Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 8

Personal Project Tracker

Projects
Status Priority Deadline

o Medium 12/19/2017
o High 12/19/2017
o High 12/20/2017
o High 12/18/2017
o Medium 12/19/2017
o Medium 12/19/2017
o Medium 12/18/2017
o Medium
o Medium 12/19/2017
o High 12/21/2017
o Medium 12/24/2017
o Medium 12/26/2017
12/19/2017
o
Low
o

12/25/2017
o

o
o
o

o 12/25/2017
o 12/28/2017
12/19/2017
o

o 12/19/2017
o 12/25/2017
o
o

o 12/19/2017
o
o
o
roject Tracker

Task Assignee
Sharq Cooling Tower Internal Wall Inspection
Daily Project Progress Report Me
Verify Equipment List
Follow Up for Jack Hammer
Order Safety equipments for Rope Access Team
Prepare a Tick Sheet for Defect area
Find method for easy defect area capture
Bind the Rope access Project data pack
Conduct Daily HSE Toolbox Talks
Complete the 3D Design of SA Ladder
Visit the consultant for design changes and approval
Prepare RFQ for Second Ladder
Find Fabricator for Second Ladder
Record Each Steps taken in MS Project with dates

HVAC Duct Cleaning and Insulation


Procurement of equipment and materials

Prepare a list of Manpower Required


Prepare list of Equipments

HSE Management
Read Fluor Arabia HSE Contractor obligation manual
Prepare HSE Policies
Order Safety equipments

NDT MPI Tank Inspection


Follow up with Suppliers
Prepare a complete list of Equipments including Rescue kit
IIS Dammam Janitorial Service and AMC
Follow Up - Bid
Today 7/18/2018

Deliverable(s) Cost/Hours
Description Deliverable % Done Fixed Cost Est. Hrs

Get a file, fill and print , sign and Complete set of Daily 0% $ -
put it in the file daily Progress with Summary 25% $ -

Prepare a simple Project , Assign


WBS , Read the 2p2m guide, align
the plan according to the guide

0% $ -

Duct Cleaning Equipment,


Insulation Material, Insulation
Equipments

All 6
Stock 5 FRC L,XL. Gloves Leather,
Lifting Gloves, Fall arrestor

MPI materials, rescue kit


Call Vice Principal
Actual Hrs

You might also like