Excel Project Tracker Full
Excel Project Tracker Full
Projects
Status Priority Deadline
o Medium 12/19/2017
o High 12/19/2017
o High 12/20/2017
o High 12/18/2017
o Medium 12/19/2017
o Medium 12/19/2017
o Medium 12/18/2017
o Medium
o Medium 12/19/2017
o High 12/21/2017
o Medium 12/24/2017
o Medium 12/26/2017
12/19/2017
o
Low
o
12/25/2017
o
o
o
o
o 12/25/2017
o 12/28/2017
12/19/2017
o
o 12/19/2017
o 12/25/2017
o
o
o 12/19/2017
o
o
o
roject Tracker
Task Assignee
Sharq Cooling Tower Internal Wall Inspection
Daily Project Progress Report Me
Verify Equipment List
Follow Up for Jack Hammer
Order Safety equipments for Rope Access Team
Prepare a Tick Sheet for Defect area
Find method for easy defect area capture
Bind the Rope access Project data pack
Conduct Daily HSE Toolbox Talks
Complete the 3D Design of SA Ladder
Visit the consultant for design changes and approval
Prepare RFQ for Second Ladder
Find Fabricator for Second Ladder
Record Each Steps taken in MS Project with dates
HSE Management
Read Fluor Arabia HSE Contractor obligation manual
Prepare HSE Policies
Order Safety equipments
Deliverable(s) Cost/Hours
Description Deliverable % Done Fixed Cost Est. Hrs
Get a file, fill and print , sign and Complete set of Daily 0% $ -
put it in the file daily Progress with Summary 25% $ -
0% $ -
All 6
Stock 5 FRC L,XL. Gloves Leather,
Lifting Gloves, Fall arrestor