Perhitungan Geometrik
Perhitungan Geometrik
Gol V
5.69%
5.72% 6.53%
5.69%
5.68%
5.70%
5.70%
5.72%
5.69%
5.71%
5.68%
5.70%
5.72%
5.70%
5.69%
5.71%
5.69%
5.72%
5.69%
5.70%
5.71%
5.70%
5.70%
5.69%
5.71%
5.70%
5.70%
5.70%
5.70%
5.70%
5.70%
5.70%
5.70%
5.70%
5.70%
5.70%
5.70%
5.70%
5.70%
5.70%
5.71%
5.70%
5.70%
Jarak awal
VR (km/jam)
reaksi (m)
120 83.3
100 69.4
80 55.6
60 41.7
Jarak awal Jarak Pandang Henti
pengereman (m)
Perhitungan Pembulatan
163.4 246.7 250
113.5 182.9 185
72.6 128.2 130
40.8 82.5 85
JALAN BEBAS HAMBATAN Tanggal: Ditangani oleh:
Diperiksa oleh:
FORMULIR IR-1: DATA MASUKAN Propinsi: Jawa Timur
-DATA UMUM No. Ruas: Kode segmen:
Baris Tipe kend. Kend.ringan Menengah berat Bis Besar Truck Besar
1.1 emp arah 1 LV: 1.00 MHV: 1.60 LB 1.70 LT: 2.50 Arus total Q
1.2 emp arah 2 LV: 1.00 MHV: 1.60 LB 1.70 LT: 2.50
kend/jam smp/jam (3) kend/jam (4) smp/jam (5) kend/jam smp/jam (7) kend/jam smp/jam Arah % kend/jam smp/jam
2 Arah (1) (2) (6) (8) (9)
3 1 0 0 0 0 0 0 0 0 0 0
4 2 0 0 0 0 0 0 0 0 0 0
5 1+2 873 873 179 286 305 519 297 743 1654 2420
6 Catatan: untuk kelandaian khusus arah 1= naik, arah 2 = turun Pemisah arah SP = Q1/(Q1-2) 50%
7 Faktor smp Fsmp =
soal Kecepatan arus bebas dasar (Fvo) penyesuaian lebar jalur lalu lintas (FVw) kecepatan arus bebas (FV)
88 2 90
Kapasitas C = Co + FCw + FC sp
2420 1.0216969185
PERENCANAAN TIKUNGAN JARAK PANDANG bebas samping
TIKUNGAN FC 2TC>LC
LC TC EC p
P1 424.29909579 220.670653512 37.52942806 OKE 0.6370960209
P2 494.882078855 261.1491915162 51.98159816 OKE MENGGUNAKAN LENGKUNG PERALIHAN
P3 91.8128292933 46.0112450664 1.677951707 OKE
P4 61.4959813406 30.7880615128 0.751856701 OKE
P5 338.591893509 173.5846759048 23.47657931 OKE
TIKUNGAN SS TS>LS
Xs Ys θs θc Lc k p Ts Es Lt
P1 98.0877449612 2.5483840835 19.30387151 0 0 -110.1175541741 -32.8710876009 99.0393146037 2.7001926504 196.295 OKE
P2 98.0877449612 2.5483840835 22.51510823 0 0 -143.0973423704 -45.4711034356 99.2030524798 2.7586524603 196.295 OKE
P3 98.0877449612 2.5483840835 4.177107793 0 0 52.2576663377 0.8748895877 98.3328078473 2.555171489 196.295 OKE
P4 98.0877449612 2.5483840835 2.797815348 0 0 67.3953277521 1.7974235963 98.2712292463 2.5514253846 196.295 OKE
P5 98.0877449612 2.5483840835 15.40454475 0 0 -69.2018414791 -20.0847835534 98.8488492769 2.643348117 196.295 OKE
TITIK KOORDINAT
TITIK X Y
A 719823.93 9146455.46
PI 01 722614.00 9145972.00
PI 02 725117.00 9143149.00
PI 03 727535.00 9143005.00
PI 04 729845.00 9142524.00
PI 05 732057.00 9142285.00
B 732654.78 9141947.28
JARAK LURUS
Titik Xakhir-Xawal X2 Yakhir-Yawal Y2
1. A-P1 2790.072 7784501.765 -483.464 233737.439
2. P1-P2 2503.000 6265009.000 -2823.000 7969329.000
3. P2-P3 2418.000 5846724.000 -144.000 20736.000
4. P3-P4 2310.000 5336100.000 -481.000 231361.000
5. P4-P5 2212.000 4892944.000 -239.000 57121.000
6 P6-B 597.780 357340.928 -337.720 114054.798
total
PERENCANAAN TIKUNGAN
VR 120 Ls (1)
e max 10.0% Ls (2)
e normal 2.0% Ls (3)
f max 0.092 0.090 Ls pakai
R min 591 R yang digunakan
D maks 2.426
D 2.389 2.3885350318
e 9.998%
Xs Ys θs θc
TIKUNGAN SS TS > LS
Xs Ys θs θc
P1 106.5823868313 3.1604938272 19.30387151 0
P2 106.5823868313 3.1604938272 22.5151082282 0
P3 106.5823868313 3.1604938272 4.1771077931 0
P4 106.5823868313 3.1604938272 2.7978153476 0
P5 106.5823868313 3.1604938272 11.6489329079 0
W 0.49 tabel
Wn 3.6
Wc 7.69
SS
P2 600 248.6 213.333
P3 SS 600 248.6 213.333
P4 600 248.6 213.333
P5 600 248.6 213.333
POSISI TIKUNGAN
STA AWAL 0
Tikungan 1 STA P1.1 STA Awal + (dA-1) 2831.650
STA TS.1 STA P1.1 - TS 2567.835
STA SC.1 TS.1 + LS 2674.501
STA CS.1 SC.1+ LC 2971.929
STA ST.1 CS + LS 3078.596
KONTROL OVERLAP
Azimuth ∆
260.169 38.608 kuadran 2 0.6738322325
221.562 45.030 kuadran 2 0.78592554
266.592 8.354 kuadran 2 0.1458085684
258.238 5.596 kuadran 2 0.0976621794
263.833 23.298 kuadran 2 0.4066244672
240.535 kuadran 2
JARAK PANDANG
66.7 Ss 248.6
106.7
51.4 25.53
106.7
600
p
OKE 0.7901234568
OKE MENGGUNAKAN LENGKUNG PERALIHAN
OKE
OKE 21.4 59.4855420552
OKE 72.9299197819
-3.8451753727
-9.619813078
27.4368657743
Lc k p Ts Es
Lc k p Ts Es
0 -91.6810225481 -30.5723363485 107.7729054928 3.3487660902
0 -123.0903446398 -42.5723514291 107.9759724285 3.4212676686
0 62.962044606 1.5666895454 106.8966991718 3.1689115351
0 77.3788650007 2.4452933632 106.8203296835 3.1642656342
0 -14.4827901608 -9.1976079424 107.3174461717 3.2269589728
E
12.8399742526
12.8399742526
7.4623432085
5.3525270879
12.8351726045
E
12.8399742526
12.8399742526
12.2287216277
11.4074441124
12.8399742526
E
12.5839177653
12.5839177653
12.5839177653
12.5839177653
12.5839177653
Lt
213.333 OKE
213.333 OKE
213.333 OKE
213.333 OKE
213.333 OKE
d TS
2831.650 263.81479365
3772.842 302.41649488
2422.284 106.89669917
2359.547 106.82032968
2224.874 177.23494461
686.583
No STA Elevasi tanah asli Elevasi rencana as jalan
1 0 + 0
2 0 + 100
3 0 + 200
4 0 + 300
5 0 + 400
6 0 + 500
7 0 + 600
8 0 + 700
9 0 + 800
10 0 + 900
11 1 + 0
12 1 + 100
13 1 + 200
14 1 + 300
15 1 + 400
16 1 + 500
17 1 + 600
18 1 + 700
19 1 + 800
20 1 + 900
21 2 + 0
22 2 + 100
23 2 + 200
24 2 + 300
25 2 + 400
26 2 + 500
27 2 + 600
28 2 + 700
29 2 + 800
30 2 + 900
31 3 + 0
32 3 + 100
33 3 + 200
34 3 + 300
35 3 + 400
36 3 + 500
37 3 + 600
38 3 + 700
39 3 + 800
40 3 + 900
41 4 + 0
42 4 + 100
43 4 + 200
44 4 + 300
45 4 + 400
46 4 + 500
47 4 + 600
48 4 + 700
49 4 + 800
50 4 + 900
51 5 + 0
52 5 + 100
53 5 + 200
54 5 + 300
55 5 + 400
56 5 + 500
57 5 + 600
58 5 + 700
59 5 + 800
60 5 + 900
61 6 + 0
62 6 + 100
63 6 + 200
64 6 + 300
65 6 + 400
66 6 + 500
67 6 + 600
68 6 + 700
69 6 + 800
70 6 + 900
71 7 + 0
72 7 + 100
73 7 + 200
74 7 + 300
75 7 + 400
76 7 + 500
77 7 + 600
78 7 + 700
79 7 + 800
80 7 + 900
81 8 + 0
82 8 + 100
83 8 + 200
84 8 + 300
85 8 + 400
86 8 + 500
87 8 + 600
88 8 + 700
89 8 + 800
90 8 + 900
91 9 + 0
92 9 + 100
93 9 + 200
94 9 + 300
95 9 + 400
96 9 + 500
97 9 + 600
98 9 + 700
99 9 + 800
100 9 + 900
101 10 + 0
102 10 + 100
103 10 + 200
104 10 + 300
105 10 + 400
106 10 + 500
107 10 + 600
108 10 + 700
109 10 + 800
110 10 + 900
111 11 + 0
112 11 + 100
113 11 + 200
114 11 + 300
115 11 + 400
116 11 + 500
117 11 + 600
118 11 + 700
119 11 + 800
120 11 + 900
121 12 + 0
122 12 + 100
123 12 + 200
124 12 + 300
125 12 + 400
126 12 + 500
127 12 + 600
128 12 + 700
129 12 + 800
130 12 + 900
131 13 + 0
132 13 + 100
133 13 + 200
134 13 + 300
135 13 + 400
136 13 + 500
137 13 + 600
138 13 + 700
139 13 + 800
140 13 + 900
141 14 + 0
142 14 + 100
143 14 + 200
144 14 + 300
Jarak pandang (Ss) 248.5765
Vr 120
22000 40
1000 g1 0.20%
23000 42 -0.10% cembung
1000 g2 0.30%
24000 45 -0.20% cembung
1000 g3 0.50%
25000 50
g4
g5
g6
g7
g8
g9
g10
ELEVASI PLV 1
ELEVASI A1
ELEVASI PPV 1
ELEVASI B1
ELEVASI PTV 1
Ev1 X1 Y1
CEMBUNG
Ss > L