The document provides calculations to determine the moment carrying capacity (Ls) of a pile socketed into rock. It lists the horizontal force (H), moment (M), pile diameter (D), concrete grade, unconfined compressive strength of the rock (UCS), and other parameters. The calculation yields a moment carrying capacity (Ls) of 0.238 meters for the socketed pile.
The document provides calculations to determine the moment carrying capacity (Ls) of a pile socketed into rock. It lists the horizontal force (H), moment (M), pile diameter (D), concrete grade, unconfined compressive strength of the rock (UCS), and other parameters. The calculation yields a moment carrying capacity (Ls) of 0.238 meters for the socketed pile.
The document provides calculations to determine the moment carrying capacity (Ls) of a pile socketed into rock. It lists the horizontal force (H), moment (M), pile diameter (D), concrete grade, unconfined compressive strength of the rock (UCS), and other parameters. The calculation yields a moment carrying capacity (Ls) of 0.238 meters for the socketed pile.
Moment at top of socket M = 161.9 kN-m Diameter of pile D = 1m Grade of concrete = 35 M Pa UCS of rock = 600 kG/cm2 = 60000 kN/m2 s = 19800 kN/m2 Ls = 0.016 + SQRT ( 104976 + 971.6 392040000 19800
Rui Calcada, Raimundo Delgado, Antonio Campos e Matos, Jose Maria Goicolea, Felipe Gabaldon-Track-Bridge Interaction On High-Speed Railways - Selected and Revise