Professional Documents
Culture Documents
Cargo Operation - Starting Aux Boiler
Cargo Operation - Starting Aux Boiler
4. Change over Steam Dumping Valve from T/G Vacuum Condenser to C.O.P.T. Vacuum
Condenser. Confirm OPEN position of the valves before and after Automatic Dump
Valve.
11. Start Main Feed Pump and stop Aux Feed Pump, monitor boiler water level and for
proper operation of the Feed Control Valve.