CNAF NAE GB Student Book (Ver 1070)
CNAF NAE GB Student Book (Ver 1070)
NAE CNAF
Green Belt
(Core)
LL ee aa nn
Latest Update May2009
Lesson 1 Introduction
Lesson 2 CPI Overview
Lesson 3 Roles and Responsibilities
Lesson 4 Facilitation Part 1: Brainstorming
Lesson 5 Simulation Round 1
Lesson 6 Charter
Lesson 7 Facilitation Part 2: Team Dynamics
Lesson 8 SIPOC
Lesson 9 Develop & Execute Plans
Lesson 10 Voice of the Customer
Lesson 11 Walk the Process (Gemba)
Lesson 12 Data Collection Plan
Lesson 13 Train & Prepare the Team
Lesson 14 Value Stream Mapping & Analysis
Lesson 15 Data Tools
Lesson 16 Flow & Pull
Lesson 17 Simulation Round 2
Lesson 18 Statistics
Lesson 19 Reducing Variation
Lesson 20 Implementing Improvements
Lesson 21 Simulation Round 3
Lesson 22 Control Plan
Lesson 23 Sustainment
Lesson 24 Final Closeout
Misc. Z- Tables
This Green Belt Student book contain not presented in the PowerPoint slides that is deemed
beneficial to new Green Belt candidates.
Due to the nature of the class the schedule is notional only. The last five pages are daily rating
forms complete one each day at the end of the class you will be required to turn all of them in along
with the completed test.
Administration
Classroom location
Restrooms
Messages / contact phone number
Lunch / Breaks
Refreshments
Starting / ending times
Class evaluations
E ti t d completion
Estimated l ti ti
time
Parking Lot
Homework
CNAF AIRSpeed SharePoint
C d off Conduct
Code C d t
Everyone participates with equal voice
High level of participation needed for success
Single discussions (respect the speaker)
All ideas welcome (what happens here stays here!)
Respect our time together – return from breaks/lunch on time
Blackberries / Phones / electronics off or on vibrate
Handle outside business on breaks
Function as a team
Have fun!
6 – Chartering
25 – Final Exam
13 – Train & & Review
7 – Facilitation: Prepare Team
Part 2
“Team 26 – Graduation
D
Dynamics”
i ” 14 – Value
Stream Mapping
and Analysis
8- SIPOC
Three Methodologies
“Lean Thinking” is a management philosophy focusing on reduction of the 8 wastes in products and
services. By eliminating waste, quality is improved, production time is reduced, and cost is reduced.”
“Si Sigma”
“Six Si ” can be
b ddefined
fi d as a methodology
th d l tto manage process variations
i ti that
th t cause d
defects,
f t d defined
fi d as
unacceptable deviation from the mean or target; and to systematically work towards managing variation to
eliminate those defects.”
“Theory of Constraints (TOC)” is a body of knowledge on the effective management of organizations as
systems.”
Lean Principles
Value has been specified
– From the Customer’s perspective
The Value Stream has been identified
– For each product/service
The product/service Flows without interruptions
The Customer can Pull value from the process
Continuous pursuit of Perfection
Activities
• Review
R i Project
P j Charter
Ch • Value
V l S Stream Map
M ffor • Identify
Id if PPotential
i l • Develop
D l Potential
P i l • IImplement
l Mi
Mistake
k
• Validate Problem Deeper Understanding and Root Causes Solutions Proofing
Statement Focus • Reduce List of • Evaluate, Select, and • Develop SOP’s,
and Goals • Identify Key Input, Process Potential Root Optimize Best Solutions Training Plan and
• Validate Voice of the and Output Metrics Causes • Develop ‘To-Be’ Value Process Controls
Customer • Develop Operational • Confirm Root Cause Stream Map(s) • Implement Solution and
and Voice of the Definitions to Output • Develop and Implement Ongoing Process
Business • Develop Data Collection Plan Relationship Pilot Solution Measurements
• Validate Financial • Validate Measurement • Estimate Impact of • Confirm Attainment of • Identify Project
Benefits System Root Causes on Key Project Goals Replication
• Validate High-Level • Collect Baseline Data Outputs • Develop Full Scale Opportunities
Value Stream Map and • Determine Process • Prioritize Root Implementation Plan • Complete Control Gate
Scope Capability Causes • Complete Improve Gate • Transition Project to
• Create Communication • Complete Measure Gate • Complete Analyze Process Owner
Plan Gate
• Select and Launch Team
• Developp Project
j
Schedule
• Complete Define Gate Identify and Implement Quick Improvements
Tools RIE/Kaizen, 5S,
• Project Charter • Value Stream Mapping • Process Constraint ID Value Analysis, • Mistake-Proofing/
Generic Pull Systems,
• Voice of the • Value of Speed (Process and Takt Time Analysis Zero Defects
Four Step Rapid
Customer and Kano Cycle Efficiency / Little’s • Cause and Effect Setup Method
• Standard Operating
Analysis Law) Analysis Procedures (SOP’s)
• SIPOC Map • Operational Definitions • FMEA • Process Control Plans
• Project Valuation / • Data Collection Plan • Hypothesis Tests/Conf. • Replenishment • Visual Process Control
ROIC Analysis Tools • Statistical Sampling Intervals Pull/Kanban Tools
• RACI and Quad • Measurement System • Simple and Multiple • Stocking Strategy • Statistical Process
Charts Analysis (MSA) Regression • Process Flow Controls (SPC)
• Stakeholder Analysis • Gage R&R • ANOVA Improvement • Solution Replication
• Communication Plan • Kappa Studies • Components of Variation • Process Balancing • Project Transition
• Effective Meeting • Control Charts • Conquering Product and • Analytical Batch Sizing Model
Tools • Histograms Process Complexity • Total Productive • Team Feedback
• Inquiry and Advocacy • Normality Test • Queuing Theory Maintenance Session
Skills • Process Capability • Design of Experiments
• Time Lines, Analysis (DOE)
Milestones, • Solution Selection Matrix
and Gantt Charting • Piloting and Simulation
• Pareto Analysis
• Belbin Analysis
GREEN BELT:
Module 2 – CPI Overview
DMAIC Improvement Process Road Map – Week 1 (Green Belt Core training)
Activities
• Review
R i Project
P j Charter
Ch • Value
V l StStream MMap ffor • Identify
Id if PPotential
i l • Develop
D l Potential
P t ti l • IImplement
l t Mistake
Mi t k
• Validate Problem Deeper Understanding Root Causes Solutions Proofing
Statement and Focus • Reduce List of • Develop SOP’s,
and Goals • Identify Key Input, Potential Root Training Plan and
• Validate Voice of the Process and Output Causes • Develop ‘To-Be’ Value Process Controls
Customer Metrics • Confirm Root Cause Stream Map(s)
and Voice of the to Output • Develop and Implement
Business • Develop Data Collection Relationship Pilot Solution
Plan • Estimate Impact of • Identify Project
• Validate High-Level Root Causes on Key Replication
Value Stream Map and • Collect Baseline Data Outputs • Develop Full Scale Opportunities
Scope • Prioritize Root Implementation Plan
• Create Communication Causes
Plan
• Select and Launch Team
• Pareto Analysis
GREEN BELT:
Module 2 – CPI Overview
DMAIC Improvement Process Road Map – Week 2 (Green Belt Advanced & Black Belt School)
Activities
• Review
R i Project
P j Charter
Ch • Value
V l S Stream Map
M ffor • Identify
Id if PPotential
i l • Develop
D l Potential
P i l • IImplement
l Mi
Mistake
k
• Validate Problem Deeper Understanding and Root Causes Solutions Proofing
Statement Focus • Reduce List of • Evaluate, Select, and • Develop SOP’s,
and Goals • Identify Key Input, Process Potential Root Optimize Best Solutions Training Plan and
• Validate Voice of the and Output Metrics Causes • Develop ‘To-Be’ Value Process Controls
Customer • Develop Operational • Confirm Root Cause Stream Map(s) • Implement Solution and
and Voice of the Definitions to Output • Develop and Implement Ongoing Process
Business • Develop Data Collection Plan Relationship Pilot Solution Measurements
• Validate Financial • Validate Measurement • Estimate Impact of • Confirm Attainment of • Identify Project
Benefits System Root Causes on Key Project Goals Replication
• Validate High-Level • Collect Baseline Data Outputs • Develop Full Scale Opportunities
Value Stream Map and • Determine Process • Prioritize Root Implementation Plan • Complete Control Gate
Scope Capability Causes • Complete Improve Gate • Transition Project to
• Create Communication • Complete Measure Gate • Complete Analyze Process Owner
Plan Gate
• Select and Launch Team
• Developp Project
j
Schedule
• Complete Define Gate
Identify and Implement Quick Improvements
Tools
• Project Charter • Value Stream Mapping • Process Constraint ID RIE/Kaizen, 5S, • Mistake-Proofing/
• Voice of the • Value of Speed (Process and Takt Time Analysis Value Analysis, Zero Defects
Customer and Kano Cycle Efficiency / Little’s • Cause and Effect Generic Pull Systems, • Standard Operating
Analysis Law) Analysis Four Step Rapid Procedures (SOP’s)
• SIPOC Map • Operational Definitions • FMEA Setup Method • Process Control Plans
• Project Valuation / • Data Collection Plan • Hypothesis Tests/Conf. • Replenishment • Visual Process Control
ROIC Analysis Tools • Statistical Sampling Intervals Pull/Kanban Tools
• RACI and Quad • Measurement System • Simple and Regression • Stocking Strategy • Statistical Process
Charts Analysis (MSA) • ANOVA • Process Flow Controls (SPC)
• Stakeholder Analysis • Gage R&R • Components of Variation Improvement • Solution Replication
• Communication Plan • Kappa Studies • Conquering Product and • Process Balancing • Project Transition
• Effective Meeting • Control Charts Process Complexity • Analytical Batch Sizing Model
Tools • Histograms • Queuing Theory • Total Productive • Team Feedback
• Inquiry and Advocacy • Normality Test Maintenance Session
Skills • Process Capability • Design of Experiments
• Time Lines, Analysis (DOE)
Milestones, • Solution Selection Matrix
and Gantt Charting • Piloting and Simulation
• Pareto Analysis
• Belbin Analysis
GREEN BELT:
Module 2 – CPI Overview
Why “Six Sigma”?
Hey, 99% is good enough right?
99% 99.99966% (6 Sigma)
• 20,000 lost postal mail items per hour • 7 lost postal mail items per hour
• 15 minutes of unsafe drinking water per day • 1 unsafe minute every seven months
• 2 long/short landings per day at a major airport • 1 long/short landing every five years
• 5,000 incorrect surgical operations per week • 1.7 incorrect operations per week
• 7 hours of lost electricity per month • 1 hour without electricity every 34 years
GREEN BELT:
Module 2 – CPI Overview
Principles of TOC:
A system must have a goal on which everything in that system is evaluated.
Systems function as chains. Strengthening the weakest link benefits the system the most.
Optimum system performance is NOT equal to the sum of the individual process optima.
Systems operate in an environment of cause and effect. Visible problems are usually indicators
((undesirable effects or UDE)) of some critical root cause(s)
( ) that must be addressed.
An optimal solution deteriorates over time. Improvement must be continuous.
Policy constraints are the most common and most difficult to break. Policy constraints offer the most
opportunity for system improvement.
TOC Applications:
Drum-Buffer-Rope (DBR): Links the pace of the first step in a process to the exit rate of the constraint. One of
the most common TOC applications; often applied to repetitive processes.
Critical Chain: An advanced application of DBR used in the project management field which treats time as
inventory.
Supply Chain Management: DBR concepts applied in the logistics arena, concentrating on the system’s ability
to replenish stock. The metric, “Time to Reliably Replenish” (TRR), is an offshoot of this application.
Thinking Processes: TOC tools to link improvement efforts to the system’s goal using the logic of cause and
effect. Uses logic trees as a way to step through the process.
TOC
OC 5 Focusing
ocus g Steps
Steps:
1. Identify - What’s the constraint?
2. Exploit – Get the most out of the constraint with minimum investment.
3. Subordinate - Focus non-constraints towards supporting the constraint
4. Elevate – Increase the constraint’s capacity
5. Repeat Step 1 - The constraint has probably moved.
LEAN
Eliminating Non-Value
Added Activities
Identify the Value Stream
Eliminate Over-Production
Eliminate Over-Processing
Create Process Flow
Create Pull System
Theory of
Constraints
CPI Six Sigma
Reducing Process
Constraint Mitigation
Variation
1. Identify the Constraint
Consistent Repeatable
2. Exploit the Constraint Processes
3. Subordinate to the Constraint Process Design / Redesign
4. Elevate the System’s Defect Prevention
Constraint
Statistical Analysis
5. Repeat Step 1, the Constraint
has probably moved Voice of the Customer
Team Responsibilities
Cross functional team including:
Members from the work area (inside eyes –minimum 1/3 )
Members from outside work area (outside eyes willing to question non-value added activities)
Customer (internal/external) voice
Suppliers/Partners/Safety Rep/Quality Rep
Process
External Customer(s):
Those who receive or use
your product or service,
outside your organization
Roles of Change
g
Process Owners/Project Sponsors:
– The individual or group who has the power to sanction or legitimize change.
– Responsible for creating an environment that enables the necessary changes to be made
on time and within budget.
Change Agents:
– The
Th individuals
i di id l or groups who
h are responsible
ibl ffor actually
t ll making
ki ththe change.
h
– Responsible to understand and diagnose the problem, develop a plan to address the
problem and execute the change effectively. (Green Belts and Black Belts)
Managing vs.
vs Facilitating
Managing Facilitating
ensuring available resources ensuring optimum use of resources
making decisions getting the team to make decisions
assigning tasks clarifying roles and responsibilities;
determining priorities getting team to assign tasks
ensuring
i team
t is
i clear
l about
b t priorities
i iti
directing
ensuring good product influencing, negotiating, mediating, teaching
installing controls ensuring good team structure and process
measuring results clarifying boundaries
helping team measure its results
allocating rewards reinforcing, encouraging, helping celebrate successes
Brainstorming
An effective brainstorming session…
Brainstorming Tips
Rapid generation is the aim
N such
No h thi
thing as “wild”
“ ild” or “b
“bad”
d” id
ideas
Chaos can be fun
Take pride in your ignorance
Always forget to combine
Assert
Build on others’ ideas
Laughter fans the flames of creativity
Each person take three Sticky notes and write an idea on what to do with
Slug Slime on each one.
1. ____________________________________________________________________________________
2. ____________________________________________________________________________________
3. ____________________________________________________________________________________
Affinity Diagram
Rules:
Start with one. Find another. Put it there.
No discussion of why.
Short clarification of what the sticky means is OK.
Resolve conflicts with duplicate stickies.
Question very large groups.
It’s over when movement stops.
Group naming – an outside person familiar with the issue should be able to name a few items in the group
based on the name of the group.
Team Exercise 2
The CEO and President would like us to begin to place our ideas in categories in order to give the research and
development branch a starting place to begin looking at a resolution to our ‘slug slime’ problem.
(Group your teams ideas into at least 4 categories for this Exercise)
Single Vote
Participants vote for their favorite idea.
Multi-Vote
Participants vote for their top three (or four, or five…), ranking can also be introduced. Multi-voting is a
group decision-making technique used to reduce a long list of items to a manageable number by means of a
structured series of votes. Follow same process as Single Vote except allow participants to use their votes
as they see fit (e.g. 4 votes for the second idea) Allows individual needs and/or prejudices to be evaluated.
Sign-Up Voting
Participants vote privately by using sticky notes and turning “ballots” in to facilitator for tally.
Team Exercise 3
After the successful brainstorming session, the accountants have come back and stated that we only have
enough R&D funds to pursue three of the categories identified in the previous affinity diagram exercise.
Work with your team and identify the three categories the team thinks will have the most likely chance of
success.
Category 1 _______________________________________
Category 2_______________________________________
Category 3_______________________________________
Big Pay-off
Nominal Group Technique (NGT) - a consensus planning tool that helps prioritize options.
Rankings are collected from all participants, and aggregated. For example:
Options Participant 1 Participant 2 Participant 3 of importance
A ranked 1 st ranked 2 nd ranked 2nd 5=ranked 1st
B ranked 3rd ranked 1st ranked 3rd 7=ranked 3rd
C ranked 2 nd ranked 3 rd ranked 1st 6=ranked 2nd
D ranked 4th ranked 4th ranked 4th 12=ranked 4th
Idea Ranking - the facilitator has participants view ideas, and rank them from most important to least
important. For example, if you have a list of six ideas, each team member would rank them from 1 to 6 (each
number can only be used once)
once). This exercise helps teams to develop a more finite ranking of ideas than a
"yes/no" vote.
Idea Weighting / Dot Voting - Give each person in the group 10 self-stick dots.) Instruct them that
to choose their priorities, they are to use "all 10 dots but no more than 4 on any ONE item." Therefore, 4 dots
would indicate their top priority. Some items will have no dots. Participants actually walk up to the flip charts and
place their dots next to their items of choice.
Team Exercise 4
The Vice President of the Research and Development branch has asked that though they
have the money to pursue three areas of research, they only have the resources to pursue
one at a time.
Using
g a PICK Chart,, prioritize
p yyour ideas to determine which category
g y she would like us to
pursue first.
R
Round
d1 Current Reality
This round is intended to give the team experience running the
current process. It includes the following phases:
Baseline
Shoot
Calculations
Exercise Requirements
Ball must travel a minimum of 40 inches and hit no other objects before landing on the floor
Each team member will be assigned a role
The balls will be marked as a preparation for shooting and for rework
– Blue dots symbolize inputs needed to complete a job function and are considered to be value
added to the process
– Red dots symbolize the time and effort required to fix a problem
No permanent markings or modifications can be made to the Statapult or balls
Target must be parallel to the base of the Statapult
Balls must be airborne a minimum of 40 inches
Customer Requirements
q
All shots must be fired at an angle of 167 degrees
All shots must land on the floor in a stationary target in an area +/-3 inches long and +/- 6 inches
wide with respect to the nominal target before hitting any other object
Pass/Fail data must be collected for each shot
The balls must be sorted based on either Pass or Fail
Only Passed balls must be delivered to customer with no markings (colored dots)
All data must be collected “real
real time”
time
Business Requirements
Balls must be transported in batches of 5
The Statapult must be recalibrated (remove & reattach rubber band) between every shot
Workers should only be concerned with their assigned jobs
All shots must originate from the floor
Must use forms 5O-5LO,
5O 5LO RUK-1D-1NG,
RUK 1D 1NG and 1-T5-L8
1 T5 L8
Balls are aligned with blue dot facing up
Specific procedures for each role will be given out 5 minutes before the Round 1 shoot
Baseline
In order to run the simulation, you must determine the accuracy and precision of the process in order to set up the
target area
Target
Red Stickers
Box of Balls
Sorter Inspector
p
Marker
Shooter
Customer
Liaison
Observer(s)
Cross Functional
Cross Functional Team
Project Sponsor Team
Execute Black Belt (Lead &
Green Belt (Lead & Facilitate
Facilitate) Complex Projects)
Green Belt (Assist
with
t Complex
Co p e
Th output
The t t off a VSA is
i a list
li t off improvement
i t opportunities
t iti which
hi h
Projects, Lead &
result in the future performance of RIEs, Projects, and JDIs.
Facilitate GB
Projects)
Improvement Opportunities
Size of Time to
N
Name D
Duration
ti S
Scope off Change
Ch
Team Implement
Solution Ready to
Implement – Project
Just Do It 1 – 2 Days Immediate
Problem Well Sponsor
Defined
Short Term, High 4 – 12
* Kaizen /
3 – 5 Days
Intensity Effort to (Full-Time Immediate to
RIE Address a Specific During Short Term
Problem Event)
Complex Problem,
3–6 3 – 15 Mid to Long
Project No Apparent Root
Months (Part-Time) Term
Cause
NAE Notes:
NAE Kaizen/RIE process required that VSM’s (Current, Ideal, Future State maps) be completed prior to the
Kaizen/RIE
The complete Kaizen/RIE event including development of VSM normally takes between 7 – 10 days (3(3-55 days
VSM, 3-5 days Kaizen/RIE)
Team Leads and selected members will normally have additional event preparation and post event follow-up
actions
Customer Issues
Event or
Project
Identified
Hot Issues
Constraints
Employee Suggestions
Bottom Up Identification
What should I be doing in my work area?
Based on the training, look for “low hanging fruit” around your work area.
– Constraints
– Poor quality
– Confusion
– Redundancy
– High rework / redo rate
Identify processes that can be done better.
Identify your internal/external customers.
– What are their expectations?
– Would you be satisfied if you were in their shoes?
Charter
Defines the Team’s mission
The charter does not solve the problem
It is a living document that will change up until the next event
Next slide is a charter example
CNAF Instruction 4790 Requires that all NAE events be loaded into CPIMS within 15
days of event completion.
Event Charters are should be loaded into CPIMS no later than the start of the event
prep-week.
IMPACT
SMART Goals
Specific
– “I want to have a process with a Cpk of >1.3.”
– “I want to reduce set-up time from 4 hours to 10 minutes”
Not Specific
– “II want to have a good quality process.
process.”
– “I want faster set-ups.”
Measurable
– “I want to reduce processing time from 50 days to 5 days.”
– “I want to reduce the weight of an F-22 by 150 pounds.”
Not Measurable
– “I want to reduce processing time.”
– “I want to reduce the weight
g of the F-22.”
Achievable
– Supported by management
– Supported by workers in process
Not Achievable
– Management not engaged, “trumps” or ignores team
– Resistance from workers in process
Relevant - Can it be done with time/resources allowed?
– “I want to improve the Cpk of my process by 50% by high rate production.”
– “I want to reduce charged labor by 15%”
Not Relevant
– “I want to double the Cpk of my process by weeks end.”
– “I want to reduce charged labor by 90%”
Time Bound - Often determined by event/event dates
– “II want to reduce the weight of an F-22
F 22 by 150 pounds by the release of block 2
2.”
– “Reduce cycle time 50% by event week end.”
Not Time Bound
– “I want to reduce the weight of an F-22 by 150 pounds.”
– “Reduce cycle time by 50% eventually.”
Slides 12 - 13
Barriers to Success
Scope or team is too small / large
Solution in mind
Unavailable resources
Politics
Wrong people
Unclear event objectives
Conflict
Insufficient resources
Uninvolved Leadership
Shifting goals and priorities
Declaring victory too early
Monument: barrier that can’t be moved
Business Description:
WC 810 maintains a rotating pool of equipment (i(i.e.
e rafts
rafts, suits
suits, life vests
vests, O2 regulators)
regulators). Majority of
items serviced by WC contain items with a shelf life. Rotating pool items are used to support visiting
aircraft and VP Squadron aircraft during ISIS maintenance cycles.
Problem Statement:
Unnecessary man-hours are used to identify items in the pool that have exceeded their shelf life. Shared
resources create a constraint in work flow during high workload times.
Business Description :
WC 810 maintains
i t i a rotating
t ti pooll off equipment
i t (i
(i.e. rafts
ft (4ea),
(4 ) suits
it (24
(24ea),
) lif
life vests
t (44
(44ea),
) O2
regulators 24ea)). 80% of items serviced by WC contain items with 90 day shelf life. Rotating pool items are
used to support visiting aircraft and VP Squadron aircraft during ISIS maintenance cycles.
Problem Statement :
Verification of shelf life status is conducted every Monday at an average cost of 4 man-hours to identify
items in the pool that have exceeded shelf life. Shared resources (air supplies and work space) create a
constraint in work flow during high workload times (P3 ISIS) impacting the ability of WC to support more than
one aircraft ISIS requirements at one time.
Goal Statement :
Develop SOP and shop layout that enables support of two congruent aircraft ISIS processes with a 6
working day period
Establish a Ready For Issue (RFI) pool for higher usage items that requires rework of less than 10% for
items with shelf life issues
Reduce by 50% time required to identify out of date material contained in RFI pool without disassembly of
end item.
Project Scope – In/Out of Scope:
Process starts with induction of items from squadrons or the identification of non-RFI items in RFI pool
Process ends with RFI items being staged for pickup by squadrons, being placed in RFI pool, being
placed in non-RIF pool (M9 NALCOMIS Status Code) or being identified as BCM/Disposal candidates.
NAE CPIMS Charter
Project Name: ______________________________________ Flight Test Facility
Project Information
Business Impact / The final step in production of our golf balls is the testing of the flight characteristics. This is
Description: accomplished at our Flight Test facility using a sophisticated machine call a Statapult. Balls
that conform to the highest quality are passed as "True Flight Balls". The use of this
machine is new to our company and restrictions and documentation requirements are in
place to ensure only quality products are delivered to our valued customers. Our supplier is
internal to our company and is the product as it completes the assembly process. Our
customer is our shipping and packaging department.
Opportunity or Problem
Statement:
Goal Statement:
Project Scope - In/Out of Process upper boundary is receipt of balls from Supplier (our manufacturing process)
Scope:
Process Lower boundary is delivery of the True Flight Balls to customer (our shipping and packaging
department)
Outcome: (not required entry)
Comments / Notes: Governing instructions: Exercise Requirements, Business Requirements, Statapult Requirements
Latest Update Dec 2009
MODULE 7: FACILITATING
Part 2 - “Team Dynamics”
Definition of a Team
To be a team, you must have…
Common purpose, shared goals
Shared outcomes (risk and rewards)
Specific roles for each member
Interdependency
p y ((must collaborate to accomplish
p g
goals))
Structure and rules
Facilitation Skills
Manage group conflict
Create a collaborative environment for participants
Help generate ideas
Maintain the focus of group discussion
Clarify and communicate meeting expectations
Enable agreement through consensus
Prepare
Ensure appropriate team members are included.
Talk to subject matter experts about the purpose of the Kaizen / RIE.
Reserve meeting space.
Prepare any materials.
Develop p an Agenda
g
– Purpose / goal
– Desired outcomes
– Date
– Place
– Start / Stop Times
– Action Items
Conduct / Facilitate
Develop ground rules.
Assign roles (i.e. scribe, timekeeper).
Reiterate / clarify purpose of event.
Ensure group maintains focus.
At the conclusion of the event, review outcomes and get agreement.
Record action items.
Action Items
Assign tasks to participants.
Determine timing.
Discuss outcome of actions.
10
11
12
13
14
15
3 2
NORMING STORMING
4 1
PERFORMING FORMING
ADJOURNING
Non-Verbal Communication
It’s important to observe your body language (non-verbal communication) for the impact it has
on the team.
The team members will tend to read your body language, interpret it, and react to it.
GREEN BELT:
Module 7 – Facilitating Part 2 Team Dynamics
Case Study 1
It’s the first day of your Kaizen / RIE and one of your key team members, Sally, has hardly spoken a
word. She sits silently, with her arms crossed and won’t make eye contact. You are depending on her
expertise and need her ideas.
As the facilitator, what can you do to encourage her participation?
Case Study 2
Team member, Ben, has been a valuable asset. He’s always the first to volunteer and speaks
up at every opportunity, but doesn’t listen to others’ ideas. He sometimes speaks forcefully in
an attempt to exert control and even takes the lead on group activities without being asked.
How can you ensure a good team process and team member involvement?
Case Study 3
Things were going smoothly until the team began the process map of the current state. Now
th ’ jumping
they’re j i to
t solutions
l ti and
d the
th group is
i disintegrating
di i t ti into
i t smaller
ll sub-teams
bt with
ith no
focus for the work.
What needs to be done to get the team back on track?
Case Study 4
It’s day three and tension is high. Lou and Robin are not listening to each other. Both are
frustrated and the unproductive debates have led to sarcasm and personal attacks. The other
team members are hopeful that you, the Green Belt, can help the group come to a consensus
and implement a strategy.
How can you get this team to commit and take ownership?
MODULE 8 : SIPOC
What is a Process?
It is a very good tool for one to see all of the things needed for a process, where they come from, and what outputs
that process produces, and where they go to. Supplier - Input - Process - Output - Customer.
A process is any activity that takes inputs, performs actions on the inputs, and results in
outputs
A SIPOC defines the inputs the process receives and the outputs that a process delivers
Definition of SIPOC
Suppliers – the internal / external people or organizations that provide materials, information, or other
resources for a process.
Inputs – the resources that are supplied.
Process – the series of work steps that transform inputs to outputs.
Outputs – the product, service, or information that is delivered to the customer.
Customers – the people, organizations, or process that receive the output. External and Internal Customers.
Process Inputs and Outputs X’s X’s Y’s
Process Inputs P
Process Process Outputs
Inputs are the resources that Process X’s quantify cost, Tangible products or services.
are required to create outputs. quality, and speed at various Identifies metrics that gauge process
points in the process: performance.
Labor hours Linked to the (Customer care-abouts,
critical to X (CTXs)) measures as defined
Errors by the customer.
Rework
Task time
etc.
X’s Y’s
X’s
People
Machines Provide a Service
Material PROCESS
PROCESS
Procedures Provide a Product
Environment
Measurements
5 What do we need
to consume?
Input Metrics (X) Process Metrics (X) Output Metrics (Y) 7 How can we
measure this?
• Accuracy of order info. • Rework % at each step • Invoice accuracy (for I, P, O)
• Accuracy of shipping • Internal scrap %
info.
• Accuracy of customer
info
info. Quality
Other Input Metrics Staff expertise
•
• Invoices • System up-time
• Time to receive order • Invoice cycle time
processed/mont
info.
h and variability
• Time to complete invoice
• System responsiveness
• Time to deliver invoice Speed
• Delay time between
t
steps
Slides 13 - 15
Suppliers Inputs Process Outputs Customerrs
Module 7 – SIPOC
GREEN BELT:
Latest Update May 2009
Analyze (Tuesday-Wednesday)
– Quickly validate root causes and identify/review sources of waste.
– Review waste elimination techniques and brainstorm process improvements for reducing variation.
Improve (Wednesday-Friday)
– Create action item list to accomplish improvements.
– Implement process improvements, train employees, test, fine-tune, and insure the process is
capable.
Control (Thursday-Friday)
– Create Standard Operating Procedures to document and sustain improvements.
– Present results to Management Team, complete follow-up, and monitor results over time.
GREEN BELT:
Slides 01 - 05
Module 9 – Developing Execute Plans
E
Event Preparation Chec
cklist Event Area _______
_____________ Event Date _____________
_
Ver Dec2008
Event Name _
____________________
____________________
____________________
__________________
3 week
ks prior 2 weeks prior
p 1 weeks prior Event Prep- week
Initial Event Requirem
ments Monday Morning Meeting Items:
I Monday Morning Items: Monday Morning Items:
AIRSpeed Office comp
plete the following Event Team Lead & Co-Lea
ad complete following T
Team Lead & Co-lead With AIRSpeed Office Black A
AIRSpeed Office complete the fo
ollowing
Develop/Confirm prelim
minary charter Review Week 3 items and re
esolve all open items that Belt complete following
B Condduct Awareness Training for Team
m and AIMD/IMA
proval for event from
Receive 1st tollgate app were not completed e any open items
Review Week 2 items and resolve perso
onnel
Champion based on pre eliminary charter Event perpetration turned ovver to the event Team Check status of ordered materialss
Identify key team members Lead & Co-lead. Monitoring progress Determine impact event will have on supporting areas
* ID Process Sponsor (usually DIVO) Build event folder on shared network drive to hold all determine means of minimizing any negative impacts
* ID Facilitator & Coach event electronic documentation If applicable, assign data collectio
on responsibilities for
ad
* ID Team Lead/Co-lea Review event team composittion with Coach and collection of additional data
* ID Barrier Buster (E7
7+) Leads making changes as re
equired Determine any Takt time requirem
ments or TRR issues
* Propose team makeu
up (number, skill set required, Review applicable TOC designs, TRR, etc. Review status of barriers with Barrrier Buster
etc) ent packages for overlap
Review previous division eve Promulgate prep-week schedule of
o events
GREEN BELT:
Inform Production Contrrol of event dates AIRSpeed Office complete th
he following
Measurement wheel, etc.
Inform area supervisorss of event dates Advertise event dates in area
With Team Lead or Co o-lead complete following Set time and day for week 2 meeting Prepare easel charts, handouts and examples
Identify team membersh
hip with a goal of identifying Team Lead & Co-lead With AIR
RSpeed Office Black Belt Conduct CPIMS training for team lead & co-lead
100% of team membersship by W/C or skill set complete folllowing Have lead or co-lead enter event charter into CPIMS
required
Determine type of data and best
b means of gathering ead & co-lead as
Conduct Excel training for team le
hip with a goal of identifying a
Identify team membersh Conduct CPIMS training for team members, sponsors
minimum of 80% of memmbership by name Collect a sample of data to ensure
e viability of data
(items processed, demand, etc)
e ete following
Team Lead & Co-lead comple
Confirm all identified event team members are AIRSpeed Office complete the following Confirm all event support material is available
available for the two week event Identify all team members byy name Conduct event planning meeting with
w AIRSpeed Office
Determine top 4-5 probllem issues within event scope Determine event members th hat required AIRSpeed Create proposed Event daily agen
nda
(used to ensure required
d data and materials for event Awareness training, confirm instructor availability (If
are available) qualified instructor is available conduct training during
weeks 1 or 2 prior to the eve ent)
Publish Week 3 schedu ule of events: Select date for
first event team meeting
g Set time, day and location AIIRSpeed Awareness
Determine Process Lea adership AIRSpeed knowledge training
and conduct training as necessary Send out invitations for AIRS
Speed Awareness training
Schedule next weeks Monday
M morning meeting with to all in AIMD/IMA
Team Lead and Co-leadd Determine availability of material required for event
and ensure availability of anyy special personnel
required as technical expertss during event
If not available reserve or ord
der material required for
event
How Will You Communicate?
The best way to identify and communicate with your team, key stakeholders and event champion is to answer
questions such as:
1.
1 Determine Audience and Media
Identify the various audiences you will need to communicate to:
Executive Team Managers Administration
Risk Management Sales Marketing
HR Consumer Relations Engineering
Finance Legal
g Customers
Salaried Hourly Marketplace
South America Distributors Europe
Asia North America
Identify the media by which you will communicate to the groups above:
Voice Mail Formal Presentations Posters
Memos Oral Communication EE-Mail
Mail
Elevator Speech
GREEN BELT:
Slides 07 - 10
Module 9 – Developing Execute Plans
2. Complete a Stakeholder Analysis
For each Stakeholder identified, determine:
– Are they critical for development of project tasks (Enabling Stakeholders) or critical for the successful
implementation of a solution (Implementation Stakeholders)?
– What concerns can you anticipate for each Stakeholder?
– What positive outcomes exist for each Stakeholder?
– What will be your message for each Stakeholder?
A Stakeholder Analysis should be completed/revised as critical aspects of the project change (I.e. scope
changes, solution options become more visible, etc.)
A Stakeholder Analysis can be a sensitive document and is intended for internal team use only.
GREEN BELT:
Slides 14 - 16
Module 9 – Developing Execute Plans
Improvement Newspaper
Team: Area:
Target Problem To Be Create Complete Results/Savings
Ref. Resolved Action Needed Resp. Date Date Prog. (Please Quantify)
1 2
4 3
1 2
4 3
1 2
4 3
1 2
4 3
Example:
Results/Savings
g
Targett
T Problem
P bl To
T Be
B Create
C t Complete
C l t
Action Needed Resp. Prog. (Please
Ref. Resolved Date Date
Quantify)
1 2 Save on lead
time for hatch
No written Standard Hatch school for House
2, 3, 9, from 1-3 days. X-
work procedure for assembly and 04/19/05
10 Walker 31 personnel will
hatches machine guy
4 3 be in next class.
ECD: 5/18/05
1 2
Post signs on Aides in
No posted cleanliness machine for Milam maintaining shop,
6, 15 04/19/05 04/20/05
standards cleanliness Miranda shop equipment,
4 3
standards tooling, & safety
Determined 1 2
1, 3, 8, Rigging gear not Milam
required rigging Reduce setup
9 10
9, 10, identified/stored in 04/18/05 04/19/05
gear for rigging Miranda time by 5 min/job
12 appropriate gear locker. 4 3
gear locker
GREEN BELT:
Slides 17 - 18
Module 9 – Developing Execute Plans
Target Progress Report
Team Leader:
TARGET PROGRESS REPORT
Co-Leader:
Value Stream: Sensei:
Area: Date:
Focus: Takt Time:
Newspaper
p p Metric Start Target
g Daily
y Progress
g % Future 1 Week 2 Weeks 3 Weeks
Item(s) (1) (2) 1 2 3 4 5 Change Target Later Later Later
1. Demand per ________
2. Staffing
6. Work in Process
7. Work in Queue
8. Totall Cycle
l Time
i
9. Set-up Time
17.Visual Controls
18
19
20
*Primary QCDSM only (1) Actual before Event.
(2) Expected results by end of Event.
Remarks:
Newspaper Metric Start Target Daily Progress % Future 1 Week 2 Weeks 3 Weeks
Item(s) (1) (2) 1 2 3 4 5 Change Target Later Later Later
1. Demand per Month 22 22 22 22 22 22 22 N/C
1 thru 16 5. Productivity (hrs / unit) 15/unit 4/unit 15/unit 2/unit 1/unit .25/unit .25/unit 98%
1 thru 16 8. Total Cycle Time -Touch Time 15hrs 7hrs 15hrs 2hr 1hr 15min 15min 98%
9. Set-up Time 1hr 1hr 1hr 1hr 1hr 15min 15min 75%
1 thru 16 10. Lead Time 48hrs 48hrs 48hrs 2 sim 2:10 2:10 2:10 96%
11. Floor Space N/A N/A N/A N/A N/A N/A N/A N/A
1 thru 16 12. Product Travel (Feet) 1005 500 1005 465 465 465 465 54%
1 thru 16 13. People Travel (Feet) 1005 500 1005 465 465 465 465 54
14. 5S Audit Score N/A N/A N/A N/A N/A N/A N/A N/A
16. Safety Issues N/A N/A N/A N/A N/A N/A N/A N/A
18
19
20
*Primary QCDSM o nly (1) Act ual b efo re Event .
(2 ) Exp ect ed res ult s b y end o f Event .
Remarks:
Internal Customers
– Whomever is a user of your process output is an
internal customer.
Focus Groups:
A panel of individuals (customers or non-customers) who answer questions about a company’s products
and services
Substantial advantage by providing a direct voice of the customer to an organization
Disadvantage is that they are higher cost than other methods
Actual Customer Statements and The Real Customer Concerns, Values or The Specific, Precise and Measurable
Comments Expectations Characteristic
• “This mower should be easy to start” • Wants the mower to start quickly and • Mower starts within two pulls on the
painlessly cord
• “The cord shouldn’t be too hard to pull”
• Mower starts with an effortless pull on
the cord
Actual Customer Statements and The Real Customer Concerns, Values or The Specific, Precise and Measurable
Comments Expectations Characteristic
• “II want to talk to the right person and • Wants to talk to the right person • No additional menu items on voice
don’t want to wait on hold too long” quickly system
• Customer reaches correct person the
first time within 30 seconds
• “This software package doesn’t do • The software does what the vendor • Every design feature needed is built into
squat” said it would do the package
• Th software
The ft iis ffully
ll operational
ti l on th
the
customer’s existing system
l De
tro fin
n e
Co
Lean
6
Me
e
rov
TOC
as
p
ure
Im
Analyze
Basics – The Five Actuals
1. Go to the actual workplace.
2. Engage the people who do the actual work.
3. Observe the actual process.
4. Collect the actual data.
5. Understand the actual value stream.
Overview
Gemba means “real place” or “go see.”
The work place is where value is created.
Management has a responsibility to “get the facts” from the work space.
More of a tactic than a special method or tool.
Used during the Define step.
step
– Helpful in defining the problem.
Essential to Measure and Analyze steps.
– Vital to observing the AS-IS condition.
Critical in the Control step.
– Actual observation of the process environment.
Gemba
“As it is
“A i written,
itt so llett it be
b done.”
d ”
– Written instructions do not always reflect reality
– “AS IS” almost never matches what is written
“Go to Gemba” is a tactic to characterize the process.
– Actual observation of the process.
– Process mapping (physical and logical)
– Time value mapping
– Value Stream Analysis
“Walking” the process gives one a sense of scale and scope of the issues.
The kaizen process uses facts and data to understand current conditions first before
changing anything. Once the process is documented the information is used to identify
opportunities for improvement. The opportunities are then turned into action items real
ti
time and
d assigned
i d tto tteam members
b tto go iimplement
l t th
themselves
l or tto coordinate
di t with
ith a
team resource , such as facilities or IT to make the change if team members are not
technically or physically able to make the change.
Therefore it is absolutely necessary that the actual process be mapped.
GREEN BELT:
Slides 01 – 06
Module 11 – Walk The Process
Example Questions to Ask
Data (top half - stopwatch readings; bottom half - subtraction; right - notes) Component
Step Operation Name Task Time
No. 1 2 3 4 5
GREEN BELT:
Slides 14 – 15
Module 11 – Walk The Process
What Is a Process Map?
A graphical representation of a process flow identifying the steps of the process – the X’s and Y’s of the
process and opportunities for improvement.
Process maps need to be modified to fit the particular needs of any specific process.
Types of process maps:
– Top-down
Top down
– Linear
– Functional (swim lanes)
– Many other types
Customer*
Customer*
Order Entry
Start
Administration
Place Bill
Under Door
Warehouse
Retrieve &
Warehouse Stop Review Bill
Administration
NO NO
Go To Go To
Process Activity
Activity Activity
Activity Activity
Activity Activity
Activity Process Front Desk Front Desk
Supplier 11 22 44 55 Customer
Adjust
the Bill
Activity
Activity
33 Settle / Pay
the Bill
Exit the
End
Hotel
GREEN BELT:
Slides 16 – 17
Module 11 – Walk The Process
Top Down Flow Chart
Purpose: To determine the correct level of the process to Value Stream Map – it is a vertical look at the
process.
Meant to provide FOCUS by selectively expanding from the highest level down to the level where the root
cause is located.
Start
Stop
GREEN BELT:
Slides 18 – 19
Module 11 – Walk The Process
Linear Process Map
Layout of process flow should be uncluttered.
May need more than one slide for presentations to make
legible.
Minimal overlap of connectors.
2p/5m/100f
5% 2p/1m/0f
1p/20m/5000f
20%
1p/5m/1500f
80% 1p/0.5m/0f
1p/120m/100f
p
2p/5m/1500f
1p/0.2/0f
2p/1/0f
98%
1p/0.2/0f
GREEN BELT:
Slides 20
Module 11 – Walk The Process
Functional (Swim Lanes)
Function A
2 min. 35 min. 15 ft. 10
Function B
15 min
min. 20 min
min. 35 ft
ft. 15
Function C
10 min. 40 ft. 2 23
Function D
5 min. 30 min. 30 ft. 4 20
Function E
40 min. 60 ft. 5 10
Function F
15 min. 4 24
STRIP NDI
Strip
TANK NDI
Tank
OFFICE
Paint
PAINT
Booth
BOOTH
51E
Paint
PAINT
Booth
BOOTH
N OFFICE
D TOOL
INDI
NDI ROOM Office
Strip
Tank
AWP/RMS STRIP
ROOM
SAFETY
520
PC
PC
51D P.C.
C.O. C.O.
DAAS DAAS
DEPT SNAP
DEPT SNAP HEAD
HEAD
ITEM
STOCK STOCK
MGR
POINT SK POINT
SK
BO1 BO1
CRANE DOCKSIDE
DEPOT PEO PEO
SUPV IWS2 SUPV IWS2
Handoffs … 47 Handoffs … 10
Flow Clock Time … 486 hrs Flow Clock Time … 90 hrs
Manual Touch Time … 108 hrs Manual Touch Time … 58 hrs
5S Workplace Organization
Sort Clearly distinguish needed items from unneeded items and eliminate the
latter.
Simplify Keep needed items in the correct place to allow for easy and immediate
retrieval.
Ask the people who use the material / equipment for help –
We don’t want to throw anything out that we actually need!
Simplify (Seiton)
Determine the location for needed items and how they should be kept
– Consider how to store tools and jigs
– Consider principles of motion waste
Identify best locations
– Labels, signboards, maps, shadows
– 5S Map: shows location of equipment in the area
– Color-Code Strategy: distinguish use of tools/parts by color
– Outlining work areas and locations
Standardize (Seiketsu)
Establish guidelines for sort, straighten, and shine conditions
Bring the condition of the area up to those standards
Make the standard guidelines visible
Maintain and monitor first 3S’s
Assign responsibilities and monitor through self audit and evaluation
Sustain (Shitsuke)
Development of new awareness and skills
Support from management
Ongoing, company wide communication
Making 5S standards part of daily work
Total employee involvement
p
Implement Sustainment Checklist
Systematic
Sort Simplify Cleaning Standardize Sustain
Level 5 Employees
p y are A dependable,
p , Area employees
p y Everyone
y is There is a
Focus on continually documented have devised a continually seeking general
Prevention seeking method has been dependable, the elimination of appearance of a
improvement developed to documented waste with changes confident
opportunities. provide continual method of documented and understanding
evaluation, and a preventive cleaning information shared. of, and
process is in place and maintenance. adherence to
to implement the 5S
improvements principles.
Level 2 Necessary and A designated Work and break Methods are being A recognizable
Focus on unnecessary items location has been areas are cleaned improved but effort has been
Basics are separated. established for on a regular, changes haven’t made to
items. scheduled basis. been documented. improve the
Key items to check condition of the
have been workplace.
identified.
Level 1 Needed and not Items are randomly Work place areas Work place Work place
Just needed items are located throughout are dirty, methods are not checks are
Beginning mixed throughout the workplace. disorganized and consistently randomly
the work place. key items not followed and are performed and
marked or undocumented. there is no
identified. visual
measurement of
5S performance.
performance
Tools, Gages, jigs, fixtures Required equipment is arranged neatly and stored in a way that keeps it clean and free from
16
& Test Equipment storage damage.
21
22
23
l De
t ro fin
n e
Co
Lean
6
M
e
e
rov
TOC
asur
Imp
Analyze
What Is a Measure?
A quantified evaluation of characteristics and / or level of performance based on observable data
Examples include:
– Length of time (speed, age)
– Size (length, height, weight)
– Dollars ((costs, sales revenue, p
profits))
– Counts of characteristics or “attributes” (types of customer, eye color, gender)
– Counts of defects (number of errors, late checkouts, complaints)
Why Measure?
Establish the current performance level (baseline)
Determine priorities for action – and whether or not to take action
– Substantiate the magnitude of the problem
G i iinsight
Gain i ht iinto
t potential
t ti l causes off problems
bl andd changes
h iin th
the process
Prevent problems and predict future performance
SMART Metric
Specific
– Describe outputs
outputs, knowledge
knowledge, task
task, experience
experience, etc
etc.
Measurable
– Time frames are included
– Data can be obtained (preferably with ease)
Achievable
– Resources (knowledge, $, time, people) are available
– Some risk, but success is possible
Relevant
– Link to the mission, vision, and goals
– Meaningful
g to the user
Trackable
– Provide step-by-step views versus giant leap
– Measurable at interim milestones
What is Measurement System Analysis (MSA)?
A scientific method of determining how much the variation within the measurement process contributes to overall
process variability
Consists of a series of controlled test where measurements are collected and compared
Quantifies the effectiveness of the measurement system
Why do we Care?
Significant error can be introduced into the process by the measurement system!
The process may be in statistical control but the measurement system may be introducing unacceptable variation,
thus showing an out of control condition!
y
Measurement Systems y
Analysis is used to:
•Validate that a measurement system is producing “correct” values
•Determine the source of measurement system inaccuracy for measurement system improvements
In plain English…
How do we know the data is good?
– Accurate? Precise? Stable?
– Can you trust the person collecting the data?
– Can you trust the measurement instrument?
– What proof do you have that the numbers reflect reality?
Can you trust the decision you are about to make using the data that was collected?
What is the cost if you are wrong?
GREEN BELT:
Slides 01 - 08
Module 12 – Data Collection Plan
Desired Measurement Properties
1. Accuracy – The degree of conformity of an average measured value to the standard or true value being
used.
2. Precision – The ability to acquire the same results of a process through repeated measurements. Also
called Repeatabilit
Repeatability.
3. Stability – The ability to acquire the same average measured value of a process through repeated
measurements over time.
-6 -4 -2 0 2 4 6
-6 -4 -2 0 2 4 6
-3 -2 -1 0 1 2 3
Never Assume:
• the standard is always correct
• computer calculations are accurate
Statistical Terminology
Population - a complete set; all items of interest
– The number of elements in a population is denoted by N
Sample - a subset of elements from the population
– The number of elements in the sample is denoted by n
Sampling
Benefits:
Saves time and money
Simplifies measurement over time
Can improve accuracy
Sampling is using a smaller group to represent the whole (the foundation of “statistics”).
Sampling Considerations
Time
Cost Units Processed Cost to Collect
Accuracy Per Day Data
R
Resources
Process
Population
• Customers • New customers per week
• Complaints • Hourly complaint volume
• Items in warehouse • Items received – shipped by day
Sampling Biases
Consider other biases as we talk about sampling strategies...
Self-selection
Self-exclusion
Missing key representatives
Ignoring
g g “non-conformances”
Grouping
S
Sampling
li Collection
C ll ti - Best
B tM Methods
th d
Random
Best approach for Population situations. Use a random number table or random function in Excel or
other software, or draw numbers from a hat.
Systematic
situation. “Systematic”
Most practical and unbiased in a Process situation Systematic means that we select every nth unit,
unit or
take samples at specific times of the day. The risk of bias comes when the timing of the sample
matches a pattern in the process.
GREEN BELT:
Slides 24 - 28
Module 12 – Data Collection Plan
Identifying Data Sources - Existing vs. New Data
Key Question: Does the data currently exist?
Existing Data
– Taking advantage of archived data or current measures to learn about the Output, Process or Input
– This is preferred when the data is in a form we can use and the Measurement System is valid (a big
assumption and concern)
New Data
– Capturing and recording observations we have not or don’t normally capture
– May involve looking at the same “stuff”, but with new Operational Definitions
– This is preferred when the data it is readily and quickly collectable (it has less concerns with
measurement problems)
Data Stratification
A data analysis technique by which data is sorted into various categories in order to surface patterns
and uncover differences in processes
Purpose: to examine the difference in measurement values between different subgroups in an attempt to
understand potential variation
Example: From the U.S. Census economists are often breaking out their data based on region, age,
ethnicity, etc.
One category the Navy uses in stratifying data is “mission readiness” for different squadrons
or carrier battle groups
Factor Example
Where y, Region,
Country, g , City,
y, Work Site
Simulation Exercise
Objective
O Measures/Data
/ Data Collection
C Data Sources
S Timing Responsible Party
(Why) (What) Method (Where) (When) (Who)
(How)
Additional Information
Factors in Sample Size Selection
Situation: Population or Process
Data Type: Continuous or Discrete
Objectives: What you’ll do with results
Familiarity: What you guess results will be
Certainty: How much “confidence” you need in your conclusions
In process sampling, you measure characteristics of things or characteristics as they pass through the process,
and observe changes over time.
Any data you collect that has “time order” included can be examined as either a population or a process –
however, the size of the sample analyzed may need to be different.
Given a choice,
choice process data gives more information
information, such as trends and shifts of short duration
duration. Process
sampling techniques are the foundation of process monitoring and control.
Sampling Strategies Considerations
Should we stratify first? ...
– Focus on one group within the process or population
– Ensure adequate representation from various segments of the population or process
• Stratified Sampling takes samples independently from each segment of a larger one. For
example in gathering data on types of customer,
example, customer you might take a sample specifically from each
key customer type to make sure all are represented—even the smaller groups.
• Common sense is also a good guide to any sampling plan.
Does it “feel right”?
– Sampling needs to fit common sense considerations
– Confront and manage your biases in advance
GREEN BELT:
Module 12 – Data Collection Plan
GREEN BELT:
Module 12 – Data Collection Plan
Latest Update Nov 2008
Questions to Consider
Who is your target audience?
What training methods will be effective?
What are your CPI cultural barriers?
Who should deliver the training?
Where should the training be held and when?
What training materials are needed?
Training Resources
Black Belt/Master Black Belt
Memory Joggers
Green Belt training materials
– From your initial training
– Online sources
CPI Offices
Your instructor____________
Team Training
Basic (initial)
Ideally, before the event
Provides a foundation to the event
Just-in-Time
Tool-driven;
T ldi apply
l as needed
d d
Should take no longer than 30 minutes
Current recommended daily event check list is published in the Green Belt
Certification Process Guidebook
GREEN BELT:
Slides 01 - 06
Module 13 – Train and Prepare Team
Latest Update Feb 2009
l De
t ro fin
n e
Co
Lean
6
M
e
e
rov
TOC
a sur
Im p
Analyze
What is Value Stream Mapping ?
A visual tool to help see and understand the flow of Material and Information
A big picture perspective that focuses on improving the whole but not optimizing pieces of the
process
A tool that requires physically observing the process area in question
Wh Map
Why M the
th Process?
P ?
Find issues which require extra processing, rework, or cause downstream errors
Uncover actions performed at the wrong time, or completely non-value added items
Discover processing steps which really aren’t needed
Show where employees, information or goods move from one place or another without any purpose
Identify upstream activity that causes downstream waiting
Show steps that ultimately don
don’tt meet the need of customer
12-Step Process
Process Name:
Process
Outputs
Customerrs
Mapping Tips
Use Post-it® notes on butcher paper.
paper
Place top of process boxes just below the middle of the page.
Leave enough room between process boxes to show inventory.
Decide whether to count all parts or just a sample part – make the assumptions up front.
Draw only one to three main suppliers/supplied items.
Title and date map.
GREEN BELT:
Slides 08 - 111
Module 14 – Value Stream Mapping and Analysis
Value Stream Mapping and Analysis
Additional Tips
Always create Process Maps and Value Stream Maps with a team. Rarely, does one person have all the
process knowledge
knowledge.
Interrogate the process by watching in many different conditions. You must watch the process as it
happens to see the detail you need.
Don’t let space be an issue. Consider using flip charts and post-its (as the process steps) and post on a
wall to get your initial ideas across.
If your map does not have space to list all the information, use numbered reference sheets as
attachments.
Maintain your Process and Value-Stream Maps with dates and update them as necessary. Use them as
a reference. Always maintain a baseline and version control.
Keep Parking Lots list to stay focused:
– Improvement Ideas
– Assumptions that were made when mapping the process
– Questions team members have
– Add’l Observations that may or may not be displayed on the process map
Mapping the Current State and Gathering Data
– You must walk the process (experience it) to accurately capture the process.
– Talk to the operators to find hidden factories, then verify it.
– Use pencil not computer – makes the map more visual.
– Concentrate on process, not tools.
– Identify what is used to measure the process effectiveness, efficiency and customer satisfaction (take
detail notes).
– Do not use data your team does not verify themselves.
– Create your own standard symbols if necessary.
Data Blocks
Walk the Value Stream and see how the “Item” flows
Gather data for each step in the process
Repair
Trigger:
gg What Starts the pprocess?
Done: When do we know it is done?
Span Time: Total time elapsed in the process
Touch Time: Actual time item was worked on
Auto Cycle Time: Operation time without human intervention
Number of People: Number of p people
p in pprocess
WIP Pieces: Items being worked not yet completed
C/O Time: Change over time (normally machine setup times)
Distance Item Travels: Distance traveled from last process
% Rework: How often are items redone
Topp 3 Defects: Typical
yp items reworked
1.
2.
3.
Transactional / Office
Repair
Trigger: Product Rcvd What Starts the process?
Done: I
Inspection
ti cmpll Wh d
When do we kknow it iis d
done?
?
Span Time: 20 Total time elapsed in the process
Touch Time: 5 Actual time item was worked on
Auto Cycle Time: Operation time without human intervention
Number of People: 2 Number of people in process
WIP Pieces: 1 Items being worked not yet completed
C/O Time: Change over time (normally machine setup times)
Distance Item Travels: 35 Distance traveled from last process
% Rework: 2% How often are items redone
Top 3 Defects: Typical items reworked
1
1. Holes not within spec.
spec
Gap Analysis
2. Coating not within spec Why is Span Time four times longer than
touch time
3.
(sk why 5 times.)
Always
y qquestion travel distances ((Ask why
y5
times.)
Select those metrics most appropriate to your process, including those data identified in your data
collection plan
Slides 16
Touch Time:
T Touch Time: Toucch Time:
Auto Cyccle Time: Auto Cycle
C Time: Auto Cycle Time:
Number of People: Numbe er of People: Number of People:
WIP Pieces: WIP Pieces: WIP Pieces:
C/O Tim
me: C/O Time: C/O Time:
T
Distancee Item Travels: Distancce Item Travelss: Dista
ance Item Trave
els:
% Rewo ork: % Rewwork: % Reework:
Top 3 Defects: Top 3 Defects: Top 3 Defects:
1. 1. 1.
2. 2. 2.
3. 3. 3.
Trigger: Trigger: Trigg
ger:
Done: Done: Donee:
Process Data Blocks for Simulation
1: SIPOC
Value Analysis
The objective is to:
– Eliminate the hidden costs that do not add value to the customer
– Reduce unnecessary process complexity, and thus errors
– Reduce
R d th
the process cycle
l titime
– Increase capacity by better utilizing resources
Value
Value Added (VA)
– Activities that change form, fit, or function of a product or service
– Activities the customer wants to pay for
– Activities done right the first time
Non-Value Added (NVA)
– Activities that do not change form, fit, or function
– Activities that fall under any of the eight forms of waste
– Activities not performed right the first time
Business Value (BV)
– Activities causing no value to be created but which cannot be eliminated based on current
technology
tec o ogy or
o requirements
equ e e ts
Does
Customer Was Form,
consider step Yes Fit or Yes Yes
Rework?
of VALUE and Function
willing to pay changed?
for it?
T – Transportation
No I – Inventory
No No M – Motion
W – Waiting
O – Over-production
Required by O – Over-processing
Current Value
Busines Adde D – Defects
Instructions Yes
s Value d
or U – Under-utilization of
Technology people
No Non-
Value
Added
Value Added
Non-value Added
Business Value*
Value
DEPT
W/C 51A/B Material HEAD
P.C.
PC ITEM
Technician MGR
SK
BO1
CRANE
DEPOT
SUPV
STRIP NDI
Strip
TANK
Tank
NDI
OFFICE
PPAINT
Paint
i t
Booth
BOOTH
1: SIPOC
2: BOUNDARIES See the Process…
3: VOICE OF THE CUSTOMER
4: GATHER APPROPIATE
INFORMATION
GREEN BELT:
Slides 32 – 33
Module 14 – Value Stream Mapping and Analysis
Latest Update Dec 2008
l De
t ro f in
C on e
Lean
6
M
e
rov
TOC
asu r
Im p
Analyze
The Quality Toolbox
Fishbone Diagram
Flow Chart
Histogram
Pareto C hart o f T ype
250
100
200
150
80
Percent
Scatter Diagram
Count
60
100
50
40
20
Pareto Chart
0 0
T ype
an
s
an
s
an
s
an
s
an
s er
th
Be Be Be Be Be O
en to d s ve
re P in
ke Ha Ha
G Ba
ht
Days of Week
Mig
C o unt 150 42 15 9 4 3
Category 1 2 3 4 5 6 Total
Percent 67.3 18.8 6.7 4.0 1.8 1.3 A
Cum % 67.3 86.1 92.8 96.9 98.7 100.0
B
C
D
E Control Chart
6 5 F
Check Sheet Total
7 Quality Tools
I his
In hi b
book k Introduction
I t d ti to t Quality
Q lit Control,
C t l Kaoru
K Ishikawa
I hik id
identified
tifi d seven b
basic
i ttools
l ffor quality
lit control
t lb by
combining his work with the concept of variation and statistical control charts. These tools represent the first
practical scientific tools in analyzing and improving process performance.
Check Sheets
Used for organizing and collecting facts and data
– To make better decisions
– To solve problems faster
Three common types of check sheets
– Recording check sheets (e.g. data sheets, checkbook register)
– Checklists (e.g. inspection checklist)
– “Measles” charts (e.g. rental car customer’s vehicle inspection sheet)
Yes
20%
No
Histograms
A histogram is a useful way of graphically displaying data in groups
Divide the data into classes
– Classes may be attributes (e.g., Red, Yellow, Green, Blue, Brown, Orange)
– For classes of variable data divide the data into ranges (e.g, Class 1 is between 0 and 10, Class 2 is
between 10 and 20)
60
– Count the number of occurrences in each class and chart on a bar graph
50
0
40
Frequency
40
Histogram Example Frequency of Test
30 Scores
Frequency
20
10
0
25 35 45 55 65 75 85 95 105
Test Scores
160 100%
140
80%
120
60%
80
60 40%
% against this axis
40
20%
20
0
A B C D E F G H I J K L M N O P Q
0%
Categories
Scatter Diagrams
Examples:
– Ice Cream sales as they relate to outside temperature 1
2
F a cto r B
Fa ctor B
2
Fa cctor B
1
1
F
0 0
0 0 0.5 1
0 1 2 3
0 1 2 3 Factor A
Factor A
Factor A
GREEN BELT:
Slides 12 - 18
Module 15 – Data Tools
Control Charts
Used to analyze variation in a process
– Attribute (count) based,
– Variable (measurement) based
Statistics-intensive
Used to determine if variation is inherent to the system (common cause) or caused by an assignable event
(special cause)
Out of Control Processes
A control chart demonstrates special cause variation if:
– Points are outside of control limits
– Increasing / decreasing trends
– Cycles
y
To reduce special cause variation:
– Find the assignable cause
– If appropriate, take action to prevent it from recurring
• SOP
• Poka Yoke
In Control Processes
If no out of control conditions exist, then the process is said to be in control.
In control processes demonstrate common cause variation.
– Normal variation
– Due to the nature of our universe
To reduce common cause variation you must change the system.
– New equipment
– New methodologies
40
UCL=36
UCL 36.40
40
Deficci enci es per 1000950 MDs
30
20
U=14.27
10
0 LCL=0
Subgroup 0 10 20 30
QPI Date 09/01/01 11/09/01 01/18/02 03/29/02
Pick
Pi k one main
i cause and d ask
k “Why
“Wh did the
th main
i cause occur?”
?”
Results in causes A, B, C, ...
Work one Main Cause I
category at
a time…
please!
C
B
Problem A
Pick one main cause and ask “Why did cause A occur
Results in causes A1, A2, A3, etc.
Work one
Main Cause I
category at
a time…
please!
Problem A1
A2
Pick one cause and ask “Why?” 5 times. A3
End result is a probable cause
Main Cause I
Ask “Why?”
5 times?
Why A?
A A2A Why A2A1? A2A1A
Probable
Problem Cause
A2 Why A2A? A2A1 Why A2A1A? A2A1A1
C
Problem B
A
A
Main Cause IV Main Cause V
Main Cause III
Severity Scale
1. No effect on performance
2. Minor loss of performance with negligible effect on output
3. Minor loss of performance
4. Reduced performance
5. Minor inability to meet customer requirements
6. Inability to meet customer requirements
7. Cause serious customer dissatisfaction
8. Cause a failure
9. Break regulations or other law
10
10. Cause an injury
Note: This is a sample scale and must be revised to fit your application of FMEA
9 Once p
per 3 – 4 days
y Less than or equal
q to 30%
Worn or tarnished
Electronic enter locks Door will not close 10 6 Replace / clean contacts 1 60
contacts
Door clutch failure Hall doors will not open 10 Clutch spring fails 1 Replace spring 1 10
l De
ro fin
nt e
Co
Lean
6
M
ve
TOC
a
ro
sur
Imp
Analyze
TOC Analogies
TOC experts see processes and systems as chains. The strength of the chain is dependent upon the
strength of the weakest link
Theory of Constraints
TOC takes the chain analogy and applies the concept to the flow of work through a system…
system
“The slowest vehicle in a convoy sets the pace”
Every system has a constraint. Constraints limit the flow of work
What is a Constraint?
Every process has a constraint – a step in the process that takes longer to do than other steps
Constraint mitigation is necessary when you can not meet customer demand
What is Pull?
Upstream
No one upstream produces a good or
service until the downstream
customer asks for it.
it Activity
y
Activity
Information Flows
Upstream Activity
Material/Service Flows
Downstream Activity
Downstream
GREEN BELT:
Slide 01 - 13
Module 16 – TOC & Lean
Pull Systems
Elements
– Upstream Supplier
– Downstream Customer
– Visual Trigger (Kanban) Pull
Sequenced
S d
– Use FIFO lanes
Replenished
– Create supermarkets
P1 P2 P3 P4
10 seconds 10 seconds 5 seconds 8 seconds
GREEN BELT:
Slide 14 - 17
Module 16 – TOC & Lean
Terms and Definitions
Think about the lines at Disneyland in March…
WIP 5 people
Cycle Time = =
Exit Rate 1 person/minute
…Conclusion: Fixed Capacity (Exit Rate) + Increased People (WIP) = Slower Cycle Times!
Process
ocess Seque
Sequence:
ce The e steps necessary
ecessa y to produce
p oduce a product
p oduct or
o service,
se ce, witht some
so e process
p ocess steps be
being
g
dependent upon other steps being performed first
Lead Time: The total time from customer order to delivery of the desired product or service
Pitch: Customer configured delivery requirement based on Takt Time (Takt time x batch quantity)
Takt Charts
A tool to see how the process is performing against the customer expectations
Data for takt charts are drawn from the data blocks of the Value Stream Map,
p and from customer demand
Plot the steps on the horizontal axis using time as your vertical axis
Cycle
Time
Operators A B C D E
• Batch
REMOVE ORDER
operations INSPECT PART
• Isolated
processes TEST
• Unknown
status TEST SOLDER
SIGN-OFF
Workplace Layout
ORDER
PART REMOVE TEST INDUCT
• Single-piece flow
INSTALL
• Visual status
GREEN BELT:
Slide 22 - 27
Module 16 – TOC & Lean
Work Cell or Office Space?
Andon signals Admin support to keep
need for help the value-added workers
on task and undistracted!
Workplace Layout
R
Raw
Materials
Cross-trained employees to flex with
changing demand!
Finished
Goods
Segregate excess WIP away from the improved process; develop a plan to eliminate it.
Set-Up Definition
The amount of time taken to change over from the completion of the previous process to
the beginning of the next process … ”clock time” not labor time.
Set-Up Reduction
You drive a car/truck
Your vehicle needs:
1) Four new tires
2) Full tank of gasoline, and
3) You need a drink of Gatorade
QUESTION:
How long will it take you to accomplish
these three tasks?
Lot sizes are made large because set-ups take a long time.
– Attempt to increase total throughput
– Ignores underlying issues
S
Set-ups take a long time because they are not done often.
f
The cycle repeats endlessly.
– It’s best to improve set-ups first.
– Set-up reduction “feels” contradictory and so it is often ignored; spend effort improving NVA to improve VA.
Implementation Details
Be careful in adjusting lot sizes.
– Run pilot trials.
– Monitor set-up times and idle times closely.
– Don’t let large transportation lots throw away the benefits of smaller process lots.
Ensure work release is not the driving factor.
– Develop a good work release plan.
– Monitor interactions with lot sizing.
If the process doesn’t meet customer demand after Step 2, how do we subordinate to the constraint?
GREEN BELT:
Slide 24 - 38
Module 16 – TOC & Lean
Exercise
Consider the following set of processes:
A customer needs 25 units in 15 minutes (900 seconds)
Order entry takes 20 seconds
Delivery takes 10 minutes (600 seconds)
Order P4 Delivery
P1 P2 P3
Entry 8 seconds 600 seconds
10 seconds 10 seconds 5 seconds
20 seconds
Variation happens!
Worst case 11 secs 13 secs 7 secs 14 secs
Time (secs)
P1 P2 P3 P4
10 ± 1 10 ± 3 5±2 8±6
seconds seconds seconds seconds
Best case
Time ((secs)) 9 secs 7 secs 3 secs 2 secs
Drum-Buffer-Rope
Drum – The pace at which the system is operating
Buffer – A way to protect the constraint from being “starved”, to ensure the constraint always has work
Rope – the signaling system that allows work to be put into the system at the appropriate time to support
efficient use of the constraint
The aim is to protect the constraint, and therefore the system as a whole, against process variation.
Heijunka (Hi-junk-a)
Even distribution of work to meet takt time, especially for different products from the same process
– Determine pitch for each product
– Create a production sequence
– Create a production sequence table
A heijunka box is the schedule of work that includes what things arrive when and when they should be
done
W kl d Balancing
Workload B l i - Takt
T kt Ch
Chartt E
Example
l 70 sec
Takt Time = 65 Seconds
Chart existing operator cycle times 45 sec
Cycle
Time 30 sec 30 sec35 sec
This equation is to be used to identify potential areas for improvement and not a justification for manpower
reduction efforts
Balance Work between operators Takt Time = 65 Seconds
By workload balancing
Cycle 57 sec 57 sec 57 sec
we can free up personnel 39 sec
Time Where’s operator E?
Available for
redeployment!
A B C D
GREEN BELT:
Slide 44 - 49
Module 16 – TOC & Lean
Cards
Kanban Rules
Never move defective items
The customer withdraws only what is needed STOCKING
Produce only the quantity withdrawn by the customer LOCATION- 106-0 PROCESS
Level production FABRICATION
CELL -106
Use Kanban to fine-tune production ITEM # 406699
OPER. DESC.
Stabilize and strengthen the process 10 ROUGH TURN
TURBINE
DESCRIPTION
Types of Pull Signals (Kanbans) BOX BOX
DISK
ISSUED
20
30
.......
.......
CAPACITY TYPE # 40 .......
Containers (Kits) 2 C-04 1 OF 4 50
Lights .......
Out of parts!!
Square on Floor
Low on parts!
Have parts
After doing steps 2 & 3, check to see if we moved the constraint. If so, go back to step 1
Elevating the constraint usually requires time and resources. This is primarily Black Belt
territory
Sometimes WIP is necessary. In these cases, always determine optimal WIP and maintain WIP
control.
Even when WIP helps, it remains NON VALUE ADDED! Where there is WIP (or NVA of any kind), ask
“why?”
why? to determine root cause.
cause In this case,
case root cause is set-up
set up time
time. Use Kaizen / Rapid
Improvement Events to reduce set-up time and drive down WIP for HUGE cycle time reductions!
Remember: Use set-up time reduction to reduce WIP, not to increase process “up” time. Set-up time
reduction alone results in only modest gains. But reduce set-up time by 50% and optimal WIP is cut in
half. Reduce WIP by 50% and cut cycle time by 50% while still maximizing exit rate (in this case, 10
seconds).
Often the best way to reduce cycle time is to reduce set-up time. The REAL constraint is often set-up
time, NOT any of the individual process steps.
To answer the question “what is the optimum lot size” you have to balance the cost of adding one more
to the lot against time saved by adding it to the lot.
lot Cost Benefit Analysis is often required,
required but CBA can
only be applied accurately if you first understand takt, set-up time, proper lot sizing, and the process
constraint!
This is not always easy! Ask your Black Belts for help!
Customer Requirements
All shots must be fired at an angle of 167 degrees
All shots must land on the floor in a stationary target in an area +/-3 inches long and +/- 6 inches wide with
respect to the nominal target before hitting any other object
Ball distance must be measured to the nearest ½ inch
Pass/Fail data must be collected for each shot
The balls must be sorted based on either Pass or Fail
Only passed balls must be delivered to customer with no markings (colored dots)
All data must be collected “real time”
Business Requirements
All shots must originate from the floor
Must use form RUK-1D-1NG
Balls are aligned with blue dot facing up
Statapult Requirements
The Statapult settings and structure cannot be modified
The Statapult can not be aligned/modified with any tools, devices or aids
The Statapult can only be handled/touched by the Shooter
The Statapult must be placed so that the base is horizontal to the floor and in a stationary position
GREEN BELT:
Slides 01 - 07
Module 17 – Simulation Round 2
Baseline
In order to run the simulation, you must again determine the accuracy and precision of the process in
order to set up the target area.
Position your Statapult in area designated by instructor
Obtain 20 balls
T k 20 test
Take t t shots
h t 12 inches
Mark the landing of each shot with an adhesive dot or piece of
tape Masking Tape
Use masking tape to mark off target area
X 6 inches
Round 2 Shoot Target Center
Your Future State Map was approved
Statapult layout is ready
Target area is taped off
Balls are shot this
Measurement system is setup
direction
Round 2 Histogram
What is the number of data points (shots)?
N = ____
What is the range?
R = Xmax - Xmin =____ - ____ = ____
Calculate k, the number of classes (columns in your graph)
When N < 150, k = N
k = ____
If k is not a whole number
number, round up to the next highest value
Determine the class width (w)
w = R/k = ____
If w is not a whole number, round up to the next highest value
15
14
Histogram 13
12
11
berof Occurences
10
7
Num
Category
GREEN BELT:
Slides 08 - 11
Module 17 – Simulation Round 2
Calculations – Round 2
1. Customer Order ______ (1)
The amount of balls successfully delivered to the customer
2. Total Balls Fired ______ (2)
The total amount of balls fired for the exercise
3. Total Failures ______ (3)
The total amount of failures called by the inspector
4. Time to First Delivery ______ (4)
The time to make the first delivery to the customer
5. Total Lead Time (seconds) ______ (5)
Total time to complete the customer order
6. WIP (Work In Progress) ______ (6)
The total amount of balls left at each work area
7. Total Obsolete/Scrap ______ (7)
The total amount of balls scrapped or deemed obsolete
8. Yield = Customer Order (1) / Total Balls Fired (2) ______ (8)
Time to Cost of
First Total Lead Lead Time Poor Cost per
Deliveryy Time per Unit
p WIP Yield Quality Unit
Round 2
Round 3
l De
n t ro f in
e
Co
Lean
6
M
ve
TOC
a
ro
sur
Imp
Analyze
The Role of Statistics
Descriptive Statistics
– Describing a set of data with graphs and a few summary numbers (location, variation,
shape)
Inferential Statistics
– Using descriptive statistics to make educated guesses about the future
Data Types
Before we can go further with statistics we need to know something about data
Much information comes to us in qualitative form (job is expensive or takes too long)
Project
j information must be collected in quantitative form and can represent:
– Whether something happened or not
• Attribute or discrete data – Counting data
– Specifics about what happened
• Variable or continuous data – Measurement data
Variable (continuous) Data - characterizes a product or
process feature in terms of a parameter such as size, weight or Dimensions
time Time
Temperature Weight
Variable data gives more information than just knowing if the
part was good or bad.
Statistical Terminology
Population - a complete set; all items of interest
–The number of elements in a population is denoted by N
Sample - a subset of elements from the population
–The number of elements in the sample is denoted by n
We can characterize a population or sample in 3 ways:
–Measure
Measure of location (center or middle)
–Measure of variation (spread or width)
–Measure of shape (what does the set look like when viewed graphically)
Measures of Variability
Why do we care about variation?
Process 1 Process 2
Because just looking at the central tendency doesn’t tell the whole story!
8 3 Both columns of numbers have a mean of 10.
However – which process is the better one?
9 7
GREEN BELT:
Slides 08 - 15
Module 18 – Statistics
Measures of Variability
N
Population xi
2
Variance
i 1 2
N
N
Sample x i 2
i 1 S or ^ 2
2
Est.Variance
n-1
n 1
Class Exercise
Compute the variance & standard deviation of the sample: {8, 18, 12, 3, 9 }
Variance:
1. Determine the mean of the column of numbers
2. Subtract each number in the column from the mean
3. Square the difference
4. Add the squares together, divide by n-1
Standard Deviation: The square root of the variance.
i x i x i x x i x 2
Description:
1
Totals
Measures of Variability
How do we use Variance and Standard Deviation?
Variance can be used to compare two processes to see if they are similar
– Example: compare cycle time from 3 different factories to see if they are significantly different or the
same. If one factory is different (i.e., worst), you start looking at that factory first
Standard Deviation can be used to determine how well your process is working
– Can be used to create a control chart ((Lesson 19))
– Can be used to describe quality
GREEN BELT:
Slides 16 - 18
Module 18 – Statistics
Let’s Talk About Di90
stribution (i.e., Shape)
A graph of the data presents a visual of the data set, that can be more descriptive than just numbers
A graph provides a “snapshot” of the central tendency and variability of the data
Mapping the data – common graphs
– Histograms,
Histograms Stem & Leaf plots
plots, Boxplots
– Shows the data in relation to the scale
Defining Normal Distributions
The most common distribution is the normal distribution. It is a variable data distribution with
a mean and a standard deviation as its primary measures.
Normal distribution means that data values are evenly distributed about the mean, and the
distribution is symmetric.
symmetric
Normal distribution is the most common shape
Normal distributions are described with two parameters:
– The mean defines location
– Standard deviation defines spread
Examine the following data distributions and compare the means and standard deviations for
each
Distribution Characteristics
From Lesson 2:
100% of the data is included underneath the curve
curve.
Certain percentages of data fall between the sigma σ represents
divisions. standard deviation
If you fired the statapult 1,000 times, how many of
the shots would fall between 19 and 31 inches?
Answer = ______
= 2 inches 19 21 23 25 27 29 31
-3 -2 -1 Mean +1 +2 +3
Statapult Shooting Distance
The Role of Statistics – Inferential Statistics (inches)
Types of data and measures of location, variation and distribution are descriptive statistics
Inferential statistics can be used to infer, or make predictions, about processes based on the descriptive
statistics
Inference is done by using the data for a normal distribution, and specific statistical tables
One hundred percent of data falls under the curve
A Z-table is used to compute the probabilities of data falling under a specific area of the curve
X
X -
Z =
X = the value you are interested in predicting by the formula, giving a z
value. This allows you to
µ = the mean of your data set look up probabilities on
σ = the standard deviation of your data set
the z-table.
Using Inferential Statistics (Z-table)
Scenario: You process travel claims. You have instituted a new process and collected data on
processing time. It shows that you have a normal data set (distribution) with a mean of 32 minutes and a
standard deviation of 1.89.
Your boss wants to know what are the odds (probability) that a travel claim will be processed in 37
minutes or less.
X - 37 - 32
Z = = 2.65
z 0.00 0.01 0.02 0.03 0.04 0.05 0.06 0.07 0.08 0.09
2.5 0.9938 0.9940 0.9941 0.9943 0.9945 0.9946 0.9948 0.9949 0.9951 0.9952
2.6 0.9953 0.9955 0.9956 0.9957 0.9959 0.9960 0.9961 0.9962 0.9963 0.9964
2.7 0.9965 0.9966 0.9967 0.9968 0.9969 0.9970 0.9971 0.9972 0.9973 0.9974
Z Table
ANSWER: The probability of a travel claim being processed in 37
1.89
minutes or less is 99.6%
U i Inferential
Using I f ti l Statistics
St ti ti (Z-table)
(Z t bl )
37 - 32 = 2.65 2.65
The shaded area to the left
represents the travel claims that
will be processed in 37 minutes
32 37
or less - 99.6% of the time.
33.89 35.70
1. Complete the table for z value and probability: 120 40 < 180
28 4 < 32
85 5 >100
2. A normally distributed process has output which is below the upper specification limit 99.7% of the
time. How many standard deviations is the USL from the process mean? ___________
GREEN BELT:
Slides 26- 28
Module 18 – Statistics
Z-Table Identification
Central Limit Theorem – the sampling distribution of the means tend to take the shape of a normal
distribution curve
– If you have a data set
– You can take samples of the data and find the mean of those samples
– Then if you plot the means, you will a get a normal distribution
Quick Summary
Data has two types: Variable or Attribute
We describe data three ways:
– Measure of Central Tendency (center)
– Measure of Variability (spread)
– Measure of Distribution (shape)
The above measures are going to be different based on the type of data that you have
Most common distribution is the normal distribution
Binomial dist.
Normal dist.
Measures of Distribution Poisson dist.
Exponential dist.
Uniform dist.
40 100
Frequency % Cumulative
80
30
60
% Cumulative Curve
Percent
Count
20
40
10
Categories
g 20
0 0
Color Brown Blue Green Yellow Orange Other
Count 15 9 7 5 3 1
Percent 37.5 22.5 17.5 12.5 7.5 2.5
Cum % 37.5 60.0 77.5 90.0 97.5 100.0
GREEN BELT:
Module 18 – Statistics
M & M Exercise
Break into 7 groups One for each color and one for the total number of M & M in the Bag
• Collect data from everyone in the class
• For each group, create a histogram describing your group
• Extra credit: Calculate the median value
GREEN BELT:
Module 18 – Statistics
Latest Update Nov 2008
l De
ro f in
nt e
Co
Lean
6
Mea
e
rov
TOC
su
Im p
re
Analyze
Six Sigma as a Metric
Benchmark for perfection
A Six Sigma process results in only 3.4 defects per million opportunities (DPMO)
– A defect is anything that does not meet customer requirements
Manage process variation LSL USL
Monitor Key Performance Indicators (KPI)
Drive continuous improvement
Process B
Variation in the Process
Based on Statistical Thinking
All work is a series of processes
Process A
All processes have variation
Businesses improve when they reduce or eliminate variation
Types of Variation
Common cause (inherent) variation is always present in a process.
– A process that exhibits only common cause variation is a stable process.
– A stable process is predictable.
Special cause (assignable) variation is some unusual, uncommon event.
– A process that exhibits special cause variation is an unstable process.
– An unstable process is unpredictable.
Common Cause Variation Overview
Usually part of the process
Acting totally at random and independently
Root causes are in the key elements of the system
– Slight variations in raw materials
– People
– Slight machine vibration
– Environment
Special Cause Variation Overview
Caused by a special abnormal activity resulting in an unexpected change in the process output.
– Incorrect machine setup
– Defects in materials
– Untrained operator
– Programming error
The effects are intermittent and unpredictable.
All processes must be brought into statistical control by first detecting and removing the special cause
variation.
GREEN BELT:
Slides 01 - 08
Module 19 – Reducing Variation
Comparison of Variation Types
Common Causes
Special Cause
Reducing Variation
The two types of variation require different approaches and tools to detect and attack them.
104
103 103
Mean = X
102
102
101
101
100
100
99
98
_ X - 3
99
97
98
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
96
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Control Chart
105
Zone A
104
Z
Zone B UCL
103
Zone C
102
101
Center Line
100
99
98 Zone C
Zone B LCL
Zone A
97
96
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
GREEN BELT:
Slides 09 - 13
Module 19 – Reducing Variation
Out of Control Conditions: Extreme Points
Out of control conditions are frequently detected by the extreme point condition
Extreme Point (1 Point Beyond 2 Out of 3 Points on same side of average in Zone A
UCL or LCL) or Beyond
UCL A
UCL B
C
CL X C
B
A
LCL LCL
CL CL
LCL LCL
Takeaways
A stable, predictable, improved process is required to achieve and maintain product quality.
Variation in processes may be due to either common causes or special causes.
Control charts monitor the process so that we may act to eliminate or reduce variation.
Root Cause
Why find the root cause of a defect?
Eliminate the root cause,, not the symptom
y p
Problem doesn't show up again
Corrective action must:
Ensure that the error is physically prevented from occurring again
Prevents a defect loop
C
Cause Eff t
Effect
Pick one main cause and ask “Why did the main cause occur?”
Results in causes A,, B,, C,, ...
Ask “Why did cause A occur?”
Work one Results in causes A1, A2, A3, etc.
category at Main Cause I
a time…
Work one
please!
C category at Main Cause I
B a time…
A please!
Problem
ob e Why did the main cause occur? Why did cause “A”
A occur?
A
A1
Problem A2
A3
GREEN BELT:
Module 19 – Reducing Variation Slides 26 - 26
Fishbone Diagrams
Pick one cause and ask “Why?” 5 times.
End result is a probable cause
Ask “Why?”
5 times? Main Cause I
Why A2A1A?
Why A?
Why A2A?
A A2A A2A1A Probable
Cause
Problem A2 A2A1A1
Why A2? A2A1 Why A2A1?
Introduction to Poka-Yoke
The new procedure completely eliminated the problem of the missing springs.
In the new approach, a small plate is placed in front of the parts box and the worker's
first task is to take two springs out of the box and place them on the plate.
Examples:
– Critical specification or dimensional requirements
– Ineffective standard procedures and processes
– Multiple parts, processes, or steps
– Repetitive, fast-paced operations
– Short-cuts and work-arounds
– New products, processes, or people
– Multiple suppliers
Mistake Proofing
Results
Benefits
Eliminates defects
Easy to do the right thing the first time
Improves quality
Makes it easy to do the right things in the right
Reduces variation
order in the right way
Improves on-time
on time delivery
Prevents accidentally doing the wrong things in
the wrong order in the wrong way Reduces or eliminates accidents
Improves morale0
Jidoka
Sakichi Toyoda first introduced the Japanese concept of jidoka (pronounced jee-DOH-kah)
In conjunction with poka yoke, comes the concept of jidoka
– Jidoka has been defined
f by Toyota as “automation
“ with a human mind.”
– It implies intelligent workers and machines identifying errors and taking quick countermeasures.
– No product moves into the next step of the process if it contains errors (AKA: Quality at the
source).
GREEN BELT: Slides 36- 40
Module 19 – Reducing Variation
Mistake vs. Defect
MISTAKE DEFECT
An incorrect, unwise, or unfortunate
act or decision caused by bad
A failing, or flaw, especially one
that still allows the affected item to
$$
judgment or a lack of information or
care
function, however imperfectly
$
Mistakes, however small, can lead to defects which lead to rework or scrap and increased cost
The sooner we can catch errors, the easier and less costly it is to fix them.
CPI helps minimize COPQ.
A method to reduce COPQ is to develop standard work/processes.
What is Standard Work ?
Standard Work is…..
– A prescribed sequence of production steps
– Assigned to a single person
– Balanced to the takt time
What is meant by “Standard Work”?
The principles, tools, and techniques used to ensure process standardization in a just-in-time
environment.
Developed by the people who do the work
Focused on efficient use of resources through waste elimination
Establishes the foundation for Continuous Improvement
K
Standard Work K S
Improvement
K S
K S
K S K K
K = Kaizen K S K K
K
S = Standardization
time
Locks in improvement and establishes a new baseline
l De
tro fin
n e
Co
Lean
6
Me
e
rov
TOC
as
p
ure
Im
Analyze
Purpose of the Pilot
A pilot allows us to:
– Test run the solution in a small part of the organization
– See where possible failure points exist
– Validate and refine cost and benefit estimates
– Evaluate the p process measures for the improvement
p
– Increase organizational buy-in
– Improve the proposed solution Overall benefit is a better solution with fewer surprises
– Modify the implementation plan
Pilot Planning
What – Needs to be piloted
Where – Will the pilots be run
Who – Will be involved
When – (How long) will the pilots run
How – Will the pilots be conducted
Lessons Learned
At the completion of the pilot,
pilot capture what worked and what needed improvement
improvement.
Include lessons learned in the full roll out of the new process:
– Compile lessons learned
– Categorize by type; by defect type, key analysis used, key words, problem / opportunity
statement, root causes, etc.
– Communicate lessons learned to others
Visual Controls
Visual Controls are communication devices used in the work environment that tell us at a glance how work
should be done
– Communicate information quickly and clearly
– Locate things and places
– Highlight defects, over-production and/or under-production
– Provide instruction
– Spotlight abnormal conditions
– Communicate status to all
Effective Visuals
Create a work environment that is…
Self – explaining
Self – ordering
Self – regulating
Self - improving
p g
Types of Visuals
Display – Broadcast
data Controls – Limit behavior Shadowing
GREEN BELT:
Module 20 – Implementing Improvements Slides 09 - 13
Production Control Boards
Daily
y Board Walk
Managers review as employees update
Issues are identified, addressed, and corrective actions established
Exceptions can be identified clearly (priorities)
Targets must be clearly defined
Weekly Meetings
– A venue ffor the
th cellll tto discuss
di generall
operational issues and continuous improvement
Agendas
– Keeps a meeting focused on its purpose
– Allows participants to prepare
GREEN BELT:
Slides 14 - 18
Module 20 – Implementing Improvements
Latest Update Feb 2010
Business Requirements
Balls are aligned with blue dot facing up
Statapult Requirements
The Statapult must be placed so that the base is horizontal to the floor and in a stationary position
Summarize your new procedures on flip chart paper and post for approval by your instructor.
Exercise - Baseline
8 inches
As in previous rounds, the target area will be set up based on 20
shots. For this round, teams will record the actual baseline shot
measurements on the following page. Masking Tape
Position your Statapult X 4 inches
Obtain 20 balls Target Center
Take 20 test shots
Mark the landings
Measure the shots
Balls are shot this
Mark off target area direction
GREEN BELT: Slides 01 - 07
Module 21 – Simulation Round 3
Baseline Data
Launch Number Distance (inches)
1
2
3
4
5
X=
6
(Average of the data points)
7
Target =
8
(Target = X)
9
UCL =
10
(Upper Control Limit = X + 3σ)
11
LCL =
12
13 (Lower Control Limit = X - 3σ)
14 =
16
17
18
19
20
21
22
23
24
25
+3
+2
+1
X
-1
1
-2
-3
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
GREEN BELT:
Slides 10 - 12
Module 21 – Simulation Round 3
Calculations – Round 3
GREEN BELT:
Slides 14 - 17
Module 21 – Simulation Round 3
22. Time Penalty Cost ______ (22)
= Non Value Time (11) * $10 Cost per Second
23. WIP Cost ______ (23)
= WIP (6) * $50 Cost per Unit WIP
24. Rework Cost ______ (24)
= Total Failures (3) * $150 Cost per Failure
25. Obsolescence/Scrap Cost ______ (25)
= Total Obsolete/Scrap (7) * $300 Cost per Unit Obsolete/Scrap
26.
6 Warranty
yCCost ______ ((26)
6)
= Customer Order (1) * Warranty Cost per Unit (from table below)
Predicted Long Term Yield <75% 75-85% 85-95% 95-99% 99-99.9% 99.9-99.99% >99.99%
Warranty Cost Per Unit $500 $350 $200 $40 $15 $5 $`1
27. Cost of Poor Quality (COPQ) ______ (27)
= Rework Cost (24) + Obsolescence/Scrap Cost (25) + Warranty Cost (26)
28 Penalty Cost
28. ______ (28)
Total of any penalty costs assigned during shoot
29. Total Cost ______ (29)
= Time Penalty Cost (22) + WIP Cost (23) + COPQ (27) + Penalty Cost (28)
Round 1
Round 2
l De
tro fin
n e
Co
Lean
6
M
e
e
rov
TOC
asur
Imp
Analyze
Control System Contents
Control Systems contain:
– Inputs and critical outputs
– Desired outputs / performance levels
– Capture and reporting of actual process performance measures
– A feedback mechanism to report deviations in actual outputs from desired levels
– Adjustments to the process
Can be reinforcing (amplify the deviation) or balancing (bring back to equilibrium) - balancing is normally
what gets implemented
CharacteristIcs M e t h o d s
Special
Class.
Operation Desc
Desc. Evaluation
S
GREEN BELT:
Slides 01 - 07
Module 22 – Control Plan
Control Plan Tips
Establish controls to detect failure modes if the failure cannot be prevented
Use illustrations
Use flow diagrams
Use work instructions that really work
Use reaction plans that really work
F
Focus on the
th quality
lit off d
documentation,
t ti nott th
the quantity
tit
Use workers to help with the instruction
Clearly lay out authorities, roles, and responsibilities
Focus on the identification of nonconforming services.
Ensure segregation by identification or location to prevent inadvertent use.
Address the need for recall or previously provided service.
Ensure the benefit of rework versus loss.
Ensure that rework actually produces first quality service.
Ensure that corrective actions are initiated whenever nonconforming services are provided.
There is nothing wrong with including the Cause and Effect Diagram that helped build
the Control Plan as a reference.
C
Control
l Pl
Plans Summary
S
Control plans can be likened to sustainment in 5S
SPC is not successful without religious use of control plans
Control Plans are living documents. If processes change and a new variation cause develops, add it to the
Control Plan
MODULE
O U 23:
3 EXECUTION:
CU O SUSSUSTAINMENT
l De
tro fin
n e
Co
Lean
6
M
ve
TOC
a
ro
sur
Imp
Analyze
Definition of Sustainment
Consistently adhere to process improvements, ensuring all benefits are fully realized.
The old way is gone, the new way is the way
Human nature resists change and reverts to old habits
Performance
without
Baseline Sustainment
Benefit Categories
Goal: Reduce Costs
Metric: Type I Benefits – Cost Reductions to Budget Line Items
Example: Same work done with fewer resources
Goal: Increase Speed
Metric: Type II Benefits – Cycle Time Reduction / Improved Resource Utilization
Example: More done with same resources
Goals: Improve Safety and Quality of Life
Metric: Type III Non-Financial / Other Benefits
Example: Risks to assets or personnel reduced
TYPE I BENEFITS: Permanent cost reductions identified to Budget Line Items (BLIs) (Hard Savings)*
– Future Year Defense Plan (FYDP) Benefits will be realigned by the staffs of the CNO and CMC,
depending
p g on the p
program
g and budget
g cycle
y based on DON p priorities
TYPE IB:
Type IB Benefits offset Efficiency Challenges
– If your budget has already been cut and the objective of your Event is to get things done within your
new financial constraints, your savings are Type IB
SECNAV will NOT “double dip” your savings.
Benefit Categorizations – TYPE II
TYPE II BENEFITS: Potential Cost Reduction From Decreased Cycle Times Or Improved Equipment/Space
Utilization (Soft Savings / Cost Avoidance)*
Improves safety
Improves quality of work
work-life
life
Improves customer satisfaction
At the Project – Were assets freed up? At the Business – What did we do with the assets?
Yes No
Benefits Is it a No More No WY’s spread Yes
Is it less across multiple
Q
Quantifi
ifi whole
h l than one
“stuff”? departments or TYPE II
able body? WY?
less than one
WY
No Yes Yes
Yes
No
Yes
TYPE II Available Asset
Summary:
y Financial Process for Capturing
p g Benefits
1. Deployment Champion identifies type of project benefits. Value Stream Champion assigns Financial
expert to team
2. Belt/Team reviews identified benefits for applicability and provides input
3. Belt/Team establishes process for capturing benefits during RIE/Kaizen
4. Capture benefits during RIE/Kaizen
5. Report benefits through CPIMS or Financial Benefits Workbook (Excel file)
Event Documentation
Clearly captures the results of the event
Should include:
– Charter information
– Tools utilized
– Improvements made
– Evidence of data driven decision makingg
– Before / After process flows and metrics
– ROI calculations
– Other improvement opportunities
GREEN BELT:
Module 23 – Execution - Sustainment Slides 18 - 22
Three Week Folloow-up Checklist
Event Name
Slides 24
Rank First Last
L name Phone Number
E
Event Team Lead
CPI Office Belt (responnsible for Event)
Event Process
P Sponsor
Week One
O W Two
Week Week Three or until Event POA&M and
Following documentation is loaded into CPIMS
C T
Team Lead with CPI Office & Prrocess Sponsor reviewed
Outbrieef PowerPoint (all photo minimizzed) EEvent POA&M items Parking Lot issues are resolved
Current State Map (Excel format) Project Sponsor trackinng progress of Event POA&M iteems
GREEN BELT:
T
Team Lead with CPI Office & Prrocess Sponsor reviewed incomplete items (OIC//CO to be briefed minimum of monthly
m
Charter iss complete & all team memberss loaded in to CPIMS EEvent Parking Lot issues on alll uncompeted items
POA&M posted
p in Event area listing item
ms required to CPI Office presents Brieef on all Event incomplete items
complete Event
Standard Work procedures are posted inn Work area as
required
All event Parking
P Lot issues have been addressed
a
Ensure Prrocess Sponsor understands reesponsibilities for
completioon of Event POA&M and Parkinng Lot issues
Have all team members responded apprropriately CPIMS
invitationss to join Event
What is CPIMS?
A value added tool for Lean Practitioners
CPIMS is a web-based relational database
CPIMS is a central repository for
CPI events
Templates and forms
Gate reviews
Training data
CPIMS is used to automatically create reports
Lessons Learned
Every improvement effort offers a lesson.
It is what we do with these lessons that matters.
For successful projects, we want to document our efforts and conclusions to repeat the success.
If not successful, we want to document what went wrong to prevent repeating the same mistakes.
The availability of this type of information can greatly accelerate future efforts.
LEAN
Integrating a Culture of Eliminating Non-Value
Added Activities
Continuous Improvement Identify the Value Stream
Eliminate Over-Production
Eliminate Over-Processing
Create Process Flow
Create Pull System
Theory of
CPI Six Sigma
Constraints Reducing Process
Constraint Mitigation Variation
1. Identify the Constraint Consistent Repeatable
2. Exploit the Constraint Processes
3. Subordinate to the Constraint Process Designg / Redesign
g
4. Elevate the System’s Defect Prevention
Constraint Statistical Analysis
5. Repeat Step 1, the Constraint Voice of the Customer
has probably moved
Lean/Six Sigma/TOC
In Summary:
Lean is about speed
– Increase process flow by eliminating waste
– Waste is anything – effort, costs, or work that adds no value in the eyes of the customer
Six Sigma is about quality and variation
– Reducing defects by eliminating mistakes
– Reducing differences in similar or identical processes
Theory of Constraints is about constraint mitigation
– Identify the constraint, elevate it, and eliminate it
– Increases throughput, decreases inventory and operating expenses
Master Black
Yellow Belt Green Belt Black Belt
Belt
GREEN BELT:
Module 24 – Acronyms Japanese Terms & General LSS Information
Common Non-English Lean Terms
Heijunka Japanese. Production smoothing through level-loading work
Japanese. Literally "autonomation" or "automation with the human touch." Jidoka involves the automatic or immediate detection of errors or defects
Jidoka during a process, followed immediately by finding and eliminating the causes of problems so they do not recur.
Literally "Kai" = "Change" and "Zen" = "Good". Japanese for "change for the better" or "improvement". The English translation is "continuous
improvement , or "continual
improvement" continual improvement
improvement." "Kaizen
Kaizen Events"
Events are Rapid Improvement Events designed to quickly develop and apply process
Kaizen
improvements. Emphasis is on a "learn by doing" process and experimentation to better understand a process should be encouraged. Trivia:
Technically "Kaizen" is the correct usage, not "Kaizen Event".
Japanese. Literally "Kan" = "Visual" and "Ban" = "Card" or "Board". Kanban is a signaling system. As its name suggests, Kanban often uses cards to
Kanban
signal the need for an item. Tool used to communicate customer demand (pull).
Japanese. Literally "avoiding" (yokeru) "inadvertent errors" (poka). Pronounced "POH-kah YOH-keh", means "fail-safing" or "mistake-proofing". Takes
Poke Yoke on two forms: 1) Preventing defects from occuring or 2) Immediate detection of defects when they do occur. Trivia: Originated by Shigeo Shingo and
(Poka Yoke) originally described as "Baka" yoke, (meaning "fool-proofing" or "idiot proofing"). The name was changed to the Poka yoke to remove the implied
judgment.
(清潔): The fourth of the five S's. Japanese. Loosely translated as "Standardize". Literally "standards". Allows for control and consistency. Basic
housekeeping standards apply everywhere in the facility. Everyone knows exactly what his or her responsibilities are. House keeping duties are part of
Seiketsu
regular work routines.
(整理): The first of the five S's. Japanese. Loosely translated as "Sort". Literally "organization". Refers to the practice of sorting through all the tools,
materials, etc., in the work area and keeping only essential items. Everything else is stored or discarded. This leads to fewer hazards and less clutter to
Seiri
interfere with productive work.
(清掃): The third of the five S's. Japanese. Loosely translated as "Systematically clean" or "Sweep". Literally "cleanliness". Indicates the need to keep
the workplace clean as well as neat. Cleaning in should be an ongoing activity -- not just at the end of each shift, but constantly. Think of cleanliness as
Seiso
a habit (If you stay ready, you never have to get ready). Also, think of an ongoing inspection process seeking new opportunities for improvement.
(整頓): The second of the five S's. Japanese. Loosely translated as "Simplify". Literally "orderliness" or "tidiness". Focuses on the need for an orderly
workplace. Tools, equipment, and materials must be systematically arranged for the easiest and most efficient access. There must be a place for
Seiton
everything and everything must be in its place
everything, place.
(躾): The fifth of the five S's. Japanese. Loosely translated as "Sustain". Literally "discipline". Refers to maintaining standards and keeping the facility
Shitsuke in safe and efficient order day after day, year after year.
GREEN BELT:
Module 24 – Acronyms Japanese Terms & General LSS Information
Table 1 – Z Table in Decimal beyond a given value (z from 0 to 6)
z table as proportion gre ater than a given z v alue (0.00 z 6.00)
0.00 0.01 0.02 0.03 0.04 0.05 0.06 0.07 0.08 0.09
0.00 0.500000000 0.496010621 0.492021646 0.488033473 0.484046501 0.480061127 0.476077747 0.472096760 0.468118560 0.464143544
0.10 0.460172104 0.456204636 0.452241530 0.448283177 0.444329967 0.440382288 0.436440527 0.432505067 0.428576291 0.424654580
0.20 0.420740313 0.416833866 0.412935613 0.409045927 0.405165176 0.401293726 0.397431943 0.393580186 0.389738814 0.385908182
0.30 0.382088643 0.378280543 0.374484230 0.370700045 0.366928327 0.363169410 0.359423626 0.355691301 0.351972760 0.348268323
0.40 0.344578303 0.340903014 0.337242763 0.333597852 0.329968580 0.326355241 0.322758126 0.319177519 0.315613701 0.312066949
0.50 0.308537533 0.305025719 0.301531771 0.298055944 0.294598489 0.291159655 0.287739682 0.284338808 0.280957264 0.277595276
0.60 0.274253065 0.270930848 0.267628834 0.264347230 0.261086235 0.257846044 0.254626846 0.251428824 0.248252158 0.245097021
0.70 0.241963578 0.238851994 0.235762424 0.232695018 0.229649924 0.226627280 0.223627221 0.220649876 0.217695369 0.214763817
0.80 0.211855334 0.208970026 0.206107994 0.203269335 0.200454139 0.197662492 0.194894473 0.192150158 0.189429614 0.186732906
0.90 0.184060092 0.181411225 0.178786354 0.176185520 0.173608762 0.171056112 0.168527597 0.166023240 0.163543057 0.161087061
1.00 0.158655260 0.156247655 0.153864244 0.151505020 0.149169971 0.146859081 0.144572328 0.142309686 0.140071125 0.137856610
1.10 0.135666102 0.133499557 0.131356927 0.129238161 0.127143201 0.125071989 0.123024458 0.121000541 0.119000166 0.117023256
1.20 0.115069732 0.113139509 0.111232501 0.109348617 0.107487762 0.105649839 0.103834747 0.102042381 0.100272634 0.098525394
1.30 0.096800549 0.095097982 0.093417573 0.091759198 0.090122734 0.088508052 0.086915021 0.085343508 0.083793378 0.082264493
1.40 0.080756711 0.079269891 0.077803888 0.076358555 0.074933743 0.073529300 0.072145075 0.070780913 0.069436656 0.068112148
1.50 0.066807229 0.065521737 0.064255510 0.063008383 0.061780193 0.060570771 0.059379950 0.058207562 0.057053437 0.055917403
1.60 0.054799289 0.053698923 0.052616130 0.051550737 0.050502569 0.049471451 0.048457206 0.047459659 0.046478632 0.045513949
1.70 0.044565432 0.043632903 0.042716185 0.041815099 0.040929468 0.040059114 0.039203858 0.038363523 0.037537931 0.036726904
1 80
1.80 0 035930266
0.035930266 0 035147838
0.035147838 0 034379445
0.034379445 0 033624911
0.033624911 0 032884058
0.032884058 0 032156713
0.032156713 0 031442700
0.031442700 0 030741845
0.030741845 0 030053974
0.030053974 0 029378914
0.029378914
1.90 0.028716493 0.028066539 0.027428881 0.026803350 0.026189776 0.025587990 0.024997825 0.024419115 0.023851694 0.023295398
2.00 0.022750062 0.022215525 0.021691624 0.021178201 0.020675095 0.020182148 0.019699203 0.019226106 0.018762701 0.018308836
2.10 0.017864357 0.017429116 0.017002962 0.016585747 0.016177325 0.015777551 0.015386280 0.015003369 0.014628679 0.014262068
2.20 0.013903399 0.013552534 0.013209339 0.012873678 0.012545420 0.012224433 0.011910588 0.011603756 0.011303811 0.011010627
2.30 0.010724081 0.010444050 0.010170414 0.009903053 0.009641850 0.009386687 0.009137452 0.008894029 0.008656308 0.008424177
2.40 0.008197529 0.007976255 0.007760251 0.007549411 0.007343633 0.007142815 0.006946857 0.006755661 0.006569129 0.006387167
2.50 0.006209680 0.006036575 0.005867760 0.005703147 0.005542646 0.005386170 0.005233635 0.005084954 0.004940046 0.004798829
2.60 0.004661222 0.004527147 0.004396526 0.004269282 0.004145342 0.004024631 0.003907076 0.003792607 0.003681155 0.003572649
2.70 0.003467023 0.003364211 0.003264148 0.003166769 0.003072013 0.002979819 0.002890125 0.002802872 0.002718003 0.002635461
2.80 0.002555191 0.002477136 0.002401244 0.002327463 0.002255740 0.002186026 0.002118270 0.002052424 0.001988442 0.001926276
2.90 0.001865880 0.001807211 0.001750225 0.001694878 0.001641129 0.001588938 0.001538264 0.001489068 0.001441311 0.001394956
3.00 0.001349967 0.001306308 0.001263943 0.001222838 0.001182960 0.001144276 0.001106754 0.001070363 0.001035071 0.001000851
3.10 0.000967671 0.000935504 0.000904323 0.000874099 0.000844806 0.000816419 0.000788912 0.000762260 0.000736440 0.000711429
3.20 0.000687202 0.000663738 0.000641016 0.000619014 0.000597711 0.000577086 0.000557122 0.000537798 0.000519095 0.000500996
3.30 0.000483483 0.000466538 0.000450144 0.000434286 0.000418948 0.000404113 0.000389767 0.000375895 0.000362482 0.000349515
3.40 0.000336981 0.000324865 0.000313156 0.000301840 0.000290906 0.000280341 0.000270135 0.000260276 0.000250753 0.000241555
3.50 0.000232673 0.000224097 0.000215816 0.000207822 0.000200105 0.000192656 0.000185467 0.000178530 0.000171836 0.000165377
3.60 0.000159146 0.000153135 0.000147337 0.000141746 0.000136353 0.000131154 0.000126141 0.000121308 0.000116649 0.000112158
3.70 0.000107830 0.000103659 0.000099641 0.000095768 0.000092038 0.000088445 0.000084983 0.000081650 0.000078440 0.000075349
3.80 0.000072372 0.000069507 0.000066749 0.000064094 0.000061539 0.000059081 0.000056715 0.000054438 0.000052248 0.000050142
3.90 0.000048116 0.000046167 0.000044293 0.000042491 0.000040758 0.000039092 0.000037491 0.000035952 0.000034473 0.000033052
4.00 0.000031686 0.000030374 0.000029113 0.000027902 0.000026739 0.000025622 0.000024549 0.000023519 0.000022530 0.000021580
4.10 0.000020669 0.000019794 0.000018954 0.000018148 0.000017375 0.000016633 0.000015922 0.000015239 0.000014584 0.000013956
4.20 0.000013354 0.000012777 0.000012223 0.000011692 0.000011183 0.000010696 0.000010228 0.000009780 0.000009351 0.000008940
4.30 0.000008546 0.000008169 0.000007807 0.000007461 0.000007130 0.000006812 0.000006508 0.000006217 0.000005939 0.000005672
4.40 0.000005417 0.000005173 0.000004939 0.000004716 0.000004502 0.000004297 0.000004102 0.000003914 0.000003736 0.000003564
4.50 0.000003401 0.000003244 0.000003095 0.000002952 0.000002815 0.000002685 0.000002560 0.000002441 0.000002327 0.000002218
4 60
4.60 0 000002115
0.000002115 0 000002015
0.000002015 0 000001921
0.000001921 0 000001830
0.000001830 0 000001744
0.000001744 0 000001661
0.000001661 0 000001583
0.000001583 0 000001508
0.000001508 0 000001436
0.000001436 0 000001368
0.000001368
4.70 0.000001302 0.000001240 0.000001181 0.000001124 0.000001070 0.000001018 0.000000969 0.000000922 0.000000878 0.000000835
4.80 0.000000794 0.000000756 0.000000719 0.000000684 0.000000650 0.000000618 0.000000588 0.000000559 0.000000531 0.000000505
4.90 0.000000480 0.000000456 0.000000433 0.000000412 0.000000391 0.000000372 0.000000353 0.000000335 0.000000318 0.000000302
5.00 0.000000287 0.000000273 0.000000259 0.000000246 0.000000233 0.000000221 0.000000210 0.000000199 0.000000189 0.000000179
5.10 0.000000170 0.000000161 0.000000153 0.000000145 0.000000138 0.000000130 0.000000124 0.000000117 0.000000111 0.000000105
5.20 0.000000100 0.000000095 0.000000090 0.000000085 0.000000080 0.000000076 0.000000072 0.000000068 0.000000065 0.000000061
5.30 0.000000058 0.000000055 0.000000052 0.000000049 0.000000047 0.000000044 0.000000042 0.000000039 0.000000037 0.000000035
5.40 0.000000033 0.000000032 0.000000030 0.000000028 0.000000027 0.000000025 0.000000024 0.000000023 0.000000021 0.000000020
5 50
5.50 0 000000019
0.000000019 0 000000018
0.000000018 0 000000017
0.000000017 0 000000016
0.000000016 0 000000015
0.000000015 0 000000014
0.000000014 0 000000014
0.000000014 0 000000013
0.000000013 0 000000012
0.000000012 0 000000011
0.000000011
5.60 0.000000011 0.000000010 0.000000010 0.000000009 0.000000009 0.000000008 0.000000008 0.000000007 0.000000007 0.000000006
5.70 0.000000006 0.000000006 0.000000005 0.000000005 0.000000005 0.000000004 0.000000004 0.000000004 0.000000004 0.000000004
5.80 0.000000003 0.000000003 0.000000003 0.000000003 0.000000003 0.000000002 0.000000002 0.000000002 0.000000002 0.000000002
5.90 0.000000002 0.000000002 0.000000002 0.000000002 0.000000001 0.000000001 0.000000001 0.000000001 0.000000001 0.000000001
6.00 0.000000001
GREEN BELT:
Module 24 – Acronyms Japanese Terms & General LSS Information
Table 2 – Z Table in Decimal beyond a given value (z from -6 to 0)
z table as proportion greate r than a give n z v alue (-6.00 z 0.00)
0.00 0.01 0.02 0.03 0.04 0.05 0.06 0.07 0.08 0.09
-6.00 0.999999999
-5.90
5 90 0 999999998
0.999999998 0 999999998
0.999999998 0 999999998
0.999999998 0 999999998
0.999999998 0 999999999
0.999999999 0 999999999
0.999999999 0 999999999
0.999999999 0 999999999
0.999999999 0 999999999
0.999999999 0 999999999
0.999999999
-5.80 0.999999997 0.999999997 0.999999997 0.999999997 0.999999997 0.999999998 0.999999998 0.999999998 0.999999998 0.999999998
-5.70 0.999999994 0.999999994 0.999999995 0.999999995 0.999999995 0.999999996 0.999999996 0.999999996 0.999999996 0.999999996
-5.60 0.999999989 0.999999990 0.999999990 0.999999991 0.999999991 0.999999992 0.999999992 0.999999993 0.999999993 0.999999994
-5.50 0.999999981 0.999999982 0.999999983 0.999999984 0.999999985 0.999999986 0.999999986 0.999999987 0.999999988 0.999999989
-5.40 0.999999967 0.999999968 0.999999970 0.999999972 0.999999973 0.999999975 0.999999976 0.999999977 0.999999979 0.999999980
-5.30 0.999999942 0.999999945 0.999999948 0.999999951 0.999999953 0.999999956 0.999999958 0.999999961 0.999999963 0.999999965
-5.20 0.999999900 0.999999905 0.999999910 0.999999915 0.999999920 0.999999924 0.999999928 0.999999932 0.999999935 0.999999939
-5.10 0.999999830 0.999999839 0.999999847 0.999999855 0.999999862 0.999999870 0.999999876 0.999999883 0.999999889 0.999999895
-5.00
5 00 0 999999713
0.999999713 0 999999727
0.999999727 0 999999741
0.999999741 0 999999754
0.999999754 0 999999767
0.999999767 0 999999779
0.999999779 0 999999790
0.999999790 0 999999801
0.999999801 0 999999811
0.999999811 0 999999821
0.999999821
-4.90 0.999999520 0.999999544 0.999999567 0.999999588 0.999999609 0.999999628 0.999999647 0.999999665 0.999999682 0.999999698
-4.80 0.999999206 0.999999244 0.999999281 0.999999316 0.999999350 0.999999382 0.999999412 0.999999441 0.999999469 0.999999495
-4.70 0.999998698 0.999998760 0.999998819 0.999998876 0.999998930 0.999998982 0.999999031 0.999999078 0.999999122 0.999999165
-4.60 0.999997885 0.999997985 0.999998079 0.999998170 0.999998256 0.999998339 0.999998417 0.999998492 0.999998564 0.999998632
-4.50 0.999996599 0.999996756 0.999996905 0.999997048 0.999997185 0.999997315 0.999997440 0.999997559 0.999997673 0.999997782
-4.40 0.999994583 0.999994827 0.999995061 0.999995284 0.999995498 0.999995703 0.999995898 0.999996086 0.999996264 0.999996436
-4.30 0.999991454 0.999991831 0.999992193 0.999992539 0.999992870 0.999993188 0.999993492 0.999993783 0.999994061 0.999994328
-4.20 0.999986646 0.999987223 0.999987777 0.999988308 0.999988817 0.999989304 0.999989772 0.999990220 0.999990649 0.999991060
-4 10
-4.10 0 999979331
0.999979331 0 999980206
0.999980206 0 999981046
0.999981046 0 999981852
0.999981852 0 999982625
0.999982625 0 999983367
0.999983367 0 999984078
0.999984078 0 999984761
0.999984761 0 999985416
0.999985416 0 999986044
0.999986044
-4.00 0.999968314 0.999969626 0.999970887 0.999972098 0.999973261 0.999974378 0.999975451 0.999976481 0.999977470 0.999978420
-3.90 0.999951884 0.999953833 0.999955707 0.999957509 0.999959242 0.999960908 0.999962509 0.999964048 0.999965527 0.999966948
-3.80 0.999927628 0.999930493 0.999933251 0.999935906 0.999938461 0.999940919 0.999943285 0.999945562 0.999947752 0.999949858
-3.70 0.999892170 0.999896341 0.999900359 0.999904232 0.999907962 0.999911555 0.999915017 0.999918350 0.999921560 0.999924651
-3.60 0.999840854 0.999846865 0.999852663 0.999858254 0.999863647 0.999868846 0.999873859 0.999878692 0.999883351 0.999887842
-3.50 0.999767327 0.999775903 0.999784184 0.999792178 0.999799895 0.999807344 0.999814533 0.999821470 0.999828164 0.999834623
-3.40 0.999663019 0.999675135 0.999686844 0.999698160 0.999709094 0.999719659 0.999729865 0.999739724 0.999749247 0.999758445
-3.30 0.999516517 0.999533462 0.999549856 0.999565714 0.999581052 0.999595887 0.999610233 0.999624105 0.999637518 0.999650485
-3
3.20
20 0.999312798 0.999336262 0.999358984 0.999380986 0.999402289 0.999422914 0.999442878 0.999462202 0.999480905 0.999499004
-3.10 0.999032329 0.999064496 0.999095677 0.999125901 0.999155194 0.999183581 0.999211088 0.999237740 0.999263560 0.999288571
-3.00 0.998650033 0.998693692 0.998736057 0.998777162 0.998817040 0.998855724 0.998893246 0.998929637 0.998964929 0.998999149
-2.90 0.998134120 0.998192789 0.998249775 0.998305122 0.998358871 0.998411062 0.998461736 0.998510932 0.998558689 0.998605044
-2.80 0.997444809 0.997522864 0.997598756 0.997672537 0.997744260 0.997813974 0.997881730 0.997947576 0.998011558 0.998073724
-2.70 0.996532977 0.996635789 0.996735852 0.996833231 0.996927987 0.997020181 0.997109875 0.997197128 0.997281997 0.997364539
-2.60 0.995338778 0.995472853 0.995603474 0.995730718 0.995854658 0.995975369 0.996092924 0.996207393 0.996318845 0.996427351
-2.50 0.993790320 0.993963425 0.994132240 0.994296853 0.994457354 0.994613830 0.994766365 0.994915046 0.995059954 0.995201171
-2.40 0.991802471 0.992023745 0.992239749 0.992450589 0.992656367 0.992857185 0.993053143 0.993244339 0.993430871 0.993612833
-2.30
30 0.989275919 0.989555950 0.989829586 0.990096947 0.990358150 0.990613313 0.990862548 0.991105971 0.991343692 0.991575823
-2.20 0.986096601 0.986447466 0.986790661 0.987126322 0.987454580 0.987775567 0.988089412 0.988396244 0.988696189 0.988989373
-2.10 0.982135643 0.982570884 0.982997038 0.983414253 0.983822675 0.984222449 0.984613720 0.984996631 0.985371321 0.985737932
-2.00 0.977249938 0.977784475 0.978308376 0.978821799 0.979324905 0.979817852 0.980300797 0.980773894 0.981237299 0.981691164
-1.90 0.971283507 0.971933461 0.972571119 0.973196650 0.973810224 0.974412010 0.975002175 0.975580885 0.976148306 0.976704602
-1.80 0.964069734 0.964852162 0.965620555 0.966375089 0.967115942 0.967843287 0.968557300 0.969258155 0.969946026 0.970621086
-1.70 0.955434568 0.956367097 0.957283815 0.958184901 0.959070532 0.959940886 0.960796142 0.961636477 0.962462069 0.963273096
-1.60 0.945200711 0.946301077 0.947383870 0.948449263 0.949497431 0.950528549 0.951542794 0.952540341 0.953521368 0.954486051
-1.50 0.933192771 0.934478263 0.935744490 0.936991617 0.938219807 0.939429229 0.940620050 0.941792438 0.942946563 0.944082597
-1.40 0.919243289 0.920730109 0.922196112 0.923641445 0.925066257 0.926470700 0.927854925 0.929219087 0.930563344 0.931887852
-1.30 0.903199451 0.904902018 0.906582427 0.908240802 0.909877266 0.911491948 0.913084979 0.914656492 0.916206622 0.917735507
-1.20 0.884930268 0.886860491 0.888767499 0.890651383 0.892512238 0.894350161 0.896165253 0.897957619 0.899727366 0.901474606
-1.10 0.864333898 0.866500443 0.868643073 0.870761839 0.872856799 0.874928011 0.876975542 0.878999459 0.880999834 0.882976744
-1.00 0.841344740 0.843752345 0.846135756 0.848494980 0.850830029 0.853140919 0.855427672 0.857690314 0.859928875 0.862143390
-0.90 0.815939908 0.818588775 0.821213646 0.823814480 0.826391238 0.828943888 0.831472403 0.833976760 0.836456943 0.838912939
-0.80 0.788144666 0.791029974 0.793892006 0.796730665 0.799545861 0.802337508 0.805105527 0.807849842 0.810570386 0.813267094
-0.70 0.758036422 0.761148006 0.764237576 0.767304982 0.770350076 0.773372720 0.776372779 0.779350124 0.782304631 0.785236183
-0.60 0.725746935 0.729069152 0.732371166 0.735652770 0.738913765 0.742153956 0.745373154 0.748571176 0.751747842 0.754902979
-0.50 0.691462467 0.694974281 0.698468229 0.701944056 0.705401511 0.708840345 0.712260318 0.715661192 0.719042736 0.722404724
-0.40 0.655421697 0.659096986 0.662757237 0.666402148 0.670031420 0.673644759 0.677241874 0.680822481 0.684386299 0.687933051
-0.30 0.617911357 0.621719457 0.625515770 0.629299955 0.633071673 0.636830590 0.640576374 0.644308699 0.648027240 0.651731677
-0.20 0.579259687 0.583166134 0.587064387 0.590954073 0.594834824 0.598706274 0.602568057 0.606419814 0.610261186 0.614091818
-0.10 0.539827896 0.543795364 0.547758470 0.551716823 0.555670033 0.559617712 0.563559473 0.567494933 0.571423709 0.575345420
0.00 0.500000000 0.503989379 0.507978354 0.511966527 0.515953499 0.519938873 0.523922253 0.527903240 0.531881440 0.535856456
GREEN BELT:
Module 24 – Acronyms Japanese Terms & General LSS Information
4. Facilitation & Brainstorming
5. Simulation Round 1
Grading Scale:
S
• (1) Stron
ngly disagree
6. Charter Writing
2. CPI Overview
• (2) Disa
agree
1. Introduction
• (3) Neuttral
8. SIPOC
• (4) Agre
ee
• (5) Stron
ngly Agree
Comments:
I learned what I expected to learn
I am confident in my ability to applly what I have learneed in my position
This training was
w a valuable use of my time
I would recomm
mend this training to
o others
The instructor clearly
c knew the subject and material
Overall, the loccation provided a go
ood learning environ
nment
The lecture is good
g just as it is
The class mateerials are appropriate and helpful
Comments
14. Value Stream Map & Analysis
Grading Scale:
S
13. Train the Team
• (1) Stron
ngly disagree
18. Statistics
• (3) Neuttral
• (4) Agre
ee
• (5) Stron
ngly Agree
Comments:
I learned what I expected to learn
I am confident in my ability to applly what I have learneed in my position
This training was
w a valuable use of my time
I would recomm
mend this training to
o others
The instructor clearly
c knew the subject and material
Overall, the loccation provided a go
ood learning environ
nment
The lecture is good
g just as it is
The class mateerials are appropriate and helpful
Comments
20. Implement Improvements
Grading Scale:
S
Overall Course
• (3) Neuttral
• (4) Agre
ee
• (5) Stron
ngly Agree
Comments:
I learned what I expected to learn
I am confident in my ability to applly what I have learneed in my position
This training was
w a valuable use of my time
I would recomm
mend this training to
o others
The instructor clearly
c knew the subject and material
Overall, the loccation provided a go
ood learning environ
nment
The lecture is good
g just as it is
The class mateerials are appropriate and helpful
Comments
GREEN BELT:
Module 24 – Acronyms Japanese Terms & General LSS Information