Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Note:

Position of anchor
Position of drill

PREPARED FULL NAME SIGNATURE HO CHI MINH CITY URBAN RAILWAY CONSTRUCTION PROJECT
DATE REV. DESCRIPTION SIGNATURE
SHIMIZU-MAEDA JOINT OPERATION BEN THANH-SUOI TIEN SECTION (LINE 1)
DESIGNER
A1:1/100 A3:1/200
DALISAY MARK JAY
17/09/2015 TENORIO
CHECKER HUI NGAM CHUNG OPERA HOUSE STATION
JAMES
TEAM LEADER
31/07/2015
UDAYASURIAN
NJPT Association KUMARAVAL SHEET 2
DESIGN MANAGER
KAORU.YAMANE TECHNICAL DESIGN DRAWINGS DRAWING NO
AECOM Singapore Pte. Ltd. PROJECT MANAGER (2ND IN PROGRESS SUBMISSION )
NOBUYUKI.KAWAI -

You might also like