TEST REPORT FOR

SEL MOTOR PROTECTION SEL 710


RELAY-SEL 710
DATE: 21.06.2018

Project : SINGARENI THERMAL POWER PLANT, TELANGANA

Client : M/s STEAG ENEGY SERVICES PVT LTD

End Client : M/S SINGARENI

Panel Ref : SPARE MOTOR FEEDER,PANELNO:07

Relay Make & Model : SEL-710

Serial No : 3140060036

CT & VT Ratio : 250/194A

1. Phase Over Current TOC – [ 51P] Non Directional Current (I) – 4XFLA A : TD- 0s ,FLA:0.815

Phase Set Current (A) Inj. Current(A) Actual Tripping Trip Time(s)
Time (s)
R-N 3.26 3.26 0 0.038

Y-N 3.26 3.26 0 0.041

B-N 3.26 3.26 0 0.037

2. [51N ] Current (I) – 10A : Time Delay- 0 s

Phase Set Current (A) Inj. Current(A) Actual Tripping Trip Time(s)
Time (s)
R-N 10 10 0 0.019

Y-N 10 10 0 0.012

B-N 10 10 0 0.029

3. JAM Current (I) – 2XFLA A ,Time Delay- 5 s FLA:0.815

PROTECTION ENGG M/S STEAG ENERGY SERVICE LTD

JAYAMKONDAN V MR.JEYAKUMAR
TEST REPORT FOR
SEL MOTOR PROTECTION SEL 710
RELAY-SEL 710
DATE: 21.06.2018

Phase Set Current (A) Inj. Current(A) Actual Tripping Trip Time(s)
Time (s)
R-N 1.63 1.63 5 4.92

Y-N 1.63 1.63 5 4.98

B-N 1.63 1.63 5 5.03

4. CURRENT IMBALANCE Current (I) – 10%A ,Time Delay- 5 s

Phase Set Current (A) Inj. Current(A) Actual Tripping Trip Time(s)
Time (s)
R-N 0.733 0.733 5 5.60

Y-N 0.733 0.733 5 5.53

B-N 0.733 0.733 5 5.33

UNDER VOLTAGE Voltage (I) – 0.7xVnm ,Time Delay- 2 s

Phase Sett Voltage (v) Inj. Voltage(v) Actual Tripping Trip Time(s)
Time (s)
R-N 45 45 2 2.01

Y-N 45 45 2 2.02

B-N 45 45 2 2.05

5. THERMAL OVER LOAD

Phase Inj. Current(A) Trip Time(s)

PROTECTION ENGG M/S STEAG ENERGY SERVICE LTD

JAYAMKONDAN V MR.JEYAKUMAR
TEST REPORT FOR
SEL MOTOR PROTECTION SEL 710
RELAY-SEL 710
DATE: 21.06.2018

R,Y,B 0.8 590

R,Y,B 0.9 397

R,Y,B 1.0 293

Check List:

1. LED Functions has been checked and found ok.


2. Relay operations has been found satisfied and fit for service.

PROTECTION ENGG M/S STEAG ENERGY SERVICE LTD

JAYAMKONDAN V MR.JEYAKUMAR