Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 23

KALKULASI

KSO MJPL-MURZA
DOCUMENT NO. REV. : 0
PONDASI TRANSFER PUMP
PAGES :
HSN-CS-50-001-A4 TBBM MAKASAR 1 of 23

PEMILIK : PT PERTAMINA (PERSERO)


DIREKTORAT PEMASARAAN DAN NIAGA
KONTRAKTOR : KSO MJPL - MURZA
NAMA PROYEK : PIPANISASI AVTUR TBBM MAKASAR KE DPPU
HASUNUDDIN
LOKASI : TBBM MAKASAR – DPPU HASANUDDIN
CONTRACT NO. : SPB-080/F00000/2016-SO (Tgl 26 September 2016)

ISSUED FOR
0 09 Mei 17 GZ KA TH
REVIEW

PREP’D CHECKED APPROVED PREP’D CHECKED APPROVED


REV. DATE DESCRIPTION
KSO MJPL - MURZA MK - SI PERTAMINA
KALKULASI
KSO MJPL-MURZA
DOCUMENT NO. REV. : 0
PONDASI TRANSFER PUMP
PAGES :
HSN-CS-50-001-A4 TBBM MAKASAR 2 of 23

LEMBARAN REVISI

Rev. No. Tanggal Deskprisi


KALKULASI
KSO MJPL-MURZA
DOCUMENT NO. REV. : 0
PONDASI TRANSFER PUMP
PAGES :
HSN-CS-50-001-A4 TBBM MAKASAR 3 of 23

DAFTAR ISI

1.0 PENDAHULUAN……………………………………………………………………...4
1.1 Umum..................................................................................................................4
1.2 Ruang Lingkup...................................................................................................4
1.3 Referensi..............................................................................................................4

2.0 HASIL RINGKASAN………………………………………………………………….4


2.1 Analisi Statis dan Hasil........................................................................................4
2.2 Perancangan Pondasi Slab...................................................................................6
3.0 DESAIN BASIS………………..……………………………………………………….6

4.0 BEBAN DASAR…….………………………………………………………………….7

4.1 Data list Transfer Pump...........................................................................................7


4.2 Beban Angin........................................................................................................7
4.3 Beban Gempa.......................................................................................................7

5.0 PERHITUNGAN PONDASI TRANSFER PUMP..…………………………………8

5.1 Ukuran Pondasi………...........................................................................................8


5.2 Beban Pondasi dan Pompa..................................................................................8

6.0 PERHITUNGAN DAYA DUKUNG TANAH PONDASI…..……………………...11

7.0 PERHITUNGAN PENULANGAN PONDASI…………..…..……………………..13

8.0 KONTROL GESER PADA PONDASI……….…………..…..…………………….14

9.0 KONTROL STABILITAS GULING PADA PONDASI………….……………….15

10.0 PERHITUNGAN ANCHOR BOLT……………………………….……………….15

LAMPIRAN
KALKULASI
KSO MJPL-MURZA
DOCUMENT NO. REV. : 0
PONDASI TRANSFER PUMP
PAGES :
HSN-CS-50-001-A4 TBBM MAKASAR 4 of 23

1.0 PENDAHULUAN
1.1 Umum
PT. PERTAMINA (PERSERO) berencana untuk membuat rehabilitasi sarana pasokan avtur
untuk TBBM - DPPU Hasanuddin. Lingkup pekerjaan meliputi fasilitas berikut:
• Detil rekayasa desain, pengadaan, konstruksi, pengujian dan pra-komisi
1.2 Ruang Lingkup
Laporan ini mencakup perhitungan desain untuk pondasi pemisah penyaring mikro. Desain pondasi
dangkal untuk Transfer Pump DPPU - Hasanuddin. berdasarkan daftar peralatan mekanik saja, data
vendor tidak tersedia. Oleh karena itu, kebutuhan desain ditinjau vendor data aktual dan tata letak
peralatan terbaru.
1.3 Referensi
1.3.1 Document Proyek
 Design Specification for Civil, Structural and Architectural, HSN-CS-50-012-A4.
 Mechanical Data Sheet for Transfer Pump ( Lampiran )
 Soil Investigation Report.
1.3.2 Kode
 Uniform Building Code 1997 (UBC ’97).
 American Society of Civil Engineers - Minimum Design Loads for Buildings and
Other Structure, ANSI/ASCE 7-02.
 American Concrete Institute - Building Code Requirement for Structural Concrete,
ACI 318-2002.
 Standar Perencanaan Ketahanan Gempa Untuk Struktur Bangunan Gedung, SNI
03-1726-2012.

2.0 HASIL RINGKASAN


2.1 Analisa Statik dan Hasil
Pondasi dirancang berdasarkan statis dalam kondisi tempat sebagaimana diringkaskan di bawah
ini.
KALKULASI
KSO MJPL-MURZA
DOCUMENT NO. REV. : 0
PONDASI TRANSFER PUMP
PAGES :
HSN-CS-50-001-A4 TBBM MAKASAR 5 of 23

2.1.1 Faktor Keamanan (SF) untuk Stabilitas Guling (M)


Minimum SF for the stabilitas guling is 3.7 yang diijinkan SF of 1.50 ( based on ACI
351.2R-94 ).

Mguling Mpenahan Aktual Diijinkan


Load Combination Keterangan
(kN.m) (kN.m) SF SF
DL+ Gempa 97.5 356.6 3.7 1.50 (Ok)
DL+ Angin 48.6 356.6 7.5 1.50 (Ok)

2.1.2 Faktor Keamanan (SF) for Stabilitas Geser (V)


Minimum SF untuk stabilitas geser adalah 1.54 dimana yang diijinkan SF of 1.50
(based on ACI 351.2R-94).

Shear Shear
Aktual Diijinkan
Load Combination Vgeser Vpenahan Keterangan
SF SF
(kN) (kN)
DL+ Gempa 38.04 69.57 1.83 1.50 (Ok)
DL+ Angin 45.23 69.57 1.54 1.50 (Ok)

2.1.3 Daya Dukung (q)


Daya dukung tanah ijin 187 kN/m² dimana kapasitas daya dukung ultimate yang
terjadi 607.5 kN/m² ( HB-3 Cross TBBM )
Daya dukung tanah ijin maximum yang terjadi 34.31 kN/m² yang lebih dari of 0
kN/m²

Maximum Manimum
Tekanan Tekanan Kapasitas
Kombinasi Beban Tanah Tanah Tanah Ijin Keterangan
qmax qmin qall (kN/m²)
(kN/m²) (kN/m²)
Pump ( Dead Load ) 19.06 19.06 202.5 (Ok)
DL + Gempa 34.31 3.81 269.32 (Ok)
DL + Angin 26.67 11.45 269.32 (Ok)

Note :
 Untuk beban sementara (kombinasi dengan angin atau gempa), qall akan meningkat
sebesar 33%.

Dimana,
DL = Dead load + Pompa (Self weight of foundation).
Angin = Beban Angin
Gempa = Beban Gempa
KALKULASI
KSO MJPL-MURZA
DOCUMENT NO. REV. : 0
PONDASI TRANSFER PUMP
PAGES :
HSN-CS-50-001-A4 TBBM MAKASAR 6 of 23

2.2 Perancangan Pondasi Slab


2.2.1 Perencanaan Beton Slab
2.2.1.1 Ukuran Pondasi
Ukuran pondasi yang dibuat 2.440 m (width) x 3.965 m (length) x 0.60 m
(tebal)
2.2.1.2 Penulangan Pondasi Slab
Pembesian pondasi slab yang dipakai Appendix-A. yang dipergunakan
dalam penulangan ini 1340.4 mm²/m (D16@150, two layers) Sedangkan
luasan tulangan yang diperlukan dalam perhitungan adalah 930.60 mm²/m.

3.0 DESIGN BASIS


 Tekanan tanah di bawah pondasi harus diasumsikan terdistribusi secara linier sepanjang dasar atau
lebar.

 Bahan dipertimbangkan untuk desain ditunjukkan pada Lampiran-A.


 Tulangan pondasi beton harus didasarkan pada pengendalian penyusutan atau sebagaimana diatur
dalam ACI 318-2002
KALKULASI
KSO MJPL-MURZA
DOCUMENT NO. REV. : 0
PONDASI TRANSFER PUMP
PAGES :
HSN-CS-50-001-A4 TBBM MAKASAR 7 of 23

4.0 BEBAN DASAR


4.1 Data list Transfer Pump
Berdasarkan Mechanical equipment list beban equipment
 Dead weight of transfer pump condition E(E)
E(E) = 1588 kg  15.537 kN
 The total weight of transfer pump during normal operation condition E(O)
E(O) = 1710 kg.  16.770 kN
 The total weight of transfer pumpduring skid (base plate) E(T)
E(T) = 1232 kg  12.082 kN
4.2 Beban Angin
Beban angin dihitung sesuai dengan rumus yang diberikan di ANSI/ASCE 7-02
W = q.G.C.A
Dimana, W = Wind load (N).
q = Velocity pressure (N/m2).
G = Gust effect factor.
C = Net pressure coefficient.
A = Projected area normal (m2).
 Tekanan Angin ("q")

q = 0.613 Kz Kzt I (V)2 (N/m2)


Dimana, Kzt = 1.
Kz = Exposure Coefficient Table-6-3 of ANSI/ASCE7-02 (Exposure-C).
I = Importance factor = 1.0.
V = Basic design wind velocity (20 m/s).
4.3 Beban Gempa
Analisa struktur tahan gempa ditentukan bedasarkan konfigurasi struktur dan fungsi yg
dikaitkan Total beban dasar geser harus dihitung dengan menggunakan rumus:
V = Cs x Wt

Dimana, V = Gaya geser dasar


Ie = Faktor keutamaan gempa
KALKULASI
KSO MJPL-MURZA
DOCUMENT NO. REV. : 0
PONDASI TRANSFER PUMP
PAGES :
HSN-CS-50-001-A4 TBBM MAKASAR 8 of 23

Rp = Koefesien reduksi gempa


T = Ct. H0.9
Cs = Seismic responsed factor.
Wt = Total weight of structure (kN).

5.0 Perhitungan Pondasi Transfer Pump

Ukuran pondasi minimum : (Brosur pump outline and vendor catalogue)

5.1 Ukuran Pondasi

B= 2.440 m
L= 3.965 m
A (Luas)
= 9.675 m2
T (Tebal) = 0.60 m
 (beton) = 24 kN/m3
Df = 0.50 m
m 0.10

5.2 Beban Pondasi dan Pompa


1. Beban
a. Berat Pondasi
W = c x L x B x T 
pondasi
KALKULASI
KSO MJPL-MURZA
DOCUMENT NO. REV. : 0
PONDASI TRANSFER PUMP
PAGES :
HSN-CS-50-001-A4 TBBM MAKASAR 9 of 23

= 139 kN

b. Berat Pompa
Mechanical Data Sheet brosur API 610 BB3 Multi stage Pump
Wp = berat pompa = 3500 lb = 1588 kg = 15.573 kN
Wdrive = berat operating = 3770 lb = 1710 kg = 16.770 kN
Wplate = berat plat/skid = 2716 lb = 1232 kg = 12.082 kN
c. Beban Gempa
Analisa struktur tahan gempa ditentukan berdasarkan konfigurasi struktur dan
fungsi yang dikaitkan dengan tanah dasar dan peta zonasi gempa Sesuai SNI 03-
1726-2012.
V = Cs x Wt
dimana :
V = Gaya geser dasar
Ie = Faktor keutamaan gempa
Ie = 1
Rp = Koefesien reduksi gempa
Rp = 2.5
T = Ct. H0.9
T = 0.0488. 1.2950.9
T = 0.114 detik
H = 2.563 m
SD1
Cs = R Nilai koefesien respon sesmik
T( 𝑃 )
Ie
S1 = Respon Spektral MCE Periode 1 detik redaman 5% (Wilayah Makasar)
SS = Respon Spektral MCE Pendek 1 detik redaman 5% (Wilayah Makasar)
SDS = Respon Spektral Periode Tertentu
SD1 = Respon Spektral Periode 1 Detik
Ct = Perode Pendekatan (table)
Ct = 0.0488
Cu = Koefesien batas atas periode yang dihitung (table)
Fa = Koefesien situs periode pendek
Fv = Koefesien situs periode panjang
SMS = Respon Spektral MCE Periode Pendek
SMI = Respon Spektral MCE Periode 1 Detik
SS = 0.25 ( gempa Makasar)
Fa = 1.6 (Tabel)
S1 = 0.15 ( gempa Makasar)
Fv = 2.4 (Tabel)
KALKULASI
KSO MJPL-MURZA
DOCUMENT NO. REV. : 0
PONDASI TRANSFER PUMP
PAGES :
HSN-CS-50-001-A4 TBBM MAKASAR 10 of 23

SMS = Fa x SS = 1.6 x 0.25


SMS = 0.4
SM1 = Fv x S1 = 2.4 x 0.15
SM1 = 0.36
SDS = 2/3 x SMS = 2/3 x 0.4
SDS = 0.27
SD1 = 2/3 x SM1 = 2/3 x 0.36
SD1 = 0.24
SD1
Cs = R = 0.84
T( 𝑃 )
Ie
Wt = Berat total struktur ( kondisi operating )
= 4600 kg
= 45.111 kN
Ve = Cs x Wt
= 0.84 x 45.111
Ve = 3879.14 kg
38.08 kN
M = Ve. H
= 3879.14 x 2.563
M = 9942 kgm
= 98 kNm

d. Beban Angin
Perhitungan beban angin berdasarkan dari ANSI ASCE 7-02
W = q. G. C. A
dimana ;
G = Gust effect factor = 0.85
C = Koefesien tekanan = 0.70
A = Projected area normal (m2)
W = Beban angin (N)
Ht = 1.079 m
D = 0.864 m
A = 0.603 m2
Tekanan Angin ( q )
q = 0.613. Kz. Kzt. I. V2 ( N/m2 )
dimana ;
Kzt = 1.00
Kz = Exposure Coeficient for H < 4.6 m = 0.85
Table 6-3 of ANSI ASCE 7-02 (Exposure C)
I = Importance factor = 1.00
V = Basic design wind velocity = 20 m/s
Ht = 0.5 x (K + F + F + F + 0.10)
KALKULASI
KSO MJPL-MURZA
DOCUMENT NO. REV. : 0
PONDASI TRANSFER PUMP
PAGES :
HSN-CS-50-001-A4 TBBM MAKASAR 11 of 23

Ht = 1.079 m
q = 0.613 x 1 x 0.85 x 1 x 202
= 208.42 N/m2
= 2.044 kN/m2
W= q. G. C. A
W= 115.56 N
= 0.116 kN

Ht

Ukuran :
L = 4.547 m K = 0.914 m F = 0.381 m
J = 1.765 m E = 0.406 m H = 0.432 m
A = 0.432 m B = 0.432 m
Beban Angin ke Arah Bersinggungan
Tinggi dari Tekanan angin Tinggi Luas Geser Momen
permukaan tanah q Ht A W or Vw M1
2
(m) (kN/m ) (m) (m2) ( kN ) ( kN.m )
0.00 - 4.60 2.044 1.079 0.932 0.116 48.653
Gaya Geser = 0.116 kN
Momen = Wt x Ht
= 45.111 x 1.079
= 48.653 kNm

6.0 Perhitungan Daya Dukung Tanah Pondasi


Data tanah mengambil dari pengujian (soil investigation) titik HB-3 Cross TBBM
 = 30o
c = 7.94 kN/m2
 = 15.98 kN/m3
Df = 0.50 m
B = 2.440 m
KALKULASI
KSO MJPL-MURZA
DOCUMENT NO. REV. : 0
PONDASI TRANSFER PUMP
PAGES :
HSN-CS-50-001-A4 TBBM MAKASAR 12 of 23

L = 3.965 m
Persamaan Terzaghi & Peck (1948)
qu = c. Nc. ( 1 + 0.3 B/L ) + Df. . Nq + 0.5. B. N ( 1- 0.2. B/L )

qu ultimate
= ultimate bearing capacity, kN/m²
c = Kohesi Tanah, kN/m²
 = Berat Jenis Tanah, kN/m³
Po = tekanan beban merata tanah akibat kedalamaan Df, kN/m²
Df = Kedalaman Pondasi, (m)
B = Lebar Pondasi, (m)
L = Panjang Pondasi, (m)
Nc = bearing capacity factor
Nq = bearing capacity factor
N = bearing capacity factor
 = 30o
Nc = 40.4
Nq = 25.3
N = 23.7
qu = 643.45 kN/m2
qall = qu / FK
FK = 3
qall = 202.50 kN/m2
qalllpermanen = 202.50 kN/m2
qalllsementara = 269.32 kN/m2
Daya dukung ijin max = 1959kN  184 kN ( Ok )
Sect Modulus (Z) = 6.393 m3
Gross soil bearing q = (Wt + Wfound)/(B x L) + 6M/(B x L2) kN/m2
Daya
Maximum soil pressure Minimum soil Dukung
Load Keterangan
qmax (kN/m2) pressure qmin (kN/m2) Tanah Ijin
kN/m2
Pump (Dead Load) 19.06 19.06 202.50 OK
DL + Gempa 34.31 3.81 269.32 OK
DL + Angin 26.67 11.45 269.32 OK
KALKULASI
KSO MJPL-MURZA
DOCUMENT NO. REV. : 0
PONDASI TRANSFER PUMP
PAGES :
HSN-CS-50-001-A4 TBBM MAKASAR 13 of 23

7.0 Perhitungan Penulangan Pondasi


Kuat Tekan Beton fc = 21 Mpa
Tegangan leleh baja fy = 414 Mpa

L= 3.97 m Mu = 1/8 x q x L2
q = 34.31 kN/m2 Vu = 1/2 x q x L
Mu = 67.43 kNm
Vu = 68.03 kN
h tebal pondasi = 0.60 m
b lebar pondasi per m’ = 1.00 m
cc selimut beton = 0.075 m
de tebal efektif pondasi = 0.517 m
L panjang pondasi = 3.97 m
Es Modulus elastisitas = 210000 Mpa
 Factor reduksi = 0.90
D diameter tulangan = 0.016 m
min = 0.0018
Momen Max ditengah bentang Mu = 67.43 kNm
= 6743.12 kgm
= 66127407.30 Nmm
Mn = 7492.35 kgm
= 734748997.00 Nmm
m = fy / 0.85,fc' = 23.18
KALKULASI
KSO MJPL-MURZA
DOCUMENT NO. REV. : 0
PONDASI TRANSFER PUMP
PAGES :
HSN-CS-50-001-A4 TBBM MAKASAR 14 of 23

Ru = Mu / f b. d2 = 0.313

1 2mRu
 = (1 − √1 − )
m fy

 = 0.000236
min = 0.0018
Jika  < rmin maka digunakan min
As perlu = min x b x de (per 1 m lebar)
As perlu = 201.06 mm2
Tulangan yang diperlukan D = 16 mm
As perlu = 201.06 mm2
Jarak Tulangan = 150 mm
As perlu = 7 bh
As perlu = 1340.41  930.60 mm2 OK
Digunakan D 16 – 150 mm
Cek Penulangan Geser
Vu = 68.03 kN
Vc = 1/6 * (f'c)^0.5 * B * de
Vc = 394865.27 N
= 394.87 kN
Vn = 0.75. Vc (Ø = 0.75) (shear reduction factor, ACI 9.3.2.3)
Vn = 296.15 Kn
Vn = 296.15  Vu = 68.03 kN OK

8.0 Kontrol Terrhadap Geser


Fw = Gaya Horisontal
Fr = Gaya Penahan
R . tg  = ( Wpondasi + W total ) tg 
 = 2/3. 
 = 20.67
tan  = 0.377
Fr = 69.57 kN
KALKULASI
KSO MJPL-MURZA
DOCUMENT NO. REV. : 0
PONDASI TRANSFER PUMP
PAGES :
HSN-CS-50-001-A4 TBBM MAKASAR 15 of 23

Beban Fw Fr FK Ijin FK Keterangan

DL + Gempa 38.04 69.57 1.83 1.5 OK


DL + Angin 45.23 69.57 1.54 1.5 OK

9.0 Kontrol Terrhadap Stabilitas Guling


Mguling = M due to gempa atau angin
Mpenahan = (Wt + Wpondsi) x 0.5L
SF = Mpenahan / Mguling
Mpenahan = 365.62 kNm
Mguling Mpenahan
Beban FK Ijin FK Keterangan
(kN-m) (kN-m)
DL + Gempa 97.5 365.62 3.7 1.5 OK
DL + Angin 48.65 365.62 7.5 1.5 OK

10. Perhitungan Anchor Bolt


1. Data
Gaya Tekan (Pu) = 4192.41 N
Gaya Moment (Mu) = 24375.40 N
Gaya Geser (Vu) = 9510.49 N
2. Base Plat
Tegangan Leleh Baja (fy) = 240 Mpa
Tegangan Tarik Baja (fup) = 400 Mpa
Lebar Base Plat (B) = 300 mm
Panjang Base Plat (L) = 300 mm
Tebal Base Plat (t) = 12 mm
3. Anchor Bolt
Tipe Anchor Bolt = ASTM 307
Tegangan Tarik (fub) = 137.90 Mpa
Tegangan Leleh (fy) = 248.21 Mpa
KALKULASI
KSO MJPL-MURZA
DOCUMENT NO. REV. : 0
PONDASI TRANSFER PUMP
PAGES :
HSN-CS-50-001-A4 TBBM MAKASAR 16 of 23

Diameter Baut = 16 mm
Bagian Tarik Anchor Bolt (nt) = 2 bh
Bagian Tekan Anchor Bolt (nc) = 2 bh
Bagian Jarak Baut Tengah Baut (f) = 100 mm
Panjang Ancor Bolt (La) = 350 mm
4. Baja
Bentuk
Ukuran Lebar Profile (h) = 150 mm
Tebal Profile (tf) = 6 mm
e = Mu / Pu 5.814 mm
L/6 50 mm
ht = 150 mm
et = f + h/2 175 mm
ec = f - h/2 25 mm
Total Anchor Bolt n = nt + n c 4 bh

Kekuatan Tahanan Beton


Pt = Pu * ec / et Gaya Tarik Anchor Bolt = 598.92 N
Puc = Pu + Pt Gaya Tekan Anchor Bolt = 4791.33 N
Y=3*(L-h)/2 = 225 mm
A1 = B * L Luas Area Plat = 90000 mm2
A2 = bx * by Luas Area Pedestal = 38359789 mm2
fcn = 0.85 * fc' * √ ( A2 / A1 ) = 368.51 Mpa
fcn = 1.70 * fc' = 35.70 Mpa
fcn = used nominal bearing resistance = 35.70 Mpa
 = factor reduksi = 0.65
 fcn = 23.21 Mpa
fcu = 2 * Puc / ( Y * B ) = 0.14 Mpa
Kontrol
fcu ≤ . fcn
0.14 ≤ 23.21 ( OK )
Cek Ukuran Base Plat
Minimum requirement for width of base plate
Bp min = Puc / ( ½ * f * fcn * Y ) = 0 mm
KALKULASI
KSO MJPL-MURZA
DOCUMENT NO. REV. : 0
PONDASI TRANSFER PUMP
PAGES :
HSN-CS-50-001-A4 TBBM MAKASAR 17 of 23

B = 300 mm
Bp min ≤ B
0 ≤ 300 ( OK )
a = ( L - 0.95 * ht ) / 2 = 78.75 mm
fcu1 = ( 1 - a / Y ) * fcu = 0.107 Mpa
Z = 1/4 * B * t2 = 10800 mm3
Mup = 1/2 * B * fcu1 * a2 + 1/3 * B * ( fcu - fcu1 ) * a2 = 116654 Nmm
b = 0.90
Mn = fy * Z = 2592000 Nmm
b * Mn = 2332800 Nmm
Kontrol
Mup ≤ b * Mn
116654 ≤ 2332800 ( OK )

Cek Tegangan Tarik Anchor


Tu1 = Pt / nt = 299.46 N
fub = 248.21 Mpa
Ab = Luasan Area Anchor Bolt = 201.06 mm2
t = Faktor Reduksi = 0.90
Tn = 0.75 * Ab * fub = 37429.19 N
t * Tn = 33686.27 N

Kontrol
Tu1 ≤ t * Tn
299.5 ≤ 33686.27 ( OK )
Cek Tegangan Geser Anchor
Vu1 = Vu / n = 0.64 N
fub = 248.21 Mpa
m = 1
r1 = 0.40
Ab = Luasan Area Anchor Bolt = 201.06 mm2
f = 0.75
Vn = r1 * m * Ab * fub = 19962.23 N
f * Vn = 14971.67 N
KALKULASI
KSO MJPL-MURZA
DOCUMENT NO. REV. : 0
PONDASI TRANSFER PUMP
PAGES :
HSN-CS-50-001-A4 TBBM MAKASAR 18 of 23

Kontrol
Vu1 ≤ f * Vn

0.64 ≤ 14971.6 ( OK )
Cek Kedalamaan Anchor
Kedalaman Anchor Bolt (La) = 350 mm
Kuat Tekan Beton (fc’) = 21 Mpa
Tegangan Leleh Tul. (fy) = 240 Mpa
Diameter Anchor Baut (d) = 16 mm
Min. Anchor Bolt Lmin fy / ( 4 *  fc' ) * d = 209.49 mm

Kontrol
Lmin ≤ Le
210 ≤ 350 ( OK )
KALKULASI
KSO MJPL-MURZA
DOCUMENT NO. REV. : 0
PONDASI TRANSFER PUMP
PAGES :
HSN-CS-50-001-A4 TBBM MAKASAR 19 of 23
KALKULASI
KSO MJPL-MURZA
DOCUMENT NO. REV. : 0
PONDASI TRANSFER PUMP
PAGES :
HSN-CS-50-001-A4 TBBM MAKASAR 20 of 23
KALKULASI
KSO MJPL-MURZA
DOCUMENT NO. REV. : 0
PONDASI TRANSFER PUMP
PAGES :
HSN-CS-50-001-A4 TBBM MAKASAR 21 of 23
KALKULASI
KSO MJPL-MURZA
DOCUMENT NO. REV. : 0
PONDASI TRANSFER PUMP
PAGES :
HSN-CS-50-001-A4 TBBM MAKASAR 22 of 23
KALKULASI
KSO MJPL-MURZA
DOCUMENT NO. REV. : 0
PONDASI TRANSFER PUMP
PAGES :
HSN-CS-50-001-A4 TBBM MAKASAR 23 of 23