Code Point Place Progresive Side Bolt Bits Time Quality Rock Date Installed Results
Code Point Place Progresive Side Bolt Bits Time Quality Rock Date Installed Results
Code Point Place Progresive Side Bolt Bits Time Quality Rock Date Installed Results
Code Point Place Progresive Side Bolt Bits Time Quality Rock Date Installed Results
1 TALUD SS 8FT /39 mm 37 mm IVB 7/4/2017 0 TN
3 2 TALUD SS 8FT /39 mm 37 mm IVB 7/4/2017 4.2 TN
3 TALUD SOSTENIMIENTO SS 8FT /39 mm 37 mm IVB 7/4/2017 2 TN
TALUD
1 1 TALUD SS 8FT /39 mm 37 mm IVB 7/5/2017 4.5 TN
1 TALUD SS 8FT /39. mm 37 mm 52 S IVB 7/6/2017 3 TN
3
2 TALUD SS 8FT /39 mm 37 mm 51 S IVB 7/6/2017 3 TN
1 1 Portal
SOSTENIMIENTO
REBAR 7FT /22mm IVB 7/30/2017 23.0
PORTAL
1 Portal REBAR 7FT /22mm IVB 7/31/2017 8
SOSTENIMIENTO
3 2 Portal PORTAL REBAR 7FT /22mm IVB 7/31/2017 16
3 Portal REBAR 7FT /22mm IVB 7/31/2017 17
LEYENDA DE COLORES
1 SPLIT SET
2 REBAR
3 SWELLEX
4 HYDRABOLT
5 ENSAYO NO CUMPLEN
TEST
Minimum Required (Tn) observations
07.5 TN
07.5 TN
07.5 TN
07.5 TN
07.5 TN
07.5 TN
20 TN
20 TN
20 TN
20 TN
minimo requerido
REBAR 7FT /22mm 20.0 Tn
SS 8FT /39.5mm 8 Tn
SS 7FT /40mm 6.5 Tn
Sw 8FT/28mm 12.0 Tn
Sw 7FT/28mm 12. 0 Tn
Sw 10FT/35mm 24.0 Tn
HY 7FT/29mm 12.0 Tn