RE: BUV LOOSE FURNITURE PACKAGE - 2nd Quick Evaluation For 2nd Submission
RE: BUV LOOSE FURNITURE PACKAGE - 2nd Quick Evaluation For 2nd Submission
com>
RE: BUV LOOSE FURNITURE PACKAGE - 2nd Quick evaluation for 2nd submission
5 messages
Dear All,
Kindly find attached for summary of 2nd tender submission & below for quick summary checking of Loose Furniture for
your kind attention
GI :
3. Construction period for Tender B1 is 6 weeks (exclusive Thetre seestings TS 01 & Vondom Faz series -OF 01 ,OF
03 need total 10 weeks )
4. Construction period for tender B2 is 6 weeks (exclusive Thetre seestings TS 01 need total 10 weeks )
5. For chair CH01a (Aspen chair) and CH07 (Zazzle chair), KIAN advised they only produce these chair in Black or
White only , About grey colour follow Design specification they required minimum quantity order is at least 300 units
KINGSMEN
1. There is only Kingsmen submit Tender A –comply with specification ( follow confirmation from Mr Long Propject
Director via phone this everning )
TTT:
4. Construction period for tender B2 is 69 days & Proposed some alternative contract conditions
Dear Designers
Please advise which options was accepted for we do assessment accordingly
Thanks
Best Regards,
CONFIDENTIALLY CAUTION:
The information contained in this e-mail (including any attachment) is confidential and legally privileged. If you are not the intended
recipient (or the person responsible to deliver it to the intended recipient) or have received it in error, please do not use, disclose,
disseminate, distribute or copy this e-mail (including any attachment) or any part of it. Please immediately delete or destroy it and
notify us by sending a return e-mail. Thank you
Dear all,
Please find attached loose furniture package tende opening result and belink for submitted tender documents.
Tender documents (hard copies) will be couriered to Atelier HCMC on 26th Dec 17.
https://drive.google.com/open?id=1Vm3rC5FcdEekMigw-IITe6mrVoFMRIJZ
Kind Regards,
Vo Ta Hai Dai
Virus-free. www.avast.com
Dear Michelle,
Thank you.
Regards,
Sharalyn Ang
Project Architect
On Mon, Dec 25, 2017 at 10:21 PM, Michelle Le <michellele@ateliermgt.vn> wrote:
Dear All,
Kindly find attached for summary of 2nd tender submission & below for quick summary checking of Loose Furniture for
your kind attention
GI :
3. Construction period for Tender B1 is 6 weeks (exclusive Thetre seestings TS 01 & Vondom Faz series -OF 01 ,OF
03 need total 10 weeks )
4. Construction period for tender B2 is 6 weeks (exclusive Thetre seestings TS 01 need total 10 weeks )
5. For chair CH01a (Aspen chair) and CH07 (Zazzle chair), KIAN advised they only produce these chair in Black or
White only , About grey colour follow Design specification they required minimum quantity order is at least 300 units
RDO:
Kindly issue attached TCQ3D to GI Corporation and request them to submit by today.
KINGSMEN
1. There is only Kingsmen submit Tender A –comply with specification ( follow confirmation from Mr Long Propject
Director via phone this everning )
RDO:
Alternative proposal on the theatre seat TS01 is not accepted. This make Kingsmen tender price gone up to VND
12,693,805,946 (exc VAT) for their alternative proposal which is higher than GI.
TTT:
RDO:
TTT submit highest price in Alternative proposal.
[Quoted text hidden]
3 attachments
BUV - LF - TCQ 03-D.DOCX
180K
BUV - LF - TCQ 03-D.pdf
208K
BUV - LF - TCQ 03-D, Attachment A - GI.pdf
398K
Dear Michelle,
Could you please provide Tender report including table comparison with updated second submission and TCQ 3 by
today.
Thanks.
[Quoted text hidden]
--
Regards,
Jeff Yong l Assistant Manager
Vincent Tan Associates
(Chartered Quantity Surveyors & Construction Cost Consultant)
D-2-52, Block Dahlia, 10 Boulevard,
Lebuhraya Sprint, PJU6A,
47400 Petaling Jaya,
Selangor
T: +603-7733 3222 l F: +603-7733 3666
Email: jeff.vtaqs@gmail.com
Dear Michelle,
As discussed, please find attached herewith the summary of the alternative proposal that accepted by us for all 3
tenderers.
Based on our selection, GI Corporation shall be the lowest tenderer. Therefore, we will proceed our recommendation to
GI corporation.
Dear All,
Kindly proceed your recommendation accordingly.
Thank you.
Regards,
Sharalyn Ang
Project Architect
On Tue, Dec 26, 2017 at 10:53 AM, Sharalyn Ang <sharalyn.ang@rdo.my> wrote:
[Quoted text hidden]
6 attachments
BUV -LF ALternative Proposed - GI.pdf
428K
BUV -LF ALternative Proposed - GI.xlsx
1518K
BUV -LF ALternative Proposed - Kingsmen.pdf
267K
BUV -LF ALternative Proposed - Kingsmen.xlsx
2012K
BUV -LF Alternative proposed format- FINAL - TTT.pdf
1102K
BUV -LF Alternative proposed format- FINAL - TTT.xlsx
4117K
Dear All,
Regard to below Designer email to confirmed accepted Alterna ves items of 3 Tenderers , kindly find a ached for
updated tender cost comparison for your kind a en on
Thanks
Best Regards,
CONFIDENTIALLY CAUTION:
The information contained in this e-mail (including any attachment) is confidential and legally privileged. If you are not the intended
recipient (or the person responsible to deliver it to the intended recipient) or have received it in error, please do not use, disclose,
disseminate, distribute or copy this e-mail (including any attachment) or any part of it. Please immediately delete or destroy it and
notify us by sending a return e-mail. Thank you