB1e BT 16 1 2 2 1.624 0.450 0.450 2.52 5.0

B C
BB 16 1 2 2 A 1.624 0.450 0.450 2.52 5.0

B
E
A C
LINK 6 1 10 10 0.520 0.070 0.520 0.070 0.144 1.32 13.2
D
B
Bar Ref: R6 R10 T12 T16 T20 T25 T32 T40
Total Length (m) 13.24 0.00 0.00 10.10 0.00 0.00 0.00 0.00
Kg/m 0.222 0.617 0.888 1.579 2.466 3.854 6.313 9.864
Total Weight (kg) 2.94 0.00 0.00 15.94 0.00 0.00 0.00 0.00
PROJECT TITLE : DRAWING NO. :
ITEM : GROUND BEAM CONCRETE COVER : 0.040
STRUCTURE : SLAB THICKNESS: : 0.150

TAKING OFF SHEET

Meter Concrete Grade (M³) Formwork Lean Concrete Excavation


Item Description
L W D No G 25 M² M² M³

1 GB1f 5.36 0.15 0.60 1.00 0.48 6.43 0.80 0.2

TOTAL QUANTITY 0.48 6.43 0.80 0.20

PROJECT : CONCRETE COVER : 0.040 HOOK : 0.024 dia


LAPPING : 40 dia
DESCRIPTION : dia

Bar No. of No. of Total A B C D E F Bar Length R6 R10 T12 T16 T20 T25 T32 T40
Member Bar Size Shape
Mark Mbrs bars bars (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
A
B C
GB1f BT 16 1 2 2 5.282 0.450 0.450 6.18 12.4

B C
BB 16 1 2 2 A 5.282 0.450 0.450 6.18 12.4

B
E
A C
LINK 6 1 28 28 0.520 0.070 0.520 0.070 0.144 1.32 37.1
D
B
Bar Ref: R6 R10 T12 T16 T20 T25 T32 T40
Total Length (m) 37.07 0.00 0.00 24.73 0.00 0.00 0.00 0.00
Kg/m 0.222 0.617 0.888 1.579 2.466 3.854 6.313 9.864
Total Weight (kg) 8.23 0.00 0.00 39.05 0.00 0.00 0.00 0.00
PROJECT TITLE : DRAWING NO. :
ITEM : GROUND BEAM CONCRETE COVER : 0.040
STRUCTURE : SLAB THICKNESS: : 0.150

TAKING OFF SHEET

Meter Concrete Grade (M³) Formwork Lean Concrete Excavation


Item Description
L W D No G 25 M² M² M³

1 GB2a 0.99 0.15 0.60 2.00 0.18 2.37 0.30 0.07

TOTAL QUANTITY 0.18 2.37 0.30 0.07

PROJECT : CONCRETE COVER : 0.040 HOOK : 0.024 dia


LAPPING : 40 dia
DESCRIPTION : dia

Bar No. of No. of Total A B C D E F Bar Length R6 R10 T12 T16 T20 T25 T32 T40
Member Bar Size Shape
Mark Mbrs bars bars (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
A
B C
GB2a BT 16 2 2 4 0.909 0.450 0.450 1.81 7.2

B C
BB 16 2 2 4 A 0.909 0.450 0.450 1.81 7.2

B
E
A C
LINK 6 2 6 12 0.520 0.070 0.520 0.070 0.144 1.32 15.9
D
B
Bar Ref: R6 R10 T12 T16 T20 T25 T32 T40
Total Length (m) 15.89 0.00 0.00 14.47 0.00 0.00 0.00 0.00
Kg/m 0.222 0.617 0.888 1.579 2.466 3.854 6.313 9.864
Total Weight (kg) 3.53 0.00 0.00 22.85 0.00 0.00 0.00 0.00
PROJECT TITLE : DRAWING NO. :
ITEM : GROUND BEAM CONCRETE COVER : 0.040
STRUCTURE : SLAB THICKNESS: : 0.150

TAKING OFF SHEET

Meter Concrete Grade (M³) Formwork Lean Concrete Excavation


Item Description
L W D No G 25 M² M² M³

1 GB2b 4.65 0.15 0.60 5.00 2.09 27.88 3.49 0.87

TOTAL QUANTITY 2.09 27.88 3.49 0.87

PROJECT : CONCRETE COVER : 0.040 HOOK : 0.024 dia


LAPPING : 40 dia
DESCRIPTION : dia

Bar No. of No. of Total A B C D E F Bar Length R6 R10 T12 T16 T20 T25 T32 T40
Member Bar Size Shape
Mark Mbrs bars bars (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
A
B C
GB2b BT 16 5 2 10 4.567 0.450 0.450 5.47 54.7

B C
BB 16 5 2 10 A 4.567 0.450 0.450 5.47 54.7

B
E
A C
LINK 6 5 25 125 0.520 0.070 0.520 0.070 0.144 1.32 165.5
D
B
Bar Ref: R6 R10 T12 T16 T20 T25 T32 T40
Total Length (m) 165.50 0.00 0.00 109.34 0.00 0.00 0.00 0.00
Kg/m 0.222 0.617 0.888 1.579 2.466 3.854 6.313 9.864
Total Weight (kg) 36.74 0.00 0.00 172.65 0.00 0.00 0.00 0.00
PROJECT TITLE : DRAWING NO. :
ITEM : GROUND BEAM CONCRETE COVER : 0.040
STRUCTURE : SLAB THICKNESS: : 0.150

TAKING OFF SHEET

Meter Concrete Grade (M³) Formwork Lean Concrete Excavation


Item Description
L W D No G 25 M² M² M³

1 GB2c 3.43 0.15 0.60 2.00 0.62 8.23 1.03 0.26

TOTAL QUANTITY 0.62 8.23 1.03 0.26

PROJECT : CONCRETE COVER : 0.040 HOOK : 0.024 dia


LAPPING : 40 dia
DESCRIPTION : dia

Bar No. of No. of Total A B C D E F Bar Length R6 R10 T12 T16 T20 T25 T32 T40
Member Bar Size Shape
Mark Mbrs bars bars (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
A
B C
GB2c BT 16 2 2 4 3.349 0.450 0.450 4.25 17.0

B C
BB 16 2 2 4 A 3.349 0.450 0.450 4.25 17.0

B
E
A C
LINK 6 2 19 38 0.520 0.070 0.520 0.070 0.144 1.32 50.3
D
B
Bar Ref: R6 R10 T12 T16 T20 T25 T32 T40
Total Length (m) 50.31 0.00 0.00 33.99 0.00 0.00 0.00 0.00
Kg/m 0.222 0.617 0.888 1.579 2.466 3.854 6.313 9.864
Total Weight (kg) 11.17 0.00 0.00 53.67 0.00 0.00 0.00 0.00
PROJECT TITLE : DRAWING NO. :
ITEM : GROUND BEAM CONCRETE COVER : 0.040
STRUCTURE : SLAB THICKNESS: : 0.150

TAKING OFF SHEET

Meter Concrete Grade (M³) Formwork Lean Concrete Excavation


Item Description
L W D No G 25 M² M² M³

1 GB2d 3.27 0.15 0.60 3.00 0.88 11.78 1.47 0.37

TOTAL QUANTITY 0.88 11.78 1.47 0.37

PROJECT : CONCRETE COVER : 0.040 HOOK : 0.024 dia


LAPPING : 40 dia
DESCRIPTION : dia

Bar No. of No. of Total A B C D E F Bar Length R6 R10 T12 T16 T20 T25 T32 T40
Member Bar Size Shape
Mark Mbrs bars bars (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
A
B C
GB2d BT 16 3 2 6 3.192 0.450 0.450 4.09 24.6

B C
BB 16 3 2 6 A 3.192 0.450 0.450 4.09 24.6

B
E
A C
LINK 6 3 18 54 0.520 0.070 0.520 0.070 0.144 1.32 71.5
D
B
Bar Ref: R6 R10 T12 T16 T20 T25 T32 T40
Total Length (m) 71.50 0.00 0.00 49.10 0.00 0.00 0.00 0.00
Kg/m 0.222 0.617 0.888 1.579 2.466 3.854 6.313 9.864
Total Weight (kg) 15.87 0.00 0.00 77.54 0.00 0.00 0.00 0.00
PROJECT TITLE : DRAWING NO. :
ITEM : GROUND BEAM CONCRETE COVER : 0.040
STRUCTURE : SLAB THICKNESS: : 0.150

TAKING OFF SHEET

Meter Concrete Grade (M³) Formwork Lean Concrete Excavation


Item Description
L W D No G 25 M² M² M³

1 GB2e 1.29 0.15 0.60 2.00 0.23 3.11 0.39 0.1

TOTAL QUANTITY 0.23 3.11 0.39 0.10

PROJECT : CONCRETE COVER : 0.040 HOOK : 0.024 dia


LAPPING : 40 dia
DESCRIPTION : dia

Bar No. of No. of Total A B C D E F Bar Length R6 R10 T12 T16 T20 T25 T32 T40
Member Bar Size Shape
Mark Mbrs bars bars (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
A
B C
GB2e BT 16 2 2 4 1.214 0.450 0.450 2.11 8.5

B C
BB 16 2 2 4 A 1.214 0.450 0.450 2.11 8.5

B
E
A C
LINK 6 2 8 16 0.520 0.070 0.520 0.070 0.144 1.32 21.2
D
B
Bar Ref: R6 R10 T12 T16 T20 T25 T32 T40
Total Length (m) 21.18 0.00 0.00 16.91 0.00 0.00 0.00 0.00
Kg/m 0.222 0.617 0.888 1.579 2.466 3.854 6.313 9.864
Total Weight (kg) 4.70 0.00 0.00 26.70 0.00 0.00 0.00 0.00