Download as pdf or txt
Download as pdf or txt
You are on page 1of 63

SAP S/4HANA Manufacturing – E2E with Product

Costing & Profitability Analysis in Finance


Demo ID: 13595
Last Update: 30 May 2018
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

SAP S/4HANA Manufacturing – E2E with Product


Costing & Profitability Analysis in Finance
1. DEMO SCRIPT OVERVIEW ...................................................................................................................... 3
1.1. Demo Description .................................................................................................................................. 3
1.2. Why now ................................................................................................................................................. 3
1.3. Why SAP ................................................................................................................................................. 3
1.4. Story ........................................................................................................................................................ 3
2. TECHNICAL REQUIREMENTS ................................................................................................................. 4
2.1. Demo Environment & Users ................................................................................................................. 4
3. PRE-REQUISITE CHECK .......................................................................................................................... 5
4. S/4HANA PRODUCTION ORDER CREATION ....................................................................................... 16
5. S/4HANA PRODUCTION EXECUTION WITH MRP ............................................................................... 21
6. S/4HANA FINANCE ORDER CLOSING ................................................................................................. 40
7. S/4HANA FINANCE COPA ANALYSIS .................................................................................................. 55

2018-05-30 2
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

1. DEMO SCRIPT OVERVIEW


1.1. Demo Description
Highlights
With high volume of Production Orders in multiple plants and warehouses, organizations are facing more
complexity and inability to respond adequately. Witness how S/4HANA combats this and helps customers
enhance their manufacturing & controlling processes and detect streamlined flow into Unified GL &
Profitability Analysis. This will be done by visualizing a typical and streamlined manufacturing demo flow -
recorded in the S/4HANA On-Premise (1610).

1.2. Why now


 Multiple systems used to manage production orders, MRP runs, financial close and profitability
analysis
 Inability to make decisions based on real-time data
 Missed shipments due to material shortage
 Reconciliation of Finance and Controlling reports is a cumbersome and time-consuming process

1.3. Why SAP


 Improve customer satisfaction with on-time deliveries
 Insight to action minimizes risk of material shortages during production
 Single source of truth with Universal Journal and no more reconciliation needed by design
 Reporting is not limited by application boundaries (e.g. FI + CO + CO-PA)


1.4. Story
Meet Marcus. He is a Production engineer at Velotics Bikes, Inc. He handles multiple production orders and
executes multiple MRP runs daily for various plants. He finds it difficult to respond to material shortages and
analyze different options to best fulfil the shortages due to outdated information stored in multiple systems.
And unfortunately, material shortages result in customer shipping delays which leads to poor customer
satisfaction. It’s also nearly impossible to perform accurate product costing and financial analysis on
manufacturing data because of the different systems involved.

Luckily Velotics recently installed S/4HANA Manufacturing and teams in Manufacturing, Costing, and
Finance are already seeing many benefits. Marcus now has access to real-time data on multiple
production orders and can perform mass processing to address issues such as material shortages. The
Costing and Finance teams can now easily analyze cost drill down and profitability quickly and easily in a
single system. A task that once took over an hour to complete can now be completed in minutes, thanks to
SAP!

2018-05-30 3
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

2. TECHNICAL REQUIREMENTS
2.1. Demo Environment & Users
SAP Demo Cloud
This demo scenario can be executed in the following showrooms:
 Green Phoenix (CSA)
 CLA1 (Public)

You can directly register for the showroom from the Cloud Self-Service Portal:
http://www.sapdemocloud.com/

How To (SAP internal only):

1) For details on how to use the SDC portal please watch this Smart Video on “How to Access the SAP
Demo Cloud Showrooms".
2) In case you need to access the showroom via VPN, e.g. for showing the demo scenario from your mobile,
please check out this video: “How to Access the SDC Showrooms via VPN F5".

Online Demo - System Access Details

Access the demo in the CLA-18Q1 (Public) showroom:


Fiori Launchpad URL (can be used for access from inside and outside the showroom):
Demo URL: https://s4fiori-dc-claq1-na.sapdemocloud.com
Username: PROD-FIN
Password: Welcome1

Access the demo in the CSA / Green Phoenix and LOB ALL for Partners showroom:
Fiori Launchpad URL (can only be accessed from showroom desktop)
Demo URL: https://cimg4.wdf.sap.corp:44302
Username: PROD-FIN
Password: Welcome1

Backend System Access (only from WTS within the showroom):


If you require backend access please open SAP Logon, select the respective system (see below table) and
logon either with the demo user and password, or with your showroom user and password:

System Type System ID / Client

Backend system HE4 / 400

Gateway (frontend) system MG4 / 001

2018-05-30 4
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

3. Pre-Requisite Check
What to do and what to say What you should see

Objective of Pre-requisite Steps:

To run an end to end on-line


demo, one should follow these
pre-requisite steps in order to
ensure that the stock of
professional frame is zero and
there shouldn't be any future
purchase order's and/or
reservations for this material
during the scheduled production
period.

This professional frame material is


used in the production of
professional ebike and during the
MRP run, we should get the
shortage of professional frame
which will be procured and
consumed completely during the
production of professional ebike as
demonstarted in chapter
'S/4HANA Production Execution
with MRP'.

On-line demo is completely


repeatable, unless any one stops
the demo in between without
consuming procured professional
frame completely. If anyone stops
the demo in between, we won't get
MRP issues of professional frame
as per the demo flow.

1. Click on tile Manage Stock

2018-05-30 5
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

A) Manage Stock

Ensure that the stock balance of


professional frame is zero and if
any, remove the stock by
scrapping it.

2. Click .

3. Select
Plant

4. Enter Profe in the Material field.

2018-05-30 6
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

5. Select .

6. Click .

You see that the stock balance of


professional frame is zero. If
not, scrap the stock by clicking on
'Unrestricted-Use Stock' button
next to quantity and post the
material document.

7. Click .

2018-05-30 7
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

B) Monitor Material Coverage:

Sometimes, eventhough stock


balance is zero there might
be future purchase requisitions,
purchase orders,dependent
requirements and/or reservarions
during scheduled production
period which affects the MRP run
of professional frame.

In this case, you need to delete


these future purchase orders
and/or reservations to get ready
for the execution of an on-line
demo.

8. Click on tile Monitor Material


Coverage

9. Enter: MZ-RM-E108-01

2018-05-30 8
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

10. Click .

11. Click
a
gainst the material MZ-RM-E108-
01

12. Click

2018-05-30 9
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

Note: If you see no open purchase


orders, reservations etc. here,
please ignore the remaining steps
of this pre-requisites section and
proceed to "Production Order
Creation".

13. Click .

14. Click

15. Click .

2018-05-30 10
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

16. Click .

17. Click

18. Click .

2018-05-30 11
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

19. Click .

20. Click .

21. Click .

2018-05-30 12
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

22. Click .

23. Click .

24. Click .

2018-05-30 13
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

25. Click .

26. Click .

27. Click .

2018-05-30 14
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

28. Click .

Now, you see that there are no


future purchase orders and
reservation for professional
frames.

29. Click .

2018-05-30 15
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

4. S/4HANA Production Order Creation


What to do and what to say What you should see

Production Order Creation:

Here, we create production order


for professional ebike for a
quantity of 20 PC by scheduling
and releasing the order.

If you follow the pre-requisite steps


perfectly then you will get a
message indicating the missing
parts list/shortage of professional
frame, while releasing the
production order. Ignore this
message and proceed to release
& create the production order. We
are going to handle it in the next
unit.

Once the production order is


created, note down the order
number as further activities to be
performed on this production
order.

Note:
If you execute off-line demo,
directly you can start from this unit
without performing the unit 1 i.e.
Pre-requisite Steps.

1. Click on
Create Production Order Tile.

2018-05-30 16
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

2. Enter Profe in the Material


Field.

3. Double click

4. Enter YBM1 in the Order Type


box.

5. Click after entering


Production Plant as 1710 and
Order Type as YBM1.

2018-05-30 17
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

6. Enter Total Qty as 20

7. Click to select the End


Date.

8. Double Click on tomorrow's


date

2018-05-30 18
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

9. Click .

10. Click .

11. Click
.

2018-05-30 19
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

Ignore the warning message and


click on SAVE button.

12. Click .

Please note down the production


order number created to use
in further process.

13. Click .

2018-05-30 20
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

5. S/4HANA Production Execution with MRP


What to do and what to say What you should see

A) Monitor Production Orders

With the help of 'Monitor


Production Orders' tile, you can
monitor lot of production orders
and do mass processing, if
required.

Here, we are going to check


details and the status of the
production order created in the
previous step. You can see
missing component i.e.
professional frame in this case, to
start the production process
which will be procured in few
clicks.

You analyze available purchase


orders with delivery in near future
which won't help to start your
production process by tomorrow.

Hence you initiate a new purchase


order which has a proposed
delivery in near future, which will
be changed as discussed and
agreed with vendor over call to
deliver by tomorrow and do the
goods receipt.

Ensure that everything is ready


before proceeding for the actual
production process.

1. Click on tile Monitor


Production Orders

2018-05-30 21
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

2. Click .

3. Click to check Release.

4. Click .

2018-05-30 22
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

5. Click .

6. Click .

You can identify your production


order with the name 'professional'
which is released.

7. Click to select all line items.

2018-05-30 23
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

8. Click .

Out of so many orders available


here, select your production order
to proceed further.

9. Click
.

10. Click .

2018-05-30 24
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

You can see the production order


details like status of the order,
scheduling dates, Order
quantity, production version used
etc.

11. Click .

It provides nice visualization of


production order progress like
release date, start date, finish date
and goods receipt date. Now, the
current status of the order is
released.

We can also see the operations


involved in the production process
of professional ebikes and the
relevant work center where these
operations are going to be
performed. In further steps, we do
final acceptance in the work center
Z_INSP4, where scrap of
professional ebike is also
generated.

12. Click .

2018-05-30 25
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

See that one component is


missing i.e. nothing but the
professional frame and proceed
for the next actions (To get
professional frame under missing
components, we followed pre-
requisite steps to make the stock
balance as zero).

13. Click .

14. Click .

15. Click .

2018-05-30 26
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

Here, you can see the available


future purchase orders for the
material professional frame in a
tabular format.

16. Click .

Here, you can see the avaiable


purchase orders for professional
frame in graphical format and the
expected delivery dates.

Currently, professional frame stock


balance is zero and by tomorrow
i.e. the actual start of production of
professional ebikes, the shortage
of frames is 20 PC and as per the
available purchase orders we can
expect delivery of 10 PC of frame
in next 4 days and the delivery of 5
PC of frame in next 10 days. So, it
doesn't helpful to start
the production process by
tomorrow.

Hence, simulating a new purchase


order for the required quantity of
20 PC from HighTech vendor.

17. Click .

2018-05-30 27
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

But the proposed expected


delivery from Hightech vendor is
also after 4days. So, we had a call
with the vendor who agreed to
deliver it by tomorrow. Hence,
changing the proposed delivery
date and proceeding to create a
purchase order.

18. Click .

19. Click .

20. Double click on tomorrow's


date.

2018-05-30 28
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

21. Click .

Now, you see that the available


stock of frame will be 20 PC by
tomorrow i.e. 21.02.2017 in this
case.

22. Click .

Now, proceed further to do the


goods receipt of frame against the
newly created purchase order.

23. Click .

2018-05-30 29
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

24. Click and then click


on 'Purchase order'

25. Click .

26. Click

2018-05-30 30
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

27. Click .

28. Click .

29. Click .

2018-05-30 31
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

30. Click .

Now, you can see that the


required stock of 20 PC of frame is
available.

31. Click .

Here, you can observe that all the


required components are available
now and we can proceed to start
the production as there is no risk
of material shortage.

32. Click .

2018-05-30 32
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

33. Click .

B) Production Cost Analysis

Before starting the actual


production process, with the help
of 'Production Cost Analysis' tile
find out your order out of existing
thousands of open and closed
orders and then check the costs &
quantities against the production
order created.

You can observe that only plan


costs of the order are updated and
no actual and target costs
updated.

34. Click on tile Production Cost


Analysis

35. Select Order Status as 'Open


and Close' After that Click on Go.

2018-05-30 33
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

Make sure that the selected Order


status is 'Open and Closed'

36. Click

37. Click .

38. Click .

2018-05-30 34
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

C) Confirm Production Order


Operation

To accelerate the process in few


clicks, we are going to do
milestone confirmation and
backflushing.

Along with the milestone operation


i.e.20, all previous operations (i.e.
Operation 10) are confirmed with
target activity quantities.

With backflushing, goods issue


and goods receipt are posted
instead of entering manually.

Change the yield quantity from 20


to 18 PC and enter 1 PC of rework
and 1 PC of scrap to analyze in
scrap reports in further steps.

Slightly change the goods issue


quantity of any material from
proposed quantity, to get
production variances at the end.

39. Click on tile Confirm


Production Order Operation

40. Enter Production


Order Created in previous process
"Production Order Creation" in
this case"1002879".

2018-05-30 35
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

41. Enter Operation as 20

42. Click .

43. Click .

2018-05-30 36
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

44. Click .

Change default yield from 20 to


other quantity say 18 and the
balance as Scrap 1 Qty and
rework as 1 Qty

45. Click .

46. Enter Quantity: 22, against the


material "MZ-RM-E108-02"

2018-05-30 37
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

47. Click .

48. Click HOME

D) Production Cost Analysis

After actual postings


(confirmations, goods issue and
goods receipt) against to the
production order, actual costs &
quantities update on the
production order

49. Click on tile Production Cost


Analysis.

2018-05-30 38
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

50. Click .

51. Click .

2018-05-30 39
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

6. S/4HANA Finance Order Closing


What to do and what to say What you should see

I. Analysis of Costs and Scrap

A) Production Cost Analysis

Here, by clicking on the production


order number you are able to see
the detailed costs of the
production order instead of just
balances.

1. Click on tile Production Cost


Analysis

Make sure that the selected Order


status is 'Open and Closed'

2. Click .

3. Click on your Order which is


created in earlier step, In this
case" ".

2018-05-30 40
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

4. Click .

B) Material Scrap

Tiles 'Material Scrap', 'Scrap


Reason' and 'Operation Scrap' are
released in S/4HANA 1610 On-
premise.

Here, you can see the confirmed


material scrap of professional
ebikes in the form of bubble chart
through which you can drill down
to the confirmed scrap quanity by
material. You can also see the
timely view of scrap.

5. Click on tile Material Scrap


Maximum Deviation

6. Click to select the bubble.

2018-05-30 41
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

7. Click .

8. Click

9. Click here .

2018-05-30 42
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

10. Click

11. Click .

12. Click on tile Scrap Reason

C) Scrap Reason

Here, you can find out the scrap


quantity with reference to different
reasons.

2018-05-30 43
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

13. Click .

14. Click on tile Operation Scrap

D) Operation Scrap

You can see the work centers


causing the scrap and can choose
your material i.e. professional
ebikes in this case, to get the
scrap quantity of your material on
work centers.

You can also analyze the scrap on


work centers over a timeline.

15. Click .

2018-05-30 44
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

16. Click .

17. Click

18. Click .

2018-05-30 45
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

19. Click

20. Click .

II. Period End Activities against


Production Orders in Finance

In general, we perform period end


activities at plant/s level and not
for each individual order.

But in this case, to present an end


to end demo for the created &
processed production order, we
are performing these finance
period end activities for an
individual order.

A) Actual Overhead Calculation

Overhead calculation enables you


to apply actual overhead on
production order, which will be

2018-05-30 46
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see


charged from the cost center
specified in settings. This
overhead will be posted with
reference to seconday cost
elements.

21. Click on tile Actual Overhead


Calculation

22. Enter your Order, in this


case 1002879.

23. Enter the current period in this


case 2.

24. Enter the current fiscal year in


this case 2017.

25. Click to unselect.

26. Click Execute

Click on 'Next List Level' button


after execution

27. Click .

2018-05-30 47
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

B) Variance Calculation

In general we perform Work in


process (WIP)calculation, before
variance calculation.

But in this case since the order is


completely delivered and there is
no prior calculated work in process
on this order, we are skipping this
process.

Variance calculation enables you


to calculate production variance
and scrap variance. It also
determines the causes of variance
into different variance categories
and provides the details of
variance at cost element level.

28. Click on tile Variance


Calculation

29. Enter the your Order, in this


case 1002879.

30. Enter the current period in this


case 2.

31. Enter the current fiscal year in


this case 2017.

32. De-Select Test Run Check


Box

33. Select Details List Check Box

34. Click .

2018-05-30 48
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

35. Select the Order

36. Click .

37. Click .

C) Actual Settlement

Here, we are going


to settle variances calculated in
the previous step to financial
accounitng and CO-PA (Here, it is
account based CO-PA).

38. Click on tile Actual


Settlement Individual
Processing

2018-05-30 49
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see


39. Enter your Order, in this
case 1002879.

40. Enter the current period in this


case 2.

41. Enter the current fiscal year in


this case 2017.

42. Click .

Click on 'Detail Lists' button after


execution

43. Click .

44. Click .

2018-05-30 50
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

45. Click .

D) Production Cost Analysis

You can analyze plan costs, actual


costs and target costs business
transactions wise (like goods
issues, confirmations,
overhead and goods receipt) in
detail and with reference to the
origin of cost.

46. Click on tile Production Cost


Analysis

47. Enter plant "1710".

48. Select Open and closed


option from drop down button.

49. Enter Company code inthis


case "1710".

50. Click .

2018-05-30 51
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

51. Click your Order, In this case

..

52. Click

53. Click .

2018-05-30 52
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

54. Click .

55. Click .

56. Click .

2018-05-30 53
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

2018-05-30 54
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

7. S/4HANA Finance COPA Analysis


What to do and what to say What you should see

A) Trial Balance

By accessing the trial balance, you


can analyze balances (Stating,
Debit, Credit and Ending) of G/L's
for the selected timeline.

You can also see G/L wise


balances with reference to the
selected material, by adding it in
the selection criteria.

We can also see the graphical


display of trial balance.

1. Click on tile Trial Balance

2. Click .

2018-05-30 55
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

3. Click .

4. Click to check Material

5. Click .

2018-05-30 56
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

6. Select the Check Box.

7. Click .

Now, you can see the material


field on selection parameters and
the trial balance will be displayed
for the selected material.

8. Enter MZ-FG in Material Field.

9. Click .

2018-05-30 57
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

10. Click .

Here, you can see the COGS


break-up and production variance
break up and other G/L's balances
for the selected professional ebike
material.

11. Click .

12. Click .

2018-05-30 58
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

B) Market Segments - Actuals

Here, you can see financial results


in a structured way instead of G/L
wise which are sorted in
alphabetical order by default.

You can select the required G/L


hierarchy say contribution margin
and analyze the financial results
within this hierachy.

You can add material as a


reporting field under columns so
that you can analyze and compare
contribution margin results with
reference to all materials.

13. Click on tile Market Segments


Actuals

14. Enter Current Fiscal year in


this case 2017.

15. Enter Company code in this


case 1710.

16. Click after entering


current fiscal year i.e. 2017 and
company code 1710 in this case

2018-05-30 59
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

Select Rows as 'G/L Account' and


Column as 'Key Figure'

17. Click .

18. Click .

19. Click to Select "GL


Account Hierarchy YPA1".

2018-05-30 60
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

20. Click .

21. Click

22. Click

2018-05-30 61
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

23. Click .

24. Click here to scroll down.

25. Click .

2018-05-30 62
SAP S/4HANA MANUFACTURING – E2E WITH PRODUCT COSTING & PROFITABILITY ANALYSIS IN FINANCE

What to do and what to say What you should see

26. Click .

2018-05-30 63