Report Pondasi
Report Pondasi
KSO MJPL-MURZA
DOCUMENT NO. REV. : 0
PONDASI TRANSFER PUMP
PAGES :
HSN-CS-50-001-A4 TBBM MAKASAR 1 of 23
ISSUED FOR
0 09 Mei 17 GZ KA TH
REVIEW
LEMBARAN REVISI
DAFTAR ISI
1.0 PENDAHULUAN……………………………………………………………………...4
1.1 Umum..................................................................................................................4
1.2 Ruang Lingkup...................................................................................................4
1.3 Referensi..............................................................................................................4
LAMPIRAN
KALKULASI
KSO MJPL-MURZA
DOCUMENT NO. REV. : 0
PONDASI TRANSFER PUMP
PAGES :
HSN-CS-50-001-A4 TBBM MAKASAR 4 of 23
1.0 PENDAHULUAN
1.1 Umum
PT. PERTAMINA (PERSERO) berencana untuk membuat rehabilitasi sarana pasokan avtur
untuk TBBM - DPPU Hasanuddin. Lingkup pekerjaan meliputi fasilitas berikut:
• Detil rekayasa desain, pengadaan, konstruksi, pengujian dan pra-komisi
1.2 Ruang Lingkup
Laporan ini mencakup perhitungan desain untuk pondasi pemisah penyaring mikro. Desain pondasi
dangkal untuk Transfer Pump DPPU - Hasanuddin. berdasarkan daftar peralatan mekanik saja, data
vendor tidak tersedia. Oleh karena itu, kebutuhan desain ditinjau vendor data aktual dan tata letak
peralatan terbaru.
1.3 Referensi
1.3.1 Document Proyek
Design Specification for Civil, Structural and Architectural, HSN-CS-50-012-A4.
Mechanical Data Sheet for Transfer Pump ( Lampiran )
Soil Investigation Report.
1.3.2 Kode
Uniform Building Code 1997 (UBC ’97).
American Society of Civil Engineers - Minimum Design Loads for Buildings and
Other Structure, ANSI/ASCE 7-02.
American Concrete Institute - Building Code Requirement for Structural Concrete,
ACI 318-2002.
Standar Perencanaan Ketahanan Gempa Untuk Struktur Bangunan Gedung, SNI
03-1726-2012.
Shear Shear
Aktual Diijinkan
Load Combination Vgeser Vpenahan Keterangan
SF SF
(kN) (kN)
DL+ Gempa 38.04 69.57 1.83 1.50 (Ok)
DL+ Angin 45.23 69.57 1.54 1.50 (Ok)
Maximum Manimum
Tekanan Tekanan Kapasitas
Kombinasi Beban Tanah Tanah Tanah Ijin Keterangan
qmax qmin qall (kN/m²)
(kN/m²) (kN/m²)
Pump ( Dead Load ) 19.06 19.06 202.5 (Ok)
DL + Gempa 34.31 3.81 269.32 (Ok)
DL + Angin 26.67 11.45 269.32 (Ok)
Note :
Untuk beban sementara (kombinasi dengan angin atau gempa), qall akan meningkat
sebesar 33%.
Dimana,
DL = Dead load + Pompa (Self weight of foundation).
Angin = Beban Angin
Gempa = Beban Gempa
KALKULASI
KSO MJPL-MURZA
DOCUMENT NO. REV. : 0
PONDASI TRANSFER PUMP
PAGES :
HSN-CS-50-001-A4 TBBM MAKASAR 6 of 23
B= 2.440 m
L= 3.965 m
A (Luas)
= 9.675 m2
T (Tebal) = 0.60 m
(beton) = 24 kN/m3
Df = 0.50 m
m 0.10
= 139 kN
b. Berat Pompa
Mechanical Data Sheet brosur API 610 BB3 Multi stage Pump
Wp = berat pompa = 3500 lb = 1588 kg = 15.573 kN
Wdrive = berat operating = 3770 lb = 1710 kg = 16.770 kN
Wplate = berat plat/skid = 2716 lb = 1232 kg = 12.082 kN
c. Beban Gempa
Analisa struktur tahan gempa ditentukan berdasarkan konfigurasi struktur dan
fungsi yang dikaitkan dengan tanah dasar dan peta zonasi gempa Sesuai SNI 03-
1726-2012.
V = Cs x Wt
dimana :
V = Gaya geser dasar
Ie = Faktor keutamaan gempa
Ie = 1
Rp = Koefesien reduksi gempa
Rp = 2.5
T = Ct. H0.9
T = 0.0488. 1.2950.9
T = 0.114 detik
H = 2.563 m
SD1
Cs = R Nilai koefesien respon sesmik
T( 𝑃 )
Ie
S1 = Respon Spektral MCE Periode 1 detik redaman 5% (Wilayah Makasar)
SS = Respon Spektral MCE Pendek 1 detik redaman 5% (Wilayah Makasar)
SDS = Respon Spektral Periode Tertentu
SD1 = Respon Spektral Periode 1 Detik
Ct = Perode Pendekatan (table)
Ct = 0.0488
Cu = Koefesien batas atas periode yang dihitung (table)
Fa = Koefesien situs periode pendek
Fv = Koefesien situs periode panjang
SMS = Respon Spektral MCE Periode Pendek
SMI = Respon Spektral MCE Periode 1 Detik
SS = 0.25 ( gempa Makasar)
Fa = 1.6 (Tabel)
S1 = 0.15 ( gempa Makasar)
Fv = 2.4 (Tabel)
KALKULASI
KSO MJPL-MURZA
DOCUMENT NO. REV. : 0
PONDASI TRANSFER PUMP
PAGES :
HSN-CS-50-001-A4 TBBM MAKASAR 10 of 23
d. Beban Angin
Perhitungan beban angin berdasarkan dari ANSI ASCE 7-02
W = q. G. C. A
dimana ;
G = Gust effect factor = 0.85
C = Koefesien tekanan = 0.70
A = Projected area normal (m2)
W = Beban angin (N)
Ht = 1.079 m
D = 0.864 m
A = 0.603 m2
Tekanan Angin ( q )
q = 0.613. Kz. Kzt. I. V2 ( N/m2 )
dimana ;
Kzt = 1.00
Kz = Exposure Coeficient for H < 4.6 m = 0.85
Table 6-3 of ANSI ASCE 7-02 (Exposure C)
I = Importance factor = 1.00
V = Basic design wind velocity = 20 m/s
Ht = 0.5 x (K + F + F + F + 0.10)
KALKULASI
KSO MJPL-MURZA
DOCUMENT NO. REV. : 0
PONDASI TRANSFER PUMP
PAGES :
HSN-CS-50-001-A4 TBBM MAKASAR 11 of 23
Ht = 1.079 m
q = 0.613 x 1 x 0.85 x 1 x 202
= 208.42 N/m2
= 2.044 kN/m2
W= q. G. C. A
W= 115.56 N
= 0.116 kN
Ht
Ukuran :
L = 4.547 m K = 0.914 m F = 0.381 m
J = 1.765 m E = 0.406 m H = 0.432 m
A = 0.432 m B = 0.432 m
Beban Angin ke Arah Bersinggungan
Tinggi dari Tekanan angin Tinggi Luas Geser Momen
permukaan tanah q Ht A W or Vw M1
2
(m) (kN/m ) (m) (m2) ( kN ) ( kN.m )
0.00 - 4.60 2.044 1.079 0.932 0.116 48.653
Gaya Geser = 0.116 kN
Momen = Wt x Ht
= 45.111 x 1.079
= 48.653 kNm
L = 3.965 m
Persamaan Terzaghi & Peck (1948)
qu = c. Nc. ( 1 + 0.3 B/L ) + Df. . Nq + 0.5. B. N ( 1- 0.2. B/L )
qu ultimate
= ultimate bearing capacity, kN/m²
c = Kohesi Tanah, kN/m²
= Berat Jenis Tanah, kN/m³
Po = tekanan beban merata tanah akibat kedalamaan Df, kN/m²
Df = Kedalaman Pondasi, (m)
B = Lebar Pondasi, (m)
L = Panjang Pondasi, (m)
Nc = bearing capacity factor
Nq = bearing capacity factor
N = bearing capacity factor
= 30o
Nc = 40.4
Nq = 25.3
N = 23.7
qu = 643.45 kN/m2
qall = qu / FK
FK = 3
qall = 202.50 kN/m2
qalllpermanen = 202.50 kN/m2
qalllsementara = 269.32 kN/m2
Daya dukung ijin max = 1959kN 184 kN ( Ok )
Sect Modulus (Z) = 6.393 m3
Gross soil bearing q = (Wt + Wfound)/(B x L) + 6M/(B x L2) kN/m2
Daya
Maximum soil pressure Minimum soil Dukung
Load Keterangan
qmax (kN/m2) pressure qmin (kN/m2) Tanah Ijin
kN/m2
Pump (Dead Load) 19.06 19.06 202.50 OK
DL + Gempa 34.31 3.81 269.32 OK
DL + Angin 26.67 11.45 269.32 OK
KALKULASI
KSO MJPL-MURZA
DOCUMENT NO. REV. : 0
PONDASI TRANSFER PUMP
PAGES :
HSN-CS-50-001-A4 TBBM MAKASAR 13 of 23
L= 3.97 m Mu = 1/8 x q x L2
q = 34.31 kN/m2 Vu = 1/2 x q x L
Mu = 67.43 kNm
Vu = 68.03 kN
h tebal pondasi = 0.60 m
b lebar pondasi per m’ = 1.00 m
cc selimut beton = 0.075 m
de tebal efektif pondasi = 0.517 m
L panjang pondasi = 3.97 m
Es Modulus elastisitas = 210000 Mpa
Factor reduksi = 0.90
D diameter tulangan = 0.016 m
min = 0.0018
Momen Max ditengah bentang Mu = 67.43 kNm
= 6743.12 kgm
= 66127407.30 Nmm
Mn = 7492.35 kgm
= 734748997.00 Nmm
m = fy / 0.85,fc' = 23.18
KALKULASI
KSO MJPL-MURZA
DOCUMENT NO. REV. : 0
PONDASI TRANSFER PUMP
PAGES :
HSN-CS-50-001-A4 TBBM MAKASAR 14 of 23
Ru = Mu / f b. d2 = 0.313
1 2mRu
= (1 − √1 − )
m fy
= 0.000236
min = 0.0018
Jika < rmin maka digunakan min
As perlu = min x b x de (per 1 m lebar)
As perlu = 201.06 mm2
Tulangan yang diperlukan D = 16 mm
As perlu = 201.06 mm2
Jarak Tulangan = 150 mm
As perlu = 7 bh
As perlu = 1340.41 930.60 mm2 OK
Digunakan D 16 – 150 mm
Cek Penulangan Geser
Vu = 68.03 kN
Vc = 1/6 * (f'c)^0.5 * B * de
Vc = 394865.27 N
= 394.87 kN
Vn = 0.75. Vc (Ø = 0.75) (shear reduction factor, ACI 9.3.2.3)
Vn = 296.15 Kn
Vn = 296.15 Vu = 68.03 kN OK
Diameter Baut = 16 mm
Bagian Tarik Anchor Bolt (nt) = 2 bh
Bagian Tekan Anchor Bolt (nc) = 2 bh
Bagian Jarak Baut Tengah Baut (f) = 100 mm
Panjang Ancor Bolt (La) = 350 mm
4. Baja
Bentuk
Ukuran Lebar Profile (h) = 150 mm
Tebal Profile (tf) = 6 mm
e = Mu / Pu 5.814 mm
L/6 50 mm
ht = 150 mm
et = f + h/2 175 mm
ec = f - h/2 25 mm
Total Anchor Bolt n = nt + n c 4 bh
B = 300 mm
Bp min ≤ B
0 ≤ 300 ( OK )
a = ( L - 0.95 * ht ) / 2 = 78.75 mm
fcu1 = ( 1 - a / Y ) * fcu = 0.107 Mpa
Z = 1/4 * B * t2 = 10800 mm3
Mup = 1/2 * B * fcu1 * a2 + 1/3 * B * ( fcu - fcu1 ) * a2 = 116654 Nmm
b = 0.90
Mn = fy * Z = 2592000 Nmm
b * Mn = 2332800 Nmm
Kontrol
Mup ≤ b * Mn
116654 ≤ 2332800 ( OK )
Kontrol
Tu1 ≤ t * Tn
299.5 ≤ 33686.27 ( OK )
Cek Tegangan Geser Anchor
Vu1 = Vu / n = 0.64 N
fub = 248.21 Mpa
m = 1
r1 = 0.40
Ab = Luasan Area Anchor Bolt = 201.06 mm2
f = 0.75
Vn = r1 * m * Ab * fub = 19962.23 N
f * Vn = 14971.67 N
KALKULASI
KSO MJPL-MURZA
DOCUMENT NO. REV. : 0
PONDASI TRANSFER PUMP
PAGES :
HSN-CS-50-001-A4 TBBM MAKASAR 18 of 23
Kontrol
Vu1 ≤ f * Vn
0.64 ≤ 14971.6 ( OK )
Cek Kedalamaan Anchor
Kedalaman Anchor Bolt (La) = 350 mm
Kuat Tekan Beton (fc’) = 21 Mpa
Tegangan Leleh Tul. (fy) = 240 Mpa
Diameter Anchor Baut (d) = 16 mm
Min. Anchor Bolt Lmin fy / ( 4 * fc' ) * d = 209.49 mm
Kontrol
Lmin ≤ Le
210 ≤ 350 ( OK )
KALKULASI
KSO MJPL-MURZA
DOCUMENT NO. REV. : 0
PONDASI TRANSFER PUMP
PAGES :
HSN-CS-50-001-A4 TBBM MAKASAR 19 of 23
KALKULASI
KSO MJPL-MURZA
DOCUMENT NO. REV. : 0
PONDASI TRANSFER PUMP
PAGES :
HSN-CS-50-001-A4 TBBM MAKASAR 20 of 23
KALKULASI
KSO MJPL-MURZA
DOCUMENT NO. REV. : 0
PONDASI TRANSFER PUMP
PAGES :
HSN-CS-50-001-A4 TBBM MAKASAR 21 of 23
KALKULASI
KSO MJPL-MURZA
DOCUMENT NO. REV. : 0
PONDASI TRANSFER PUMP
PAGES :
HSN-CS-50-001-A4 TBBM MAKASAR 22 of 23
KALKULASI
KSO MJPL-MURZA
DOCUMENT NO. REV. : 0
PONDASI TRANSFER PUMP
PAGES :
HSN-CS-50-001-A4 TBBM MAKASAR 23 of 23