SICE has the expertise and knowledge
required to participate and assist during
Functional design
all the phases of a the implementation
Operation plan
and operation of a Tunnel Control
Detailed Design
System Project.
Installation
Start up
Operation, Management
Maintenance
Scope
Tunnels
Safety assurance
Quick and efficient incident management
Providing information to drivers
Co-ordination with external emergency
services.
Allow emergency actions
Surveillance and control of traffic and
contaminants conditions
Local and centralized actions
Centralized information about the situation
Objectives
Tunnels
4 levels architecture
Tunnel equipment
Communications
Control Center
SICE Solution
Tunnels
Tunnel Equipment
Power, Gen-set, UPS,..
Lighting (Inside the tunnel and approaches)
Ventilation
Gas level control (CO, NO2, visibility..)
Fire detection
CCTV System
Incident detection System
Emergency call phones
Public address system
Outside signals (signs, traffic lights, barriers,..)
Inside signals
Water circuits (BIE) and dry column
Emergency exit switchboard
Auxiliary elements
SICE Solution
Tunnels
Remote Control Units
Redundant
Open Protocol TCP/IP
Power under local and centralized control
Controls all tunnel systems
Standard CTN 135
Router Special
Equipments
LAN
I/O I/O
Field Bus
Series Series
Channels Channels
I/O
SICE Solution
Tunnels
Communications
Rented Owned
TCP/IP
Radio Cable Radio Cable
100 BASE FX
SICE Solution
Tunnels
Hardware Control Center
Ethernet
TCP/IP
Oracle
Clients
Ethernet
TCP/IP
S
O
S
SICE Solution
Tunnels
Control Center. Applications
EXPLOITATION
Visual Management Remote Units Alarms, events Users Control and
by CCTV incidents Attention Information
MANUAL
Alarms record
Changes
System logger
RULES
Data Base Data Base Data Base Data Base Rules
Configuration Historic Events ON-LINE
SYSTEM
Priorities
Graphic Management
On line -
Administration Alarms and events Data Base
Access Automatic Tasks
Users
Interface
Edition rules
And priorities
Print Graphic
Edition
Semi-automatic Tasks
Manual and forced Tasks
SICE Solution
Tunnels
Software Control Center
GASES
LOCAL CONTROL
CENTRAL CONTROL
CCTV - SOS
SICE Solution
Tunnels
Big Numbers
38 tunnels and 22 Control Centers
> 100.000 m of Tunnels
> 130 Remote units
> 1200 signs (variable, arrow/cross, speed)
> 1300 Emergency call phones
> 1200 CCTV cameras
> 3.500.000 m cables
> 100.000 m of radianting cable
Calle 30 Tunnels
Control Centre. 28 subsystems controlled
70.000 m radiating cable
180.000 different input/output signals