ELECTRICAL MAINTENANCE
DEPARTMENT
TABLE OF CONTENTS
Contents
1. LIST OF ABBREVIATIONS .............................................................................................................. 3
2. LIST OF CONTROLLED COPY HOLDERS ........................................................................................ 5
3. AMENDMENT RECORD.................................................................................................................. 6
4. ABOUT THE DEPARTMENT OR DEPARTMENT FUNCTIONS ....................................................... 7
5. DEPARTMENT CHART.................................................................................................................... 8
6. ROLES AND RESPONSIBILITIES W.R.T QUALITY, ENVIRONMENT AND SAFETY ....................... 9
7. EHSQS POLICY ............................................................................................................................. 10
8. DEPARTMENT PROCEDURES/ PROCESSES FLOW CHARTS ....................................................... 11
9. WORK INSTRUCTIONS................................................................................................................. 24
10. DEPARTMENT LEGAL AND OTHER REQUIREMENTS ............................................................ 74
11. OBJECTIVES AND TARGETS..................................................................................................... 75
ACTION PLAN FOR ACHIEVING OBJECTIVE .................................................................................... 76
12. HIRA (HAZARD IDENTIFICATION AND RISK ASSESSMENT) ................................................. 84
OH&S OBJECTIVES ........................................................................................................................... 93
OH&S MANAGEMENT PROGRAMME (OH&S MP) ......................................................................... 95
CRITICAL TASK ANALYSIS ............................................................................................................... 97
OCP (OPERATIONAL CONTROL PROCEDURE) ............................................................................. 104
13. ENVIRONMENT ASPECTS AND IMPACTS AND LIFE CYCLE PROSPECTIVE CONCERN ........ 112
14. INTERNAL AND EXTERNAL ISSUES W.R.T QUALITY AND ENVIRONMENT ......................... 116
15. NEEDS AND EXPECTATIONS OF INTERESTED PARTIES W.R.T QUALITY AND
ENVIRONMENT ................................................................................................................................... 117
16. RISK AND OPPORTUNITIES W.R.T QUALITY AND ENVIRONMENT ..................................... 119
17. LIST OF FORMS ....................................................................................................................... 121
18. LIST OF RECORDS ................................................................................................................... 122
19. LIST OF EXTERNAL DOCUMENTS .......................................................................................... 123
Page 2 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
1. LIST OF ABBREVIATIONS
Page 3 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Page 4 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Controlled
Controlled Copy Holder Soft Copy (CD)/ Hard Copy
Copy No.
Hard Copy,
2. HOD-EM
Electrical Intranet site
Page 5 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
3. AMENDMENT RECORD
NIL
Page 6 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Departmental Road map, to achieve station objectives has been developed and is
available with the department and can be shared during Assessment Team site visit.
Page 7 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
5. DEPARTMENT CHART
Page 8 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Page 9 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
7. EHSQS POLICY
Page 10 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
1. PURPOSE
2. SCOPE
3. REFERENCES
4. RESPONSIBILITY:
Page 11 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
5. RECORDS :
6. PROCEDURE:
6.1 The maintenance jobs in electrical maintenance are carried out as per “SAP”
on-line maintenance system. Maintenance Jobs are planned daily in the
planning meeting indicating the defects/condition/faults raised by
operation/MTP/ maintenance departments. As maintenance of electrical
equipments are critical activities, where- in absence of written instructions,
the quality of work is likely to get affected, the jobs are controlled through
written work instructions
i. Preventative maintenance
iv. Overhauling
Page 12 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Preventive maintenance jobs are carried out as per the schedule mentioned in
“SAP” system. Depending upon the equipment, the preventive maintenance
schedules are forwarded to MTP department by the area engineers.
Accordingly preventive maintenance jobs are planned in “SAP” system. Upon
planning in the system respective area engineers are taking permits from
operation department through “SAP” system to execute the jobs. On job
completion the permits are cancelled.
The condition of the critical & high cost equipment that effect process
capability are monitored by MTP department through “SAP” based on the
schedule given by area engineers. Accordingly predictive maintenance jobs
are planned in “SAP“ system. After planning the jobs in the SAP system,
respective area engineers are taking permits from operation department to
assess the condition of the equipment. After conducting the test / taking the
measurements permits are returned to Operation department and data is
being uploaded to the SAP for usage by different user groups like MTP,
Corporate OS etc.
Page 13 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
6.1.4 Overhauling :
Protective relay testing is done for electrical equipments once in a year / once
in two years in staggered manner. The testing activities are planned along
with preventive maintenance schedule of the equipments in “SAP” system &
the equipments for which shutdown cannot be availed during normal running
of Unit, are planned in Unit Overhauling or in any major outage of the unit.
Adherence to the planning schedule is monitored by MTP department. On
planning, the system respective area engineers are taking permits from
Page 14 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Off-line energy meter calibration is being done for 400KV outgoing line energy
meters used in billing purpose as per PPA with Zera make 0.02 class accuracy
testing kit.
The meters, other than substandard meters which are required for testing &
calibration purpose, are calibrated with respect to substandard meters. The
list of instruments which will be calibrated internally is enclosed as Annexure-1.
Page 15 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
All maintenance jobs are carried out on Contract basis. The following activities are
carried out by area in charge to ensure timely award of contracts & their execution.
Maintenance jobs are carried out taking all necessary safety precautions as
per site requirement.
HOD (EM), sectional heads, area in charges and area engineers are
responsible for carrying out the work safely.
Page 16 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
1. OBJECTIVE
2. BOUNDARY
3. REFERENCES
i. Procedure
iii. SAP
4. PROCESS OWNER
5. RECORDS
6. PROCESS MAP
Page 17 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Page 18 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Doc. No.: EMD/PC/02 Process Title: Break down Maintenance Date : 01/02/2018
Rev. No.: 03 Sheet : 01 of 03
1. OBJECTIVE :
2. BOUNDARY:
3. REFERENCES
a. Past experience.
b. O&M Manuals.
4. PROCESS OWNER
5. RECORDS
a. SAP
6. PROCESS MAP
Page 19 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Doc
Page 20 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Page 21 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
1. OBJECTIVE
2. BOUNDARY
3. REFERENCES
a. Procedure
b. Work Instructions
c. SAP
4. PROCESS OWNER
5. RECORDS
a. SAP
6. PROCESS MAP
Page 22 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Page 23 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
9. WORK INSTRUCTIONS
Page 24 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Page 25 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
1. PURPOSE
Parameter recording of Generator and finding out any abnormalities.
2. REFERENCES
a. Supplier Manuals
3. RESPONSIBILITY
a. Area engineer
4. RESOURCES REQUIRED
5. RECORDS
Sl no Description Location Format/ form no. Retention
period
1 Checklist of Sankalp EMD/FORM/001 01 Year
Generator
Parameters
Record Book
6. INSTRUCTIONS
a. Take the EMD/FORM/001 for recording the parameters.
b. Go to the Units and record generator parameters from UCB/ Local in
EMD/FORM/001 .
c. Check for any abnormality in the parameters and take necessary Corrective
action.
Page 26 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Doc. No.: EMD / WI /005 WI Title: Maintenance of Paddle Feeders Date : 01/02/2018
Rev. No.: 02 Sheet : 01 of 03
1. PURPOSE
To carryout quarterly maintenance of Paddle feeders in CHP
2. REFERENCES
a. SUPPLIER MANUALS
3. RESPONSIBILITY
a. Area engineer
4. RESOURCES REQUIRED
Sl no Resource Description
1 Manpower Technician –1, helper –01.
Air blower, spanner set, screw driver set,
2 Tools & tackles
hair brush, cleaning agent, Megger.
Personal protection
3 Safety helmet and safety shoe
equipment
5. RECORDS
Sl no Description Location Format/ form no. Retention
period
1 History Register CHP EMD/REC/004 Years
for Paddle Feeders
6. INSTRUCTIONS
6.1 Obtain PTW.
6.2 Check for isolation.
6.3 Externally clean the paddle feeder of all coal pieces and dust accumulation
completely clean the control panel with air blower.
6.4 Inspect the main contacts of main contactor for pump control
6.5 Replace worn out moving / fixed contacts if any or clean the contacts with petrol and
cloth. Never use emery paper for contact cleaning.
6.6 Clean other contactors with hair brush & petrol.
6.7 In case of dust accumulation over control cards clean them by blowing air.
6.8 Check tightness of all connections at contactors and terminal block.
Page 27 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Page 28 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
1. PURPOSE
To carryout Preventive Maintenance of CHP area motors as per SAP Schedule.
2. REFERENCES
a. Supplier Manuals
3. RESPONSIBILITY
a. Area engineer
4. RESOURCES REQUIRED
Sl No Resource Description
1 Manpower Technician –1, helper –01.
2 Tools & Tackles Spanner set, CRC 226, screw driver set
Personal Protection
3 Safety helmet safety Shoe.
Equipment
5. RECORDS
Sl Description Location Format/ Form Retention
No No. Period
1 History Register CHP EMD/REC/005 03 Years
for Motor
Maintenance
6. INSTRUCTIONS
6.1 Obtain PTW.
6.2 Clean the motor body and open motor T.B cover and discharge the power
termination.
6.3 Check termination tightness and clean T.B.
6.4 IF any problem like cable burning or T.B damage is noticed inform engineer in-charge
and attend the defect. damaged T.B should be replaced and re-termination of power
cable should be done if any heating in termination is observed.
6.5 Check and ensure double earthing of motor body and ensure tightness.
6.6 Ensure proper glanding of power cable and seal extra gland holes if any.
6.7 Close the T.B cover and seal if required.
6.8 Measure the IR value of the motor & also winding resistance.
6.9 Open fan cover and clean before putting back the cover.
Page 29 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Page 30 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
1. PURPOSE
Calibration of Generation related Transducer along with indication meters in Electrical
Control Panel (ECP).
2. References :
a. Manuals and drawings of BHEL on ECP
3. RESPONSIBILTY
a. Electrical Lab in-charge
4. Resources required
Sl No Resources Description
5. Records
Sl.No. Description Location Format Number Retention
Period
6. Instructions
6.1 Ensure availability of PTW
Page 31 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
6.2 Find out the applicable current & voltage terminals at the terminal block for
the selected transducer from the drawing.
6.3 The current terminals shall be shorted at the terminal block towards
Current transformer side.
6.4 Disconnect the current & voltage input terminals in the transducer without
disturbing the other circuit connections.
6.5 Connect the Power meter in between the “Current & voltage injector
source” & the transducer.
6.6 Inject the required current & voltage inputs to transducer input terminal
with the help of current/voltage source.
6.7 Check the output of the transducers. If the transducer reading is not
matching with the theoretical output, replace the transducer or adjust to
get the required output.
6.8 After ensuring healthiness of the transducer, check the power meter
indication readings with the ECP indication meters reading
6.9 Adjust the ECP indication meters if required.
Page 32 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Doc. No.: EMD / WI /009 WI Title : Maintenance of 11/3.3KV and Date : 01/02/2018
Rev. No.: 02 11/0.415 KV Transformer Sheet : 01 of 02
1. PURPOSE
Preventive Maintenance (PM) of 11/3.3KV, 11/0.415KV Transformers as per SAP schedule.
2. References
a. Manuals of BHEL/CGL/Bharat Bijlee / Voltamp
3. RESPONSIBILITY
a. Area Engineer
4. Resources required
Sl. No Resources Description
Tools and tackles Spanner set, Screw driver, Torque wrench, Megger,
2
Multimeter
5. Records
Sl. No. Description Location Format Number Retention
Period
6. Instructions
6.1 Ensure availability for PTW.
6.2 Identify the transformer correctly.
6.3 Ensure isolation from up stream and down stream switchgear.
Page 33 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
6.4 Identify the Marshalling Box A/C supply and isolate it.
6.5 Follow each and every step in line with transformer PM format EMD/FORM/014.
6.6 Box up the transformer LV/HV compartments on completion of job.
6.7 Normalise chamber Marshalling Box AC supply.
Page 34 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Doc. No.: EMD / WI /011 WI Title: Transformer oil sampling Date : 01/02/2018
Rev. No.: 02 Sheet : 01 of 02
1. PURPOSE
Transformer oil sampling for detailed analysis as per requirement
2. References
a. Previous Experience
3. RESPONSIBILITY
a. Area Engineer
4. Resources required
Sl No Resources Description
Tools and tackles Steel sampling bottles, set of spanners, cotton waste,
2
sampling attachment, bucket
5. Records
Sl No. Description Location Format Number Retention Period
6. Instructions
6.1. Ensure availability of LWC.
6.2 Open the dummy flange and clean the sampling area.
6.3 Connect the sampling arrangement to the flange and also to the sampling
bottle.
6.4 Open the sampling valve slowly and allow oil to flow freely through the
bottle.
6.5 Close the valve.
Page 35 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
6.6 Rinse the bottle thoroughly with the oil in the bottle.
6.9 Collect the oil for final sampling with the non connected end of the bottle in
16 degree upward position.
6.10 Allow oil to flow freely to ensure that there is no entrapped air bubbles.
Page 36 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
1. PURPOSE
Carry out of Overhaul maintenance of LT MCC.
2. REFERENCES :
a. Switchgear maintenance manual, breaker maintenance manual, past experience.
3. RESPONSIBILITY
a. Area Engineer
4. RESOURCES REQUIRED
Sl.No Resource Description
2 Tools & Tackles Ring Spanner set, ‘D’ Spanner set, Screw
driver(Heavy duty), Screw driver(Light duty),
Combination pliers, Ratchet spanner set, Air
Blower, Brushes of various sizes, PVC
insulation tape, Cleaners, Rust
removers/preventers, Megger, Multimeter,
Markin cloth, Jute.
3 Personal Protection Safety Helmet and safety shoe
Equipment
5. RECORDS
Sl.No Description Location Form No. Retention
Period
6. INSTRUCTIONS
6.1 Ensure availability of PTW.
6.2 Check all the necessary isolations and locking of Incomers and tie feeders.
Page 37 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
6.3 Carry out the work and record all the observations as per the format of check
sheet.
6.4 Return the PTW.
Page 38 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
1. PURPOSE
Preventive Maintenance of LT Motor as per SAP schedule.
2. REFERENCES :
a. Motor manufacturers recommendations and past experience.
3. RESPONSIBILITY
a. Area engineer
4. RESOURCES REQUIRED
Sl.No Resource Description
2 Tools & Tackles Spanner set, Screw driver, Ratchet spanner set, Air
Blower, Cleaning Brushes, Cleaning solvent/agent,
Megger, Motor checker, Markin cloth, Jute etc., as
per the requirement
3 Personal Protection Safety Shoe and safety helmet
Equipment
5. RECORDS
Sl.No Description Location Form No. Retention
Period
1 LT Motor check list Sankalp EMD EMD/FORM/021 3 Years
Office
6. INSTRUCTIONS
6.1 Ensure availability of PTW.
6.2 Ensure proper isolation.
6.3 Carry out the work as per the check sheet and record the readings and observations
in check sheet.
6.4 Return the PTW for cancellation.
Page 39 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
1. PURPOSE
To carry out monthly preventive maintenance of batteries ( Ni-CD )
2. References
a. Manuals of HBL- NIFE batteries and AMCO batteries.
3. RESPONSIBILITY
a. Area engineer
4. Resources required
Sl No Resources Description
5. RECORDS
Sl.No Description Location Form No. Retention Period
6. Instructions
6.1 The work is to be carried out on monthly basis on each battery set as per the
instruction of the area engineer.
6.2 Sulphation at any cell terminals are to be removed with Insulated scrapper and
then tightness of all cell terminals to be ensured with insulated spanners.
6.3 Petroleum jelly is to be applied at cell terminals at required quantity so that a thin
layer of coating is formed over the cell terminals.
6.4 Outer surface of all the cells in the battery sets are to be cleaned with dry markin
cloth.
Page 40 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
6.6 Any abnormality observed on battery set while performing the Work shall be
informed to the area engineer.
Page 41 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
1. PURPOSE
To Carryout Monthly Pipe to Soil Potential (PSP) reading for Cathodic Protection
system.
2. References
a. Supplier Manuals
3. RESPONSIBILITY
a. Area engineer
4. Resources Required
Sl No Resource Description
5. Records
Sl.No Description Location Form No. Retention Period
6. Instructions
6.1 Necessary information to be given to the Operator Present at the Location.
6.2 Record the Readings at TR Unit-1
6.3 Record the Readings at TR Unit-2
6.4 Record the Readings at all TLP Points
Page 42 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Page 43 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
1. PURPOSE
To carry out calibration of 0.2 class commercial energy meters installed in the 400 KV
out going lines as per PPA agreement.
2. REFERENCES
a. Power Purchase Agreement
b. Energy meter Manual
c. Instruction manual for 0.02 Class ZERA testing Kit
3. RESPONSIBILITY
a. Switchyard Area Engineer
4. RESOURCES REQUIRED
Sl.No Resource Description
5. RECORDS
Sl.No Description Location Form No. Retention Period
Page 44 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
6. INSTRUCTIONS
6.1 Obtain proper PTW from Switchyard SCE
6.2 Ensure the presence of representative from APTRANSCO (interested party). Each out
going line is having two 0.2 class static energy meters. One is called as main meter
and the other as check meter. If the meter under test is main meter , then the
substitute meter will be corresponding check meter of that particular feeder.
6.3 Note down the initial readings of the substitute meter and Meter under test (MUT)
in the form EMD/FORM/025. Short the CT secondary terminals and remove the
voltage links at the energy meter TTB for MUT. Set up the testing kit and check the
functionality of the kit. Inject the voltage and current as per the EMD/FORM/024 and
record the errors obtained. If the errors obtained are within specified limits i.e ± 0.2%
then the meter can be put back in to service. Otherwise put new tested spare meter
in to service in place of failed meter.
6.4 Put back the meter and normalize the CT, PT connections.
6.5 Note down the final readings of the substitute meter and MUT in EMD/FORM/025.
6.6 Make the computed energy statement as per the EMD/FORM/025. Get the computed
energy statement and test report signed by APTRANSCO representative.
6.7 Inform the switchyard SCE about the computed energy. Cancel the PTW.
Page 45 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
1. PURPOSE
To carry out the annual / bi annual maintenance of 400 KV Current Transformer.
2. REFERENCES
a. 400 KV CT Instruction manual.
3. RESPONSIBILITY
a. Switchyard Engineer
4. RESOURCES REQUIRED
Sl.No Resource Description
3 Personal Protection Equipment Safety Shoe , Safety Belt and safety helmet.
5. RECORDS
Sl.No Description Location Form No. Retention Period
6. INSTRUCTIONS
6.1 Obtain PTW from Switchyard SCE.
6.2 Ensure the proper isolation and earthing of the equipment under PTW.
6.3 Open the CT secondary terminal box and ensure that no water ingress is there. If
water ingress is observed, analyze the cause and attend the same.
6.4 Check the CT secondary terminal tightness in secondary terminal box, CT JB and
in Control and Relay panels.
6.5 Clean the porcelain bushings and check for any cracks.
Page 46 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
6.6 Check the secondary terminal board, primary terminals and top chamber cover
for any oil leakages.
6.7 Check the oil level in the top view glass.
6.8 Check the nitrogen pressure and top up the nitrogen if required up to 5 psi.
6.9 Check the Capacitance and Tandelta values of the CT and record the same in the
CT History register. If the Tandelta value is >0.7% or Capacitance value is >1000pF
then plan for the replacement of the CT at the earliest.
6.10 Ensure the tightness of P.F terminal earthing connection after Capacitance and
tandelta measurement.
6.11 Check the tightness of primary connections.
6.12 Record any abnormalities and activities done in the history register
EMD/REC/010
6.13 Apply RTV sealant to the CT secondary terminal box for ensuring proper
sealing of the box.
6.14 Cancel the PTW
Page 47 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Doc. No.: EMD / WI /024 WI Title: 400 KV CVT Annual / Bi Annual Date : 01/02/2018
Rev. No.: 02 maintenance Sheet : 01 of 02
1. PURPOSE
To carry out the annual/ Bi annual maintenance of 400 KV Capacitive Voltage
Transformer (CVT).
2. REFERENCES
a. 400 KV CVT Instruction manual.
3. RESPONSIBILITY
a. Switchyard Area engineer
4. RESOURCES REQUIRED
Sl.No RESOURCE DESCRIPTION
5. RECORDS
Sl.No Description Location Form No. Retention
Period
6. INSTRUCTIONS
6.1 Obtain PTW from Switchyard SCE.
6.2 Ensure the proper isolation and earthing of the equipment under PTW.
6.3 Open the CVT secondary terminal box and ensure that no water ingress is there. If
water ingress is observed, analyse the cause and attend the same.
Page 48 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
6.4 Check the CVT secondary terminal tightness in secondary terminal box , CVT JB and in
Control and Relay panels.
6.5 Clean the porcelain bushings and check for any cracks.
6.6 Check the secondary terminal box and HF link chamber for any oil leakages and attend
the same.
6.7 Check the oil level in the view glass and top up if required.
6.8 Check the nitrogen pressure and top up the nitrogen if required up to 5 psi.
6.9 Check the tightness of primary connections.
6.10 Check the Capacitance and Tandelta values of the CVT and record the same in the
CT History register. If the Tandelta value is >0.7% then plan for the replacement of
the CVT at the earliest.
6.11 Ensure the tightness of P.F terminal earthing connection after Capacitance and
tandelta measurement.
6.12 Cancel the PTW
6.13 Measure the secondary voltages after the energization of CVT and record the
values in the history register EMD/REC/011.
6.14 Record the abnormalities found, corrective actions taken and activities done
during the maintenance in the history register EMD/REC/011.
Page 49 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Doc. No.: EMD / WI /025 WI Title: 400 KV Lightening Arrestor Date : 01/02/2018
Rev. No.: 02 Annual / Bi Annual Maintenance Sheet : 01 of 02
1. PURPOSE
To carry out the annual / Bi annual maintenance of 400 KV Lightening Arrestor (LA).
2. REFERENCES
a. 400 KV LA Instruction manual.
3. RESPONSIBILITY
a. Switchyard Area Engineer
4. RESOURCES REQUIRED
Sl.No Resource Description
5. RECORDS
Sl.No Description Location Form No. Retention
Period
6. INSTRUCTIONS
6.1 Obtain PTW from Switchyard SCE.
6.2 Ensure the proper isolation and earthing of the equipment under PTW.
6.3 Clean the LA stacks and inspect for any cracks or damages in the porcelain stacks.
6.4 Check the healthiness of the operation counter by applying 1-phase voltage to
the counter.
Page 50 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Page 51 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Doc. No.: EMD / WI /027 WI Title: Annual / Bi Annual Checking of Date : 01/02/2018
Rev. No.: 02 400 KV Bus bar Protection Healthiness. Sheet : 01 of 02
1. PURPOSE
To check the healthiness of 400 KV Bus bar protections Main 1 & Main 2 for both 400 KV
bus 1 and 2.
2. REFERENCES
a. Bus Bar Protection instruction manuals.
b. Bus Bar protection Schematic Drawings.
3. RESPONSIBILITY
a. Switchyard area engineer
4. RESOURCES REQUIRED
Sl.No Resource Description
5. RECORDS
Sl.No Description Location Form No. Retention Period
6. INSTRUCTIONS
6.1 Obtain PTW from Operation.
6.2 Ensure the proper isolation of the corresponding 400 KV Bus.
Page 52 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
6.3 Inject the current in the secondary circuit of Main-1 protection and ensure the
operation of the relay. Check for the set values of alarm and trip and actual
operated values.
6.1 Inject the current in the secondary circuit of Main-2 protection and ensure the
operation of the relay. Check for the set values of alarm and trip and actual
operated values.
6.2 Inject the current in the secondary circuit of both Main-1 and Main-2 protection and
check for the operation of bus bar trip relays (96) .Ensure tripping of all the
feeders connected to that particular bus.
6.3 Check the initiation of Bus bar to LBB protection for all the feeders connected in
that bus.
6.4 Check the alarm and event logger contacts.
6.5 Check the LBB to Bus bar initiation and ensure tripping of bus bar on LBB
initiation for all the feeders connected in that bus.
6.6 Reset all the relays and ensure the changeover of all the LBB, Trip relay contacts
for all the feeders connected in that bus.
6.7 Tighten all the connections.
6.8 Record the set values and operated values of the currents and relays operated in
EMD/REC/014.
6.9 Cancel the PTW and normalize the bus.
Page 53 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Doc. No.: EMD / WI /028 WI Title: Annual / Bi Annual Checking of Date: 01/02/2018
Rev. No.: 02 400 KV LINE Protection. Sheet : 01 of 02
1. PURPOSE
To check the healthiness of 400 KV line protections Main 1 & Main 2 and carrier
trippings for 400 KV Lines.
2. REFERENCES
a. Line distance protection instruction manuals.
b. Line protection Schematic Drawings .
c. Recommended Relay Settings for 400 KV Lines
3. RESPONSIBILITY
a. Switchyard Area Engineer
4. RESOURCES REQUIRED
Sl.No RESOURCE DESCRIPTION
5. RECORDS
Sl.No Description Location Form No. Retention Period
6. INSTRUCTIONS
6.1 Obtain PTW from Operation .
6.2 Ensure proper isolation of the line from both ends.
Page 54 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
6.3 Isolate the Main-1 and Main-2 relays from yard side by opening the CT /PT
disconnecting links .
6.4 Setup the distance relay testing kit and give the CT /PT connections to the relay.
6.5 Inject the current and voltages as per the relay settings of Zone-1, 2, 3 etc and ensure
the operation of the relay for correct impedance and timings.
6.6 Ensure the carrier transmission as per the relay settings.
6.7 Check the operation of Auto re-close relay for single phase faults.
6.8 Check the operation of Over voltage relays and tee differential relays.
6.9 Check the carrier permissive and direct trippings. Check the advancement of Tx/Rx
counters for carrier send /receive and check event logger contacts also.
6.10 Check the triggering of disturbance recorder and observe the waveforms.
6.11 Remove the kit connections and normalize the CT / PT connections.
6.12 Record the observations and relays operated in EMD/REC/015
6.13 Cancel the PTW and normalize the line.
Page 55 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Doc. No.: EMD / WI /029 WI Title: Annual / Bi Annual Checking of Date : 01/02/2018
Rev. No.: 02 400 KV Bay Protection. Sheet : 01 of 02
1. PURPOSE
To check the healthiness of 400 KV Switchyard bay protections Main 1 & Main 2 ,
Interlocks and alarms.
2. REFERENCES
a. Bay protection Relays instruction Manual.
b. Bay protection Schematic Drawings.
c. Recommended relay Settings for 400 KV Switchyard .
3. RESPONSIBILITY
a. Switchyard Area engineer
4. RESOURCES REQUIRED
Sl.No. RESOURCE DESCRIPTION
5. RECORDS
Sl.No Description Location Form No. Retention Period
6. INSTRUCTIONS
6.1 Obtain PTW from Operation.
6.2 Measure and record the spill currents of Main-1 and Main-2 protections.
Page 56 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Page 57 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
1. PURPOSE
Overhauling of HT motor 11/ 3.3 KV in the main plant and off site as & when directed by
MTP.
2. REFERENCES
a. Instruction manual for HT Motors.
3. RESPONSIBILITY
a. Area engineer
4. RESOURCES REQUIRED
Sl.No RESOURCE DESCRIPTION
2 Tools & Tackles Chain block , hook chuk , D-shackles , slings , Inside &
Outside micro meter, Bearing Puller , spanner set ,
Alignment checker, Hydraulic Jack , 0- 5 KV Megger.
5. RECORDS
Sl.No Description Location Form No. Retention Period
6. INSTRUCTIONS
6.1 Obtain PTW from Operation .
6.2 Ensure the proper isolation of the corresponding HT breaker and breaker is isolated
and panel is locked .
Page 58 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
6.3 Open the motor T.B cover & discharge with earthing rod .
6.4 Open cable termination (power & CT cables), earthing connection and space heater
connections.
6.5 Decouple the drive after noting down the alignment reading. Disconnect all lube oil /
cooling water lines (Wherever applicable).
6.6 Dismantle and lift the rain hood wherever provided.
6.7 Lift and shift the motor with proper care to workshop or any other suitable location.
6.8 Dismantle the motor coupling, fan, DE and NDE side end covers. Take out the rotor.
6.9 Note down any abnormality in stator winding for overheating, condition of stator
wedges & slots, deposit of excess grease on stator over heating portion, mechanical
damage and crack in rotor, condition of bearings.
6.10 Clean the stator winding, rotor, bearings, end covers and all other dismantled parts
with proper cleaning agents. Clean heat exchanger tubes with nylon brush.
6.11 Check bearing condition, measure bearing clearances. Replace with new ones if
necessary.
6.12 Check the healthiness of space heaters.
6.13 Check varnishing of stator winding, rotor and apply new varnish if required.
6.14 Ensure no foreign material inside, assemble the motor with proper care and check
for rotor freeness.
6.15 Externally clean the motor surface & paint the motor with enamel painting with
existing shade.
6.16 Measure bearing insulation at 100 V/260 V, stator winding insulation at 1 KV &
stator winding resistance.
6.17 Clean motor base plate (foundation) & shift the motor back to the foundation.
6.18 Align the motor and check the alignment. Tight the foundation bolts and terminates
all the power & Control cables correctly. Connect all the lube oil & cooling water
pipes.
6.19 Check the IR of the motor along with power cable.
6.20 Take the decoupled trial run and record no load current, vibration readings in
EMD/REC/017.
6.21 Couple the motor and fix the rain hood.
6.22 Cancel the PTW.
Page 59 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
1. PURPOSE
Overhauling of HT breaker 11/ 3.3 KV in the main plant and Ash handling plant and off
sites.
2. REFERENCES
a. Instruction manual for HT Breakers.
b. Past experience
3. RESPONSIBILITY
a. Area engineer
4. RESOURCES REQUIRED
SL.NO RESOURCE DESCRIPTION
5. RECORDS
Sl.No Description Location Form No. Retention Period
6. INSTRUCTIONS
6.1 Obtain PTW from Operation.
6.2 Ensure the proper isolation of the corresponding HT breaker and Breaker is kept in
test position .
6.3 Clean the breaker thoroughly.
Page 60 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Page 61 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
1. PURPOSE
Overhauling of HT Switchgear 11/ 3.3 KV in the main plant and Ash handling plan-t and
off sites.
2. REFERENCES
a. Past experience
3. RESPONSIBILITY
a. Area Engineer
4. RESOURCES REQUIRED
SL.NO RESOURCE DESCRIPTION
5. RECORDS
Sl.No Description Location Form No. Retention Period
6. INSTRUCTIONS
6.1 Obtain PTW from Operation.
6.2 Ensure the proper isolation of the HT Switchgear from corresponding incomers.
Ensure isolations from remote end also for transformer feeders.
6.3 Check that board is dead by ensuring incomer breakers are switches off and are in
racked out condition. Rack in the bus earthing truck and close it.
Page 62 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
6.4 Open the bus chamber. Clean the bus bar chamber thoroughly and check the
tightness of nuts /bolts with torque wrench .
6.5 Check the tightness of power cables in all the feeders. Inspect the surge suppressors
and rectify the damages if any .
6.6 Ensure proper tightness of control circuit of Bus PT Cubicle.
6.7 Check the IR value of the Bus before opening and after boxing up with 1 KV megger
and record in EMD/REC/019
6.8 Ensure that all the Tools & tackles are taken out from bus chamber and no foreign
material is inside the bus chamber.
6.9 Box up the bus chamber.
6.10 Open the bus earth truck and rack out the same.
6.11 Cancel the PTW.
Page 63 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
1. PURPOSE
Preventive maintenance of HT Motors 11/ 3.3 KV in the main plant and Ash handling
plant and off sites.
2. REFERENCES
a. Instruction manual for HT Motors
b. Past experience
3. RESPONSIBILITY
a. Area engineer
4. RESOURCES REQUIRED
SL.NO RESOURCE DESCRIPTION
5. RECORDS
Sl.No Description Location Form No. Retention
Period
6. INSTRUCTIONS
6.1 Obtain PTW from Operation.
6.2 Ensure the proper isolation of the HT motor from corresponding breaker incomer.
6.3 Open the motor T.B cover and discharge with discharge rod.
Page 64 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Page 65 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Doc. No.: EMD / WI /034 WI Title: Disposal of Ni-Cd Batteries Date : 01/02/2018
Rev. No.: 02 Sheet : 01 of 02
1. PURPOSE
Identifying the defective Ni-Cd batteries, replacing with new ones and safe disposal of
the defective ones.
2. REFERENCES
a. Battery manufacturer Instruction Manual.
3. RESPONSIBILITY
a. Area engineer
4. RESOURCES REQUIRED
SL.NO RESOURCE DESCRIPTION
5. RECORDS
Sl.No Description Location Form No. Retention
Period
6. INSTRUCTIONS
6.1 Measure the individual cell voltages. Ensure that the voltage is not less than the
minimum voltages specified by the manufacturer as indicated in the Instruction
manual.
6.2 If voltage of any cell is found to be less than the specified minimum value, then
identify the cell and record in the EMD / REC / 021. Take corrective action if any as
suggested by OEM. If the cell voltage does not improve then plan for Replacement
of the defective cells.
6.3 Obtain the PTW and ensure proper isolation of the battery bank.
6.4 Replace the defective cell with new one and boost charge it up to the voltage
specified Instruction manual.
Page 66 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
6.5 Cancel the PTW and ensure the normalization of the battery bank.
6.6 Hand over the defective cell to NTPC Stores for further handing over to
6.7 Original equipment manufacturer / supplier for the safe disposal / re cycling of the
cell.
Page 67 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
1. PURPOSE
To control work environmental pollution in handling and disposal of discarded lead acid
batteries.
2. References
a. Past Experience
3. RESPONSIBILITY
a. Area Engineer
4. Resources required
Sl.No Resources Description
5. Records
Sl. No. Description Location Format Number Retention Period
6. Instructions
6.1 Limited quantity of Lead acid batteries are available for starting of Diesel generators
in main plant DG room & Fire water pump houses.
6.2 Check the lead acid batteries as per the respective scheduled Preventive
Maintenance to identify the defective batteries.
6.3 Check for defective batteries during attending breakdown work orders on batteries.
Page 68 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
6.4 Ensure availability of pre-designated earmarked area for temporary storage of the
discarded batteries.
6.6 Return the discarded batteries to store through Material Return Note.
6.7 Care should be taken to avoid any spillage during the storage handling and
transportation to stores.
6.8 Keep a record of discarded batteries and update the records as and when job is
done.
Page 69 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
1. PURPOSE
To control work environmental pollution in handling and disposal of Transformer Oil.
2. References
a. Past Experience
3. RESPONSIBILITY
a. Area Engineer
4. Resources required
Sl .No Resources Description
5. Records
Sl. No. Description Location Format Number Retention Period
Transformer oil
1 Sankalp EMD Office 1802/44 5 Years
disposal Balance
6. Instructions
6.1 Ensure observation of transformers for oil leakages and physical healthiness as per
respective scheduled checklist.
6.2 Identify the transformers from where oil leakages are observed and take necessary
steps to avoid ground contamination by placing a suitable waste oil container, and
then transferred into waste oil drums.
6.3 Depending upon severity of oil leakages problem will be attended during
opportunity/shutdown of the equipment.
Page 70 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
6.4 Ensure availability of designated area for keeping Waste Oil to be disposed.
6.5 Measure should be taken to handle used transformer oil with care to avoid any land
contamination due to spillage.
6.6 Proper care should be taken whenever transformer oil is drained from tank for
sampling, maintenance.
6.7 Note that waste transformer oil shall be properly handled and returned to stores
through MRN.
6.8 Keep a record of oil disposal and update the records as and when job is done
6.9 During the storage handling and transportation to stores care should be taken to
avoid any spillage.
6.10 Return the waste transformer oil drums to store through MRN & keep the record.
Page 71 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Doc. No.: EMD / WI /038 WI Title: Maintenance of Window AC- Date : 01/02/2018
Rev. No.: 01 Handling of CFC Sheet : 01 of 02
1. PURPOSE
To Control and minimize CFC leakages into the atmosphere during operation and
Maintenance of Window, Split, Package Air Conditioners. and Water coolers
2. REFERENCES
a. Past Experience
3. RESPONSIBILITY
a. Area Engineer
4. RESOURCES REQUIRED
SL.NO RESOURCE DESCRIPTION
5. RECORDS
Sl.No Description Location Form No. Retention
Period
6. INSTRUCTIONS
Page 72 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
6.1 Window air conditioners , Split , Package Air Conditioners and Water coolers of are
located at various plant locations, Communication building, Documentation
building, Sea water and Sweet water pump houses.
6.2 Note that any release of Freon / CFC into the atmosphere has significant
environmental impact. Until eco-friendly technology replaces the existing one,
utmost importance to be given for control and minimize of CFC releases.
6.3 Ensure quarterly observation checklist for healthy running of Window, Split, Package
Air Conditioners. and Water coolers The item which is prone to regular complaints is
to be inspected for complete healthiness of components including gas tightness
check.
6.4 Whenever any air conditioner or water cooler is taken for any type of Maintenance
work for compressor/fan or other problems, gas leak check is to be conducted
without fail and “Gas leak & filling Record” is to be maintained.
6.5 All the Air Conditioners and Water coolers should be inspected once in three months
for observation of healthy functioning / maintaining normal grill temperature.
6.6 Whenever compressor failure occurs for any Air Conditioner or Water cooler the gas
leak test with N2 should be carried out at the time of replacement of compressor.
Further, the manufacturer’s recommendations are to be followed for maintenance
works.
Page 73 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Sl.
Statute Requirement Authority Frequency Responsibility
No.
Page 74 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Page 75 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Compliance to PM, Break down and % of SAP WOC 95 % in every ORT Data / Quarterly by 59.6% 52.12%
1 HOD
PDM job schedules. attended month. SAP HOD (EM) (649/1089) (910/1746)
Page 76 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Timely payment of
100% by 7th of Quarterly by
9 Preventive, BD & OH maint. Process HOD wages to contract 100.00% 100.00%
every month HOD (EM)
workmen
Availability of ESP 100% Quarterly by
10 Preventive, BD & OH maint. Process HOD HOD (EM) 100.00% 96.88%
fields from EMD side availability
Page 77 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Reviewing previous
As and when
2 occurrence of critical Area In charge
occurred
equipment trippings
As and when
3 Analyzing the root causes, HOD (EM)
occurred
Page 78 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
actions occurred
HOD (EM)
5 Review of Status Quarterly
Page 79 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Page 80 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Page 81 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Page 82 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Page 83 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Page 84 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Lack of
training, Not
OCP01,
following √ √ II B 5 III D 14
OCP02
instructions,
Improper tools
Fire and OCP01 ,
√ √ I D 8 II D 10
explosions OCP02
Falling From
Transformer Oil √ I D 8 OCP02 III D 14
EM-03 NR heights
Filtration
Lack of
training, Not
OCP01,
following √ √ II B 5 III D 14
OCP02
instructions,
Improper tools
OCP 01,
Electric shock √ III B 9 III D 14
OCP 03
Page 85 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Lack of
training, Not
OCP01,
following √ √ II B 5 III D 14
OCP02
instructions,
Improper tools
Flash Over &
√ √ II D 10 OCP 01 III D 14
Burns
Maintenance Falling From
and Testing of √ I D 8 OCP02 III D 14
EM- 05 NR heights
switch yard. Lack of
Equipment training, Not
OCP01,
following √ II B 5 III D 14
OCP02
instructions,
Improper tools
Flash Over &
√ √ II D 10 OCP 01 III D 14
Burns
Page 86 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Page 87 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Lack of
training, Not
OCP01,
following √ II B 5 III D 14
OCP02
instructions,
Improper tools
Fire and
√ √ I E 12 OCP 01 III E 17
explosions
1.Injury due to
manual
handling of
loads
Generator √ √ II D 10 OCP02 III D 14
EM- 10 NR 2. fall of
overhauling objects
3. Falling of
People
Lack of
training, Not
OCP01,
following √ II B 5 III D 14
OCP02
instructions,
Improper tools
Flash Over &
√ √ II D 10 OCP 01 III D 14
Maintenance of Burns
EM-11 R
33 KV Lines
Falling From
√ I D 8 OCP02 III D 14
heights
Page 88 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Lack of
training, Not
OCP01,
following √ II B 5 III D 14
OCP02
instructions,
Improper tools
Tall Ladder / OCP 01 ,
Flash Over &
Tall objects / Tall √ √ II D 10 OCP02, III D 14
Burns
Vehicles shifting OCP 03
EM-12 NR at Railway Lack of
Crossing below training, Not
25 KV Traction OCP01,
following √ √ II B 5 III D 14
OCP02
Line instructions,
Improper tools
Page 89 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Lack of training, Not following Hands on training is imparted to the workers by the area engineer in-charge.
4
instructions, Improper tools Continuous close supervision by the engineer in- charge during the execution of the job.
Catastrophic I Death due to serious injuries or illnesses Plant outage > one week and/or losses > Rupees 100 crores
Page 90 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Disabling injury or severe occupational Facility outage upto one week and/or losses > Rupees 20
Critical II
illness crores but < Rupees 100 crores
Medical Aid Injury or minor occupational Facility outage upto 2 days and/or losses > Rupees 1 crore but
Marginal III
illness < Rupees 20 crores
Negligible IV Minor injury or illness (First Aid case) Facility outage upto 1 day and/or losses < Rupees 1 crore
Frequent A Likely to occur frequently or at least once per year or more frequently
Probable B Likely to occur several times in life of the system or at least once in 3 year period
Occasional C Likely to occur sometime in life of the system or once in 6 years period
Remote D Unlikely, but possible to occur in the life of the system or once in 15 years period
Improbable E Highly unlikely, but possible to occur in the lifecycle of the system or once in more than 15 years period.
Page 91 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
RISK CODES:
PROBABILITY SEVERITY
I II III IV
CATASTROPHIC CRITICAL MARGINAL NEGLIGIBLE
FREQUENT A 1 3 7 13
PROBABLE B 2 5 9 16
OCCASSIONAL C 4 6 11 18
REMOTE D 8 10 14 19
IMPROBABLE E 12 15 17 20
Page 92 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
OH&S OBJECTIVES
Reference No (From the Risk EM01, EM02, EM05, EM07, EM09, EM10 & EM11
Assessment worksheet).
Department(s)/Section(s) Electrical Maintenance
Work Activity (ies) Flashover/Electric Shock
Overall Risk Code 14 to 14
(As shown on the Risk Assessment Worksheet)
Legal Requirements, if any
Indian electricity Rules 1956,
S 36-A ( Chapter IV) of The Factories Act,
1948
Corporate guidelines
Define external interested parties Contractors
Define controls Work instructions / PTW /control measures
Description of Objective Imparting OHSAS awareness-cum-Refresher
training to Newcomers to the Dept.
Page 93 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Page 94 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
OH&S EM: MP : 01
OH&S EM: MP : 02
Page 95 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
OH&S EM: MP : 03
Page 96 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Area : TOTAL PLANT AREA RISK ASSESSMENT WORKSHEET Ref. No. EM- 07
RISK CODE : 11
Sl
Tasks Performed P S F T =P x Sx F
No
LEGEND :
P Probability of failure to comply with laid down controls/procedures
S Severity
F Frequency of operation of the task
T Total = P x S x F
Sl Task Observation/
Critical Task Responsibility
No Review Frequency
Page 97 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Area : TOTAL PLANT AREA RISK ASSESSMENT WORKSHEET Ref. No. EM- 08
RISK CODE : 11
Sl T=
Tasks Performed P S F
No PxSxF
LEGEND :
P Probability of failure to comply with laid down controls/procedures
S Severity
F Frequency of operation of the task
T Total = P x S x F
Sl Task Observation/
Critical Task Responsibility
No Review Frequency
Page 98 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Area : TOTAL PLANT AREA RISK ASSESSMENT WORKSHEET Ref. No. EM- 10
RISK CODE : 12
Sl T=
Tasks Performed P S F
No PxSxF
3 Provision of Earthing 1 4 1 4
LEGEND :
P Probability of failure to comply with laid down controls/procedures
S Severity
F Frequency of operation of the task
T Total = P x S x F
Sl Task Observation/
Critical Task Responsibility
No Review Frequency
Page 99 of 125
NTPC –Simhadri
NTPC Road, Near Pittavanipalem Village, Visakhapatnam,
Andhra Pradesh 531020
Electrical Maintenance Department-Functional Manual
ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 Requirements
Issue NO : Effective Date : 01/02/2018 Doc No : NTPC/EMD/01 Rev No : 00
Area : TOTAL PLANT AREA RISK ASSESSMENT WORKSHEET Ref. No. EM- 11
RISK CODE : 10
Sl T=
Tasks Performed P S F
No PxSxF
4 Provision of Earthing. 1 4 2 8
LEGEND :
P Probability of failure to comply with laid down controls/procedures
S Severity
F Frequency of operation of the task
T Total = P x S x F
Sl Task Observation/
Critical Task Responsibility
No Review Frequency
4 Provision of Earthing
Area : TOTAL PLANT AREA RISK ASSESSMENT WORKSHEET Ref. No. EM- 06
RISK CODE : 12
Sl T=
Tasks Performed P S F
No PxSxF
1 To ensure that the conductivity of the DM water that will be used for 1 4 2 8
hot line washing, to be less than 1 micro mho
2 To ensure that the warning system for the leakage current > 1 milli 1 4 2 8
amp is working properly
LEGEND :
P Probability of failure to comply with laid down controls/procedures
S Severity
F Frequency of operation of the task
T Total = P x S x F
Sl Task Observation/
Critical Task Responsibility
No Review Frequency
Area : TOTAL PLANT AREA RISK ASSESSMENT WORKSHEET Ref. No. EM- 13
RISK CODE : 12
Work Activity : Tall Ladder / Tall objects / Tall Vehicles shifting at Railway Crossing below 25 KV
Traction Line
Sl T=
Tasks Performed P S F
No PxSxF
LEGEND :
P Probability of failure to comply with laid down controls/procedures
S Severity
F Frequency of operation of the task
T Total = P x S x F
Sl Task Observation/
Critical Task Responsibility
No Review Frequency
1. Purpose: To reduce the risk of flashover and/or burns while carrying out
Maintenance activities on electrical equipment.
4. Cross Reference:
(a) NTPC Safety Rules Hand-book (E&M)
(b) Risk Assessment Work-sheets (EM)
8. Activities:
Sl.
Activity Responsibility
No
Area Maint.
1. To ensure proper PTW system is followed
Engineer
5. To ensure that work is carried out as per NTPC Safety Rules Area Maint.
Engineer
Area Maint.
6. To ensure that proper work instructions are followed. Engineer
Area Maint.
7. To ensure that proper tools and testing equipment are used
Engineer
7. Records:
Records of PTW & details of work carried out on on-line SAP system.
Records of Site visit /inspection.
1. Purpose: To reduce the risk of falling from heights while carrying out
Maintenance activities on electrical equipment.
5. Cross Reference:
o NTPC Safety Rules Hand-book (E&M)
o Risk Assessment Work-sheets (EM)
6. Activities:
Sl.
Activity Responsibility
No.
6 To ensure that proper work instructions are followed. Area Maint. Engineer
1. Purpose: To reduce the risk of flashover / severe injury while crossing tall ladder /
objects at railway crossing below 25 KV traction line.
5. Cross Reference:
(a) NTPC Safety Rules Hand-book (E&M)
(b) Risk Assessment Work-sheets (EM)
6. Activities:
Sl.
No Activity Responsibility
.
To ensure that the ladder / tall objective is shifted in the Area Maint.
1. presence of NTPC Executive / Supervisor Engineer
To ensure that a caution board “TALL OBJECTS SHOULD NOT Area Maint.
4. BE CROSSED”–is provided at all crossings on both sides Engineer
Area Maint.
5. To ensure that work is carried out as per NTPC Safety Rules
Engineer
8. Records:
Records of PTW & details of work carried out on on-line SAP system.
Records of Site visit /inspection.
1. PURPOSE: To reduce the risk of injury during loading, hazard due to leakage while
filling when the H2 Plant is in operation.
2. SCOPE: Can minimize the chances of injury while loading & leakage of Hydrogen
3. RESPONSIBILITIES: Engineer-in-Charge
5. CROSS REFERENCE:
1. NTPC safety rules Handbook
2. LMI
3. Risk assessment worksheets
6. ACTIVITY:
4 Ensure all the filled cylinders are fitted with cap. Operator
8. RECORDS:
Records of PTW on online SAP.
Report of fortnightly inspections by safety officer with safety department.
13. ENVIRONMENT ASPECTS AND IMPACTS AND LIFE CYCLE PROSPECTIVE CONCERN
Reference: ISO 14001
Sl. N/ Rating
D/I F+ Significance
No Activity Aspect A/ Impact Applicable LOR Remark
D L R F EI P T EI (YES/NO)
. E
Ground
Transformer Oil spillage, Contaminati HWM Sec Work instruction
01 oil filtration & A D on, 5 1 1 1 1 9 2 5,6,7,9,10,20 Yes is prepared.
Waste oil
use generation Water (4) (EMD/WI/037)
Pollution
Ground
400 kV Contaminati
Breaker Failure of on, HWM Sec
02 Hydraulic seals and oil A D 0 1 1 1 1 4 2 5,6,7,9,10,20(4 No
Health
operating leakages )
Hazard
machine
400 kV
Breaker SF6
03 Gas leakage A D Air Pollution 0 1 1 1 1 4 2 No
gas for arc
quenching
Ground E’ waste
Lighting
04 Fused lamps N D Contaminati 0 1 3 1 1 11 4 management No
maintenance
on rule
Generation of
Maintenance Cotton Ground
HWM Sec
06 of electrical waste, waste N D Contaminati 0 1 3 1 1 6 4 No
6,7,10,20(4)
equipment oil, soldering on
waste
Generation of
Ground
Actuator Cotton HWM Sec
09 E D Contaminati 0 1 1 1 1 4 2 No
maintenance waste, waste 6,7,10,20(4)
on
oil
Ground
Generation of Contaminati
Switchgear on,
10 scrap, like E D 0 1 1 1 1 4 2 No
maintenance
fuses Health
hazard
Water
Acid spillage , Pollution, Batteries
Maintenance Yes Work instruction
Generation of
11 of Lead Acid A D Ground 5 1 1 1 1 9 2 Mgmt rules (EMD/WI/036) is
Used
batteries Contaminati 2001, sec 10.1 prepared.
batteries
on
3. Leakage of A D Water 0 1 1 1 1 5 2
Oil Pollution
15. NEEDS AND EXPECTATIONS OF INTERESTED PARTIES W.R.T QUALITY AND ENVIRONMENT
Type of
Sl Interested Needs and
interested party Responsibility EMS/QMS Risk Level , Action to Mitigate the Risk
NO Parties Expectation
Internal/External
Power Utilities External HOD Maintaining Cordial QMS Low Risk: May not extend help during
3
in the Vicinity Relations and
Sl. Location of
Drawing No. Description of drawing
No. Storage
Sl. Location of
Equipment OEM/OES Document Description
No. Storage
--*--*--