VESSEL NAME :- SEA LINK

FIRE / BILGE PUMP CALCULATION: 200 PAX HIGH SPEED CRAFT

Rule :- HSC 1994( MSC .36(63))

10.3.6 Diameter of bilge main


dm = 1.68 √{L (B + D)} + 25 [mm]
B = moulded breadth of the craft [m] – for monohull = 7.5
D = moulded depth to the watertight deck [m]= 2.8
L = length of craft [m] as defined in Chapter 1. 32.475
C= Length of compartment
Required dm = 55.73 mm
Provided dm = 100 mm

10.3.7 Branch bilge sunction


db = 2.15 √{C (B + D)} + 25 [mm]

db is should not be less than 25 mm. (As per HSC 1994 PARA 10.3.7)

length of branch bilge


compartmen compartme suction pipe provided
t nt(C) required =db db=
Void space 3 3.75 38.362 50
Engine room 6.25 42.250 50
Tank room 3.75 38.362 50
Void space 2 3.75 38.362 50
Crew
accomodatio
n room 6.25 42.250 50
Void space 1 7.5 43.897 50
Fore peak 2.625 36.179 50
10.3.12 Capacity of pumps
Q = (5.75/10^3 ) x dm2 [m3/hour]
= 17.86 [m3/hour]
from HSC 1994

Number of pumps required = 2 nos ( AS PER HSC 1994 . RULE 10.9)


Number of pumps required = 3 nos
Capacity of each pump provided= 25 [m3/hour]

HSC 1994 - Rule 7.7.8 Capacity of fire Pump


=

d = 1+0.066(L(B+D))0.5
Required fire pump capacity 25 m3/hr
Required no of fire pump 2 nos
Provided fire pump capacity 25 m3/hr
Provided no of fire pump 2 nos