SCOPE OF WORKS
I. CIVIL WORKS
A. EARTHWORKS
1. Excavation
a. Footing
b. Wall Footing
2. Backfilling
a. Footing
b. Wall Footing
B. REINFORCEMENT
1. Footing
a. Footing
b. Wall Footing
2. Column
3. Beam
a. Tie Beams
b. Second Floor Beams
4. Slabs
a. Slab on Fill
b. Second Floor Slabs
5. Stairs
C. FORMWORKS
1. Column
2. Beam
c. Tie Beams
d. Second Floor Beams
3. Stairs
D. SCAFFOLDINGS
E. CONCRETE WORKS
1. Footing
a. Footing
b. Wall Footing
2. Column
3. Beam
e. Tie Beams
f. Second Floor Beams
4. Slabs
a. Slab on Fill
b. Second Floor Slabs
5. Stairs
F. MASONRY
1. CHB Walls
2. Plastering/Finishings
a. Rough
b. Fine
G. CEILING
1. Fiber Cement
H. ROOFING
1. Truss Details
2. Connection Details
3. Purlins
I. LUMBER
1. Chalkboard
II. ARCHITECTURAL
A. TILEWORK
1. Glazed
2. Unglazed
B. PAINTING
1. Masonry Painting
2. Wood Painting
3. Metal Painting
C. DOORS AND WINDOWS
D. RAILINGS
IV. PLUMBING
E. Water Line
F. Sanitary Line
G. Plumbing Fixtures