PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 005
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 001-R1/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Expose
Lantai : Lower Ground

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)

Expose

Kolom lantai LG
1 As. A / 6' K29 m2 8.78 - 13,500 -
2 As. A / 8 K29 m2 8.78 - 13,500 -

3 As. A / 2 K27 m2 10.53 95 10.00 13,500 135,047


4 As. A / 3 K27 m2 10.53 95 10.00 13,500 135,047
5 As. A / 4 K28 m2 10.53 95 10.00 13,500 135,047
6 As. A / 5 K26 m2 10.53 95 10.00 13,500 135,047
7 As. A / 6 K28 m2 10.53 - 13,500 -

8 As. B / 1 K27 m2 10.53 95 10.00 13,500 135,047

9 As. C / 1 K27 m2 10.53 95 10.00 13,500 135,047


10 As. C / 3 K14 m2 10.53 95 10.00 13,500 135,047
11 As. C / 4 K15 m2 10.53 95 10.00 13,500 135,047
12 As. C / 5 K26 m2 10.53 95 10.00 13,500 135,047
13 As. C / 6 K26 m2 10.53 95 10.00 13,500 135,047
14 As. C / 7' K28 m2 10.53 - 13,500 -

15 As. D / 1 K23 m2 10.53 95 10.00 13,500 135,047


16 As. D / 3 K24 m2 10.53 95 10.00 13,500 135,047
17 As. D / 4 K15 m2 10.53 95 10.00 13,500 135,047
18 As. D / 5 K26 m2 10.53 95 10.00 13,500 135,047
19 As. D / 6 K26 m2 10.53 95 10.00 13,500 135,047
20 As. D / 7' K28 m2 10.53 - 13,500 -

21 As. E / 1 K23 m2 10.53 95 10.00 13,500 135,047


22 As. E / 3 K24 m2 10.53 95 10.00 13,500 135,047
23 As. E / 4 K15 m2 10.53 95 10.00 13,500 135,047
24 As. E / 5 K16 m2 10.53 95 10.00 13,500 135,047
25 As. E / 7 K23 m2 10.53 - 13,500 -
26 As. E / 8 K25 m2 8.78 - 13,500 -
27 As. E / 9 K25 m2 8.78 - 13,500 -

28 As. E' / 10 KB3 m2 12.83 - 13,500 -


29 As. E' / 11 KB3 m2 12.83 - 13,500 -

30 As. F / 1 K19 m2 11.70 95 11.12 13,500 150,053


31 As. F / 3 K20 m2 10.53 95 10.00 13,500 135,047
32 As. F / 4 K21 m2 10.53 95 10.00 13,500 135,047
33 As. F / 5 K22 m2 10.53 95 10.00 13,500 135,047
34 As. F / 7 K23 m2 10.53 - 13,500 -
35 As. F / 8 K23 m2 10.53 - 13,500 -
36 As. F / 9 K22 m2 10.53 - 13,500 -
37 As. F / 10 KB3 m2 12.83 - 13,500 -
38 As. F / 11 KB3 m2 12.83 - 13,500 -
39 As. F / 13 K16 m2 10.53 - 13,500 -

40 As. G / 1 KB1 m2 14.85 75 11.14 13,500 150,356


41 As. G / 3 K13 m2 11.70 75 8.78 13,500 118,463
42 As. G / 4 K14 m2 10.53 75 7.90 13,500 106,616
43 As. G / 5 K15 m2 10.53 75 7.90 13,500 106,616
44 As. G / 7 K15 m2 10.53 75 7.90 13,500 106,616
45 As. G / 8 K16 m2 10.53 - 13,500 -
46 As. G / 9 K16 m2 10.53 - 13,500 -
47 As. G / 10 K17 m2 10.53 40 4.21 13,500 56,862
48 As. G / 11 K10 m2 10.53 40 4.21 13,500 56,862
49 As. G / 13 K10 m2 10.53 40 4.21 13,500 56,862
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 005
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 001-R1/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Expose
Lantai : Lower Ground

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 005
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 001-R1/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Expose
Lantai : Lower Ground

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)
50 As. H / 1 KB2 m2 11.70 - 13,500 -
51 As. H / 3 K7 m2 10.53 - 13,500 -
52 As. H / 4 K8 m2 10.53 95 10.00 13,500 135,047
53 As. H / 5 K8 m2 10.53 95 10.00 13,500 135,047
54 As. H / 6 K9 m2 10.53 95 10.00 13,500 135,047
55 As. H / 8 K18 m2 11.70 - 13,500 -
56 As. H / 9 K11 m2 11.70 - 13,500 -
57 As. H / 10 K11 m2 11.70 - 13,500 -
58 As. H / 11 K10 m2 11.70 - 13,500 -
59 As. H / 13 K12 m2 10.53 - 13,500 -
60 As. H / 1 KB3 m2 12.83 - 13,500 -

61 As. I / 1 K6 m2 10.53 90 9.48 13,500 127,940


62 As. I / 13 K6 m2 10.53 90 9.48 13,500 127,940

63 As. J / 2 K1 m2 10.53 90 9.48 13,500 127,940


64 As. J / 3 K1 m2 10.53 90 9.48 13,500 127,940
65 As. J / 4 K2 m2 11.70 90 10.53 13,500 142,155
66 As. J / 5 K3 m2 11.70 90 10.53 13,500 142,155
67 As. J / 7 K2 m2 11.70 90 10.53 13,500 142,155
68 As. J / 8 K4 m2 11.70 90 10.53 13,500 142,155
69 As. J / 9 K5 m2 11.70 90 10.53 13,500 142,155
70 As. J / 10 K5 m2 11.70 90 10.53 13,500 142,155
71 As. J / 11 K6 m2 10.53 - 13,500 -
72 As. J / 12 K6 m2 10.53 - 13,500 -

RAMP ( Kolom Ramp Dalam )

73 As. 10 / D' CR9 m2 10.87 100 10.87 13,500 146,711


74 As. 7' / C' CR11 m2 9.92 100 9.92 13,500 133,954
75 As. 7' / B' CR3 m2 9.11 100 9.11 13,500 123,019
76 As. 9' / A CR6 m2 12.15 90 10.94 13,500 147,623
77 As. 9'' / A CR6 m2 12.15 90 10.94 13,500 147,623
78 As. 10' / B' CR7 m2 10.80 90 9.72 13,500 131,220
79 As. 10' / C' CR7 m2 10.80 90 9.72 13,500 131,220
80 As. 10 / C' CR8 m2 12.15 90 10.94 13,500 147,623
81 As. 9' / D CR1 m2 12.83 90 11.54 13,500 155,824
82 As. 8'' / D' CR2 m2 12.15 90 10.94 13,500 147,623
83 As. 8' / D' CR2 m2 12.15 90 10.94 13,500 147,623
84 As. 8' / C CR2 m2 12.15 90 10.94 13,500 147,623
85 As. 8' / A-B CR5 m2 12.15 90 10.94 13,500 147,623

TOTAL 7,505,480.25
Pelaksana :
Jakarta, 26 Desember 2015
Kepala Tukang Costing, Site Manager, Project Manager

UNYIL PRAMA Damanik WELLY KURNIAWAN


Kepala Tukang Costing Site Manager Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

RISALAH PEMBAYARAN KEPALA TUKANG


No. DOM : 005
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 001-R1/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Expose
Lantai : Lower Ground

NO URAIAN JUMLAH (RP)

A NILAI SPK 12,575,553.75

B PROGRESS AKUMULATIF S/D SAAT INI 7,505,480.25

C RETENSI 5 % (375,274.01)

D PEMBAYARAN AKUMULATIF S/D SAAT INI (B-C) 7,130,206.24

E PEMBAYARAN AKUMULATIF SEBELUMNYA (6,606,349.88)

F PEMBAYARAN SAAT INI (D-E) 523,856.36

G DIBULATKAN 523,000.00

TERBILANG Lima Ratus Dua Puluh Tiga Ribu Rupiah

Jakarta, 26 Desember 2015


Kepala Tukang Costing, Project Manager

UNYIL PRAMA WELLY KURNIAWAN


Kepala Tukang Costing Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 005
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 002-R1/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Expose
Lantai : Lower Ground

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)

Expose

Kepala Kolom ( Ukuran )


1 As. A / 6' K29 0.7 x 0.8 unit 1.00 - 80,000 -
2 As. A / 8 K29 0.7 x 0.8 unit 1.00 - 80,000 -

3 As. A / 2 K27 0.9 x 0.9 unit 1.00 95 0.95 80,000 76,000


4 As. A / 3 K27 0.9 x 0.9 unit 1.00 95 0.95 80,000 76,000
5 As. A / 4 K28 0.9 x 0.9 unit 1.00 95 0.95 80,000 76,000
6 As. A / 5 K26 0.9 x 0.9 unit 1.00 95 0.95 80,000 76,000
7 As. A / 6 K28 0.9 x 0.9 unit 1.00 - 80,000 -

8 As. B / 1 K27 0.9 x 0.9 unit 1.00 95 0.95 80,000 76,000

9 As. C / 1 K27 0.9 x 0.9 unit 1.00 95 0.95 80,000 76,000


10 As. C / 3 K14 0.9 x 0.9 unit 1.00 95 0.95 80,000 76,000
11 As. C / 4 K15 0.9 x 0.9 unit 1.00 95 0.95 80,000 76,000
12 As. C / 5 K26 0.9 x 0.9 unit 1.00 95 0.95 80,000 76,000
13 As. C / 6 K26 0.9 x 0.9 unit 1.00 95 0.95 80,000 76,000
14 As. C / 7' K28 0.9 x 0.9 unit 1.00 - 80,000 -

15 As. D / 1 K23 0.9 x 0.9 unit 1.00 95 0.95 80,000 76,000


16 As. D / 3 K24 0.9 x 0.9 unit 1.00 95 0.95 80,000 76,000
17 As. D / 4 K15 0.9 x 0.9 unit 1.00 95 0.95 80,000 76,000
18 As. D / 5 K26 0.9 x 0.9 unit 1.00 95 0.95 80,000 76,000
19 As. D / 6 K26 0.9 x 0.9 unit 1.00 95 0.95 80,000 76,000
20 As. D / 7' K28 0.9 x 0.9 unit 1.00 - 80,000 -

21 As. E / 1 K23 0.9 x 0.9 unit 1.00 95 0.95 80,000 76,000


22 As. E / 3 K24 0.9 x 0.9 unit 1.00 95 0.95 80,000 76,000
23 As. E / 4 K15 0.9 x 0.9 unit 1.00 95 0.95 80,000 76,000
24 As. E / 5 K16 0.9 x 0.9 unit 1.00 95 0.95 80,000 76,000
25 As. E / 7 K23 0.9 x 0.9 unit 1.00 - 80,000 -
26 As. E / 8 K25 0.7 x 0.8 unit 1.00 - 80,000 -
27 As. E / 9 K25 0.7 x 0.8 unit 1.00 - 80,000 -

28 As. E' / 10 KB3 1.5 x 0.4 unit 1.00 - 80,000 -


29 As. E' / 11 KB3 0.4 x 1.5 unit 1.00 - 80,000 -

30 As. F / 1 K19 1 x 1 unit 1.00 95 0.95 80,000 76,000


31 As. F / 3 K20 0.9 x 0.9 unit 1.00 95 0.95 80,000 76,000
32 As. F / 4 K21 0.9 x 0.9 unit 1.00 95 0.95 80,000 76,000
33 As. F / 5 K22 0.9 x 0.9 unit 1.00 95 0.95 80,000 76,000
34 As. F / 7 K23 0.9 x 0.9 unit 1.00 95 0.95 80,000 76,000
35 As. F / 8 K23 0.9 x 0.9 unit 1.00 95 0.95 80,000 76,000
36 As. F / 9 K22 0.9 x 0.9 unit 1.00 - 80,000 -
37 As. F / 10 KB3 0.4 x 1.5 unit 1.00 - 80,000 -
38 As. F / 11 KB3 0.4 x 1.5 unit 1.00 - 80,000 -
39 As. F / 13 K16 0.9 x 0.9 unit 1.00 - 80,000 -

40 As. G / 1 KB1 1.5 x 0.7 unit 1.00 - 80,000 -


41 As. G / 3 K13 1 x 1 unit 1.00 - 80,000 -
42 As. G / 4 K14 0.9 x 0.9 unit 1.00 90 0.90 80,000 72,000
43 As. G / 5 K15 0.9 x 0.9 unit 1.00 90 0.90 80,000 72,000
44 As. G / 7 K15 0.9 x 0.9 unit 1.00 90 0.90 80,000 72,000
45 As. G / 8 K16 0.9 x 0.9 unit 1.00 90 0.90 80,000 72,000
46 As. G / 9 K16 0.9 x 0.9 unit 1.00 90 0.90 80,000 72,000
47 As. G / 10 K17 0.9 x 0.9 unit 1.00 - 80,000 -
48 As. G / 11 K10 0.9 x 0.9 unit 1.00 - 80,000 -
49 As. G / 13 K10 0.9 x 0.9 unit 1.00 - 80,000 -
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 005
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 002-R1/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Expose
Lantai : Lower Ground

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 005
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 002-R1/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Expose
Lantai : Lower Ground

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)
50 As. H / 1 KB2 0.5 x 1.5 unit 1.00 - 80,000 -
51 As. H / 3 K7 0.9 x 0.9 unit 1.00 - 80,000 -
52 As. H / 4 K8 0.9 x 0.9 unit 1.00 90 0.90 80,000 72,000
53 As. H / 5 K8 0.9 x 0.9 unit 1.00 90 0.90 80,000 72,000
54 As. H / 6 K9 0.9 x 0.9 unit 1.00 90 0.90 80,000 72,000
55 As. H / 8 K18 1 x 1 unit 1.00 - 80,000 -
56 As. H / 9 K11 1 x 1 unit 1.00 - 80,000 -
57 As. H / 10 K11 1 x 1 unit 1.00 - 80,000 -
58 As. H / 11 K10 1 x 1 unit 1.00 - 80,000 -
59 As. H / 13 K12 0.9 x 0.9 unit 1.00 - 80,000 -
60 As. H / 1 KB3 1.5 x 0.4 unit 1.00 - 80,000 -

61 As. I / 1 K6 0.9 x 0.9 unit 1.00 90 0.90 80,000 72,000


62 As. I / 13 K6 0.9 x 0.9 unit 1.00 90 0.90 80,000 72,000

63 As. J / 2 K1 0.9 x 0.9 unit 1.00 95 0.95 80,000 76,000


64 As. J / 3 K1 0.9 x 0.9 unit 1.00 95 0.95 80,000 76,000
65 As. J / 4 K2 1 x 1 unit 1.00 95 0.95 80,000 76,000
66 As. J / 5 K3 1 x 1 unit 1.00 95 0.95 80,000 76,000
67 As. J / 7 K2 1 x 1 unit 1.00 95 0.95 80,000 76,000
68 As. J / 8 K4 1 x 1 unit 1.00 95 0.95 80,000 76,000
69 As. J / 9 K5 1 x 1 unit 1.00 95 0.95 80,000 76,000
70 As. J / 10 K5 1 x 1 unit 1.00 - 80,000 -
71 As. J / 11 K6 0.9 x 0.9 unit 1.00 - 80,000 -
72 As. J / 12 K6 0.9 x 0.9 unit 1.00 - 80,000 -

RAMP ( Kolom Ramp Dalam )

73 As. 9' / A CR6 0.6 x 1.2 unit 1.00 90 0.90 80,000 72,000
74 As. 9'' / A CR6 0.6 x 1.2 unit 1.00 90 0.90 80,000 72,000
75 As. 10' / B' CR7 0.6 x 1 unit 1.00 90 0.90 80,000 72,000
76 As. 10' / C' CR7 0.6 x 1 unit 1.00 90 0.90 80,000 72,000
77 As. 10 / C' CR8 0.6 x 1.2 unit 1.00 90 0.90 80,000 72,000
78 As. 9' / D CR1 0.7 x 1.2 unit 1.00 90 0.90 80,000 72,000
79 As. 8'' / D' CR2 0.6 x 1.2 unit 1.00 90 0.90 80,000 72,000
80 As. 8' / D' CR2 0.6 x 1.2 unit 1.00 90 0.90 80,000 72,000
81 As. 8' / C CR2 0.6 x 1.2 unit 1.00 90 0.90 80,000 72,000
82 As. 8' / A-B CR5 0.6 x 1.2 unit 1.00 90 0.90 80,000 72,000

TOTAL 3,872,000.00
Pelaksana :
Jakarta, 26 Desember 2015
Kepala Tukang Costing, Site Manager, Project Manager

UNYIL PRAMA Damanik WELLY KURNIAWAN


Kepala Tukang Costing Site Manager Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

RISALAH PEMBAYARAN KEPALA TUKANG


No. DOM : 005
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 002-R1/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Expose
Lantai : Lower Ground

NO URAIAN JUMLAH (RP)

A NILAI SPK 6,560,000.00

B PROGRESS AKUMULATIF S/D SAAT INI 3,872,000.00

C RETENSI 5 % (193,600.00)

D PEMBAYARAN AKUMULATIF S/D SAAT INI (B-C) 3,678,400.00

E PEMBAYARAN AKUMULATIF SEBELUMNYA (3,465,600.00)

F PEMBAYARAN SAAT INI (D-E) 212,800.00

G DIBULATKAN 212,000.00

TERBILANG Dua Ratus Dua Belas Ribu Rupiah

Jakarta, 26 Desember 2015


Kepala Tukang Costing, Project Manager

UNYIL PRAMA WELLY KURNIAWAN


Kepala Tukang Costing Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 005
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 003-R1/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Scaffolding
Lantai : Lower Ground

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)

Scaffolding

Pasang+bongkar Scaffolding untuk Expose pada Kolom


( 1 unit kolom 1 set Scaffolding )
1 As. A / 6' K29 unit 1.00 - - 6,000 -
2 As. A / 8 K29 unit 1.00 - - 6,000 -

3 As. A / 2 K27 unit 1.00 95 0.95 6,000 5,700


4 As. A / 3 K27 unit 1.00 95 0.95 6,000 5,700
5 As. A / 4 K28 unit 1.00 95 0.95 6,000 5,700
6 As. A / 5 K26 unit 1.00 95 0.95 6,000 5,700
7 As. A / 6 K28 unit 1.00 - - 6,000 -

8 As. B / 1 K27 unit 1.00 95 0.95 6,000 5,700

9 As. C / 1 K27 unit 1.00 95 0.95 6,000 5,700


10 As. C / 3 K14 unit 1.00 95 0.95 6,000 5,700
11 As. C / 4 K15 unit 1.00 95 0.95 6,000 5,700
12 As. C / 5 K26 unit 1.00 95 0.95 6,000 5,700
13 As. C / 6 K26 unit 1.00 95 0.95 6,000 5,700
14 As. C / 7' K28 unit 1.00 - - 6,000 -

15 As. D / 1 K23 unit 1.00 95 0.95 6,000 5,700


16 As. D / 3 K24 unit 1.00 95 0.95 6,000 5,700
17 As. D / 4 K15 unit 1.00 95 0.95 6,000 5,700
18 As. D / 5 K26 unit 1.00 95 0.95 6,000 5,700
19 As. D / 6 K26 unit 1.00 95 0.95 6,000 5,700
20 As. D / 7' K28 unit 1.00 - - 6,000 -

21 As. E / 1 K23 unit 1.00 95 0.95 6,000 5,700


22 As. E / 3 K24 unit 1.00 95 0.95 6,000 5,700
23 As. E / 4 K15 unit 1.00 95 0.95 6,000 5,700
24 As. E / 5 K16 unit 1.00 95 0.95 6,000 5,700
25 As. E / 7 K23 unit 1.00 - - 6,000 -
26 As. E / 8 K25 unit 1.00 - - 6,000 -
27 As. E / 9 K25 unit 1.00 - - 6,000 -

28 As. E' / 10 KB3 unit 1.00 - - 6,000 -


29 As. E' / 11 KB3 unit 1.00 - - 6,000 -

30 As. F / 1 K19 unit 1.00 95 0.95 6,000 5,700


31 As. F / 3 K20 unit 1.00 95 0.95 6,000 5,700
32 As. F / 4 K21 unit 1.00 95 0.95 6,000 5,700
33 As. F / 5 K22 unit 1.00 95 0.95 6,000 5,700
34 As. F / 7 K23 unit 1.00 - - 6,000 -
35 As. F / 8 K23 unit 1.00 - - 6,000 -
36 As. F / 9 K22 unit 1.00 - - 6,000 -
37 As. F / 10 KB3 unit 1.00 - - 6,000 -
38 As. F / 11 KB3 unit 1.00 - - 6,000 -
39 As. F / 13 K16 unit 1.00 - - 6,000 -

40 As. G / 1 KB1 unit 1.00 80 0.80 6,000 4,800


41 As. G / 3 K13 unit 1.00 80 0.80 6,000 4,800
42 As. G / 4 K14 unit 1.00 80 0.80 6,000 4,800
43 As. G / 5 K15 unit 1.00 80 0.80 6,000 4,800
44 As. G / 7 K15 unit 1.00 80 0.80 6,000 4,800
45 As. G / 8 K16 unit 1.00 - - 6,000 -
46 As. G / 9 K16 unit 1.00 - - 6,000 -
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 005
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 003-R1/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Scaffolding
Lantai : Lower Ground

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)
47 As. G / 10 K17 unit 1.00 80 0.80 6,000 4,800
48 As. G / 11 K10 unit 1.00 80 0.80 6,000 4,800
49 As. G / 13 K10 unit 1.00 80 0.80 6,000 4,800
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 005
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 003-R1/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Scaffolding
Lantai : Lower Ground

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 005
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 003-R1/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Scaffolding
Lantai : Lower Ground

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)
50 As. H / 1 KB2 unit 1.00 - - 6,000 -
51 As. H / 3 K7 unit 1.00 - - 6,000 -
52 As. H / 4 K8 unit 1.00 95 0.95 6,000 5,700
53 As. H / 5 K8 unit 1.00 95 0.95 6,000 5,700
54 As. H / 6 K9 unit 1.00 95 0.95 6,000 5,700
55 As. H / 8 K18 unit 1.00 - - 6,000 -
56 As. H / 9 K11 unit 1.00 - - 6,000 -
57 As. H / 10 K11 unit 1.00 - - 6,000 -
58 As. H / 11 K10 unit 1.00 - - 6,000 -
59 As. H / 13 K12 unit 1.00 - - 6,000 -
60 As. H / 1 KB3 unit 1.00 - - 6,000 -

61 As. I / 1 K6 unit 1.00 80 0.80 6,000 4,800


62 As. I / 13 K6 unit 1.00 80 0.80 6,000 4,800

63 As. J / 2 K1 unit 1.00 90 0.90 6,000 5,400


64 As. J / 3 K1 unit 1.00 90 0.90 6,000 5,400
65 As. J / 4 K2 unit 1.00 90 0.90 6,000 5,400
66 As. J / 5 K3 unit 1.00 90 0.90 6,000 5,400
67 As. J / 7 K2 unit 1.00 90 0.90 6,000 5,400
68 As. J / 8 K4 unit 1.00 90 0.90 6,000 5,400
69 As. J / 9 K5 unit 1.00 90 0.90 6,000 5,400
70 As. J / 10 K5 unit 1.00 90 0.90 6,000 5,400
71 As. J / 11 K6 unit 1.00 - - 6,000 -
72 As. J / 12 K6 unit 1.00 - - 6,000 -

RAMP ( Kolom Ramp Dalam )

73 As. 10 / D' CR9 unit 0.70 100 0.70 6,000 4,200


74 As. 7' / C' CR11 unit 0.70 100 0.70 6,000 4,200
75 As. 7' / B' CR3 unit 0.75 100 0.75 6,000 4,500
76 As. 9' / A CR6 unit 1.00 90 0.90 6,000 5,400
77 As. 9'' / A CR6 unit 1.00 90 0.90 6,000 5,400
78 As. 10' / B' CR7 unit 1.00 90 0.90 6,000 5,400
79 As. 10' / C' CR7 unit 1.00 90 0.90 6,000 5,400
80 As. 10 / C' CR8 unit 1.00 90 0.90 6,000 5,400
81 As. 9' / D CR1 unit 1.00 90 0.90 6,000 5,400
82 As. 8'' / D' CR2 unit 1.00 90 0.90 6,000 5,400
83 As. 8' / D' CR2 unit 1.00 90 0.90 6,000 5,400
84 As. 8' / C CR2 unit 1.00 90 0.90 6,000 5,400
85 As. 8' / A-B CR5 unit 1.00 90 0.90 6,000 5,400

TOTAL 306,300.00
Pelaksana :
Jakarta, 26 Desember 2015
Kepala Tukang Costing, Site Manager, Project Manager

UNYIL PRAMA Damanik WELLY KURNIAWAN


Kepala Tukang Costing Site Manager Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

RISALAH PEMBAYARAN KEPALA TUKANG


No. DOM : 005
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 003-R1/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Scaffolding
Lantai : Lower Ground

NO URAIAN JUMLAH (RP)

A NILAI SPK 504,900.00

B PROGRESS AKUMULATIF S/D SAAT INI 306,300.00

C RETENSI 5 % (15,315.00)

D PEMBAYARAN AKUMULATIF S/D SAAT INI (B-C) 290,985.00

E PEMBAYARAN AKUMULATIF SEBELUMNYA (273,030.00)

F PEMBAYARAN SAAT INI (D-E) 17,955.00

G DIBULATKAN 17,000.00

TERBILANG Tujuh Belas Ribu Rupiah

Jakarta, 26 Desember 2015


Kepala Tukang Costing, Project Manager

UNYIL PRAMA WELLY KURNIAWAN


Kepala Tukang Costing Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 005
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 004/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Scaffolding
Lantai : Lower Ground

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)

Scaffolding

Jembatan Kerja Pek Kolom

1 As. A / 6' K29 m' 1.50 - - 1,500 -


2 As. A / 8 K29 m' 1.50 - - 1,500 -

3 As. A / 2 K27 m' 1.50 95 1.43 1,500 2,138


4 As. A / 3 K27 m' 1.50 95 1.43 1,500 2,138
5 As. A / 4 K28 m' 1.50 95 1.43 1,500 2,138
6 As. A / 5 K26 m' 1.50 95 1.43 1,500 2,138
7 As. A / 6 K28 m' 1.50 - - 1,500 -

8 As. B / 1 K27 m' 1.50 95 1.43 1,500 2,138

9 As. C / 1 K27 m' 1.50 95 1.43 1,500 2,138


10 As. C / 3 K14 m' 1.50 95 1.43 1,500 2,138
11 As. C / 4 K15 m' 1.50 95 1.43 1,500 2,138
12 As. C / 5 K26 m' 1.50 95 1.43 1,500 2,138
13 As. C / 6 K26 m' 1.50 95 1.43 1,500 2,138
14 As. C / 7' K28 m' 1.50 - - 1,500 -

15 As. D / 1 K23 m' 1.50 95 1.43 1,500 2,138


16 As. D / 3 K24 m' 1.50 95 1.43 1,500 2,138
17 As. D / 4 K15 m' 1.50 95 1.43 1,500 2,138
18 As. D / 5 K26 m' 1.50 95 1.43 1,500 2,138
19 As. D / 6 K26 m' 1.50 95 1.43 1,500 2,138
20 As. D / 7' K28 m' 1.50 - - 1,500 -

21 As. E / 1 K23 m' 1.50 95 1.43 1,500 2,138


22 As. E / 3 K24 m' 1.50 95 1.43 1,500 2,138
23 As. E / 4 K15 m' 1.50 95 1.43 1,500 2,138
24 As. E / 5 K16 m' 1.50 95 1.43 1,500 2,138
25 As. E / 7 K23 m' 1.50 - - 1,500 -
26 As. E / 8 K25 m' 1.50 - - 1,500 -
27 As. E / 9 K25 m' 1.50 - - 1,500 -

28 As. E' / 10 KB3 m' 1.50 - - 1,500 -


29 As. E' / 11 KB3 m' 1.50 - - 1,500 -

30 As. F / 1 K19 m' 1.50 95 1.43 1,500 2,138


31 As. F / 3 K20 m' 1.50 95 1.43 1,500 2,138
32 As. F / 4 K21 m' 1.50 95 1.43 1,500 2,138
33 As. F / 5 K22 m' 1.50 95 1.43 1,500 2,138
34 As. F / 7 K23 m' 1.50 - - 1,500 -
35 As. F / 8 K23 m' 1.50 - - 1,500 -
36 As. F / 9 K22 m' 1.50 - - 1,500 -
37 As. F / 10 KB3 m' 1.50 - - 1,500 -
38 As. F / 11 KB3 m' 1.50 - - 1,500 -
39 As. F / 13 K16 m' 1.50 - - 1,500 -

40 As. G / 1 KB1 m' 1.50 90 1.35 1,500 2,025


41 As. G / 3 K13 m' 1.50 90 1.35 1,500 2,025
42 As. G / 4 K14 m' 1.50 90 1.35 1,500 2,025
43 As. G / 5 K15 m' 1.50 90 1.35 1,500 2,025
44 As. G / 7 K15 m' 1.50 90 1.35 1,500 2,025
45 As. G / 8 K16 m' 1.50 - - 1,500 -
46 As. G / 9 K16 m' 1.50 - - 1,500 -
47 As. G / 10 K17 m' 1.50 90 1.35 1,500 2,025
48 As. G / 11 K10 m' 1.50 90 1.35 1,500 2,025
49 As. G / 13 K10 m' 1.50 90 1.35 1,500 2,025
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 005
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 004/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Scaffolding
Lantai : Lower Ground

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 005
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 004/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Scaffolding
Lantai : Lower Ground

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)
50 As. H / 1 KB2 m' 1.50 - - 1,500 -
51 As. H / 3 K7 m' 1.50 - - 1,500 -
52 As. H / 4 K8 m' 1.50 95 1.43 1,500 2,138
53 As. H / 5 K8 m' 1.50 95 1.43 1,500 2,138
54 As. H / 6 K9 m' 1.50 95 1.43 1,500 2,138
55 As. H / 8 K18 m' 1.50 - - 1,500 -
56 As. H / 9 K11 m' 1.50 - - 1,500 -
57 As. H / 10 K11 m' 1.50 - - 1,500 -
58 As. H / 11 K10 m' 1.50 - - 1,500 -
59 As. H / 13 K12 m' 1.50 - - 1,500 -
60 As. H / 1 KB3 m' 1.50 - - 1,500 -

61 As. I / 1 K6 m' 1.50 90 1.35 1,500 2,025


62 As. I / 13 K6 m' 1.50 90 1.35 1,500 2,025

63 As. J / 2 K1 m' 1.50 90 1.35 1,500 2,025


64 As. J / 3 K1 m' 1.50 90 1.35 1,500 2,025
65 As. J / 4 K2 m' 1.50 90 1.35 1,500 2,025
66 As. J / 5 K3 m' 1.50 90 1.35 1,500 2,025
67 As. J / 7 K2 m' 1.50 90 1.35 1,500 2,025
68 As. J / 8 K4 m' 1.50 90 1.35 1,500 2,025
69 As. J / 9 K5 m' 1.50 90 1.35 1,500 2,025
70 As. J / 10 K5 m' 1.50 90 1.35 1,500 2,025
71 As. J / 11 K6 m' 1.50 - - 1,500 -
72 As. J / 12 K6 m' 1.50 - - 1,500 -

RAMP ( Kolom Ramp Dalam )

73 As. 10 / D' CR9 m' 1.05 100 1.05 1,500 1,575


74 As. 7' / C' CR11 m' 1.05 100 1.05 1,500 1,575
75 As. 7' / B' CR3 m' 1.13 100 1.13 1,500 1,688
76 As. 9' / A CR6 m' 1.50 90 1.35 1,500 2,025
77 As. 9'' / A CR6 m' 1.50 90 1.35 1,500 2,025
78 As. 10' / B' CR7 m' 1.50 90 1.35 1,500 2,025
79 As. 10' / C' CR7 m' 1.50 90 1.35 1,500 2,025
80 As. 10 / C' CR8 m' 1.50 90 1.35 1,500 2,025
81 As. 9' / D CR1 m' 1.50 90 1.35 1,500 2,025
82 As. 8'' / D' CR2 m' 1.50 90 1.35 1,500 2,025
83 As. 8' / D' CR2 m' 1.50 90 1.35 1,500 2,025
84 As. 8' / C CR2 m' 1.50 90 1.35 1,500 2,025
85 As. 8' / A-B CR5 m' 1.50 90 1.35 1,500 2,025

TOTAL 117,112.50
Pelaksana :
Jakarta, 26 Desember 2015
Kepala Tukang Costing, Site Manager, Project Manager

UNYIL PRAMA Damanik WELLY KURNIAWAN


Kepala Tukang Costing Site Manager Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

RISALAH PEMBAYARAN KEPALA TUKANG


No. DOM : 005
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 004/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Scaffolding
Lantai : Lower Ground

NO URAIAN JUMLAH (RP)

A NILAI SPK 189,337.50

B PROGRESS AKUMULATIF S/D SAAT INI 117,112.50

C RETENSI 5 % (5,855.63)

D PEMBAYARAN AKUMULATIF S/D SAAT INI (B-C) 111,256.88

E PEMBAYARAN AKUMULATIF SEBELUMNYA (101,745.00)

F PEMBAYARAN SAAT INI (D-E) 9,511.88

G DIBULATKAN 9,000.00

TERBILANG Sembilan Ribu Rupiah

Jakarta, 26 Desember 2015


Kepala Tukang Costing, Project Manager

UNYIL PRAMA WELLY KURNIAWAN


Kepala Tukang Costing Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

SURAT PERINTAH KERJA

No. SPK : 005/UNYL/FNS/P.1501/MAK/2015


Nama Kepala Tukan : UNYIL
Jenis Pekerjaan : Grouting
Lantai : Lower Ground

INDIVIDU
HARGA
NO JENIS PEKERJAAN SAT VOL SPK NILAI SPK
SATUAN
SEKARANG
( Rp ) ( Rp )

Grouting

Grouting Dinding Retwall


1 As. 1 - B ( Diagonal ) titik 40.00 2,000 80,000

TOTAL 80,000.00

Menyetujui, Jakarta, 8 Agustus 2015

UNYIL WELLY KURNIAWAN


Kepala Tukang Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 001
Periode : 3 September 2015 - 16 September 2015
No. SPK : 005/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Grouting
Lantai : Lower Ground

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)

Grouting

Grouting Dinding Retwall


1 As. 1 - B ( Diagonal ) titik 40.00 100 40.00 2,000 80,000

TOTAL 80,000.00
Pelaksana :
Jakarta, 8 Agustus 2015
Kepala Tukang Costing, Site Manager, Project Manager

UNYIL PRAMA Damanik WELLY KURNIAWAN


Kepala Tukang Costing Site Manager Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

RISALAH PEMBAYARAN KEPALA TUKANG


No. DOM : 001
Periode : 3 September 2015 - 16 September 2015
No. SPK : 005/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Grouting
Lantai : Lower Ground

NO URAIAN JUMLAH (RP)

A NILAI SPK 80,000.00

B PROGRESS AKUMULATIF S/D SAAT INI 80,000.00

C RETENSI 5 % (4,000.00)

D PEMBAYARAN AKUMULATIF S/D SAAT INI (B-C) 76,000.00

E PEMBAYARAN AKUMULATIF SEBELUMNYA

F PEMBAYARAN SAAT INI (D-E) 76,000.00

G DIBULATKAN 76,000.00

TERBILANG Tujuh Puluh Enam Ribu Rupiah

Jakarta, 8 Agustus 2015


Kepala Tukang Costing, Project Manager

UNYIL PRAMA WELLY KURNIAWAN


Kepala Tukang Costing Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

SURAT PERINTAH KERJA

No. SPK : 006/UNYL/FNS/P.1501/MAK/2015


Nama Kepala Tukan : UNYIL
Jenis Pekerjaan : Finishing
Lantai : Lower Ground

INDIVIDU
HARGA
NO JENIS PEKERJAAN SAT VOL SPK NILAI SPK
SATUAN
SEKARANG
( Rp ) ( Rp )

Finishing

Grouting Dinding Retwall


1 As. 8-10/A' titik 53.00 2,000 106,000

Plester Dindig RetWall


2 As. 11/G-H ( Dinding GWT ) karena Dinding Menggelembung m2 17.20 14,000 240,800
3 As. 8'/A' ( sambungan Dinding ) m' 4.30 14,000 60,200
4 Kolom As. 5/H, 5/J, 8/J m2 43.20 14,000 604,800
5 Dinding Ramp As. 8-10/A' m2 43.20 14,000 604,800
6 Kepala kolom As. 9/A', 10/A' m2 2.88 14,000 40,320

7 Plester kamprot bekas bobokan dinding RetWall As. 11/G-H ls 1.00 300,000 300,000
2org, 08-16, 2hari

8 - Pasang bongkar scaffolding inc catwalk untuk pekerjaan m2 27.36 6,000 164,160
plester dinding RetWall as. 11/G-H

TOTAL 2,121,080.00

Menyetujui, Jakarta, 17 Oktober 2015

UNYIL WELLY KURNIAWAN


Kepala Tukang Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 001
Periode : 3 September 2015 - 16 September 2015
No. SPK : 006/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Finishing
Lantai : Lower Ground

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)

Finishing

Grouting Dinding Retwall


1 As. 8-10/A' titik 53.00 100 53.00 2,000 106,000

Plester Dindig RetWall


2 As. 11/G-H ( Dinding GWT ) karena Dinding Menggelembung m2 17.20 100 17.20 14,000 240,800
3 As. 8'/A' ( sambungan Dinding ) m' 4.30 100 4.30 14,000 60,200
4 Kolom As. 5/H, 5/J, 8/J m2 43.20 100 43.20 14,000 604,800
5 Dinding Ramp As. 8-10/A' m2 43.20 100 43.20 14,000 604,800
6 Kepala kolom As. 9/A', 10/A' m2 2.88 100 2.88 14,000 40,320

7 Plester kamprot bekas bobokan dinding RetWall As. 11/G-H ls 1.00 100 1.00 300,000 300,000
2org, 08-16, 2hari

8 - Pasang bongkar scaffolding inc catwalk untuk pekerjaan m2 27.36 100 27.36 6,000 164,160
plester dinding RetWall as. 11/G-H

TOTAL 2,121,080.00
Pelaksana :
Jakarta, 17 Oktober 2015
Kepala Tukang Costing, Site Manager, Project Manager

UNYIL PRAMA Damanik WELLY KURNIAWAN


Kepala Tukang Costing Site Manager Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

RISALAH PEMBAYARAN KEPALA TUKANG


No. DOM : 001
Periode : 3 September 2015 - 16 September 2015
No. SPK : 006/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Finishing
Lantai : Lower Ground

NO URAIAN JUMLAH (RP)

A NILAI SPK 2,121,080.00

B PROGRESS AKUMULATIF S/D SAAT INI 2,121,080.00

C RETENSI 5 % (106,054.00)

D PEMBAYARAN AKUMULATIF S/D SAAT INI (B-C) 2,015,026.00

E PEMBAYARAN AKUMULATIF SEBELUMNYA

F PEMBAYARAN SAAT INI (D-E) 2,015,026.00

G DIBULATKAN 2,015,000.00

TERBILANG Dua Juta Lima Belas Ribu Rupiah

Jakarta, 17 Oktober 2015


Kepala Tukang Costing, Project Manager

UNYIL PRAMA WELLY KURNIAWAN


Kepala Tukang Costing Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

SURAT PERINTAH KERJA

No. SPK : 007/UNYL/FNS/P.1501/MAK/2015


Nama Kepala Tukan : UNYIL
Jenis Pekerjaan : Potong Mandor
Lantai : Lower Ground

INDIVIDU
HARGA
NO JENIS PEKERJAAN SAT VOL SPK NILAI SPK
SATUAN
SEKARANG
( Rp ) ( Rp )

Potong Retensi Maskuri

1 Bobok sambungan kolom Ramp Turun Lt. LG karena ngeplin m2 14.05 15,000 210,750
CR3 As. 8/B', CR11 As. 8/C', CR2 As. 8'/C', CR10 As. 8'/D'
As. 8''/C', CR1 As. 9'/C', CR9 As. 9'/D'

2 Plester + Aci Kolom Ramp Turun Lt. LG karena tidak lot, m2 84.30 19,500 1,643,850
CR3 As. 8/B', CR11 As. 8/C', CR2 As. 8'/C', CR10 As. 8'/D'
As. 8''/C', CR1 As. 9'/C', CR9 As. 9'/D'

3 Cipping dan concrete fill kolom Ramp Turun Lt. LG, m2 84.30 5,000 421,500
CR3 As. 8/B', CR11 As. 8/C', CR2 As. 8'/C', CR10 As. 8'/D'
As. 8''/C', CR1 As. 9'/C', CR9 As. 9'/D'

4 Perapihan kropos kepala kolom Ramp Naik Lt. LG, CR5 As. 8'/A-B unit 3.00 45,000 135,000
CR2 As. 8'/B', CR7 As. 8'/B ( 3 kepala kolom )

5 - Plester balok Ramp Naik Lt. LG, G8 As. 9/A, G8 As. 10/C' m2 84.30 11,500 969,450
- Plester kolom GF1, As. 4/D-E, 8/G m2 32.40 11,500 372,600
- Aci kolom GF1, As. 4/D-E, 8/G m2 32.40 10,000 324,000

6 Pembersihan serbuk gergaji area Balok Ramp Naik Lt. LG m2 9.12 5,000 45,600
As. 9/A, 10/C'

7 Cipping + concrete fill, plester kolom Lt. GF1, As. 4/D, 4/E, 8/G m2 35.00 18,500 647,500

8 Bongkar bekisting kepala kolom Lt. GF1, As. 3-5/A-F, 1/D-F unit 13.00 10,000 130,000

9 Bobok kepala kolom Lt. GF1, As. 3-5/A-F, 1/D-F unit 13.00 35,000 455,000

TOTAL 5,355,250.00

Menyetujui, Jakarta, 31 Oktober 2015

UNYIL WELLY KURNIAWAN


Kepala Tukang Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 001
Periode : 15 Oktober 2015 - 28 Oktober 2015
No. SPK : 007/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Potong Mandor
Lantai : Lower Ground

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)

Potong Retensi Maskuri

1 Bobok sambungan kolom Ramp Turun Lt. LG karena ngeplin m2 14.05 100 14.05 15,000 210,750
CR3 As. 8/B', CR11 As. 8/C', CR2 As. 8'/C', CR10 As. 8'/D'
As. 8''/C', CR1 As. 9'/C', CR9 As. 9'/D'

2 Plester + Aci Kolom Ramp Turun Lt. LG karena tidak lot, m2 84.30 100 84.30 19,500 1,643,850
CR3 As. 8/B', CR11 As. 8/C', CR2 As. 8'/C', CR10 As. 8'/D'
As. 8''/C', CR1 As. 9'/C', CR9 As. 9'/D'

3 Cipping dan concrete fill kolom Ramp Turun Lt. LG, m2 84.30 100 84.30 5,000 421,500
CR3 As. 8/B', CR11 As. 8/C', CR2 As. 8'/C', CR10 As. 8'/D'
As. 8''/C', CR1 As. 9'/C', CR9 As. 9'/D'

4 Perapihan kropos kepala kolom Ramp Naik Lt. LG, CR5 As. 8'/A-B unit 3.00 100 3.00 45,000 135,000
CR2 As. 8'/B', CR7 As. 8'/B ( 3 kepala kolom )

5 - Plester balok Ramp Naik Lt. LG, G8 As. 9/A, G8 As. 10/C' m2 84.30 100 84.30 11,500 969,450
- Plester kolom GF1, As. 4/D-E, 8/G m2 32.40 100 32.40 11,500 372,600
- Aci kolom GF1, As. 4/D-E, 8/G m2 32.40 100 32.40 10,000 324,000

6 Pembersihan serbuk gergaji area Balok Ramp Naik Lt. LG m2 9.12 100 9.12 5,000 45,600
As. 9/A, 10/C'

7 Cipping + concrete fill, plester kolom Lt. GF1, As. 4/D, 4/E, 8/G m2 35.00 100 35.00 18,500 647,500

8 Bongkar bekisting kepala kolom Lt. GF1, As. 3-5/A-F, 1/D-F unit 13.00 100 13.00 10,000 130,000

9 Bobok kepala kolom Lt. GF1, As. 3-5/A-F, 1/D-F unit 13.00 100 13.00 35,000 455,000

TOTAL 5,355,250.00
Pelaksana :
Jakarta, 31 Oktober 2015
Kepala Tukang Costing, Site Manager, Project Manager

UNYIL PRAMA Damanik WELLY KURNIAWAN


Kepala Tukang Costing Site Manager Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

RISALAH PEMBAYARAN KEPALA TUKANG


No. DOM : 001
Periode : 15 Oktober 2015 - 28 Oktober 2015
No. SPK : 007/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Potong Mandor
Lantai : Lower Ground

NO URAIAN JUMLAH (RP)

A NILAI SPK 5,355,250.00

B PROGRESS AKUMULATIF S/D SAAT INI 5,355,250.00

C RETENSI 5 % (267,762.50)

D PEMBAYARAN AKUMULATIF S/D SAAT INI (B-C) 5,087,487.50

E PEMBAYARAN AKUMULATIF SEBELUMNYA

F PEMBAYARAN SAAT INI (D-E) 5,087,487.50

G DIBULATKAN 5,087,000.00

TERBILANG Lima Juta Delapan Puluh Tujuh Ribu Rupiah

Jakarta, 31 Oktober 2015


Kepala Tukang Costing, Project Manager

UNYIL PRAMA WELLY KURNIAWAN


Kepala Tukang Costing Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 005
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 008-R1/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Expose
Lantai : GF1

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)

Expose

Kolom lantai GF1


1 As. A'
6'/A' K29 m2 10.58 - 13,500 -
8/A' K29 m2 10.58 - 13,500 -

2 As. A
3/A K27 m2 13.82 95 13.13 13,500 177,293
4/A K28 m2 13.82 95 13.13 13,500 177,293
5/A K26 m2 13.82 - 13,500 -
6'/A K28 m2 13.82 - 13,500 -

3 As. C
1/C K27 m2 9.22 95 8.76 13,500 118,195
3/C K14 m2 13.82 95 13.13 13,500 177,293
4/C K15 m2 13.82 95 13.13 13,500 177,293
5/C K26 m2 13.82 95 13.13 13,500 177,293
6/C K26 m2 13.82 - 13,500 -
7'/C K28 m2 13.82 - 13,500 -

4 As. D
1/D K23 m2 9.22 95 8.76 13,500 118,195
3/D K24 m2 13.82 95 13.13 13,500 177,293
4/D K15 m2 13.82 95 13.13 13,500 177,293
5/D K26 m2 13.82 95 13.13 13,500 177,293
6/D K26 m2 13.82 - 13,500 -
7'/D K28 m2 13.82 - 13,500 -

5 As. E
1/E K23 m2 9.22 95 8.76 13,500 118,195
3/E K24 m2 13.82 95 13.13 13,500 177,293
4/E K15 m2 13.82 95 13.13 13,500 177,293
5/E K16 m2 13.82 95 13.13 13,500 177,293
7/E K23 m2 13.82 - 13,500 -
8/E K23 m2 13.82 - 13,500 -
9/E K23 m2 13.82 - 13,500 -

6 As. E'
10/E' KB3 m2 19.49 - 13,500 -
11/E' KB3 m2 19.49 - 13,500 -
12/E' K16 m2 19.49 - 13,500 -

7 As. F
1/F K19 m2 11.66 - 13,500 -
3/F K20 m2 13.82 - 13,500 -
4/F K21 m2 13.82 95 13.13 13,500 177,293
5/F K22 m2 13.82 95 13.13 13,500 177,293
7/F K23 m2 13.82 95 13.13 13,500 177,293
8/F K23 m2 13.82 95 13.13 13,500 177,293
9/F K22 m2 13.82 95 13.13 13,500 177,293
10/F KB3 m2 19.49 - 13,500 -
11/F KB3 m2 19.49 - 13,500 -
13/F K16 m2 19.49 - 13,500 -
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 005
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 008-R1/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Expose
Lantai : GF1

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)
8 As. G
1/G KB1 m2 15.88 - 13,500 -
3/G K13 m2 17.50 - 13,500 -
4/G K14 m2 13.82 95 13.13 13,500 177,293
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 005
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 008-R1/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Expose
Lantai : GF1

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)
5/G K14 m2 13.82 95 13.13 13,500 177,293
7/G K15 m2 13.82 95 13.13 13,500 177,293
8/G K16 m2 13.82 95 13.13 13,500 177,293
9/G K16 m2 13.82 - 13,500 -
10/G K17 m2 13.82 - 13,500 -
11/G K10 m2 17.50 - 13,500 -
13/G K10 m2 17.50 - 13,500 -
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 005
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 008-R1/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Expose
Lantai : GF1

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)
9 As. H
1/H KB3 m2 13.00 - 13,500 -
1/H KB3 m2 13.00 - 13,500 -
3/H K7 m2 17.50 - 13,500 -
4/H K8 m2 17.50 90 15.75 13,500 212,576
5/H K8 m2 17.50 90 15.75 13,500 212,576
7/H K9 m2 17.50 90 15.75 13,500 212,576
8/H K18 m2 17.50 - 13,500 -
9/H K11 m2 17.50 - 13,500 -
10/H K11 m2 17.50 - 13,500 -
11/H K10 m2 17.50 - 13,500 -
13/H K12 m2 17.50 - 13,500 -

10 As. I
1/I K6 m2 11.66 90 10.50 13,500 141,718
13/I K6 m2 17.50 90 15.75 13,500 212,576

11 As. J
2/J K1 m2 17.50 - 13,500 -
3/J K1 m2 17.50 - 13,500 -
4/J K2 m2 17.50 95 16.62 13,500 224,386
5/J K3 m2 17.50 95 16.62 13,500 224,386
7/J K2 m2 17.50 95 16.62 13,500 224,386
8/ K4 m2 17.50 95 16.62 13,500 224,386
9/J K5 m2 17.50 - 13,500 -
10/J K5 m2 17.50 - 13,500 -
11/J K6 m2 17.50 - 13,500 -
12/J K6 m2 17.50 - 13,500 -

TOTAL 5,790,009.60
Pelaksana :
Jakarta, 26 Desember 2015
Kepala Tukang Costing, Site Manager, Project Manager

UNYIL PRAMA Damanik WELLY KURNIAWAN


Kepala Tukang Costing Site Manager Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

RISALAH PEMBAYARAN KEPALA TUKANG


No. DOM : 005
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 008-R1/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Expose
Lantai : GF1

NO URAIAN JUMLAH (RP)

A NILAI SPK 14,522,652.00

B PROGRESS AKUMULATIF S/D SAAT INI 5,790,009.60

C RETENSI 5 % (289,500.48)

D PEMBAYARAN AKUMULATIF S/D SAAT INI (B-C) 5,500,509.12

E PEMBAYARAN AKUMULATIF SEBELUMNYA (5,223,212.10)

F PEMBAYARAN SAAT INI (D-E) 277,297.02

G DIBULATKAN 277,000.00

TERBILANG Dua Ratus Tujuh Puluh Tujuh Ribu Rupiah

Jakarta, 26 Desember 2015


Kepala Tukang Costing, Project Manager

UNYIL PRAMA WELLY KURNIAWAN


Kepala Tukang Costing Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 004
Periode : 10 Desember 2015 - 9 Desember 2015
No. SPK : 009/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang: UNYIL
Jenis Pekerjaan : Expose
Lantai : GF1

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)

Expose

Kepala Kolom GF1


1 As. A'
6'/A' K29 unit 1.00 - 80,000 -
8/A' K29 unit 1.00 - 80,000 -

2 As. A
2/A K27 unit 1.00 - 80,000 -
3/A K27 unit 1.00 95 0.95 80,000 76,000
4/A K28 unit 1.00 95 0.95 80,000 76,000
5/A K26 unit 1.00 80 0.80 80,000 64,000
6'/A K28 unit 1.00 80 0.80 80,000 64,000

3 As. B
1/B K27 unit 1.00 - 80,000 -

4 As. C
1/C K27 unit 1.00 95 0.95 80,000 76,000
3/C K14 unit 1.00 95 0.95 80,000 76,000
4/C K15 unit 1.00 95 0.95 80,000 76,000
5/C K26 unit 1.00 95 0.95 80,000 76,000
6/C K26 unit 1.00 80 0.80 80,000 64,000
7'/C K28 unit 1.00 80 0.80 80,000 64,000

5 As. D
1/D K23 unit 1.00 95 0.95 80,000 76,000
3/D K24 unit 1.00 95 0.95 80,000 76,000
4/D K15 unit 1.00 95 0.95 80,000 76,000
5/D K26 unit 1.00 95 0.95 80,000 76,000
6/D K26 unit 1.00 - 80,000 -
7'/D K28 unit 1.00 - 80,000 -

6 As. E
1/E K23 unit 1.00 95 0.95 80,000 76,000
3/E K24 unit 1.00 95 0.95 80,000 76,000
4/E K15 unit 1.00 95 0.95 80,000 76,000
5/E K16 unit 1.00 95 0.95 80,000 76,000
7/E K23 unit 1.00 - 80,000 -
8/E K23 unit 1.00 - 80,000 -
9/E K23 unit 1.00 - 80,000 -

7 As. E'
10/E' KB3 unit 1.00 - 80,000 -
11/E' KB3 unit 1.00 - 80,000 -
12/E' K16 unit 1.00 - 80,000 -

8 As. F
1/F K19 unit 1.00 95 0.95 80,000 76,000
3/F K20 unit 1.00 95 0.95 80,000 76,000
4/F K21 unit 1.00 95 0.95 80,000 76,000
5/F K22 unit 1.00 95 0.95 80,000 76,000
7/F K23 unit 1.00 95 0.95 80,000 76,000
8/F K23 unit 1.00 - 80,000 -
9/F K22 unit 1.00 - 80,000 -
10/F KB3 unit 1.00 - 80,000 -
11/F KB3 unit 1.00 - 80,000 -
13/F K16 unit 1.00 - 80,000 -
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 004
Periode : 10 Desember 2015 - 9 Desember 2015
No. SPK : 009/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang: UNYIL
Jenis Pekerjaan : Expose
Lantai : GF1

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)
9 As. G
1/G KB1 unit 1.00 - 80,000 -
3/G K13 unit 1.00 - 80,000 -
4/G K14 unit 1.00 95 0.95 80,000 76,000
5/G K14 unit 1.00 95 0.95 80,000 76,000
7/G K15 unit 1.00 95 0.95 80,000 76,000
8/G K16 unit 1.00 95 0.95 80,000 76,000
9/G K16 unit 1.00 - 80,000 -
10/G K17 unit 1.00 - 80,000 -
11/G K10 unit 1.00 - 80,000 -
13/G K10 unit 1.00 - 80,000 -

10 As. H
1/H KB3 unit 1.00 - 80,000 -
1/H KB3 unit 1.00 - 80,000 -
3/H K7 unit 1.00 - 80,000 -
4/H K8 unit 1.00 95 0.95 80,000 76,000
5/H K8 unit 1.00 95 0.95 80,000 76,000
7/H K9 unit 1.00 95 0.95 80,000 76,000
8/H K18 unit 1.00 - 80,000 -
9/H K11 unit 1.00 - 80,000 -
10/H K11 unit 1.00 - 80,000 -
11/H K10 unit 1.00 - 80,000 -
13/H K12 unit 1.00 - 80,000 -

11 As. I
1/I K6 unit 1.00 50 0.50 80,000 40,000
13/I K6 unit 1.00 - 80,000 -

12 As. J
2/J K1 unit 1.00 - 80,000 -
3/J K1 unit 1.00 75 0.75 80,000 60,000
4/J K2 unit 1.00 95 0.95 80,000 76,000
5/J K3 unit 1.00 95 0.95 80,000 76,000
7/J K2 unit 1.00 95 0.95 80,000 76,000
8/ K4 unit 1.00 95 0.95 80,000 76,000
9/J K5 unit 1.00 - 80,000 -
10/J K5 unit 1.00 - 80,000 -
11/J K6 unit 1.00 - 80,000 -
12/J K6 unit 1.00 - 80,000 -

TOTAL 2,636,000.00
Pelaksana :
Jakarta, 26 Desember 2015
Kepala Tukang Costing, Site Manager, Project Manager

UNYIL PRAMA Damanik WELLY KURNIAWAN


Kepala Tukang Costing Site Manager Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

RISALAH PEMBAYARAN KEPALA TUKANG


No. DOM : 004
Periode : 10 Desember 2015 - 9 Desember 2015
No. SPK : 009/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Expose
Lantai : GF1

NO URAIAN JUMLAH (RP)

A NILAI SPK 5,840,000.00

B PROGRESS AKUMULATIF S/D SAAT INI 2,636,000.00

C RETENSI 5 % (131,800.00)

D PEMBAYARAN AKUMULATIF S/D SAAT INI (B-C) 2,504,200.00

E PEMBAYARAN AKUMULATIF SEBELUMNYA (2,249,600.00)

F PEMBAYARAN SAAT INI (D-E) 254,600.00

G DIBULATKAN 254,000.00

TERBILANG Dua Ratus Lima Puluh Empat Ribu Rupiah

Jakarta, 26 Desember 2015


Kepala Tukang Costing, Project Manager

UNYIL PRAMA WELLY KURNIAWAN


Kepala Tukang Costing Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

SURAT PERINTAH KERJA

No. SPK : 010-R1/UNYL/FNS/P.1501/MAK/2015


Nama Kepala Tukan : UNYIL
Jenis Pekerjaan : Schaffolding
Lantai : GF1

INDIVIDU
HARGA
NO JENIS PEKERJAAN SAT VOL SPK NILAI SPK
SATUAN
SEKARANG
( Rp ) ( Rp )

Schaffolding

Pasang+bongkar Scaffolding untuk Expose pada Kolom


( 1 unit kolom 1 set Scaffolding ) Lantai GF1
1 As. C/1 K27 unit 1.00 6,000 6,000
2 As. D/1 K23 unit 1.00 6,000 6,000
3 As. E/1 K23 unit 1.00 6,000 6,000
4 As. F/1 K19 unit 1.00 6,000 6,000
5 As. G/1 KB1 unit 1.00 6,000 6,000
6 As. H/1 KB3 unit 1.00 6,000 6,000
7 As. H/1 KB3 unit 1.00 6,000 6,000
8 As. I/1 K6 unit 1.00 6,000 6,000
9 As. J/1 K1 unit 1.00 6,000 6,000

TOTAL 54,000.00

Menyetujui, Jakarta, 26 Desember 2015

UNYIL WELLY KURNIAWAN


Kepala Tukang Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 002
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 010-R1/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang: UNYIL
Jenis Pekerjaan : Schaffolding
Lantai : GF1

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)

Schaffolding

Pasang+bongkar Scaffolding untuk Expose pada Kolom


( 1 unit kolom 1 set Scaffolding ) Lantai GF1
1 As. C/1 K27 unit 1.00 90 0.90 6,000 5,400
2 As. D/1 K23 unit 1.00 90 0.90 6,000 5,400
3 As. E/1 K23 unit 1.00 90 0.90 6,000 5,400
4 As. F/1 K19 unit 1.00 90 0.90 6,000 5,400
5 As. G/1 KB1 unit 1.00 90 0.90 6,000 5,400
6 As. H/1 KB3 unit 1.00 90 0.90 6,000 5,400
7 As. H/1 KB3 unit 1.00 90 0.90 6,000 5,400
8 As. I/1 K6 unit 1.00 80 0.80 6,000 4,800
9 As. J/1 K1 unit 1.00 - - 6,000 -

TOTAL 42,600.00
Pelaksana :
Jakarta, 26 Desember 2015
Kepala Tukang Costing, Site Manager, Project Manager

UNYIL PRAMA Damanik WELLY KURNIAWAN


Kepala Tukang Costing Site Manager Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

RISALAH PEMBAYARAN KEPALA TUKANG


No. DOM : 002
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 010-R1/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Schaffolding
Lantai : GF1

NO URAIAN JUMLAH (RP)

A NILAI SPK 54,000.00

B PROGRESS AKUMULATIF S/D SAAT INI 42,600.00

C RETENSI 5 % (2,130.00)

D PEMBAYARAN AKUMULATIF S/D SAAT INI (B-C) 40,470.00

E PEMBAYARAN AKUMULATIF SEBELUMNYA (19,950.00)

F PEMBAYARAN SAAT INI (D-E) 20,520.00

G DIBULATKAN 20,000.00

TERBILANG Dua Puluh Ribu Rupiah

Jakarta, 26 Desember 2015


Kepala Tukang Costing, Project Manager

UNYIL PRAMA WELLY KURNIAWAN


Kepala Tukang Costing Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

SURAT PERINTAH KERJA

No. SPK : 011/UNYL/FNS/P.1501/MAK/2015


Nama Kepala Tukan : UNYIL
Jenis Pekerjaan : Finishing
Lantai : GF1

INDIVIDU
HARGA
NO JENIS PEKERJAAN SAT VOL SPK NILAI SPK
SATUAN
SEKARANG
( Rp ) ( Rp )

Finishing

Pembersihan sambungan bondek pada balok baja LT. GF1


1 As. 2/A m' 2.00 8,000 16,000
2 As. 3/A m' 2.00 8,000 16,000
3 As. 4/A m' 2.00 8,000 16,000
4 As. 5/A m' 2.00 8,000 16,000
5 As. 1/B m' 2.00 8,000 16,000
6 As. 1/C m' 2.00 8,000 16,000
7 As. 3/C m' 2.00 8,000 16,000
8 As. 4/C m' 2.00 8,000 16,000
9 As. 5/C m' 2.00 8,000 16,000
10 As. 1/D m' 2.00 8,000 16,000
11 As. 3/D m' 2.00 8,000 16,000
12 As. 4/D m' 2.00 8,000 16,000
13 As. 5/D m' 2.00 8,000 16,000
14 As. 1/E m' 2.00 8,000 16,000
15 As. 3/E m' 2.00 8,000 16,000
16 As. 4/E m' 2.00 8,000 16,000
17 As. 5/E m' 2.00 8,000 16,000
18 As. 1/F m' 2.00 8,000 16,000
19 As. 3/F m' 2.00 8,000 16,000
20 As. 4/F m' 2.00 8,000 16,000
21 As. 5/F m' 2.00 8,000 16,000
22 As. 3/G m' 2.00 8,000 16,000
23 As. 4/H m' 2.00 8,000 16,000

TOTAL 368,000.00

Menyetujui, Jakarta, 17 Oktober 2015

UNYIL WELLY KURNIAWAN


Kepala Tukang Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 001
Periode : 1 Oktober 2015 - 14 Oktober 2015
No. SPK : 011/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang: UNYIL
Jenis Pekerjaan : Finishing
Lantai : Lower Ground

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)

Finishing

Pembersihan sambungan bondek pada balok baja LT. GF1


1 As. 2/A m' 2.00 100 2.00 8,000 16,000
2 As. 3/A m' 2.00 100 2.00 8,000 16,000
3 As. 4/A m' 2.00 100 2.00 8,000 16,000
4 As. 5/A m' 2.00 100 2.00 8,000 16,000
5 As. 1/B m' 2.00 100 2.00 8,000 16,000
6 As. 1/C m' 2.00 100 2.00 8,000 16,000
7 As. 3/C m' 2.00 100 2.00 8,000 16,000
8 As. 4/C m' 2.00 100 2.00 8,000 16,000
9 As. 5/C m' 2.00 100 2.00 8,000 16,000
10 As. 1/D m' 2.00 100 2.00 8,000 16,000
11 As. 3/D m' 2.00 100 2.00 8,000 16,000
12 As. 4/D m' 2.00 100 2.00 8,000 16,000
13 As. 5/D m' 2.00 100 2.00 8,000 16,000
14 As. 1/E m' 2.00 100 2.00 8,000 16,000
15 As. 3/E m' 2.00 100 2.00 8,000 16,000
16 As. 4/E m' 2.00 100 2.00 8,000 16,000
17 As. 5/E m' 2.00 100 2.00 8,000 16,000
18 As. 1/F m' 2.00 100 2.00 8,000 16,000
19 As. 3/F m' 2.00 100 2.00 8,000 16,000
20 As. 4/F m' 2.00 100 2.00 8,000 16,000
21 As. 5/F m' 2.00 100 2.00 8,000 16,000
22 As. 3/G m' 2.00 100 2.00 8,000 16,000
23 As. 4/H m' 2.00 100 2.00 8,000 16,000

TOTAL 368,000.00
Pelaksana :
Jakarta, 17 Oktober 2015
Kepala Tukang Costing, Site Manager, Project Manager

UNYIL PRAMA Damanik WELLY KURNIAWAN


Kepala Tukang Costing Site Manager Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

RISALAH PEMBAYARAN KEPALA TUKANG


No. DOM : 001
Periode : 1 Oktober 2015 - 14 Oktober 2015
No. SPK : 011/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Finishing
Lantai : Lower Ground

NO URAIAN JUMLAH (RP)

A NILAI SPK 368,000.00

B PROGRESS AKUMULATIF S/D SAAT INI 368,000.00

C RETENSI 5 % (18,400.00)

D PEMBAYARAN AKUMULATIF S/D SAAT INI (B-C) 349,600.00

E PEMBAYARAN AKUMULATIF SEBELUMNYA

F PEMBAYARAN SAAT INI (D-E) 349,600.00

G DIBULATKAN 349,000.00

TERBILANG Tiga Ratus Empat Puluh Sembilan Ribu Rupiah

Jakarta, 17 Oktober 2015


Kepala Tukang Costing, Project Manager

UNYIL PRAMA WELLY KURNIAWAN


Kepala Tukang Costing Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

SURAT PERINTAH KERJA

No. SPK : 012/UNYL/FNS/P.1501/MAK/2015


Nama Kepala Tukan : UNYIL
Jenis Pekerjaan : Finishing
Lantai : GF1

INDIVIDU
HARGA
NO JENIS PEKERJAAN SAT VOL SPK NILAI SPK
SATUAN
SEKARANG
( Rp ) ( Rp )

Finishing

Pasang+bongkar Scaffolding untuk


Pembersihan sambungan bondek pada balok baja LT. GF1
1 As. 2/A unit 1.00 6,000 6,000
2 As. 3/A unit 1.00 6,000 6,000
3 As. 4/A unit 1.00 6,000 6,000
4 As. 5/A unit 1.00 6,000 6,000
5 As. 1/B unit 1.00 6,000 6,000
6 As. 1/C unit 1.00 6,000 6,000
7 As. 3/C unit 1.00 6,000 6,000
8 As. 4/C unit 1.00 6,000 6,000
9 As. 5/C unit 1.00 6,000 6,000
10 As. 1/D unit 1.00 6,000 6,000
11 As. 3/D unit 1.00 6,000 6,000
12 As. 4/D unit 1.00 6,000 6,000
13 As. 5/D unit 1.00 6,000 6,000
14 As. 1/E unit 1.00 6,000 6,000
15 As. 3/E unit 1.00 6,000 6,000
16 As. 4/E unit 1.00 6,000 6,000
17 As. 5/E unit 1.00 6,000 6,000
18 As. 1/F unit 1.00 6,000 6,000
19 As. 3/F unit 1.00 6,000 6,000
20 As. 4/F unit 1.00 6,000 6,000
21 As. 5/F unit 1.00 6,000 6,000
22 As. 3/G unit 1.00 6,000 6,000
23 As. 4/H unit 1.00 6,000 6,000

TOTAL 138,000.00

Menyetujui, Jakarta, 17 Oktober 2015

UNYIL WELLY KURNIAWAN


Kepala Tukang Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 001
Periode : 1 Oktober 2015 - 14 Oktober 2015
No. SPK : 012/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang: UNYIL
Jenis Pekerjaan : Finishing
Lantai : Lower Ground

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)

Finishing

Pasang+bongkar Scaffolding untuk


Pembersihan sambungan bondek pada balok baja LT. GF1
1 As. 2/A unit 1.00 100 1.00 6,000 6,000
2 As. 3/A unit 1.00 100 1.00 6,000 6,000
3 As. 4/A unit 1.00 100 1.00 6,000 6,000
4 As. 5/A unit 1.00 100 1.00 6,000 6,000
5 As. 1/B unit 1.00 100 1.00 6,000 6,000
6 As. 1/C unit 1.00 100 1.00 6,000 6,000
7 As. 3/C unit 1.00 100 1.00 6,000 6,000
8 As. 4/C unit 1.00 100 1.00 6,000 6,000
9 As. 5/C unit 1.00 100 1.00 6,000 6,000
10 As. 1/D unit 1.00 100 1.00 6,000 6,000
11 As. 3/D unit 1.00 100 1.00 6,000 6,000
12 As. 4/D unit 1.00 100 1.00 6,000 6,000
13 As. 5/D unit 1.00 100 1.00 6,000 6,000
14 As. 1/E unit 1.00 100 1.00 6,000 6,000
15 As. 3/E unit 1.00 100 1.00 6,000 6,000
16 As. 4/E unit 1.00 100 1.00 6,000 6,000
17 As. 5/E unit 1.00 100 1.00 6,000 6,000
18 As. 1/F unit 1.00 100 1.00 6,000 6,000
19 As. 3/F unit 1.00 100 1.00 6,000 6,000
20 As. 4/F unit 1.00 100 1.00 6,000 6,000
21 As. 5/F unit 1.00 100 1.00 6,000 6,000
22 As. 3/G unit 1.00 100 1.00 6,000 6,000
23 As. 4/H unit 1.00 100 1.00 6,000 6,000

TOTAL 138,000.00
Pelaksana :
Jakarta, 17 Oktober 2015
Kepala Tukang Costing, Site Manager, Project Manager

UNYIL PRAMA Damanik WELLY KURNIAWAN


Kepala Tukang Costing Site Manager Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

RISALAH PEMBAYARAN KEPALA TUKANG


No. DOM : 001
Periode : 1 Oktober 2015 - 14 Oktober 2015
No. SPK : 012/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Finishing
Lantai : Lower Ground

NO URAIAN JUMLAH (RP)

A NILAI SPK 138,000.00

B PROGRESS AKUMULATIF S/D SAAT INI 138,000.00

C RETENSI 5 % (6,900.00)

D PEMBAYARAN AKUMULATIF S/D SAAT INI (B-C) 131,100.00

E PEMBAYARAN AKUMULATIF SEBELUMNYA

F PEMBAYARAN SAAT INI (D-E) 131,100.00

G DIBULATKAN 131,000.00

TERBILANG Seratus Tiga Puluh Satu Ribu Rupiah

Jakarta, 17 Oktober 2015


Kepala Tukang Costing, Project Manager

UNYIL PRAMA WELLY KURNIAWAN


Kepala Tukang Costing Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

SURAT PERINTAH KERJA

No. SPK : 013/UNYL/FNS/P.1501/MAK/2015


Nama Kepala Tukan : UNYIL
Jenis Pekerjaan : Bobokan
Lantai : Lower Ground

INDIVIDU
HARGA
NO JENIS PEKERJAAN SAT VOL SPK NILAI SPK
SATUAN
SEKARANG
( Rp ) ( Rp )

Bobokan

1 - Bobok kolom yang bunting karena bekisting jebol. As. 5/H hp 1.00 75,000 75,000
As. 7/F, 1 org, 08-16
( Potong Mandor Maskuri )

2 - Bobok dan plester kepala kolom ( 6 kolom ) As. 5/A-G hp 12.00 75,000 900,000
2org ( 1kolom ),

TOTAL 975,000.00

Menyetujui, Jakarta, 17 Oktober 2015

UNYIL WELLY KURNIAWAN


Kepala Tukang Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 001
Periode : 3 September 2015 - 16 September 2015
No. SPK : 013/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Bobokan
Lantai : Lower Ground

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)

Bobokan

1 - Bobok kolom yang bunting karena bekisting jebol. As. 5/H hp 1.00 100 1.00 75,000 75,000
As. 7/F, 1 org, 08-16
( Potong Mandor Maskuri )

2 - Bobok dan plester kepala kolom ( 6 kolom ) As. 5/A-G hp 12.00 100 12.00 75,000 900,000
2org ( 1kolom ),

TOTAL 975,000.00
Pelaksana :
Jakarta, 17 Oktober 2015
Kepala Tukang Costing, Site Manager, Project Manager

UNYIL PRAMA Damanik WELLY KURNIAWAN


Kepala Tukang Costing Site Manager Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

RISALAH PEMBAYARAN KEPALA TUKANG


No. DOM : 001
Periode : 3 September 2015 - 16 September 2015
No. SPK : 013/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Bobokan
Lantai : Lower Ground

NO URAIAN JUMLAH (RP)

A NILAI SPK 975,000.00

B PROGRESS AKUMULATIF S/D SAAT INI 975,000.00

C RETENSI 5 % (48,750.00)

D PEMBAYARAN AKUMULATIF S/D SAAT INI (B-C) 926,250.00

E PEMBAYARAN AKUMULATIF SEBELUMNYA

F PEMBAYARAN SAAT INI (D-E) 926,250.00

G DIBULATKAN 926,000.00

TERBILANG Sembilan Ratus Dua Puluh Enam Ribu Rupiah

Jakarta, 17 Oktober 2015


Kepala Tukang Costing, Project Manager

UNYIL PRAMA WELLY KURNIAWAN


Kepala Tukang Costing Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

SURAT PERINTAH KERJA

No. SPK : 014/UNYL/FNS/P.1501/MAK/2015


Nama Kepala Tukan : UNYIL
Jenis Pekerjaan : Finishing
Lantai :

INDIVIDU
HARGA
NO JENIS PEKERJAAN SAT VOL SPK NILAI SPK
SATUAN
SEKARANG
( Rp ) ( Rp )

Finishing

2 - Grouting Kolom Ramp Turun Lt. LG lubang tierot titik 56.00 2,000 112,000
CR3 As. 8/B', CR11 As. 8/C', CR2 As. 8'/C', CR10 As. 8'/D'
As. 8''/C', CR1 As. 9'/C', CR9 As. 9'/D'

- Grouting balok ramp turun Lt. LG As. 8-9'/C'-D' titik 120.00 2,000 240,000

TOTAL 352,000.00

Menyetujui, Jakarta, 31 Oktober 2015

UNYIL WELLY KURNIAWAN


Kepala Tukang Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 001
Periode : 15 Oktober 2015 - 28 Oktober 2015
No. SPK : 014/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Finishing
Lantai : 0

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)

Finishing

2 - Grouting Kolom Ramp Turun Lt. LG lubang tierot titik 56.00 100 56.00 2,000 112,000
CR3 As. 8/B', CR11 As. 8/C', CR2 As. 8'/C', CR10 As. 8'/D'
As. 8''/C', CR1 As. 9'/C', CR9 As. 9'/D'

- Grouting balok ramp turun Lt. LG As. 8-9'/C'-D' titik 120.00 100 120.00 2,000 240,000

TOTAL 352,000.00
Pelaksana :
Jakarta, 31 Oktober 2015
Kepala Tukang Costing, Site Manager, Project Manager

UNYIL PRAMA Damanik WELLY KURNIAWAN


Kepala Tukang Costing Site Manager Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

RISALAH PEMBAYARAN KEPALA TUKANG


No. DOM : 001
Periode : 15 Oktober 2015 - 28 Oktober 2015
No. SPK : 014/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Finishing
Lantai :

NO URAIAN JUMLAH (RP)

A NILAI SPK 352,000.00

B PROGRESS AKUMULATIF S/D SAAT INI 352,000.00

C RETENSI 5 % (17,600.00)

D PEMBAYARAN AKUMULATIF S/D SAAT INI (B-C) 334,400.00

E PEMBAYARAN AKUMULATIF SEBELUMNYA

F PEMBAYARAN SAAT INI (D-E) 334,400.00

G DIBULATKAN 334,000.00

TERBILANG Tiga Ratus Tiga Puluh Empat Ribu Rupiah

Jakarta, 31 Oktober 2015


Kepala Tukang Costing, Project Manager

UNYIL PRAMA WELLY KURNIAWAN


Kepala Tukang Costing Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

SURAT PERINTAH KERJA

No. SPK : 015-R1/UNYL/FNS/P.1501/MAK/2015


Nama Kepala Tukan : UNYIL
Jenis Pekerjaan : Finishing
Lantai :

INDIVIDU
HARGA
NO JENIS PEKERJAAN SAT VOL SPK NILAI SPK
SATUAN
SEKARANG
( Rp ) ( Rp )

Expose Ramp Naik LG - GF2

1 Balok Melintang
1 ( 8'/A ) El. -9000 m2 8.13 13,500 109,783
2 ( 8''/A ) El. -8691 m2 8.42 13,500 113,697
3 ( 9'/A' ) El. -8366 m2 8.15 13,500 109,984
4 ( 10/A ) El. -7778 m2 8.14 13,500 109,850
5 ( 10'/A ) El. -7386 m2 8.38 13,500 113,115
6 ( 10'/B ) El. -6944 m2 8.13 13,500 109,805
7 ( 10'/B' ) El. -6533 m2 8.37 13,500 112,981
8 ( 10'/C' ) El. -6101 m2 8.13 13,500 109,783
9 ( 10'/B'' ) El. -5889 m2 8.36 13,500 112,914
10 ( 10'/B''' ) El. -5426 m2 5.82 13,500 78,629
11 ( 9''/D ) El. -4903 m2 8.05 13,500 108,665
12 ( 9'/D ) El. -4380 m2 8.54 13,500 115,352
13 ( 8'/D ) El. -3858 m2 8.04 13,500 108,598
14 ( 8/D ) El. -3465 m2 8.55 13,500 115,396
15 ( 8/C' ) El. -3073 m2 8.13 13,500 109,716
16 ( 8/B' ) El. -2530 m2 8.21 13,500 110,901
17 ( 8/A ) El. -2004 m2 8.63 13,500 116,515
18 ( 8'/A ) El. -1750 m2 5.65 13,500 76,313
19 ( 8''/A ) El. -1750 m2 8.55 13,500 115,396

2 Balok Pinggir ( dalam )


As. A/8'-9 ( CR5 - CR6 ) El. -8416 m2 8.60 13,500 116,067
As. A/9-9' ( CR6 - CR6 ) El. -7828 m2 4.34 13,500 58,593
As. A-B/10 ( CR6 - CR7 ) El. -7044 m2 6.63 13,500 89,455
As. B-C/10 ( CR7 - CR7 ) El. -6151 m2 7.97 13,500 107,569
As. C-C'/10 ( CR7 - CR8 ) El. -5476 m2 5.30 13,500 71,564
As. C'/10-9' ( CR8 - CR1 ) El. -4953 m2 3.78 13,500 50,989
As. C'/9'-9 ( CR1 - CR2 ) El. -3908 m2 9.00 13,500 121,435
As. C'/8'-8 ( CR2 - CR2 ) El. -3123 m2 6.23 13,500 84,087
As. C'-C/8'-8 ( CR2 - CR2 ) El. -2580 m2 3.79 13,500 51,213
As. C-A/8' ( CR2 - CR5 ) El. -1750 m2 8.85 13,500 119,422
As. A/8'-9' ( CR2 - CR5 ) El. -1750 m2 8.28 13,500 111,818

2 Balok Pinggir ( luar )


As. D/10'-10 ( Wall - CR9 ) El. -4853 m2 10.17 13,500 137,283
As. D/9'-9 ( CR9 - CR10 ) El. -3808 m2 18.59 13,500 250,909
As. D/8 ( CR10 - CR11 ) El. -3023 m2 11.96 13,500 161,443
As. C'-C/7' ( CR11 - CR3 ) El. -2480 m2 7.87 13,500 106,227
As. A'-A/8 ( CR3 - CR4 ) El. -1750 m2 16.91 13,500 228,333

3 Balok Tengah
Ramp Naik LG - GF2 m2 83.84 13,500 1,131,849

4 Plat Ramp Naik LG - GF2 m2 413.20 9,000 3,718,790

TOTAL 8,774,438.65

Menyetujui, Jakarta, 28 November 2015


PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

SURAT PERINTAH KERJA

No. SPK : 015-R1/UNYL/FNS/P.1501/MAK/2015


Nama Kepala Tukan : UNYIL
Jenis Pekerjaan : Finishing
Lantai :

INDIVIDU
HARGA
NO JENIS PEKERJAAN SAT VOL SPK NILAI SPK
SATUAN
SEKARANG
( Rp ) ( Rp )
UNYIL WELLY KURNIAWAN
Kepala Tukang Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 002
Periode : 12 November 2015 - 25 November 2015
No. SPK : 015-R1/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Finishing
Lantai :

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)

Expose Ramp Naik LG - GF2

1 Balok Melintang
1 ( 8'/A ) El. -9000 m2 8.13 - 13,500 -
2 ( 8''/A ) El. -8691 m2 8.42 - 13,500 -
3 ( 9'/A' ) El. -8366 m2 8.15 - 13,500 -
4 ( 10/A ) El. -7778 m2 8.14 - 13,500 -
5 ( 10'/A ) El. -7386 m2 8.38 - 13,500 -
6 ( 10'/B ) El. -6944 m2 8.13 - 13,500 -
7 ( 10'/B' ) El. -6533 m2 8.37 - 13,500 -
8 ( 10'/C' ) El. -6101 m2 8.13 - 13,500 -
9 ( 10'/B'' ) El. -5889 m2 8.36 - 13,500 -
10 ( 10'/B''' ) El. -5426 m2 5.82 - 13,500 -
11 ( 9''/D ) El. -4903 m2 8.05 - 13,500 -
12 ( 9'/D ) El. -4380 m2 8.54 - 13,500 -
13 ( 8'/D ) El. -3858 m2 8.04 - 13,500 -
14 ( 8/D ) El. -3465 m2 8.55 - 13,500 -
15 ( 8/C' ) El. -3073 m2 8.13 - 13,500 -
16 ( 8/B' ) El. -2530 m2 8.21 - 13,500 -
17 ( 8/A ) El. -2004 m2 8.63 - 13,500 -
18 ( 8'/A ) El. -1750 m2 5.65 - 13,500 -
19 ( 8''/A ) El. -1750 m2 8.55 - 13,500 -

2 Balok Pinggir ( dalam )


As. A/8'-9 ( CR5 - CR6 ) El. -8416 m2 8.60 - 13,500 -
As. A/9-9' ( CR6 - CR6 ) El. -7828 m2 4.34 - 13,500 -
As. A-B/10 ( CR6 - CR7 ) El. -7044 m2 6.63 - 13,500 -
As. B-C/10 ( CR7 - CR7 ) El. -6151 m2 7.97 - 13,500 -
As. C-C'/10 ( CR7 - CR8 ) El. -5476 m2 5.30 - 13,500 -
As. C'/10-9' ( CR8 - CR1 ) El. -4953 m2 3.78 - 13,500 -
As. C'/9'-9 ( CR1 - CR2 ) El. -3908 m2 9.00 15 1.35 13,500 18,215
As. C'/8'-8 ( CR2 - CR2 ) El. -3123 m2 6.23 15 0.93 13,500 12,613
As. C'-C/8'-8 ( CR2 - CR2 ) El. -2580 m2 3.79 15 0.57 13,500 7,682
As. C-A/8' ( CR2 - CR5 ) El. -1750 m2 8.85 - 13,500 -
As. A/8'-9' ( CR2 - CR5 ) El. -1750 m2 8.28 - 13,500 -

2 Balok Pinggir ( luar )


As. D/10'-10 ( Wall - CR9 ) El. -4853 m2 10.17 15 1.53 13,500 20,592
As. D/9'-9 ( CR9 - CR10 ) El. -3808 m2 18.59 15 2.79 13,500 37,636
As. D/8 ( CR10 - CR11 ) El. -3023 m2 11.96 15 1.79 13,500 24,216
As. C'-C/7' ( CR11 - CR3 ) El. -2480 m2 7.87 - 13,500 -
As. A'-A/8 ( CR3 - CR4 ) El. -1750 m2 16.91 - 13,500 -

3 Balok Tengah
Ramp Naik LG - GF2 m2 83.84 10 8.38 13,500 113,185

4 Plat Ramp Naik LG - GF2 m2 413.20 5 20.66 9,000 185,940

TOTAL 420,079.82
Pelaksana :
Jakarta, 28 November 2015
Kepala Tukang Costing, Site Manager, Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 002
Periode : 12 November 2015 - 25 November 2015
No. SPK : 015-R1/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Finishing
Lantai :

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)
UNYIL PRAMA Damanik WELLY KURNIAWAN
Kepala Tukang Costing Site Manager Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

RISALAH PEMBAYARAN KEPALA TUKANG


No. DOM : 002
Periode : 12 November 2015 - 25 November 2015
No. SPK : 015-R1/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Finishing
Lantai :

NO URAIAN JUMLAH (RP)

A NILAI SPK 8,774,438.65

B PROGRESS AKUMULATIF S/D SAAT INI 420,079.82

C RETENSI 5 % (21,003.99)

D PEMBAYARAN AKUMULATIF S/D SAAT INI (B-C) 399,075.83

E PEMBAYARAN AKUMULATIF SEBELUMNYA (399,075.83)

F PEMBAYARAN SAAT INI (D-E) -

G DIBULATKAN -

TERBILANG Rupiah

Jakarta, 28 November 2015


Kepala Tukang Costing, Project Manager

UNYIL PRAMA WELLY KURNIAWAN


Kepala Tukang Costing Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 005
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 016-R01/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Finishing
Lantai :

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)

Expose Ramp Turun LG - GF2

1 Balok Melintang
1 ( 10/D ) El. -1750 m2 5.84 - 13,500 -
2 ( 10'/C' ) El. -1945 m2 5.65 80 4.52 13,500 61,000
3 ( 10'/B' ) El. -2341 m2 8.55 80 6.84 13,500 92,317
4 ( 10'/B ) El. -2773 m2 5.65 80 4.52 13,500 60,975
5 ( 10'/A ) El. -3141 m2 8.55 80 6.84 13,500 92,317
6 ( 10'/A'-A) El. -3509 m2 5.65 80 4.52 13,500 61,050
7 ( 9'/A'-A ) El. -4061 m2 5.65 80 4.52 13,500 61,000
8 ( 8'/A-A ) El. -4523 m2 8.55 80 6.84 13,500 92,317
9 ( 8'/A ) El. -4986 m2 5.65 80 4.52 13,500 61,050
10 ( 8/A-B ) El. -5461 m2 8.55 80 6.84 13,500 92,317
11 ( 8/B' ) El. -5950 m2 5.65 80 4.52 13,500 61,050
12 ( 8/C' ) El. -6592 m2 5.66 80 4.53 13,500 61,100
13 ( 8'/D ) El. -7051 m2 8.53 80 6.83 13,500 92,156
14 ( 8"'/D ) El. -7510 m2 5.60 80 4.48 13,500 60,453
15 ( 9'/D ) El. -8000 m2 8.54 80 6.84 13,500 92,281
16 ( 9''/D ) El. -8000 m2 5.60 80 4.48 13,500 60,428

2 Balok Pinggir ( dalam ) R


As. 10/D ( CR1 - CR8 ) El. -1750 m2 3.51 - 16,500 -
As. 10/C' ( CR8 - CR7 ) El. -1995 m2 5.27 80 4.22 16,500 69,558
As. 10/B-C ( CR7 - CR7 ) El. -2823 m2 7.74 80 6.19 16,500 102,117
As. 10/A-B ( CR7 - CR6 ) El. -3559 m2 6.43 80 5.15 16,500 84,908
As. 9'-9/A ( CR6 - CR6 ) El. -4111 m2 4.17 80 3.34 16,500 55,060
As. 8'-9'/A ( CR6 - CR5 ) El. -5036 m2 8.34 80 6.68 16,500 110,142
As. 8'/A-C ( CR5 - CR2 ) El. -6000 m2 8.78 80 7.02 16,500 115,871
As. 8'/C-C' ( CR2 - CR2 ) El. -6642 m2 3.76 80 3.00 16,500 49,572
As. 8'/C'-C'' ( CR2 - CR2 ) El. -7560 m2 6.24 80 4.99 16,500 82,350
As. 8'-9'/D ( CR5 - CR2 ) El. -8000 m2 6.24 80 4.99 16,500 82,350

2 Balok Pinggir ( luar ) R


As. 10/D ( CR9 - CR4 ) El. -1750 m2 22.36 80 17.89 16,500 295,111
As. 10/B-C ( CR4 - CR14 ) El. -2723 m2 14.21 80 11.37 16,500 187,550
As. 10/A'-A ( CR14 - CR13 ) El. -3459 m2 11.97 80 9.58 16,500 158,030
As. 10-9'/A' ( CR13 - CR12 ) El. -4011 m2 8.35 80 6.68 16,500 110,230
As. 9-8/A' ( CR12 - CR4 ) El. -4936 m2 15.91 80 12.73 16,500 209,986
As. 8/A'-B' ( CR4 - CR3 ) El. -5900 m2 16.88 80 13.50 16,500 222,778
As. 8/C-C' ( CR3 - CR11 ) El. -6542 m2 7.88 80 6.30 16,500 104,020
As. 8/C'-D' ( CR11 - CR10 ) El. -7460 m2 16.88 80 13.50 16,500 222,778
As. D/8'-9' ( CR10 - CR9 ) El. -8000 m2 18.59 80 14.87 16,500 245,407

3 Balok Tengah ( R )
Ramp Turun LG - GF2 m2 76.66 80 61.33 16,500 1,011,970

4 Plat Ramp Turun LG - GF2 m2 398.08 80 318.47 9,000 2,866,187

TOTAL 7,487,789.89
Pelaksana :
Jakarta, 26 Desember 2015
Kepala Tukang Costing, Site Manager, Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 005
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 016-R01/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Finishing
Lantai :

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)
UNYIL PRAMA Damanik WELLY KURNIAWAN
Kepala Tukang Costing Site Manager Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

RISALAH PEMBAYARAN KEPALA TUKANG


No. DOM : 005
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 016-R01/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Finishing
Lantai :

NO URAIAN JUMLAH (RP)

A NILAI SPK 9,496,507.00

B PROGRESS AKUMULATIF S/D SAAT INI 7,487,789.89

C RETENSI 5 % (374,389.49)

D PEMBAYARAN AKUMULATIF S/D SAAT INI (B-C) 7,113,400.39

E PEMBAYARAN AKUMULATIF SEBELUMNYA (7,113,400.39)

F PEMBAYARAN SAAT INI (D-E) -

G DIBULATKAN -

TERBILANG Rupiah

Jakarta, 26 Desember 2015


Kepala Tukang Costing, Project Manager

UNYIL PRAMA WELLY KURNIAWAN


Kepala Tukang Costing Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 004
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 017/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Finishing
Lantai : GF2

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)

Finishing

Pembersihan sambungan bondek pada balok baja LT. GF2


1 As. 1/E m' 2.00 95 1.90 8,000 15,200
2 As. 1/F m' 2.00 95 1.90 8,000 15,200
3 As. 3/A m' 2.00 95 1.90 8,000 15,200
4 As. 3/C m' 2.00 95 1.90 8,000 15,200
5 As. 3/D m' 2.00 95 1.90 8,000 15,200
6 As. 3/E m' 2.00 95 1.90 8,000 15,200
7 As. 3/F m' 2.00 95 1.90 8,000 15,200
8 As. 4/A m' 2.00 95 1.90 8,000 15,200
9 As. 4/C m' 2.00 95 1.90 8,000 15,200
10 As. 4/D m' 2.00 95 1.90 8,000 15,200
11 As. 4/E m' 2.00 95 1.90 8,000 15,200
12 As. 4/F m' 2.00 95 1.90 8,000 15,200
13 As. 5/A m' 2.00 95 1.90 8,000 15,200
14 As. 5/C m' 2.00 95 1.90 8,000 15,200
15 As. 5/D m' 2.00 95 1.90 8,000 15,200
16 As. 5/E m' 2.00 95 1.90 8,000 15,200
17 As. 5/F m' 2.00 95 1.90 8,000 15,200

TOTAL 258,400.00
Pelaksana :
Jakarta, 26 Desember 2015
Kepala Tukang Costing, Site Manager, Project Manager

UNYIL PRAMA Damanik WELLY KURNIAWAN


Kepala Tukang Costing Site Manager Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

RISALAH PEMBAYARAN KEPALA TUKANG


No. DOM : 004
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 017/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Finishing
Lantai : GF2

NO URAIAN JUMLAH (RP)

A NILAI SPK 272,000.00

B PROGRESS AKUMULATIF S/D SAAT INI 258,400.00

C RETENSI 5 % (12,920.00)

D PEMBAYARAN AKUMULATIF S/D SAAT INI (B-C) 245,480.00

E PEMBAYARAN AKUMULATIF SEBELUMNYA (232,560.00)

F PEMBAYARAN SAAT INI (D-E) 12,920.00

G DIBULATKAN 12,000.00

TERBILANG Dua Belas Ribu Rupiah

Jakarta, 26 Desember 2015


Kepala Tukang Costing, Project Manager

UNYIL PRAMA WELLY KURNIAWAN


Kepala Tukang Costing Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

SURAT PERINTAH KERJA

No. SPK : 018/UNYL/FNS/P.1501/MAK/2015


Nama Kepala Tukan : UNYIL
Jenis Pekerjaan : Potong Mandor
Lantai :

INDIVIDU
HARGA
NO JENIS PEKERJAAN SAT VOL SPK NILAI SPK
SATUAN
SEKARANG
( Rp ) ( Rp )

Potong Retensi Maskuri

1 - Ciping + concrete fill kolom ramp, CR2 as. 8'/B', CR5 as. 8'/A-B m2 78.30 5,000 391,500
CR6 as. 9'/A, dari elvasi ramp turun - ramp naik,
- Plester + Aci kolom ramp, CR2 as. 8'/B', CR5 as. 8'/A-B m2 78.30 19,500 1,526,850
CR6 as. 9'/A, dari elvasi ramp turun - ramp naik,
- Pasang bongkar scaffolding pada area kolom ramp m2 24.30 6,000 145,800

2 - Concrete fill kolom K28 As. 4/A, Lt. GF2, m2 13.76 2,500 34,400
- Plester + Aci kolom K28 As. 4/A, Lt. GF2, m2 13.76 19,500 268,320

3 - Bobok kepala kolom karena ngplin, Lt. GF1, As. 3-5/G, 3/H, 5-7/H m2 28.80 7,500 216,000
4-7/J,

4 - Bongkar bekisting stopcor bondek pada kepala kolom Lt. GF1 titik 13.00 10,000 130,000
As. 4-7/F-J, 7/E

5 - Bobok ex cor pada kaki kolom Lt. GF1, As. 3-5/C, 4/D, 1-3/E, titik 11.00 25,000 275,000
5/E, 3-4/F, 5/G-H

6 - Bobok sisi kepala kolom karena ngplin, area ramp turun titik 4.00 112,500 450,000
CR2 As. 8'/C', CR2 As. 8'/B', CR5 As. 8'/A-B, CR6 As. 9'/A
2org, 3 hari

TOTAL 3,437,870.00

Menyetujui, Jakarta, 14 November 2015

UNYIL WELLY KURNIAWAN


Kepala Tukang Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 001
Periode : 29 Oktober 2015 - 11 November 2015
No. SPK : 018/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Potong Mandor
Lantai : 0

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)

Potong Retensi Maskuri

1 - Ciping + concrete fill kolom ramp, CR2 as. 8'/B', CR5 as. 8'/A-B m2 78.30 100 78.30 5,000 391,500
CR6 as. 9'/A, dari elvasi ramp turun - ramp naik,
- Plester + Aci kolom ramp, CR2 as. 8'/B', CR5 as. 8'/A-B m2 78.30 100 78.30 19,500 1,526,850
CR6 as. 9'/A, dari elvasi ramp turun - ramp naik,
- Pasang bongkar scaffolding pada area kolom ramp m2 24.30 100 24.30 6,000 145,800

2 - Concrete fill kolom K28 As. 4/A, Lt. GF2, m2 13.76 100 13.76 2,500 34,400
- Plester + Aci kolom K28 As. 4/A, Lt. GF2, m2 13.76 100 13.76 19,500 268,320

3 - Bobok kepala kolom karena ngplin, Lt. GF1, As. 3-5/G, 3/H, 5-7/H m2 28.80 90 25.92 7,500 194,400
4-7/J,

4 - Bongkar bekisting stopcor bondek pada kepala kolom Lt. GF1 titik 13.00 100 13.00 10,000 130,000
As. 4-7/F-J, 7/E

5 - Bobok ex cor pada kaki kolom Lt. GF1, As. 3-5/C, 4/D, 1-3/E, titik 11.00 100 11.00 25,000 275,000
5/E, 3-4/F, 5/G-H

6 - Bobok sisi kepala kolom karena ngplin, area ramp turun titik 4.00 100 4.00 112,500 450,000
CR2 As. 8'/C', CR2 As. 8'/B', CR5 As. 8'/A-B, CR6 As. 9'/A
2org, 3 hari

TOTAL 3,416,270.00
Pelaksana :
Jakarta, 14 November 2015
Kepala Tukang Costing, Site Manager, Project Manager

UNYIL PRAMA Damanik WELLY KURNIAWAN


Kepala Tukang Costing Site Manager Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

RISALAH PEMBAYARAN KEPALA TUKANG


No. DOM : 001
Periode : 29 Oktober 2015 - 11 November 2015
No. SPK : 018/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Potong Mandor
Lantai :

NO URAIAN JUMLAH (RP)

A NILAI SPK 3,437,870.00

B PROGRESS AKUMULATIF S/D SAAT INI 3,416,270.00

C RETENSI 5 % (170,813.50)

D PEMBAYARAN AKUMULATIF S/D SAAT INI (B-C) 3,245,456.50

E PEMBAYARAN AKUMULATIF SEBELUMNYA

F PEMBAYARAN SAAT INI (D-E) 3,245,456.50

G DIBULATKAN 3,245,000.00

TERBILANG Tiga Juta Dua Ratus Empat Puluh Lima Ribu Rupiah

Jakarta, 14 November 2015


Kepala Tukang Costing, Project Manager

UNYIL PRAMA WELLY KURNIAWAN


Kepala Tukang Costing Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 003
Periode : 26 November 2015 - 9 Desember 2015
No. SPK : 019-R1/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Finishing
Lantai : GF2

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)

Expose Balok dan Plat Dak Ramp Putar el. -1.750

1 - Balok m2 238.12 70 166.68 13,500 2,250,224


- Plat m2 164.65 - 9,000 -
- Scaffolding m2 24.30 80 19.44 6,000 116,640

TOTAL 2,366,863.75
Pelaksana :
Jakarta, 12 Desember 2015
Kepala Tukang Costing, Site Manager, Project Manager

UNYIL PRAMA Damanik WELLY KURNIAWAN


Kepala Tukang Costing Site Manager Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

RISALAH PEMBAYARAN KEPALA TUKANG


No. DOM : 003
Periode : 26 November 2015 - 9 Desember 2015
No. SPK : 019-R1/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Finishing
Lantai : GF2

NO URAIAN JUMLAH (RP)

A NILAI SPK 4,842,264.32

B PROGRESS AKUMULATIF S/D SAAT INI 2,366,863.75

C RETENSI 5 % (118,343.19)

D PEMBAYARAN AKUMULATIF S/D SAAT INI (B-C) 2,248,520.56

E PEMBAYARAN AKUMULATIF SEBELUMNYA (2,248,520.56)

F PEMBAYARAN SAAT INI (D-E) -

G DIBULATKAN -

TERBILANG Rupiah

Jakarta, 12 Desember 2015


Kepala Tukang Costing, Project Manager

UNYIL PRAMA WELLY KURNIAWAN


Kepala Tukang Costing Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 004
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 020/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Finishing
Lantai : 0

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)

Finishing

1 - Expose dinding RetWall lantai LG


As. 1'-4/J' m2 102.56 80 82.04 9,000 738,396
As. 1'/C-J' m2 267.25 80 213.80 9,000 1,924,164
As. 1'/C - 2/A' ( diagonal ) m2 53.32 80 42.66 9,000 383,904
As. 1-8/A' m2 196.01 80 156.81 9,000 1,411,250
Scaffolding pekerjaan expose dinding RetWall lt. LG m2 309.56 80 247.65 6,000 1,485,905

2 - Concrete fill kepala kolom Lt. GF1, As. 1/I, 2/J m2 17.28 95 16.42 2,500 41,040
- Plester Aci kepala kolom Lt. GF1, As. 1/I, 2/J m2 17.28 95 16.42 19,500 320,112

3 Pembersihan sambungan bondek pada balok baja LT. GF2


- As. 7/E m' 2.00 95 1.90 8,000 15,200
- As. 7/F m' 2.00 95 1.90 8,000 15,200
- As. 7/G m' 2.00 95 1.90 8,000 15,200
- As. 7/H m' 2.00 95 1.90 8,000 15,200
- As. 7/J m' 2.00 95 1.90 8,000 15,200
- As. 5/F m' 2.00 95 1.90 8,000 15,200
- As. 5/G m' 2.00 95 1.90 8,000 15,200
- As. 5/H m' 2.00 95 1.90 8,000 15,200
- As. 5/J m' 2.00 95 1.90 8,000 15,200
- As. 4/F m' 2.00 95 1.90 8,000 15,200
- As. 4/G m' 2.00 95 1.90 8,000 15,200
- As. 4/H m' 2.00 95 1.90 8,000 15,200
- As. 4/J m' 2.00 95 1.90 8,000 15,200

TOTAL 6,502,370.24
Pelaksana :
Jakarta, 26 Desember 2015
Kepala Tukang Costing, Site Manager, Project Manager

UNYIL PRAMA Damanik WELLY KURNIAWAN


Kepala Tukang Costing Site Manager Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

RISALAH PEMBAYARAN KEPALA TUKANG


No. DOM : 004
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 020/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Finishing
Lantai :

NO URAIAN JUMLAH (RP)

A NILAI SPK 8,017,682.80

B PROGRESS AKUMULATIF S/D SAAT INI 6,502,370.24

C RETENSI 5 % (325,118.51)

D PEMBAYARAN AKUMULATIF S/D SAAT INI (B-C) 6,177,251.73

E PEMBAYARAN AKUMULATIF SEBELUMNYA (4,207,269.18)

F PEMBAYARAN SAAT INI (D-E) 1,969,982.55

G DIBULATKAN 1,969,000.00

TERBILANG Satu Juta Sembilan Ratus Enam Puluh Sembilan Ribu Rupiah

Jakarta, 26 Desember 2015


Kepala Tukang Costing, Project Manager

UNYIL PRAMA WELLY KURNIAWAN


Kepala Tukang Costing Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

SURAT PERINTAH KERJA

No. SPK : 021/UNYL/FNS/P.1501/MAK/2015


Nama Kepala Tukan : UNYIL
Jenis Pekerjaan : Bongkar Material
Lantai :

INDIVIDU
HARGA
NO JENIS PEKERJAAN SAT VOL SPK NILAI SPK
SATUAN
SEKARANG
( Rp ) ( Rp )

Bongkar Material

1 Semen Gresik, SJ SI-1521333, tgl 6-11-2015 zak 200.00 1,000 200,000

2 Plester dan perekat bata ringan, SJ D1656958, tgl 2-11-2015 zak 190.00 1,000 190,000

3 Bata Ringan uk. 10 dan 7,5, BPB 890, tgl 2-11-2015, jam 02 bh 1,320.00 150 198,000

4 Bata Ringan uk. 10 dan 7,5, BPB 888, tgl 3-11-2015, jam 03.20 bh 990.00 150 148,500

5 Bata Ringan uk. 10 dan 7,5, BPB 887, tgl 3-11-2015, jam 03.25 bh 990.00 150 148,500

6 Bata Ringan uk. 10 dan 7,5, BPB 889, tgl 3-11-2015, jam 03.20 bh 990.00 150 148,500

7 Tambah bongkar Bata Ringan BPB 887, 888, 889 ls 1.00 200,000 200,000

TOTAL 1,233,500.00

Menyetujui, Jakarta, 14 November 2015

UNYIL WELLY KURNIAWAN


Kepala Tukang Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 001
Periode : 29 Oktober 2015 - 11 November 2015
No. SPK : 021/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Bongkar Material
Lantai : 0

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)

Bongkar Material

1 Semen Gresik, SJ SI-1521333, tgl 6-11-2015 zak 200.00 100 200.00 1,000 200,000

2 Plester dan perekat bata ringan, SJ D1656958, tgl 2-11-2015 zak 190.00 100 190.00 1,000 190,000

3 Bata Ringan uk. 10 dan 7,5, BPB 890, tgl 2-11-2015, jam 02 bh 1,320.00 100 1,320.00 150 198,000

4 Bata Ringan uk. 10 dan 7,5, BPB 888, tgl 3-11-2015, jam 03.20 bh 990.00 100 990.00 150 148,500

5 Bata Ringan uk. 10 dan 7,5, BPB 887, tgl 3-11-2015, jam 03.25 bh 990.00 100 990.00 150 148,500

6 Bata Ringan uk. 10 dan 7,5, BPB 889, tgl 3-11-2015, jam 03.20 bh 990.00 100 990.00 150 148,500

7 Tambah bongkar Bata Ringan BPB 887, 888, 889 ls 1.00 100 1.00 200,000 200,000

TOTAL 1,233,500.00
Pelaksana :
Jakarta, 14 November 2015
Kepala Tukang Costing, Site Manager, Project Manager

UNYIL PRAMA Damanik WELLY KURNIAWAN


Kepala Tukang Costing Site Manager Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

RISALAH PEMBAYARAN KEPALA TUKANG


No. DOM : 001
Periode : 29 Oktober 2015 - 11 November 2015
No. SPK : 021/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Bongkar Material
Lantai :

NO URAIAN JUMLAH (RP)

A NILAI SPK 1,233,500.00

B PROGRESS AKUMULATIF S/D SAAT INI 1,233,500.00

C RETENSI 5 % (61,675.00)

D PEMBAYARAN AKUMULATIF S/D SAAT INI (B-C) 1,171,825.00

E PEMBAYARAN AKUMULATIF SEBELUMNYA

F PEMBAYARAN SAAT INI (D-E) 1,171,825.00

G DIBULATKAN 1,171,000.00

TERBILANG Satu Juta Seratus Tujuh Puluh Satu Ribu Rupiah

Jakarta, 14 November 2015


Kepala Tukang Costing, Project Manager

UNYIL PRAMA WELLY KURNIAWAN


Kepala Tukang Costing Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 004
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 022-R1/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Finishing
Lantai :

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)

1 Pasang Dinding Celcon


- Toilet Public1, As. 3'-4/I-J m2 79.86 95 75.87 16,000 1,213,907
- R. Wudhu, As. 3'/J m2 36.37 95 34.55 16,000 552,878
- Mushola, As. 2-4/J-J' m2 131.22 95 124.66 16,000 1,994,482

2 Pasang Kolom Praktis


- Toilet Public1, As. 3'-4/I-J m' 69.44 95 65.97 16,000 1,055,488
- R. Wudhu, As. 3'/J m' 17.36 95 16.49 16,000 263,872
- Mushola, As. 2-4/J-J' m' 43.40 95 41.23 16,000 659,680

3 Pasang Balok Praktis


- Toilet Public1, As. 3'-4/I-J m' 1.80 95 1.71 16,000 27,360
- Mushola, As. 2-4/J-J' m' 20.37 95 19.35 16,000 309,624

4 Pasang steorofoam pertemuan celcon thdp plat


- Toilet Public1, As. 3'-4/I-J m' 19.10 95 18.14 1,500 27,210
- R. Wudhu, As. 3'/J m' 8.38 95 7.96 1,500 11,943
- Mushola, As. 2-4/J-J' m' 31.57 95 29.99 1,500 44,990

5 - Sloof pada area basah Lt. LG ( R.Wudhu - ToiletPublic ) m' 26.72 95 25.38 30,000 761,520
Uk. 25x10 cm

6 - Bor stek celcon dinding area musolla lt. LG, As. 2-4/J-J' titik 21.00 100 21.00 1,000 21,000
- Las stek kolom praktis pada balok baja lt. LG, As. 4/J-J' titik 4.00 100 4.00 2,000 8,000

7 Tambahan ringbalk gantung CO ADW1


- Mushola, As. 2-4/J-J' m' 4.00 100 4.00 4,800 19,200

TOTAL 6,971,154.30
Pelaksana :
Jakarta, 26 Desember 2015
Kepala Tukang Costing, Site Manager, Project Manager

UNYIL PRAMA Damanik WELLY KURNIAWAN


Kepala Tukang Costing Site Manager Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

RISALAH PEMBAYARAN KEPALA TUKANG


No. DOM : 004
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 022-R1/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Finishing
Lantai :

NO URAIAN JUMLAH (RP)

A NILAI SPK 7,196,640.32

B PROGRESS AKUMULATIF S/D SAAT INI 6,971,154.30

C RETENSI 5 % (348,557.72)

D PEMBAYARAN AKUMULATIF S/D SAAT INI (B-C) 6,622,596.59

E PEMBAYARAN AKUMULATIF SEBELUMNYA (6,622,596.59)

F PEMBAYARAN SAAT INI (D-E) -

G DIBULATKAN -

TERBILANG Rupiah

Jakarta, 26 Desember 2015


Kepala Tukang Costing, Project Manager

UNYIL PRAMA WELLY KURNIAWAN


Kepala Tukang Costing Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 003
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 023-R1/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Finishing
Lantai :

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)

1 Pasang Dinding Celcon


- Kios, As. 4-7/H m2 274.23 80 219.38 16,000 3,510,106
- Kios, As. 3'-7/I-J m2 405.00 85 344.25 16,000 5,508,022
- Kios, As. 4-7/G m2 283.80 85 241.23 16,000 3,859,707

2 Pasang Kolom Praktis


- Kios, As. 4-7/H m' 86.00 80 68.80 16,000 1,100,800
- Kios, As. 3'-7/I-J m' 94.60 85 80.41 16,000 1,286,560
- Kios, As. 4-7/G m' 86.00 85 73.10 16,000 1,169,600

3 Pasang Balok Praktis ( uk. 10x10cm )


- Kios, As. 4-7/H m' 16.74 80 13.39 16,000 214,272
- Kios, As. 3'-7/I-J m' 62.40 85 53.04 16,000 848,640
- Kios, As. 4-7/G m' 16.44 85 13.97 16,000 223,584

4 Pasang Balok Praktis ( RollingDoor uk. 15x10cm )


- Kios, As. 4-7/H m' 43.02 80 34.42 20,000 688,320
- Kios, As. 3'-7/I-J m' 52.40 80 41.92 20,000 838,400
- Kios, As. 4-7/G m' 42.17 80 33.74 20,000 674,720

5 Pasang steorofoam pertemuan celcon thdp plat


- Kios, As. 4-7/H m' 92.40 80 73.92 1,500 110,880
- Kios, As. 3'-7/I-J m' 129.71 80 103.77 1,500 155,654
- Kios, As. 4-7/G m' 95.20 80 76.16 16,000 1,218,560

6 - Bor stek celcon dinding Kios GF1 as 4-7/G-J ttk 217.00 85 184.45 1,000 184,450
- Las stek kolom praktis pada balok baja Kios GF1 as 4-7/G-J ttk 256.00 85 217.60 2,000 435,200

7 Penambahan harga ringbalk gantung (Kios)


- Kios, As. 4-7/H m' 44.80 80 35.84 4,800 172,032
- Kios, As. 3'-7/I-J m' 26.35 85 22.40 4,800 107,508
- Kios, As. 4-7/G m' 44.80 85 38.08 4,800 182,784

8 Scaffolding untuk RingBalok ( rollingdoor kios )


- Kios, As. 4-7/H m' 80.64 80 64.51 6,000 387,072
- Kios, As. 3'-7/I-J m' 47.43 85 40.32 6,000 241,893
- Kios, As. 4-7/G m' 80.64 85 68.54 6,000 411,264

9 - Expose Gutter melintang pada Ramp Turun (GF2) el. -1.750 m' 9.80 90 8.82 15,000 132,300

TOTAL 23,662,327.96
Pelaksana :
Jakarta, 26 Desember 2015
Kepala Tukang Costing, Site Manager, Project Manager

UNYIL PRAMA Damanik WELLY KURNIAWAN


Kepala Tukang Costing Site Manager Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

RISALAH PEMBAYARAN KEPALA TUKANG


No. DOM : 003
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 023-R1/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Finishing
Lantai :

NO URAIAN JUMLAH (RP)

A NILAI SPK 28,496,357.60

B PROGRESS AKUMULATIF S/D SAAT INI 23,662,327.96

C RETENSI 5 % (1,183,116.40)

D PEMBAYARAN AKUMULATIF S/D SAAT INI (B-C) 22,479,211.56

E PEMBAYARAN AKUMULATIF SEBELUMNYA (22,479,211.56)

F PEMBAYARAN SAAT INI (D-E) -

G DIBULATKAN -

TERBILANG Rupiah

Jakarta, 26 Desember 2015


Kepala Tukang Costing, Project Manager

UNYIL PRAMA WELLY KURNIAWAN


Kepala Tukang Costing Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

SURAT PERINTAH KERJA

No. SPK : 024/UNYL/FNS/P.1501/MAK/2015


Nama Kepala Tukan : UNYIL
Jenis Pekerjaan : Bongkar Material
Lantai :

INDIVIDU
HARGA
NO JENIS PEKERJAAN SAT VOL SPK NILAI SPK
SATUAN
SEKARANG
( Rp ) ( Rp )

Bongkar Material

1 Bata Ringan uk. 10 dan 7,5, BPB 940, tgl 24-11-2015, jam 22.00 bh 990.00 150 148,500

2 Bata Ringan uk. 10 dan 7,5, BPB 937, tgl 24-11-2015, jam 22.00 bh 990.00 150 148,500

3 Bata Ringan uk. 10 dan 7,5, BPB 932, tgl 23-11-2015, jam 21.50 bh 990.00 150 148,500

4 Acian Plester & perekat celcon, BPB 927, tgl 20-11-2015 zak 150.00 1,000 150,000

TOTAL 595,500.00

Menyetujui, Jakarta, 28 November 2015

UNYIL WELLY KURNIAWAN


Kepala Tukang Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 001
Periode : 12 November 2015 - 25 November 2015
No. SPK : 024/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Bongkar Material
Lantai : 0

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)

Bongkar Material

1 Bata Ringan uk. 10 dan 7,5, BPB 940, tgl 24-11-2015, jam 22.00 bh 990.00 100 990.00 150 148,500

2 Bata Ringan uk. 10 dan 7,5, BPB 937, tgl 24-11-2015, jam 22.00 bh 990.00 100 990.00 150 148,500

3 Bata Ringan uk. 10 dan 7,5, BPB 932, tgl 23-11-2015, jam 21.50 bh 990.00 100 990.00 150 148,500

4 Acian Plester & perekat celcon, BPB 927, tgl 20-11-2015 zak 150.00 100 150.00 1,000 150,000

TOTAL 595,500.00
Pelaksana :
Jakarta, 28 November 2015
Kepala Tukang Costing, Site Manager, Project Manager

UNYIL PRAMA Damanik WELLY KURNIAWAN


Kepala Tukang Costing Site Manager Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

RISALAH PEMBAYARAN KEPALA TUKANG


No. DOM : 001
Periode : 12 November 2015 - 25 November 2015
No. SPK : 024/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Bongkar Material
Lantai :

NO URAIAN JUMLAH (RP)

A NILAI SPK 595,500.00

B PROGRESS AKUMULATIF S/D SAAT INI 595,500.00

C RETENSI 5 % (29,775.00)

D PEMBAYARAN AKUMULATIF S/D SAAT INI (B-C) 565,725.00

E PEMBAYARAN AKUMULATIF SEBELUMNYA

F PEMBAYARAN SAAT INI (D-E) 565,725.00

G DIBULATKAN 565,000.00

TERBILANG Lima Ratus Enam Puluh Lima Ribu Rupiah

Jakarta, 28 November 2015


Kepala Tukang Costing, Project Manager

UNYIL PRAMA WELLY KURNIAWAN


Kepala Tukang Costing Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

SURAT PERINTAH KERJA

No. SPK : 025/UNYL/FNS/P.1501/MAK/2015


Nama Kepala Tukan : UNYIL
Jenis Pekerjaan : Finishing
Lantai : GF1

INDIVIDU
HARGA
NO JENIS PEKERJAAN SAT VOL SPK NILAI SPK
SATUAN
SEKARANG
( Rp ) ( Rp )

1 Pasang Dinding Celcon


- Kios, As. 8-10/G m2 279.97 16,000 4,479,587
- Kios, As. 8-10/H m2 270.68 16,000 4,330,864
- Kios, As. 8-10'/J m2 397.14 16,000 6,354,310

2 Pasang Kolom Praktis


- Kios, As. 8-10/G m' 163.40 16,000 2,614,400
- Kios, As. 8-10/H m' 103.20 16,000 1,651,200
- Kios, As. 8-10'/J m' 111.80 16,000 1,788,800

3 Pasang Balok Praktis ( RollingDoor uk. 15x10cm )


- Kios, As. 8-10/G m' 43.13 20,000 862,600
- Kios, As. 8-10/H m' 42.40 20,000 848,000
- Kios, As. 8-10'/J m' 52.39 20,000 1,047,800

4 Pasang steorofoam pertemuan celcon thdp plat


- Kios, As. 8-10/G m' 94.38 1,500 141,576
- Kios, As. 8-10/H m' 91.73 1,500 137,595
- Kios, As. 8-10'/J m' 127.88 16,000 2,046,048

5 - Bor stek celcon dinding Kios GF1 as 8-10/G-J ttk 24.00 1,000 24,000

6 Penambahan harga ringbalk gantung (Kios)


- Kios, As. 8-10/G m' 43.13 4,800 207,024
- Kios, As. 8-10/H m' 42.40 4,800 203,520
- Kios, As. 8-10'/J m' 52.39 4,800 251,472

7 Scaffolding untuk RingBalok ( rollingdoor kios )


- Kios, As. 8-10/G m2 77.63 6,000 465,804
- Kios, As. 8-10/H m2 76.32 6,000 457,920
- Kios, As. 8-10'/J m2 94.30 6,000 565,812

8 - Las stek kolom praktis ketemu bondek dan baja titik 88.00 2,000 176,000

TOTAL 28,654,332.60

Menyetujui, Jakarta, 12 Desember 2015

UNYIL WELLY KURNIAWAN


Kepala Tukang Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 001
Periode : 26 November 2015 - 9 Desember 2015
No. SPK : 025/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Finishing
Lantai :

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)

1 Pasang Dinding Celcon


- Kios, As. 8-10/G m2 279.97 25 69.99 16,000 1,119,897
- Kios, As. 8-10/H m2 270.68 - 16,000 -
- Kios, As. 8-10'/J m2 397.14 - 16,000 -

2 Pasang Kolom Praktis


- Kios, As. 8-10/G m' 163.40 25 40.85 16,000 653,600
- Kios, As. 8-10/H m' 103.20 - 16,000 -
- Kios, As. 8-10'/J m' 111.80 - 16,000 -

3 Pasang Balok Praktis ( RollingDoor uk. 15x10cm )


- Kios, As. 8-10/G m' 43.13 - 20,000 -
- Kios, As. 8-10/H m' 42.40 - 20,000 -
- Kios, As. 8-10'/J m' 52.39 - 20,000 -

4 Pasang steorofoam pertemuan celcon thdp plat


- Kios, As. 8-10/G m' 94.38 - 1,500 -
- Kios, As. 8-10/H m' 91.73 - 1,500 -
- Kios, As. 8-10'/J m' 127.88 - 16,000 -

5 - Bor stek celcon dinding Kios GF1 as 8-10/G-J ttk 24.00 25 6.00 1,000 6,000

6 Penambahan harga ringbalk gantung (Kios)


- Kios, As. 8-10/G m' 43.13 - 4,800 -
- Kios, As. 8-10/H m' 42.40 - 4,800 -
- Kios, As. 8-10'/J m' 52.39 - 4,800 -

7 Scaffolding untuk RingBalok ( rollingdoor kios )


- Kios, As. 8-10/G m2 77.63 - 6,000 -
- Kios, As. 8-10/H m2 76.32 - 6,000 -
- Kios, As. 8-10'/J m2 94.30 - 6,000 -

8 - Las stek kolom praktis ketemu bondek dan baja titik 88.00 25 22.00 2,000 44,000

TOTAL 1,823,496.80
Pelaksana :
Jakarta, 12 Desember 2015
Kepala Tukang Costing, Site Manager, Project Manager

UNYIL PRAMA Damanik WELLY KURNIAWAN


Kepala Tukang Costing Site Manager Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

RISALAH PEMBAYARAN KEPALA TUKANG


No. DOM : 001
Periode : 26 November 2015 - 9 Desember 2015
No. SPK : 025/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Finishing
Lantai :

NO URAIAN JUMLAH (RP)

A NILAI SPK 28,654,332.60

B PROGRESS AKUMULATIF S/D SAAT INI 1,823,496.80

C RETENSI 5 % (91,174.84)

D PEMBAYARAN AKUMULATIF S/D SAAT INI (B-C) 1,732,321.96

E PEMBAYARAN AKUMULATIF SEBELUMNYA

F PEMBAYARAN SAAT INI (D-E) 1,732,321.96

G DIBULATKAN 1,732,000.00

TERBILANG Satu Juta Tujuh Ratus Tiga Puluh Dua Ribu Rupiah

Jakarta, 12 Desember 2015


Kepala Tukang Costing, Project Manager

UNYIL PRAMA WELLY KURNIAWAN


Kepala Tukang Costing Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 002
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 026/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Finishing
Lantai :

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)

1 Pasang Dinding Celcon


- Lobby Escalator, LG. As. 3'/G-H m2 133.08 40 53.23 16,000 851,709

2 Pasang Kolom Praktis


- Lobby Escalator, LG. As. 3'/G-H m' 30.10 40 12.04 16,000 192,640

3 Pasang Balok Praktis ( uk. 10x20cm )


- Lobby Escalator, LG. As. 3'/G-H m' 7.15 90 6.44 20,000 128,700

4 Pasang steorofoam pertemuan celcon thdp plat


- Lobby Escalator, LG. As. 3'/G-H m' 37.41 60 22.45 1,500 33,671

5 - Bor stek celcon dinding Lobby Escalator, LG. As. 3'/G-H ttk 16.00 50 8.00 1,000 8,000

6 Penambahan harga ringbalk gantung


- Lobby Escalator, LG. As. 3'/G-H m' 7.15 90 6.44 4,800 30,888

7 Scaffolding untuk RingBalok


- Lobby Escalator, LG. As. 3'/G-H m' 12.87 80 10.30 6,000 61,776

8 - Las stek kolom praktis ketemu bondek dan baja titik 28.00 50 14.00 2,000 28,000

TOTAL 1,335,384.24
Pelaksana :
Jakarta, 26 Desember 2015
Kepala Tukang Costing, Site Manager, Project Manager

UNYIL PRAMA Damanik WELLY KURNIAWAN


Kepala Tukang Costing Site Manager Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

RISALAH PEMBAYARAN KEPALA TUKANG


No. DOM : 002
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 026/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Finishing
Lantai :

NO URAIAN JUMLAH (RP)

A NILAI SPK 2,993,531.60

B PROGRESS AKUMULATIF S/D SAAT INI 1,335,384.24

C RETENSI 5 % (66,769.21)

D PEMBAYARAN AKUMULATIF S/D SAAT INI (B-C) 1,268,615.03

E PEMBAYARAN AKUMULATIF SEBELUMNYA (497,860.00)

F PEMBAYARAN SAAT INI (D-E) 770,755.03

G DIBULATKAN 770,000.00

TERBILANG Tujuh Ratus Tujuh Puluh Ribu Rupiah

Jakarta, 26 Desember 2015


Kepala Tukang Costing, Project Manager

sember 2015
UNYIL PRAMA WELLY KURNIAWAN
Kepala Tukang Costing Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 002
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 027/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Finishing
Lantai :

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)

Expose Plat ( Dak ) Lantai LG


1 - Area Mushola, As. 2-4/J-J' m2 80.74 95 76.70 9,000 690,318
- Area Parkir, As. 1-2/H'-J' m2 89.26 95 84.79 9,000 763,155

3 - Pasang bongkar scaffolding untuk pek expose plat musolla m2 71.68 100 71.68 6,000 430,056
dan parkir lantai LG, As. 1-2/H'-J'

2 - Plester Aci, Kolom LG. As. 1/H m2 13.22 80 10.58 19,500 206,271
- Plester Aci, Kolom LG. As. 1/H' m2 12.26 80 9.80 19,500 191,178
- Plester Aci, Kolom LG. As. 1/I m2 11.61 95 11.03 19,500 215,075
- Plester Aci, Kolom LG. As. 2/J m2 11.61 95 11.03 19,500 215,075
- Plester Aci, Kolom LG. As. 3/J m2 11.61 95 11.03 19,500 215,075

3 - Plester Aci, pertemuan sudut RetWall LG. As. 1'/A' m2 4.30 100 4.30 19,500 83,850
- Plester Aci, pertemuan sudut RetWall LG. As. 0/A m2 4.30 100 4.30 19,500 83,850
- Plester Aci, pertemuan sudut RetWall LG. As. 0/B m2 4.30 100 4.30 19,500 83,850
- Plester Aci, pertemuan sudut RetWall LG. As. 5'/A' m2 4.30 100 4.30 19,500 83,850
- Plester Aci, pertemuan sudut Mushola LG. As. 4/J' m2 4.30 100 4.30 19,500 83,850

4 - ConcreteFill Dinding RetWall ( pertemuaan ex bekisting dan m2 81.15 95 77.09 2,500 192,732
pertemuan dinding dan plat ), As. 0/H'-J', 0-4/J'
- Plester+Aci Dinding RetWall ( pertemuaan ex bekisting dan m2 81.15 95 77.09 19,500 1,503,313
pertemuan dinding dan plat ), As. 0/H'-J', 0-4/J'

5 - ConcreteFill Dinding RetWall ( pertemuaan ex bekisting dan m2 27.84 95 26.45 2,500 66,126
pertemuan dinding dan plat ), As. 2-3/A', 4-5/A'
- Plester+Aci Dinding RetWall ( pertemuaan ex bekisting dan m2 27.84 95 26.45 19,500 515,782
pertemuan dinding dan plat ), As. 2-3/A', 4-5/A'

6 - Concrete fill balok luar sisi dalam Ramp Turun As. 9'/D-10'/C m2 21.83 90 19.65 2,500 49,122
- Plester+ Aci balok luar sisi dalam Ramp Turun As. 9'/D-10'/C m2 21.83 90 19.65 19,500 383,152

7 - Concrete fill balok tengah Ramp Turun As. 9/A - 10/D m2 53.98 90 48.58 2,500 121,453
- Plester + Aci balok tengah Ramp Turun As. 9/A - 10/D m2 53.98 90 48.58 19,500 947,331

8 - Grouting lubang ex tierod pada balok tengah Ramp Turun titik 410.00 95 389.50 2,000 779,000
As. 9/A - 10/D

9 - Ciping + ConcreteFill Kolom (luar) Ramp Turun, m2 51.45 95 48.88 5,000 244,388
CR4,CR12,CR13,CR14,CR4,CR9,CR10
- Ciping + ConcreteFill Kolom (luar) Ramp Turun, m2 51.45 95 48.88 19,500 953,111
CR4,CR12,CR13,CR14,CR4,CR9,CR10

TOTAL 9,100,963.93
Pelaksana :
Jakarta, 26 Desember 2015
Kepala Tukang Costing, Site Manager, Project Manager

UNYIL PRAMA Damanik WELLY KURNIAWAN


Kepala Tukang Costing Site Manager Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

RISALAH PEMBAYARAN KEPALA TUKANG


No. DOM : 002
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 027/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Finishing
Lantai :

NO URAIAN JUMLAH (RP)

A NILAI SPK 9,701,486.75

B PROGRESS AKUMULATIF S/D SAAT INI 9,100,963.93

C RETENSI 5 % (455,048.20)

D PEMBAYARAN AKUMULATIF S/D SAAT INI (B-C) 8,645,915.73

E PEMBAYARAN AKUMULATIF SEBELUMNYA (8,510,181.87)

F PEMBAYARAN SAAT INI (D-E) 135,733.86

G DIBULATKAN 135,000.00

TERBILANG Seratus Tiga Puluh Lima Ribu Rupiah

Jakarta, 26 Desember 2015


Kepala Tukang Costing, Project Manager

UNYIL PRAMA WELLY KURNIAWAN


Kepala Tukang Costing Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

SURAT PERINTAH KERJA

No. SPK : 028/UNYL/FNS/P.1501/MAK/2015


Nama Kepala Tukan : UNYIL
Jenis Pekerjaan : Bongkat Material
Lantai :

INDIVIDU
HARGA
NO JENIS PEKERJAAN SAT VOL SPK NILAI SPK
SATUAN
SEKARANG
( Rp ) ( Rp )

Bongkat Material

1 - Bata Ringan ( uk. 10cm ), tgl 11-12-2015, SJ SJ/SLI/1512009 bh 1,050.00 150 157,500

2 - Bata Ringan ( uk. 10cm ), tgl 14-12-2015, SJ SJ/SLI/1512016 bh 1,050.00 150 157,500

3 - Bata Ringan ( uk. 10cm ), tgl 11-12-2015, SJ SJ/SLI/1512010 bh 1,050.00 150 157,500

4 - Bata Ringan ( uk. 10cm ), tgl 14-12-2015, SJ SJ/SLI/1512015 bh 1,050.00 150 157,500

5 - MU 830, 40 kg, tgl 5-12-2015, No. 990 zak 70.00 1,000 70,000

6 - Semen Gresik, 40 kg, tgl 5-12-2015, No. 994 zak 200.00 1,000 200,000

7 - Aka Mortar 300, 40 kg, tgl 8-12-2015, No. 999 zak 250.00 1,000 250,000

TOTAL 1,150,000.00

Menyetujui, Jakarta, 12 Desember 2015

UNYIL WELLY KURNIAWAN


Kepala Tukang Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 001
Periode : 26 November 2015 - 9 Desember 2015
No. SPK : 028/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Bongkat Material
Lantai :

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)

1 - Bata Ringan ( uk. 10cm ), tgl 11-12-2015, SJ SJ/SLI/1512009 bh 1,050.00 100 1,050.00 150 157,500

2 - Bata Ringan ( uk. 10cm ), tgl 14-12-2015, SJ SJ/SLI/1512016 bh 1,050.00 100 1,050.00 150 157,500

3 - Bata Ringan ( uk. 10cm ), tgl 11-12-2015, SJ SJ/SLI/1512010 bh 1,050.00 100 1,050.00 150 157,500

4 - Bata Ringan ( uk. 10cm ), tgl 14-12-2015, SJ SJ/SLI/1512015 bh 1,050.00 100 1,050.00 150 157,500

5 - MU 830, 40 kg, tgl 5-12-2015, No. 990 zak 70.00 100 70.00 1,000 70,000

6 - Semen Gresik, 40 kg, tgl 5-12-2015, No. 994 zak 200.00 100 200.00 1,000 200,000

7 - Aka Mortar 300, 40 kg, tgl 8-12-2015, No. 999 zak 250.00 100 250.00 1,000 250,000

TOTAL 1,150,000.00
Pelaksana :
Jakarta, 12 Desember 2015
Kepala Tukang Costing, Site Manager, Project Manager

UNYIL PRAMA Damanik WELLY KURNIAWAN


Kepala Tukang Costing Site Manager Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

RISALAH PEMBAYARAN KEPALA TUKANG


No. DOM : 001
Periode : 26 November 2015 - 9 Desember 2015
No. SPK : 028/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Bongkat Material
Lantai :

NO URAIAN JUMLAH (RP)

A NILAI SPK 1,150,000.00

B PROGRESS AKUMULATIF S/D SAAT INI 1,150,000.00

C RETENSI 5 % (57,500.00)

D PEMBAYARAN AKUMULATIF S/D SAAT INI (B-C) 1,092,500.00

E PEMBAYARAN AKUMULATIF SEBELUMNYA

F PEMBAYARAN SAAT INI (D-E) 1,092,500.00

G DIBULATKAN 1,092,000.00

TERBILANG Satu Juta Sembilan Puluh Dua Ribu Rupiah

Jakarta, 12 Desember 2015


Kepala Tukang Costing, Project Manager

UNYIL PRAMA WELLY KURNIAWAN


Kepala Tukang Costing Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

SURAT PERINTAH KERJA

No. SPK : 029/UNYL/FNS/P.1501/MAK/2015


Nama Kepala Tukan : UNYIL
Jenis Pekerjaan : Finishing
Lantai :

INDIVIDU
HARGA
NO JENIS PEKERJAAN SAT VOL SPK NILAI SPK
SATUAN
SEKARANG
( Rp ) ( Rp )

Finishing

1 - Potong Besi stek ex tierod, area ramp As. 8-9, pada kolom titik 20.00 2,500 50,000
dinding, dan balok,

2 - Bobok+ buang puing bata ringan pertemuan dengan balok baja hp 6.00 75,000 450,000
Lt. GF1 AS. 3-5/I-J, karena pekerjaan fireproof akan dikerjakan.
2org, 08-16, tgl 08-10

TOTAL 500,000.00

Menyetujui, Jakarta, 12 Desember 2015

UNYIL WELLY KURNIAWAN


Kepala Tukang Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 001
Periode : 26 November 2015 - 9 Desember 2015
No. SPK : 029/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Finishing
Lantai :

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)

1 - Potong Besi stek ex tierod, area ramp As. 8-9, pada kolom titik 20.00 100 20.00 2,500 50,000
dinding, dan balok,

2 - Bobok+ buang puing bata ringan pertemuan dengan balok baja hp 6.00 100 6.00 75,000 450,000
Lt. GF1 AS. 3-5/I-J, karena pekerjaan fireproof akan dikerjakan.
2org, 08-16, tgl 08-10

TOTAL 500,000.00
Pelaksana :
Jakarta, 12 Desember 2015
Kepala Tukang Costing, Site Manager, Project Manager

UNYIL PRAMA Damanik WELLY KURNIAWAN


Kepala Tukang Costing Site Manager Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

RISALAH PEMBAYARAN KEPALA TUKANG


No. DOM : 001
Periode : 26 November 2015 - 9 Desember 2015
No. SPK : 029/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Finishing
Lantai :

NO URAIAN JUMLAH (RP)

A NILAI SPK 500,000.00

B PROGRESS AKUMULATIF S/D SAAT INI 500,000.00

C RETENSI 5 % (25,000.00)

D PEMBAYARAN AKUMULATIF S/D SAAT INI (B-C) 475,000.00

E PEMBAYARAN AKUMULATIF SEBELUMNYA

F PEMBAYARAN SAAT INI (D-E) 475,000.00

G DIBULATKAN 475,000.00

TERBILANG Empat Ratus Tujuh Puluh Lima Ribu Rupiah

Jakarta, 12 Desember 2015


Kepala Tukang Costing, Project Manager

UNYIL PRAMA WELLY KURNIAWAN


Kepala Tukang Costing Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

SURAT PERINTAH KERJA

No. SPK : 030/UNYL/FNS/P.1501/MAK/2015


Nama Kepala Tukan : UNYIL
Jenis Pekerjaan : Potong Mandor
Lantai :

INDIVIDU
HARGA
NO JENIS PEKERJAAN SAT VOL SPK NILAI SPK
SATUAN
SEKARANG
( Rp ) ( Rp )

Potong Retensi Mandor Maskuri

1 - Bongkar sisa bekisting angkur baja pertemuan dengan hp 4.00 75,000 300,000
Plat Lt.GF1

2 - Bongkar sisa bekisting kepala kolom pertemuan dengan hp 4.00 75,000 300,000
Plat Lt.GF2

4 - Bobok Dinding RetWall ( pertemuaan ex bekisting dan hp 3.00 75,000 225,000


pertemuan dinding dan plat ), As. 4/A', 0/C, 0/D, 0/E, 2/J', 3/J'
- Plester+Aci Dinding RetWall ( pertemuaan ex bekisting dan hp 3.00 75,000 225,000
pertemuan dinding dan plat ), As. 4/A', 0/C, 0/D, 0/E, 2/J', 3/J'

5 - Bobok Dinding RetWall ( pertemuaan ex bekisting dan hp 3.00 75,000 225,000


pertemuan dinding dan plat ), As. 0/F', 1/G', 1/H, 1/H', 0/H', 0/J
- Plester+Aci Dinding RetWall ( pertemuaan ex bekisting dan hp 3.00 75,000 225,000
pertemuan dinding dan plat ), As. 0/F', 1/G', 1/H, 1/H', 0/H', 0/J

TOTAL 1,500,000.00

Menyetujui, Jakarta, 12 Desember 2015

UNYIL WELLY KURNIAWAN


Kepala Tukang Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 001
Periode : 26 November 2015 - 9 Desember 2015
No. SPK : 030/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Potong Mandor
Lantai :

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)

Potong Retensi Mandor Maskuri

1 - Bongkar sisa bekisting angkur baja pertemuan dengan hp 4.00 100 4.00 75,000 300,000
Plat Lt.GF1

2 - Bongkar sisa bekisting kepala kolom pertemuan dengan hp 4.00 100 4.00 75,000 300,000
Plat Lt.GF2

4 - Bobok Dinding RetWall ( pertemuaan ex bekisting dan hp 3.00 100 3.00 75,000 225,000
pertemuan dinding dan plat ), As. 4/A', 0/C, 0/D, 0/E, 2/J', 3/J'
- Plester+Aci Dinding RetWall ( pertemuaan ex bekisting dan hp 3.00 100 3.00 75,000 225,000
pertemuan dinding dan plat ), As. 4/A', 0/C, 0/D, 0/E, 2/J', 3/J'

5 - Bobok Dinding RetWall ( pertemuaan ex bekisting dan hp 3.00 100 3.00 75,000 225,000
pertemuan dinding dan plat ), As. 0/F', 1/G', 1/H, 1/H', 0/H', 0/J
- Plester+Aci Dinding RetWall ( pertemuaan ex bekisting dan hp 3.00 100 3.00 75,000 225,000
pertemuan dinding dan plat ), As. 0/F', 1/G', 1/H, 1/H', 0/H', 0/J

TOTAL 1,500,000.00
Pelaksana :
Jakarta, 12 Desember 2015
Kepala Tukang Costing, Site Manager, Project Manager

UNYIL PRAMA Damanik WELLY KURNIAWAN


Kepala Tukang Costing Site Manager Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

RISALAH PEMBAYARAN KEPALA TUKANG


No. DOM : 001
Periode : 26 November 2015 - 9 Desember 2015
No. SPK : 030/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Potong Mandor
Lantai :

NO URAIAN JUMLAH (RP)

A NILAI SPK 1,500,000.00

B PROGRESS AKUMULATIF S/D SAAT INI 1,500,000.00

C RETENSI 5 % (75,000.00)

D PEMBAYARAN AKUMULATIF S/D SAAT INI (B-C) 1,425,000.00

E PEMBAYARAN AKUMULATIF SEBELUMNYA

F PEMBAYARAN SAAT INI (D-E) 1,425,000.00

G DIBULATKAN 1,425,000.00

TERBILANG Satu Juta Empat Ratus Dua Puluh Lima Ribu Rupiah

Jakarta, 12 Desember 2015


Kepala Tukang Costing, Project Manager

UNYIL PRAMA WELLY KURNIAWAN


Kepala Tukang Costing Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

SURAT PERINTAH KERJA

No. SPK : 031/UNYL/FNS/P.1501/MAK/2015


Nama Kepala Tukan : UNYIL
Jenis Pekerjaan : Finishing
Lantai : LG

INDIVIDU
HARGA
NO JENIS PEKERJAAN SAT VOL SPK NILAI SPK
SATUAN
SEKARANG
( Rp ) ( Rp )

1 Pasang Dinding Celcon


- Kios, As. 1-3/G'-J' m2 289.36 16,000 4,629,758

2 Pasang Kolom Praktis


- Kios, As. 1-3/G'-J' m' 64.50 16,000 1,032,000

3 Pasang Balok Praktis 10x10


- Kios, As. 1-3/G'-J' m' 35.50 16,000 568,000

4 - Pasang Balok Praktis Rolling Door 10x15cm


Kios, As. 1-3/G'-J' m' 58.95 20,000 1,179,000

5 Pasang steorofoam pertemuan celcon thdp plat


- Kios, As. 1-3/G'-J' m' 126.24 1,500 189,365

6 - Bor stek celcon dinding Kios, As. 1-3/G'-J' ttk 70.00 1,000 70,000
- Las stek kolom praktis pada balok baja Kios, As. 1-3/G'-J' ttk 60.00 2,000 120,000

7 Penambahan harga ringbalk gantung (Kios)


- Kios, As. 1-3/G'-J' m' 58.95 4,800 282,960

8 Scaffolding untuk RingBalok ( rollingdoor kios )


- Kios, As. 1-3/G'-J' m' 106.11 6,000 636,660

9 Scaffolding untuk celcon


- Kios, As. 1-3/G'-J' m' 121.13 6,000 726,764

TOTAL 9,434,507.30

Menyetujui, Jakarta, 26 Desember 2015

UNYIL WELLY KURNIAWAN


Kepala Tukang Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 001
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 031/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Finishing
Lantai :

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)

1 Pasang Dinding Celcon


- Kios, As. 1-3/G'-J' m2 289.36 40 115.74 16,000 1,851,903

2 Pasang Kolom Praktis


- Kios, As. 1-3/G'-J' m' 146.20 40 58.48 16,000 935,680

3 Pasang Balok Praktis 10x10


- Kios, As. 1-3/G'-J' m' 35.50 20 7.10 16,000 113,600

4 - Pasang Balok Praktis Rolling Door 10x15cm


Kios, As. 1-3/G'-J' m' 58.95 - 20,000 -

5 Pasang steorofoam pertemuan celcon thdp plat


- Kios, As. 1-3/G'-J' m' 126.24 - 1,500 -

6 - Bor stek celcon dinding Kios, As. 1-3/G'-J' ttk 70.00 40 28.00 1,000 28,000
- Las stek kolom praktis pada balok baja Kios, As. 1-3/G'-J' ttk 60.00 20 12.00 2,000 24,000

7 Penambahan harga ringbalk gantung (Kios)


- Kios, As. 1-3/G'-J' m' 58.95 20 11.79 4,800 56,592

8 Scaffolding untuk RingBalok ( rollingdoor kios )


- Kios, As. 1-3/G'-J' m' 106.11 20 21.22 6,000 127,332

9 Scaffolding untuk celcon


- Kios, As. 1-3/G'-J' m' 121.13 20 24.23 6,000 145,353

TOTAL 3,282,460.24
Pelaksana :
Jakarta, 26 Desember 2015
Kepala Tukang Costing, Site Manager, Project Manager

UNYIL PRAMA Damanik WELLY KURNIAWAN


Kepala Tukang Costing Site Manager Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

RISALAH PEMBAYARAN KEPALA TUKANG


No. DOM : 001
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 031/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Finishing
Lantai :

NO URAIAN JUMLAH (RP)

A NILAI SPK 9,434,507.30

B PROGRESS AKUMULATIF S/D SAAT INI 3,282,460.24

C RETENSI 5 % (164,123.01)

D PEMBAYARAN AKUMULATIF S/D SAAT INI (B-C) 3,118,337.23

E PEMBAYARAN AKUMULATIF SEBELUMNYA

F PEMBAYARAN SAAT INI (D-E) 3,118,337.23

G DIBULATKAN 3,118,000.00

TERBILANG Tiga Juta Seratus Delapan Belas Ribu Rupiah

Jakarta, 26 Desember 2015


Kepala Tukang Costing, Project Manager

UNYIL PRAMA WELLY KURNIAWAN


Kepala Tukang Costing Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

SURAT PERINTAH KERJA

No. SPK : 032/UNYL/FNS/P.1501/MAK/2015


Nama Kepala Tukan : UNYIL
Jenis Pekerjaan : Finishing
Lantai :

INDIVIDU
HARGA
NO JENIS PEKERJAAN SAT VOL SPK NILAI SPK
SATUAN
SEKARANG
( Rp ) ( Rp )

Finishing

1 - Expose dinding RetWall, As. 4'-9'/J' m2 55.72 9,000 501,458

2 Expose Plat Lantai GF1


- As. 4-10/J' m2 274.19 9,000 2,467,748
- As. 0-5'/A-G m2 203.54 9,000 1,831,828

3 - Bongkar Pasang scaffolding untuk Expose Plat Lantai GF1, m2 345.00 6,000 2,070,000
As. 4-10/J', As. 0-5'/A-G. incl jembatan kerja

4 Plester dinding LG
- Area Toilet dan Ruang Wudhu, As. 3'/J m2 232.47 11,500 2,673,428
- Area Lobby Escalator, As. 3-4'/G-I m2 269.15 11,500 3,095,250
- Area Mushola, As. 2-4/J-J' m2 262.43 11,500 3,017,966

5 Aci dinding LG
- Area Toilet dan Ruang Wudhu, As. 3'/J m2 232.47 10,000 2,324,720
- Area Lobby Escalator, As. 3-4'/G-I m2 269.15 10,000 2,691,522
- Area Mushola, As. 2-4/J-J' m2 262.43 10,000 2,624,319

6 Screeding lantai LG
- Area Mushola, As. 2-4/J-J' m2 161.48 8,000 1,291,824
- Area Toilet dan Ruang Wudhu, As. 3'/J m2 55.28 8,000 442,212

7 Waste celcon+pasir urugan 35 cm Area Toilet dan m2 55.28 27,500 1,520,102


Ruang Wudhu, As. 3'/J

8 Pasang Wiremesh Area Toilet dan Ruang Wudhu, As. 3'/J m2 55.28 3,500 193,468

9 Angkut Material Pasir dan split, lokasi screeding area Mushola


- Urugan m3 8.29 2,500 20,729
- Screeding m2 216.75 2,000 433,509

TOTAL 27,200,080.48

Menyetujui, Jakarta, 26 Desember 2015

UNYIL WELLY KURNIAWAN


Kepala Tukang Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 001
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 032/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Finishing
Lantai :

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)

Finishing

1 - Expose dinding RetWall, As. 4'-9'/J' m2 55.72 - 9,000 -

2 Expose Plat Lantai GF1


- As. 4-10/J' m2 274.19 90 246.77 9,000 2,220,973
- As. 0-5'/A-G m2 203.54 90 183.18 9,000 1,648,645

3 - Bongkar Pasang scaffolding untuk Expose Plat Lantai GF1, m2 345.00 90 310.50 6,000 1,863,000
As. 4-10/J', As. 0-5'/A-G. incl jembatan kerja

4 Plester dinding LG
- Area Toilet dan Ruang Wudhu, As. 3'/J m2 232.47 90 209.22 11,500 2,406,085
- Area Lobby Escalator, As. 3-4'/G-I m2 269.15 - 11,500 -
- Area Mushola, As. 2-4/J-J' m2 262.43 60 157.46 11,500 1,810,780

5 Aci dinding LG
- Area Toilet dan Ruang Wudhu, As. 3'/J m2 232.47 - 10,000 -
- Area Lobby Escalator, As. 3-4'/G-I m2 269.15 - 10,000 -
- Area Mushola, As. 2-4/J-J' m2 262.43 - 10,000 -

6 Screeding lantai LG
- Area Mushola, As. 2-4/J-J' m2 161.48 20 32.30 8,000 258,365
- Area Toilet dan Ruang Wudhu, As. 3'/J m2 55.28 - 8,000 -

7 Waste celcon+pasir urugan 35 cm Area Toilet dan m2 55.28 20 11.06 27,500 304,020
Ruang Wudhu, As. 3'/J

8 Pasang Wiremesh Area Toilet dan Ruang Wudhu, As. 3'/J m2 55.28 - 3,500 -

9 Angkut Material Pasir dan split, lokasi screeding area Mushola


Urugan m3 8.29 20 1.66 2,500 4,146
Screeding m2 216.75 20 43.35 2,000 86,702

TOTAL 10,602,716.28
Pelaksana :
Jakarta, 26 Desember 2015
Kepala Tukang Costing, Site Manager, Project Manager

UNYIL PRAMA Damanik WELLY KURNIAWAN


Kepala Tukang Costing Site Manager Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

RISALAH PEMBAYARAN KEPALA TUKANG


No. DOM : 001
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 032/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Finishing
Lantai :

NO URAIAN JUMLAH (RP)

A NILAI SPK 27,200,080.48

B PROGRESS AKUMULATIF S/D SAAT INI 10,602,716.28

C RETENSI 5 % (530,135.81)

D PEMBAYARAN AKUMULATIF S/D SAAT INI (B-C) 10,072,580.47

E PEMBAYARAN AKUMULATIF SEBELUMNYA

F PEMBAYARAN SAAT INI (D-E) 10,072,580.47

G DIBULATKAN 10,072,000.00

TERBILANG Sepuluh Juta Tujuh Puluh Dua Ribu Rupiah

Jakarta, 26 Desember 2015


Kepala Tukang Costing, Project Manager

UNYIL PRAMA WELLY KURNIAWAN


Kepala Tukang Costing Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

SURAT PERINTAH KERJA

No. SPK : 033/UNYL/FNS/P.1501/MAK/2015


Nama Kepala Tukan : UNYIL
Jenis Pekerjaan : Potong Mandor
Lantai :

INDIVIDU
HARGA
NO JENIS PEKERJAAN SAT VOL SPK NILAI SPK
SATUAN
SEKARANG
( Rp ) ( Rp )

Potong Retensi Mandor Maskuri

1 - Bongkar sisa bekisting pada angkur baja dengan dinding RetWall hp 1.00 75,000 75,000
area STP. As. 4-10'/I-J. 1 orang. Jam 08-16

2 - Bongkar sisa bekisting kepala kolom pertemuan dengan hp 4.00 75,000 300,000
stop cor Plat Lt.GF2. As. 8-12/G-J. 2 orang. Jam 08-22

4 - Bongkar sisa bekisting di plat yang terjepit area Ramp turun dgn hp 2.00 75,000 150,000
STP. As. 4-9/I-J. 1 orang. Jam 08-22

TOTAL 525,000.00

Menyetujui, Jakarta, 26 Desember 2015

UNYIL WELLY KURNIAWAN


Kepala Tukang Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 001
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 033/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Potong Mandor
Lantai :

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)

Potong Retensi Mandor Maskuri

1 - Bongkar sisa bekisting pada angkur baja dengan dinding RetWall hp 1.00 100 1.00 75,000 75,000
area STP. As. 4-10'/I-J. 1 orang. Jam 08-16

2 - Bongkar sisa bekisting kepala kolom pertemuan dengan hp 4.00 100 4.00 75,000 300,000
stop cor Plat Lt.GF2. As. 8-12/G-J. 2 orang. Jam 08-22

4 - Bongkar sisa bekisting di plat yang terjepit area Ramp turun dgn hp 2.00 100 2.00 75,000 150,000
STP. As. 4-9/I-J. 1 orang. Jam 08-22
0 - - 100 - - -

TOTAL 525,000.00
Pelaksana :
Jakarta, 26 Desember 2015
Kepala Tukang Costing, Site Manager, Project Manager

UNYIL PRAMA Damanik WELLY KURNIAWAN


Kepala Tukang Costing Site Manager Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

RISALAH PEMBAYARAN KEPALA TUKANG


No. DOM : 001
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 033/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Potong Mandor
Lantai :

NO URAIAN JUMLAH (RP)

A NILAI SPK 525,000.00

B PROGRESS AKUMULATIF S/D SAAT INI 525,000.00

C RETENSI 5 % (26,250.00)

D PEMBAYARAN AKUMULATIF S/D SAAT INI (B-C) 498,750.00

E PEMBAYARAN AKUMULATIF SEBELUMNYA

F PEMBAYARAN SAAT INI (D-E) 498,750.00

G DIBULATKAN 498,000.00

TERBILANG Empat Ratus Sembilan Puluh Delapan Ribu Rupiah

Jakarta, 26 Desember 2015


Kepala Tukang Costing, Project Manager

UNYIL PRAMA WELLY KURNIAWAN


Kepala Tukang Costing Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

SURAT PERINTAH KERJA

No. SPK : 034/UNYL/FNS/P.1501/MAK/2015


Nama Kepala Tukan : UNYIL
Jenis Pekerjaan : Finishing
Lantai :

INDIVIDU
HARGA
NO JENIS PEKERJAAN SAT VOL SPK NILAI SPK
SATUAN
SEKARANG
( Rp ) ( Rp )

Finishing

1 - Potong Besi stek ex perkuatan dinding RetWall, area mushola titik 34.00 2,500 85,000
As. 2-4/J

2 - Pembersihan puing ex. Bobokan pekerjaan injeksi area Mushola hp 3.00 75,000 225,000
As. 2-4/J. 2 orang, jam 08-16

3 - Bongkar tanggulan air + kuras air. Lt. GF1 As. 1-2/G'H'. hp 3.00 75,000 225,000
2 orang. Jam 08-16

4 - ConcreteFill Plat Lantai GF1. As. 5-6/A'-A m2 10.10 2,500 25,239


Plester+Aci Plat Lantai GF1. As. 5-6/A'-A m2 10.10 19,500 196,861

TOTAL 757,099.35

Menyetujui, Jakarta, 26 Desember 2015

UNYIL WELLY KURNIAWAN


Kepala Tukang Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 001
Periode : 26 November 2015 - 9 Desember 2015
No. SPK : 034/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Finishing
Lantai :

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)

1 - Potong Besi stek ex perkuatan dinding RetWall, area mushola titik 34.00 100 34.00 2,500 85,000
As. 2-4/J

2 - Pembersihan puing ex. Bobokan pekerjaan injeksi area Mushola hp 3.00 100 3.00 75,000 225,000
As. 2-4/J. 2 orang, jam 08-16

3 - Bongkar tanggulan air + kuras air. Lt. GF1 As. 1-2/G'H'. hp 3.00 100 3.00 75,000 225,000
2 orang. Jam 08-16

4 - ConcreteFill Plat Lantai GF1. As. 5-6/A'-A m2 10.10 100 10.10 2,500 25,239
Plester+Aci Plat Lantai GF1. As. 5-6/A'-A m2 10.10 100 10.10 19,500 196,861

TOTAL 757,099.35
Pelaksana :
Jakarta, 26 Desember 2015
Kepala Tukang Costing, Site Manager, Project Manager

UNYIL PRAMA Damanik WELLY KURNIAWAN


Kepala Tukang Costing Site Manager Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

RISALAH PEMBAYARAN KEPALA TUKANG


No. DOM : 001
Periode : 26 November 2015 - 9 Desember 2015
No. SPK : 034/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Finishing
Lantai :

NO URAIAN JUMLAH (RP)

A NILAI SPK 757,099.35

B PROGRESS AKUMULATIF S/D SAAT INI 757,099.35

C RETENSI 5 % (37,854.97)

D PEMBAYARAN AKUMULATIF S/D SAAT INI (B-C) 719,244.38

E PEMBAYARAN AKUMULATIF SEBELUMNYA

F PEMBAYARAN SAAT INI (D-E) 719,244.38

G DIBULATKAN 719,000.00

TERBILANG Tujuh Ratus Sembilan Belas Ribu Rupiah

Jakarta, 26 Desember 2015


Kepala Tukang Costing, Project Manager

UNYIL PRAMA WELLY KURNIAWAN


Kepala Tukang Costing Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

SURAT PERINTAH KERJA

No. SPK : 035/UNYL/FNS/P.1501/MAK/2015


Nama Kepala Tukan : UNYIL
Jenis Pekerjaan : Finishing
Lantai : GF1

INDIVIDU
HARGA
NO JENIS PEKERJAAN SAT VOL SPK NILAI SPK
SATUAN
SEKARANG
( Rp ) ( Rp )

1 Pasang Dinding Celcon


- Kios, As. 8-10/G m2 279.08 16,000 4,465,290
- Kios, As. 8-10/H m2 279.08 16,000 4,465,290
- Kios, As. 8-10'/J m2 404.47 16,000 6,471,494

2 Pasang Kolom Praktis


- Kios, As. 8-10/G m' 86.00 16,000 1,376,000
- Kios, As. 8-10/H m' 86.00 16,000 1,376,000
- Kios, As. 8-10'/J m' 94.60 16,000 1,513,600

3 Pasang Balok Praktis 10x10 celcon


- Kios, As. 8-10/G m' 33.60 16,000 537,600
- Kios, As. 8-10/H m' 16.50 16,000 264,000
- Kios, As. 8-10'/J m' 58.40 16,000 934,400

4 Pasang Balok Praktis 10x15 rollingdoor


- Kios, As. 8-10/G m' 42.55 20,000 851,000
- Kios, As. 8-10/H m' 42.55 20,000 851,000
- Kios, As. 8-10'/J m' 52.40 20,000 1,048,000

5 Pasang steorofoam pertemuan celcon thdp plat


- Kios, As. 8-10/G m' 93.69 1,500 140,538
- Kios, As. 8-10/H m' 93.69 1,500 140,538
- Kios, As. 8-10'/J m' 129.59 16,000 2,073,408

6 - Bor stek celcon dinding Kios GF1 as 4-7/G-J ttk 147.00 1,000 147,000
- Las stek kolom praktis pada balok baja Kios GF1 as 4-7/G-J ttk 248.00 2,000 496,000

7 Penambahan harga ringbalk gantung (Kios)


- Kios, As. 8-10/G m' 42.55 4,800 204,240
- Kios, As. 8-10/H m' 42.55 4,800 204,240
- Kios, As. 8-10'/J m' 52.40 4,800 251,520

8 Scaffolding untuk RingBalok ( rollingdoor kios )


- Kios, As. 8-10/G m' 76.59 6,000 459,540
- Kios, As. 8-10/H m' 76.59 6,000 459,540
- Kios, As. 8-10'/J m' 94.32 6,000 565,920

9 Scaffolding untuk pasang celcon


- Kios, As. 8-10/G m' 92.06 6,000 552,334
- Kios, As. 8-10/H m' 92.06 6,000 552,334
- Kios, As. 8-10'/J m' 138.94 6,000 833,630

TOTAL 31,234,455.20

Menyetujui, Jakarta, 26 Desember 2015

UNYIL WELLY KURNIAWAN


Kepala Tukang Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 001
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 035/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Finishing
Lantai :

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)

1 Pasang Dinding Celcon


- Kios, As. 8-10/G m2 279.08 40 111.63 16,000 1,786,116
- Kios, As. 8-10/H m2 279.08 - 16,000 -
- Kios, As. 8-10'/J m2 404.47 - 16,000 -

2 Pasang Kolom Praktis


- Kios, As. 8-10/G m' 86.00 40 34.40 16,000 550,400
- Kios, As. 8-10/H m' 86.00 - 16,000 -
- Kios, As. 8-10'/J m' 94.60 - 16,000 -

3 Pasang Balok Praktis 10x10 celcon


- Kios, As. 8-10/G m' 33.60 40 13.44 16,000 215,040
- Kios, As. 8-10/H m' 16.50 - 16,000 -
- Kios, As. 8-10'/J m' 58.40 - 16,000 -

4 Pasang Balok Praktis 10x15 rollingdoor


- Kios, As. 8-10/G m' 42.55 40 17.02 20,000 340,400
- Kios, As. 8-10/H m' 42.55 - 20,000 -
- Kios, As. 8-10'/J m' 52.40 - 20,000 -

5 Pasang steorofoam pertemuan celcon thdp plat


- Kios, As. 8-10/G m' 93.69 - 1,500 -
- Kios, As. 8-10/H m' 93.69 - 1,500 -
- Kios, As. 8-10'/J m' 129.59 - 16,000 -

6 - Bor stek celcon dinding Kios GF1 as 4-7/G-J ttk 147.00 - 1,000 -
- Las stek kolom praktis pada balok baja Kios GF1 as 4-7/G-J ttk 248.00 - 2,000 -

7 Penambahan harga ringbalk gantung (Kios)


- Kios, As. 8-10/G m' 42.55 - 4,800 -
- Kios, As. 8-10/H m' 42.55 - 4,800 -
- Kios, As. 8-10'/J m' 52.40 - 4,800 -

8 Scaffolding untuk RingBalok ( rollingdoor kios )


- Kios, As. 8-10/G m' 76.59 - 6,000 -
- Kios, As. 8-10/H m' 76.59 - 6,000 -
- Kios, As. 8-10'/J m' 94.32 - 6,000 -

9 Scaffolding untuk pasang celcon


- Kios, As. 8-10/G m' 92.06 - 6,000 -
- Kios, As. 8-10/H m' 92.06 - 6,000 -
- Kios, As. 8-10'/J m' 138.94 - 6,000 -

TOTAL 2,891,955.84
Pelaksana :
Jakarta, 26 Desember 2015
Kepala Tukang Costing, Site Manager, Project Manager

UNYIL PRAMA Damanik WELLY KURNIAWAN


Kepala Tukang Costing Site Manager Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

RISALAH PEMBAYARAN KEPALA TUKANG


No. DOM : 001
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 035/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Finishing
Lantai :

NO URAIAN JUMLAH (RP)

A NILAI SPK 31,234,455.20

B PROGRESS AKUMULATIF S/D SAAT INI 2,891,955.84

C RETENSI 5 % (144,597.79)

D PEMBAYARAN AKUMULATIF S/D SAAT INI (B-C) 2,747,358.05

E PEMBAYARAN AKUMULATIF SEBELUMNYA

F PEMBAYARAN SAAT INI (D-E) 2,747,358.05

G DIBULATKAN 2,747,000.00

TERBILANG Dua Juta Tujuh Ratus Empat Puluh Tujuh Ribu Rupiah

Jakarta, 26 Desember 2015


Kepala Tukang Costing, Project Manager

UNYIL PRAMA WELLY KURNIAWAN


Kepala Tukang Costing Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

SURAT PERINTAH KERJA

No. SPK : 036/UNYL/FNS/P.1501/MAK/2015


Nama Kepala Tukan : UNYIL
Jenis Pekerjaan : Bongkat Material
Lantai :

INDIVIDU
HARGA
NO JENIS PEKERJAAN SAT VOL SPK NILAI SPK
SATUAN
SEKARANG
( Rp ) ( Rp )

Bongkat Material

1 - Bata Ringan ( uk. 10cm ), tgl 19-12-2015, SJ SJ/SLI/1512034 bh 1,050.00 150 157,500

2 - Bata Ringan ( uk. 10cm ), tgl 19-12-2015, SJ SJ/SLI/1512035 bh 1,050.00 150 157,500

TOTAL 315,000.00

Menyetujui, Jakarta, 26 Desember 2015

UNYIL WELLY KURNIAWAN


Kepala Tukang Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

DAFTAR OPNAME KEPALA TUKANG


No. DOM : 001
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 036/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Bongkat Material
Lantai :

AKUM VOLUME HARGA AKUM


VOLUME PROG SESUAI SATUAN NILAI
NO JENIS PEKERJAAN SAT SPK SAAT
SAAT PROGRESS UPAH DIBAYARKAN
INI
INI (Rp) (Rp)

1 - Bata Ringan ( uk. 10cm ), tgl 19-12-2015, SJ SJ/SLI/1512034 bh 1,050.00 100 1,050.00 150 157,500

2 - Bata Ringan ( uk. 10cm ), tgl 19-12-2015, SJ SJ/SLI/1512035 bh 1,050.00 100 1,050.00 150 157,500

TOTAL 315,000.00
Pelaksana :
Jakarta, 26 Desember 2015
Kepala Tukang Costing, Site Manager, Project Manager

UNYIL PRAMA Damanik WELLY KURNIAWAN


Kepala Tukang Costing Site Manager Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

RISALAH PEMBAYARAN KEPALA TUKANG


No. DOM : 001
Periode : 10 Desember 2015 - 23 Desember 2015
No. SPK : 036/UNYL/FNS/P.1501/MAK/2015
Nama Kepala Tukang : UNYIL
Jenis Pekerjaan : Bongkat Material
Lantai :

NO URAIAN JUMLAH (RP)

A NILAI SPK 315,000.00

B PROGRESS AKUMULATIF S/D SAAT INI 315,000.00

C RETENSI 5 % (15,750.00)

D PEMBAYARAN AKUMULATIF S/D SAAT INI (B-C) 299,250.00

E PEMBAYARAN AKUMULATIF SEBELUMNYA

F PEMBAYARAN SAAT INI (D-E) 299,250.00

G DIBULATKAN 299,000.00

TERBILANG Dua Ratus Sembilan Puluh Sembilan Ribu Rupiah

Jakarta, 26 Desember 2015


Kepala Tukang Costing, Project Manager

UNYIL PRAMA WELLY KURNIAWAN


Kepala Tukang Costing Project Manager
PT. MULTIBANGUN ADHITAMA KONSTRUKSI
PROYEK HARCO GLODOK
JAKARTA

REKAP OPNAME MANDOR TO : Ibu Erlina


Periode : 10 Desember 2015 - 23 Desember 2015

NO MANDOR NO. SPK DOM TOTAL DIBAYARKAN


A UNYIL
001-R1/UNYL/FNS/P.1501/MAK/2015 005 523,000
002-R1/UNYL/FNS/P.1501/MAK/2015 005 212,000
003-R1/UNYL/FNS/P.1501/MAK/2015 005 17,000
004/UNYL/FNS/P.1501/MAK/2015 005 9,000
008-R1/UNYL/FNS/P.1501/MAK/2015 005 277,000
009/UNYL/FNS/P.1501/MAK/2015 004 254,000
010-R1/UNYL/FNS/P.1501/MAK/2015 002 20,000
017/UNYL/FNS/P.1501/MAK/2015 004 12,000
020/UNYL/FNS/P.1501/MAK/2015 004 1,969,000
026/UNYL/FNS/P.1501/MAK/2015 002 770,000
027/UNYL/FNS/P.1501/MAK/2015 002 135,000
031/UNYL/FNS/P.1501/MAK/2015 001 3,118,000
032/UNYL/FNS/P.1501/MAK/2015 001 10,072,000
033/UNYL/FNS/P.1501/MAK/2015 001 498,000
034/UNYL/FNS/P.1501/MAK/2015 001 719,000
035/UNYL/FNS/P.1501/MAK/2015 001 2,747,000
036/UNYL/FNS/P.1501/MAK/2015 001 299,000

SUB TOTAL PEK UTAMA 21,651,000


Temporary

-.00

SUB TOTAL TEMPORARY -

TOTAL 21,651,000 21,651,000


GRAND TOTAL 21,651,000 21,651,000