Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

CCR OPERATOR 1ST SHIFT CCR OPERATOR 2ND SHIFT CCR OPERATOR 3RD SHIFT DATE:

BIG BOSS CEMENT INC. PRODUCTION PROCESS PARAMETERS

GROUP NAME WEIGH FEEDER GROUP CEMENT MILL GROUP SEPARATOR GROUP ROLLER PRESS GROUP ROTARY DRYER GROUP QUALITY CONTROL

Clinker G-ash Gypsum LGG Total Feed Total Feed BALL MILL Bucket Elevator Air Separator Dust Collector Bucket Elevator De Agglomerator Roller Press Dryer Main Dryer Dedusting Hot Gas G-Ash Raw Material Weigh Burner G-Ash Cement Product Cement Silo

EQUIPMENT NAME WEIGH WEIGH WEIGH WEIGH WEIGH MILL FEED Mill Inlet Mill Outlet Mill Ear Mill Lubrication System Mill Motor Load Speed Load Damper Dedusting Fan Load Speed Motor 1 Motor 2 Roller Press Drives Grinding/Control Gearbox Bearing Hydraulic Roller Vibration Drive Motor Damper Inlet Outlet Moisture Moisture Feeder Valve Fuel Fuel Silo Sp. Surface Residue Residue Loading Percentage Level

FEEDER FEEDER FEEDER FEEDER FEEDER TOTALIZER Temp. Pressure Temp. Pressure Sounding Mill Motor Mill Reducer Girth Gear Current Power Power Current RPM Power Current Opening Current Power Power Current Load Fixed Movable Pressure L/R Temp. L/R Temp. L/R Temp. Gap Trans. Current Power Load Opening Temp. Temp. Feed Product Feed Rate Opening Pressure Consump. Level Blaine 90 mic. 45 mic. Silo # Filling Tonnage

EQUIPMENT TAG 1-2A 1-2B 1-2C 1-2D 1-2E 1-2F 1-6.7TT2 1-6.7PT1 1-6.7TT2 1-6.7PT2 1-6.7SLT 1-6.7M2TT1 1-6.7M3TT1 1-6.7M5TT1 1-6.7 (1-10) 1-12N1 (1-12) (1-15) (1-9) 1-8N1 (1-8) 1-5FD 1-5MD 1-5HPT1 1-5HPP1 1-5GTT 1-5DTT 1-5HTT1 1-5RPGT 1-5RPVT 3-4A 3-5A 3-5AD X-16ATT1 3-4ATT2 3-4AFM 3-4APM X-12A 3-2AVO1 3-2AFPT1 3-2AFFM 3-8GASLT QC101 QC102 QC103 2-5A 2-5AVL 2-5ALT

RANGE VALUE (10-100) (10-100) (1-5) (1-10) (100-120) (100-120) 200-300 (-25-45) 100-120 (-20)-(-45) (40-95) (55-70) (55-70) (55-70) 320-438 2500 45KW 72.5A 10-35Hz 110KW 172 (0-100) 72.5 450 45KW 72.5A 10-35Hz 55/28 75/28 22-130A 22-130A 6-12 MPa6-12 Mpa 25-75 25-75 25-75 (10-60) (1-6) 120-248 75 (160/246) (0-100) (25-650) (80-150) (1-8) (0-0.5) 10-100 (10-100) 100-500 100-500 T 3200+ (6-7) (0.1-0.5) (1-3) (10-100) 100-1000 T

UNIT t/h t/h t/h t/h t/h t/h C mbar C mbar % C C C Amp. KW KW Amp rpm KW Amp. % Amp. KW KW Amp rpm KW/ A KW/ A Amp. Amp. Mpa. Mpa. C C C mm mm/s Amp. KW KW/ A % C C % % t/h % PSI L/min % cm2/g % % ## % Tons

hour

8:00

9:00

10:00

11:00

12:00

13:00

14:00

15:00

16:00

17:00

18:00

19:00

20:00

21:00

22:00

23:00

0:00

1:00

2:00

3:00

4:00

5:00

6:00

7:00

Run Hours:

Ave. Feed Rate

Totalizer:

Remarks:

1 DIESEL CEMENT

2 SHIFT ENGINEER 1ST SHIFT SHIFT ENGINEER 2ND SHIFT SHIFT ENGINEER 3RD SHIFT INITIAL:

3 FINAL:

You might also like