City Wash Bay
Structural:
• Deficiencies in wall reinforcement
• Lack of proper connection between roof and
walls
• Concrete floor apparatus bays is overloaded
and cracking
Mechanical
• Systems are well beyond their expected life
spans
• Many deficiencies and violations of current
mechanical and plumbing codes
13
Station #2 Code Deficiencies
Electrical
• Numerous violations of current codes,
improper grounding, all panels need to be
replaced
• No emergency lighting and building not
equipped with emergency
power(generator)
Energy efficiency
• Minimally insulated and heating/cooling
cost very high
14
Station #2 Functional Deficiencies
15
Station #2 Functional Deficiencies
16
Fire Station #4
Replacement
• This would replace Fire
Station #4, located at
2191 1st Avenue, with a
new building on a new
site.
• The new station will
accommodate the
existing fire company
with room for future
expansion and will
include three apparatus
bays, a training room,
and space for storage.
• Cost: $9,000,559 17
Station #4 Code
Deficiencies
• Built 1978, 40 years old
Structural:
• Cracking of slabs in apparatus
bays
• Connections between masonry
walls and steel roof joists
deficient
• Masonry walls deficient, require
reinforcement
Mechanical
• Systems are well beyond their
expected life spans
• Many deficiencies and violations
of current codes in both
mechanical and plumbing
systems.
18
Station #4 Code Deficiencies
• Electrical
• Numerous violations of current codes
• No emergency lighting and building not
equipped with emergency power(generator)
• Energy efficiency
• Minimally insulated and heating/cooling
cost very high
19
Station #4 Functional Deficiencies
Site Concerns:
• Increased traffic volume at 1st Ave/22nd
St intersection
• Limited space/tight turning radius limits
apparatus assigned to station
• Small garage truck bays
• Limits apparatus that can be
stationed/positioned at location
• Limited space for fire fighters preparing
for responses to don their protective gear
20
Station #4 Functional Deficiencies
• No training/meeting room
• Continuing education difficult
• No area to meet/present classes to
public or available for
neighborhood/public use
21
Station #4 Functional Deficiencies
22
Station #4 Functional
Deficiencies
• No public accessibility/utilization
• No lobby/main entry point
• No public restrooms
• Isolates station from interaction with
neighborhood/citizens
• No meeting/classroom room
23
City of Greeley
• Cost: $5,000,000 26