FORMULIR PENGUKURAN LEVELLING

Tanggal 11-Jul-18 Surveyor Abner


Pekerjaan Survei Bathimetri Waterpass Sokkia B40
Lokasi Pomako Arah Ukur 1 Arah

Stasiun Pasut (PS) - BM DISHIDROS (DS)


Stand 1 Stand 2
Slag Titik
BA BT BB BA BT BB Beda Tinggi
PS 299.3 288.1 276.5 287.7
Slag 1
ST1 92.6 82.3 72 82
205.8 205.7 205.75
ST1 183.1 178.3 173.4 181.3
Slag 2
DS 63.6 59.1 54.6 62.2
119.2 119.1 119.15
Beda Tinggi Stasiun Pasut (PS) - BM DISHIDROS (DS) 325.48 0.58

FORMULIR PENGUKURAN LEVELLING


Tanggal 11-Jul-18 Surveyor Mikhael
Pekerjaan Survei Bathimetri Waterpass Sokkia B40
Lokasi Pomako Arah Ukur 1 Arah

BM DISHIDROS (DS) - BM Baru (TT)


Stand 1 Stand 2
Slag Titik
BA BT BB BA BT BB Beda Tinggi
DS 48.3 58 67.6 55.5
Slag 1
ST2 95.6 105.4 115.3 103
-47.4 -47.5 -47.45
ST2 99.6 106.2 112.6 106.4
Slag 2
TT 91.4 98.9 106.4 99.2
7.3 7.2 7.25
Beda Tinggi BM DISHIDROS (DS) - BM Baru (TT) -40.2

Beda Tinggi Stasiun Pasut (PS) - BM Baru (TT) 285.28

Beda Tinggi PS(Primary)-PS(Secondary)


1.34
Primary Secondary
MSL 1.339627 MSL -0.000373
LWS -0.242 LWS -1.582
HWS 3.456 HWS 2.116

Koordinat BM E N z LWS
BM DISHIDROS 696422.8 9469498 3.4968
BM Baru 696424.8 9469563 3.0948
-0.2
0

-0.05 -181.3
0 -62.2

-0.05 -55.5
0.05 -103

-0.1 -106.4
0 -99.2