Professional Documents
Culture Documents
ABS Group Presentation To NOIA - G Burton R1 PDF
ABS Group Presentation To NOIA - G Burton R1 PDF
Gareth Burton
Director
ABS Group
Global Offshore Services
Asset Integrity
Management
• Program development
• Prescriptive
• Risk-based
• Execution
• In-serve inspection
• Data management
• Anomaly identification &
tracking
• Analysis
• Anomaly resolution
• Weight control
• Stability analysis
• Life extension
Mechanical Integrity
Planning
• Criticality assessments
• Planning & Scheduling
• Spare Parts Program
Execution Phase
• Preventative Maintenance
• Predictive Maintenance
• Reliability Optimization
Control System Integrity
Assessment
ROI Focus:
• Maximizing production uptime,
Increased Production Reduced OPEX while reducing operating costs
Capacity Costs
Approach
Reduced
Downtime
Improved
Efficiency
Planned
Labor
Planned
Material • Risk/criticality based
• Utilizes condition-based & predictive
methodology versus time based
Extend Asset
Life
• Leverages planning & scheduling
efficiencies
• Addresses software & control risks
including cybersecurity
vulnerabilities