HARGA SATUAN BAHAN

NO. NAMA BAHAN SATUAN HARGA

1 Air liter 150.00


2 Kayu Kelas I m3 6,500,000.00
3 Kayu Kelas II m3 5,400,000.00
4 Kayu Kelas III m3 4,200,000.00
5 Bekisting m3 2,250,000.00
6 Bata Merah buah 500.00
7 Besi Beton (Polos/Ulir) kg 10,000.00
8 Besi Beton Polos kg 10,000.00
9 Kayu bambu Dia. (8-10) cm, Panjang 4 m btg 8,500.00
10 Gypsum Board lbr 55,000.00
11 Kawat Beton kg 13,000.00
12 Keramik Uk. (40x40) cm m2 48,000.00
13 Keramik Uk. (30x30) cm m2 46,000.00
14 Lis Keramik Dinding 10x20 buah 12,000.00
15 Keramik motif Uk. (25x20) cm m2 45,000.00
16 KR (Maksimum 30 mm) m3 180,000.00
17 List Gypsum Profil m' 8,500.00
18 Minyak Bekisting liter 2,000.00
19 Paku kg 15,000.00
20 Skrup Fixer Bh 500.00
21 Sealent Tube 30,000.00
22 Pasir Urug m3 40,000.00
23 PB ( Pasir Beton ) m3 93,000.00
24 PC ( Portland Cement) kg 1,200.00
25 Pintu Alluminium m' 65,000.00
26 PP ( Pasir Pasang) m3 83,000.00
27 Profil Alluminium m' 58,000.00
28 Profil Hollow 30.40.0.35 m' 10,000.00
29 Semen Warna kg 3,000.00
30 Seng Plat m' 73,000.00
31 Sewa Alat Jam 75,000.00
32 Paku kg 38,000.00
33 Sirtu m3 240,000.00
34 Ramset/ dina bolt bh 4,500.00
35 Tepung Gypsum kg 5,000.00
36 Tripleks 1.2x2.4 m tebal 9 mm Lembar 85,000.00
37 Pipa PVC AW diameter 2" panjang 4 m Ljr 90,000.00
38 Pipa PVC AW diameter 3/4" panjang 4 m Ljr 8,000.00
39 Pipa PVC AW diameter 4" panjang 4 m Ljr 248,000.00
40 Kloset duduk Monoblok bh 1,500,000.00
41 reng Galvalum m1 12,000.00
42 Ampelas lbr 4,000.00
43 Cat Tembok setara dulux kg 35,000.00
44 Cat Warna kg 42,000.00
45 Gerendel bh 10,100.00
46 Kaca Polos tebal 5 mm m2 55,000.00
47 Kaca Temperd 10 mm m2 700,000.00
48 Kaca Cermin + Frame & Aksesories set 350,000.00
49 Kapek bh 3,000.00
50 Kuas Cat bh 9,000.00
51 Kunci 2x Putar bh 85,000.00
52 Kunci Tanam Kamar Mandi bh 50,000.00
53 Engsel Pintu Kamar Mandi bh 11,000.00
54 Plamir Kayu kg 17,000.00
55 Plamir Tembok alkali kg 32,000.00
56 Korden Plastik & Aksesoris set 340,000.00
57 Sealent Tube 40,000.00
58 floor drain lbr 15,000.00
59 Meni ltr 12,500.00
60 kran air 3/4 & 2/3 Bj 20,000.00
61 Washtafel bh 740,000.00
63 Kabel NYY 4x2.5 mm m1 28,000.00
64 Pipa galvanis 1 1/2" m1 55,000.00
65 Pipa paralon 1/4 " m1 20,000.00
66 Buis beton U 20 bh 35,000.00
67 Buis dekker ø 100 cm bh 125,000.00
68 T dos PVC bh 5,000.00
69 klem bh 1,000.00
70 stop kontak bh 14,000.00
71 saklar ganda bh 16,000.00
72 Lampu TL 1x40 W bh 50,000.00
73 Lampu pijar 24 W bh 28,000.00
74 Seal tape btg 5,000.00

HARGA SATUAN UPAH KERJA

NO. TENAGA KERJA SAT. UPAH

1 Pekerja OH 35,000.00
2 Tukang OH 47,500.00
3 Kepala Tukang OH 50,000.00
4 Mandor OH 55,000.00
ANALISA PERHITUNGAN KONSTRUKSI 2012
PEKERJAAN TANAH

Galian Tanah M3
. Kebutuhan Satuan Indeks Harga Bahan
Pekerja OH 0.750 Rp 35,000
Tenaga Kerja
Mandor OH 0.025 Rp 55,000
Jumlah
Dibulatkan

. Urugan Pasir M3
Kebutuhan Satuan Indeks Harga Bahan
Bahan Pasir Urug M3 1.200 Rp 40,000
Pekerja OH 0.300 Rp 35,000
Tenaga Kerja
Mandor OH 0.010 Rp 55,000
Jumlah
Dibulatkan

PEKERJAAN PLESTERAN
. Plesteran M2, 1PC : 4PS, tebal 15 mm
Kebutuhan Satuan Indeks Harga Bahan
PC Kg 6.240 Rp 1,200
Bahan
PP M3 0.024 Rp 83,000
Pekerja OH 0.300 Rp 35,000
Tukang Batu OH 0.150 Rp 47,500
Tenaga Kerja
Kepala Tukang OH 0.015 Rp 50,000
Mandor OH 0.015 Rp 55,000
Jumlah
Dibulatkan

PEKERJAAN LANGIT-LANGIT

. Memasang 1 M2 Pasang Rangka Plafon Kayu


. Kebutuhan Satuan Indeks Harga Bahan
Kayu m' 3.600 Rp 10,000
Bahan
Paku Kg 0.150 Rp 38,000
Pekerja OH 0.150 Rp 35,000
Tukang Kayu OH 0.500 Rp 47,500
Tenaga Kerja
Kepala Tukang OH 0.050 Rp 50,000
Mandor OH 0.008 Rp 55,000
Jumlah
Dibulatkan

Memasang 1 M2 Langit-langit Gypsum Board Uk. (1200 x 2400 x 9) mm, Tebal


.
9 mm
Kebutuhan Satuan Indeks Harga Bahan
Gypsum Board Lbr 0.364 Rp 55,000
Bahan
Skrup Kg 0.110 Rp 38,000
Pekerja OH 0.100 Rp 35,000
Tukang Kayu OH 0.050 Rp 47,500
Tenaga Kerja
Kepala Tukang OH 0.005 Rp 50,000
Tenaga Kerja

Mandor OH 0.005 Rp 55,000


Jumlah
Dibulatkan
. Memasang 1 M' List plafond Gypsum profil
Kebutuhan Satuan Indeks Harga Bahan
List Gypsum Profil M' 1.050 Rp 8,500
Bahan
Tepung Gypsum Kg 0.150 Rp 5,000
Pekerja OH 0.060 Rp 35,000
Tukang Kayu OH 0.060 Rp 47,500
Tenaga Kerja
Kepala Tukang OH 0.006 Rp 50,000
Mandor OH 0.003 Rp 55,000
Jumlah
Dibulatkan

PEKERJAAN PASANGAN

Memasang 1 M2 Dinding Bata Merah Uk. (5x11x22) cm kosongan


Kebutuhan Satuan Indeks Harga Bahan
Bata Merah Bh 70.000 Rp -
Bahan PC Kg 9.680 Rp 1,200
PP M3 0.045 Rp 83,000
Pekerja OH 0.300 Rp 35,000
Tukang Batu OH 0.100 Rp 47,500
Tenaga Kerja
Kepala Tukang OH 0.010 Rp 50,000
Mandor OH 0.015 Rp 55,000
Jumlah
Dibulatkan

Memasang 1 M' Pasang buis beton U 20 untuk saluran


Kebutuhan Satuan Indeks Harga Bahan
Buis beton U 20 Bh 1.000 Rp 35,000
Pasir urug M3 0.069 Rp 40,000
Bahan
semen ( PC ) Kg 3.120 Rp 1,200
PP M3 0.061 Rp 83,000
Pekerja OH 0.140 Rp 35,000
Tukang Batu OH 0.070 Rp 47,500
Tenaga Kerja
Kepala Tukang OH 0.007 Rp 50,000
Mandor OH 0.007 Rp 55,000
Jumlah
Dibulatkan

Memasang 1 M' Pasang buis beton ø 100 cm


Kebutuhan Satuan Indeks Harga Bahan
Buis beton ø 100 cm Bh 1.000 Rp 125,000
Pasir urug M3 0.069 Rp 40,000
Bahan
semen ( PC ) Kg 3.120 Rp 1,200
PP M3 0.061 Rp 83,000
Pekerja OH 0.140 Rp 35,000
Tukang Batu OH 0.070 Rp 47,500
Tenaga Kerja
Kepala Tukang OH 0.007 Rp 50,000
Mandor OH 0.007 Rp 55,000
Jumlah
Dibulatkan
Memasang 1 M2 Dinding Bata Merah Uk. (5x11x22) cm tebal 1/2 bata,
Campuran Spesi 1 Pc : 5 Ps
Kebutuhan Satuan Indeks Harga Bahan
Bata Merah Bh 70.000 Rp 500
Bahan PC Kg 9.680 Rp 1,200
PP M3 0.045 Rp 83,000
Pekerja OH 0.300 Rp 35,000
Tukang Batu OH 0.100 Rp 47,500
Tenaga Kerja
Kepala Tukang OH 0.010 Rp 50,000
Mandor OH 0.015 Rp 55,000
Jumlah
Dibulatkan

PEKERJAAN ALLUMINIUM
Memasang 1 M Kusen Pintu Alluminium
Kebutuhan Satuan Indeks Harga Bahan
Profil Alluminium M 1.100 Rp 58,000
Bahan Skrup Fixer Bh 2.000 Rp 500
Sealent Tube 0.060 Rp 30,000
Pekerja OH 0.043 Rp 35,000
Tukang Besi Konstruksi OH 0.043 Rp 47,500
Tenaga Kerja
Kepala Tukang OH 0.0043 Rp 50,000
Mandor OH 0.0021 Rp 55,000
Jumlah
Dibulatkan

Memasang 1 M2 Pintu & Jendela Kaca Rangka Alluminium


Kebutuhan Satuan Indeks Harga Bahan
Pintu Alluminium M' 4.400 Rp 58,000
Bahan Profil Kaca M' 4.500 Rp 13,000
Sealant Tube 0.270 Rp 30,000
Pekerja OH 0.085 Rp 35,000
Tukang Besi OH 0.085 Rp 47,500
Tenaga Kerja
Kepala Tukang OH 0.009 Rp 50,000
Mandor OH 0.005 Rp 55,000
Jumlah
Dibulatkan
PEKERJAAN BETON

Membuat 1 M3 Beton Mutu F'c : 16.9 Mpa (K200), Slump (12 +/- 2) cm, w/c :
.
0.61
Kebutuhan Satuan Indeks Harga Bahan
PC Kg 326.00 Rp 1,200
PB m3 0.499 Rp 93,000
Bahan
KR (Maksimum 30 mm) m3 0.530 Rp 180,000
Air Ltr 215.00 Rp 150
Pekerja OH 1.650 Rp 35,000
Tukang Batu OH 0.275 Rp 47,500
Tenaga Kerja
Kepala Tukang OH 0.028 Rp 50,000
Mandor OH 0.083 Rp 55,000
Jumlah
Dibulatkan

. Pembesian Per 10 Kg Besi Polos atau Ulir


Kebutuhan Satuan Indeks Harga Bahan
Besi Beton (Polos/Ulir) Kg 10.500 10,000.00
Bahan
Kawat Beton Kg 0.150 13,000.00
Pekerja OH 0.070 Rp 35,000
Tukang Besi OH 0.070 Rp 47,500
Tenaga Kerja
Kepala Tukang OH 0.007 Rp 50,000
Mandor OH 0.004 Rp 55,000
Jumlah
Dibulatkan

Pembesian Per 1 Kg Besi polos atau ulir kg 0.100 113,295.00

. Memasang 1 M2 Bekisting Untuk Sloof


Kebutuhan Satuan Indeks Harga Bahan
Papan Bekisting M3 0.045 2,250,000.00
Bahan Paku Kg 0.300 15,000.00
Minyak Bekisting Ltr 0.100 2,000.00
Pekerja OH 0.520 Rp 35,000
Tukang Kayu OH 0.260 Rp 47,500
Tenaga Kerja
Kepala Tukang OH 0.026 Rp 50,000
Mandor OH 0.026 Rp 55,000
Jumlah
Dibulatkan

Begesting digunakan 5 X pakai


- Bahan 0.200 105,950.000
- Tenaga Kerja 1.000 33,280.00

. Memasang 1 M2 Bekisting Untuk Kolom


Kebutuhan Satuan Indeks Harga Bahan
Papan Bekisting M3 0.040 2,250,000.00
Paku Kg 0.400 15,000.00
Minyak Bekisting Ltr 0.200 2,000.00
Bahan
Balok Bekisting M3 0.015 4,200,000.00
Tripleks 1.2x2.4 m tebal 9 mm Lbr 0.350 85,000.00
Bahan

Kayu Bambu Dia. (8-10) cm,


Btg 2.000 8,500.00
panjang 4 m
Pekerja OH 0.660 Rp 35,000
Tukang Kayu OH 0.330 Rp 47,500
Tenaga Kerja
Kepala Tukang OH 0.033 Rp 50,000
Mandor OH 0.033 Rp 55,000
Jumlah
Dibulatkan
Begesting digunakan 5 X pakai
- Bahan 0.200 206,150.000
- Tenaga Kerja 1.000 42,240.00
. Memasang 1 M2 Bekisting Untuk Balok
Kebutuhan Satuan Indeks Harga Bahan
Papan Bekisting M3 0.040 2,250,000.00
Paku Kg 0.400 15,000.00
Minyak Bekisting Ltr 0.200 2,000.00
Bahan
Balok Bekisting M3 0.018 4,200,000.00
Tripleks 1.2x2.4 m tebal 9 mm Lbr 0.350 85,000.00
Kayu Bambu Dia. (8-10) cm,
Btg 2.000 8,500.00
panjang 4 m
Pekerja OH 0.660 Rp 35,000
Tukang Kayu OH 0.330 Rp 47,500
Tenaga Kerja
Kepala Tukang OH 0.033 Rp 50,000
Mandor OH 0.033 Rp 55,000
Jumlah
Dibulatkan
Begesting digunakan 5 X pakai
- Bahan 0.200 218,750.000
- Tenaga Kerja 1.000 42,240.00

. Memasang 1 M2 Bekisting Untuk Lantai


Kebutuhan Satuan Indeks Harga Bahan
Papan Bekisting M3 0.047 2,250,000.00
Paku Kg 0.490 15,000.00
Minyak Bekisting Ltr 0.400 2,000.00
Bahan
Balok Bekisting M3 0.015 4,200,000.00
triplek Lbr 0.350 85,000.00
Kayu Bambu Dia. (8-10) cm, panja Btg 6.000 8,500.00
Pekerja OH 0.720 Rp 35,000
Tukang Kayu OH 0.330 Rp 47,500
Tenaga Kerja
Kepala Tukang OH 0.033 Rp 50,000
Mandor OH 0.033 Rp 55,000
Jumlah
Dibulatkan
Begesting digunakan 5 X pakai
- Bahan 0.200 257,650.000
- Tenaga Kerja 1.000 44,340.00

PEKERJAAN LANTAI

. Memasang 1 M2 Lantai Keramik Uk. (40 x 40) cm


Kebutuhan Satuan Indeks Harga Bahan
Keramik Uk. (40 x 40) cm Polos m2 1.060 48,000.00
PC Kg 8.160 1,200.00
Bahan
PP M3 0.045 83,000.00
Semen Warna Kg 1.300 3,000.00
Pekerja OH 0.620 Rp 35,000
Tukang Batu OH 0.350 Rp 47,500
Tenaga Kerja
Kepala Tukang OH 0.035 Rp 50,000
Mandor OH 0.030 Rp 55,000
Jumlah
Dibulatkan
. Memasang 1 M2 Lantai Keramik Uk. (30x30) cm
Kebutuhan Satuan Indeks Harga Bahan
Keramik Uk. (30x30) cm Polos M3 1.060 46,000.00
PC Kg 8.160 1,200.00
Bahan
PP M3 0.039 83,000.00
Semen Warna Kg 1.300 3,000.00
Pekerja OH 0.620 Rp 35,000
Tukang Batu OH 0.350 Rp 47,500
Tenaga Kerja
Kepala Tukang OH 0.035 Rp 50,000
Mandor OH 0.030 Rp 55,000
Jumlah
Dibulatkan

. Memasang 1 M2 Keramik dinding Uk. (25 x 20) cm


Kebutuhan Satuan Indeks Harga Bahan
Keramik Uk. (25x20) cm Polos m2 1.060 45,000.00
PC Kg 0.186 1,200.00
Bahan
PP M3 0.018 83,000.00
Semen Warna Kg 1.940 3,000.00
Pekerja OH 0.620 Rp 35,000
Tukang Batu OH 0.350 Rp 47,500
Tenaga Kerja
Kepala Tukang OH 0.035 Rp 50,000
Mandor OH 0.030 Rp 55,000
Jumlah
Dibulatkan

. Memasang 1 M1 Lis Keramik Dinding Uk. (8 x 20) cm


Kebutuhan Satuan Indeks Harga Bahan
Keramik Uk. (8x20) cm Polos Bh 5.300 12,000.00
PC Kg 0.023 1,200.00
Bahan
PP M3 0.003 83,000.00
Semen Warna Kg 0.025 3,000.00
Pekerja OH 0.090 Rp 35,000
Tukang Batu OH 0.090 Rp 47,500
Tenaga Kerja
Kepala Tukang OH 0.009 Rp 50,000
Mandor OH 0.005 Rp 55,000
Jumlah
Dibulatkan

PEKERJAAN PIPA DAN SANITER

. Memasang 1 buah kloset duduk/monoblok


Kebutuhan Satuan Indeks Harga Bahan
kloset duduk/monoblok Bh 1.000 1,500,000.00
Bahan
perlengkapan 6% harga Bahan 0.060 90,000.00
Pekerja OH 3.300 Rp 35,000
Tukang batu OH 1.100 Rp 47,500
Tenaga Kerja
Kepala tukang OH 0.001 Rp 50,000
Mandor OH 0.160 Rp 55,000
Jumlah
Dibulatkan
. Memasang 1 buah Washtafel
Kebutuhan Satuan Indeks Harga Bahan
Wastafel bh 1.000 740,000.00
Perlengkapan 12% bahan 0.120 740,000.00
Bahan
Semen abu-abu kg 6.000 1,200.00
Pasir pasang m3 0.010 83,000.00
Pekerja OH 1.200 Rp 35,000
Tukang batu OH 1.450 Rp 47,500
Tenaga Kerja
Kepala tukang OH 0.150 Rp 50,000
Mandor OH 0.100 Rp 55,000
Jumlah
Dibulatkan

. Memasang 1 m3 pipa galvanis diameter 1 1/2"


Kebutuhan Satuan Indeks Harga Bahan
Pipa galvanis m' 1.200 55,000.00
Bahan
Perlengkapan 35,0% harga bahan 0.350 55,000.00
Pekerja OH 0.108 Rp 35,000
Tukang batu OH 0.180 Rp 47,500
Tenaga Kerja
Kepala tukang OH 0.018 Rp 50,000
Mandor OH 0.005 Rp 55,000
Jumlah
Dibulatkan
. Memasang 1 m' pipa PVC tipe AW diameter 3/4"
Kebutuhan Satuan Indeks Harga Bahan
Pipa PVC m' 1.200 8,000.00
Bahan
Perlengkapan 0.35% harga bahan 0.350 2,800.00
Pekerja OH 0.036 Rp 35,000
Tukang OH 0.060 Rp 47,500
Tenaga Kerja
Kepala Tukang OH 0.006 Rp 50,000
Mandor OH 0.002 Rp 55,000
Jumlah
Dibulatkan

. Memasang 1 m3 pipa PVC tipe AW diameter 4"


Kebutuhan Satuan Indeks Harga Bahan
Pipa PVC 4 " Batang 0.200 Rp 248,000
Bahan
Perlengkapan 35,0% harga bahan 0.350 Rp 86,800
Pekerja OH 0.035 Rp 35,000
Tukang batu OH 0.060 Rp 47,500
Tenaga Kerja
Kepala tukang OH 0.006 Rp 50,000
Mandor OH 0.002 Rp 55,000
Jumlah
Dibulatkan

PEKERJAAN PASANG KACA

. Pasang 1 m2 pasang kaca Tempered tebal 10 mm


Kebutuhan Satuan Indeks Harga Bahan
Bahan Kaca Tempered m2 1.100 700,000.00
Pekerja OH 0.250 Rp 35,000
Tukang Batu OH 0.125 Rp 47,500
Tenaga Kerja
Kepala Tukang OH 0.013 Rp 50,000
Mandor OH 0.013 Rp 55,000
Jumlah
Dibulatkan

. Pasang 1 bh pasang kaca cermin tebal 5 mm


Kebutuhan Satuan Indeks Harga Bahan
Kaca Cermin + Frame &
Bahan set 1.000 350,000.00
aksesories
Pekerja OH 0.160 Rp 35,000
Tukang Batu OH 0.160 Rp 47,500
Tenaga Kerja
Kepala Tukang OH 0.016 Rp 50,000
Mandor OH 0.008 Rp 55,000
Jumlah
Dibulatkan
PEKERJAAN KUNCI DAN PENGGANTUNG
1 BUAH PASANGAN ENGSEL DOOR CLOSER
Kebutuhan Satuan Indeks Harga Bahan
Bahan Engsel Door closer BH 1.000 300,000.00
Pekerja OH 0.015 Rp 35,000
Tukang alumunium OH 0.150 Rp 47,500
Tenaga Kerja
Kepala Tukang OH 0.015 Rp 50,000
Mandor OH 0.001 Rp 55,000
Jumlah
Dibulatkan

1 BUAH PASANG ENGSEL PINTU KAMAR MANDI


Kebutuhan Satuan Indeks Harga Bahan
Bahan Engsel Pintu BH 1.000 11,000.00
Pekerja OH 0.015 Rp 35,000
Tukang alumunium OH 0.150 Rp 47,500
Tenaga Kerja
Kepala Tukang OH 0.015 Rp 50,000
Mandor OH 0.001 Rp 55,000
Jumlah
Dibulatkan

1 BUAH KUNCI 2X PUTAR


Kebutuhan Satuan Indeks Harga Bahan
Bahan Kunci 2X Putar m2 1.000 85,000.00
Pekerja OH 0.010 Rp 35,000
Tukang alumunium OH 0.500 Rp 47,500
Tenaga Kerja
Kepala Tukang OH 0.010 Rp 50,000
Mandor OH 0.005 Rp 55,000
Jumlah
Dibulatkan

1 BUAH KUNCI TANAM KAMAR MANDI


Kebutuhan Satuan Indeks Harga Bahan
Bahan Kunci Tanam Kamar Mandi m2 1.000 50,000.00
Pekerja OH 0.010 Rp 35,000
Tukang alumunium OH 0.500 Rp 47,500
Tenaga Kerja
Kepala Tukang OH 0.010 Rp 50,000
Mandor OH 0.005 Rp 55,000
Jumlah
Dibulatkan

PEKERJAAN PENGECATAN DAN FINISHING

. 1 m2 pengecetan bidang tembok baru 2 lapis


Kebutuhan Satuan Indeks Harga Bahan
Cat tembok Kg 0.240 35,000.00
Plamir tembok Kg 0.050 32,000.00
Bahan Ampelas lbr 0.250 4,000.00
Kapek Bh 0.025 3,000.00
Roll Bh 0.015 9,000.00
Pekerja OH 0.060 Rp 35,000
Tukang cat OH 0.050 Rp 47,500
Tenaga Kerja
Tenaga Kerja
Kepala Tukang OH 0.005 Rp 50,000
Mandor OH 0.003 Rp 55,000
Jumlah
Dibulatkan
1 m2 pengecatan langit-langit 2 lapis dengan cat tembok,menggunakan kuas
.
termasuk plamur
Kebutuhan Satuan Indeks Harga Bahan
Plamir tembok Kg 0.075 32,000.00
Cat tembok Kg 0.180 35,000.00
Bahan Ampelas lbr 0.375 4,000.00
Kuas Bh 0.011 9,000.00
Kapek Bh 0.038 960.00
Pekerja OH 0.080 Rp 35,000
Tukang cat OH 0.060 Rp 47,500
Tenaga Kerja
Kepala Tukang OH 0.006 Rp 50,000
Mandor OH 0.004 Rp 55,000
Jumlah
Dibulatkan

PEKERJAAN LISTRIK
1 Titik pasang instalasi listrik
Kebutuhan Satuan Indeks Harga Bahan
kabel NYY 4x2.5 mm m1 10.000 28,000.00
Pipa paralon 1/4 " m1 3.000 20,000.00
Bahan
T dos Pvc Bh 1.000 5,000.00
Klem Bh 1.000 1,000.00
Tukang OH 0.230 Rp 47,500
tenaga Kerja
Pekerja OH 0.105 Rp 35,000
Jumlah
Dibulatkan

1 Buah pasang stop kontak


Kebutuhan Satuan Indeks Harga Bahan
Bahan stop kontak m1 1.000 14,000.00
Tukang OH 0.230 Rp 47,500
tenaga Kerja
Pekerja OH 0.105 Rp 35,000
Jumlah
Dibulatkan

1 Buah pasang saklar ganda


Kebutuhan Satuan Indeks Harga Bahan
Bahan saklar ganda m1 1.000 16,000.00
Tukang OH 0.230 Rp 47,500
tenaga Kerja
Pekerja OH 0.105 Rp 35,000
Jumlah
Dibulatkan

1 Buah pasang lampu TL 40 watt + kap lampu per


Kebutuhan Satuan Indeks Harga Bahan
Bahan Lampu TL 1 x 40 watt m1 1.000 50,000.00
Tukang OH 0.230 Rp 47,500
tenaga Kerja
Pekerja OH 0.105 Rp 35,000
Jumlah
Dibulatkan
1 Buah pasang lampu pijar
Kebutuhan Satuan Indeks Harga Bahan
Bahan lampu pijar 24 watt m1 1.000 28,000.00
Tukang OH 0.230 Rp 47,500
tenaga Kerja
Pekerja OH 0.105 Rp 35,000
Jumlah
Dibulatkan
PERHITUNGAN KONSTRUKSI 2012

Jml. Harga
26,250.00
1,375.00
27,625.00
27,625.00

Jml. Harga
48,000.00
10,500.00
550.00
59,050.00
59,050.00

Jml. Harga
7,488.00
1,992.00
10,500.00
7,125.00
750.00
825.00
28,680.00
28,680.00

sang Rangka Plafon Kayu


Jml. Harga
36,000.00
5,700.00
5,250.00
23,750.00
2,500.00
440.00
73,640.00
73,640.00

ngit-langit Gypsum Board Uk. (1200 x 2400 x 9) mm, Tebal

Jml. Harga
20,020.00
4,180.00
3,500.00
2,375.00
250.00
275.00
30,600.00
30,600.00
Jml. Harga
8,925.00
750.00
2,100.00
2,850.00
300.00
165.00
15,090.00
15,090.00

nding Bata Merah Uk. (5x11x22) cm kosongan


Jml. Harga
-
11,616.00
3,735.00
10,500.00
4,750.00
500.00
825.00
31,926.00
31,926.00

sang buis beton U 20 untuk saluran


Jml. Harga
35,000.00

3,744.00
5,063.00
4,900.00
3,325.00
350.00
385.00
52,767.00
52,767.00

sang buis beton ø 100 cm


Jml. Harga
125,000.00

3,744.00
5,063.00
4,900.00
3,325.00
350.00
385.00
142,767.00
142,767.00
nding Bata Merah Uk. (5x11x22) cm tebal 1/2 bata,
Pc : 5 Ps
Jml. Harga
35,000.00
11,616.00
3,735.00
10,500.00
4,750.00
500.00
825.00
66,926.00
66,926.00

Jml. Harga
63,800.00
1,000.00
1,800.00
1,505.00
2,042.50
215.00
115.50
70,478.00
70,478.00

Jml. Harga
255,200.00
58,500.00
8,100.00
2,975.00
4,037.50
450.00
275.00
329,537.50
329,537.00
on Mutu F'c : 16.9 Mpa (K200), Slump (12 +/- 2) cm, w/c :

Jml. Harga
391,200.00
46,444.20
95,400.00
32,250.00
57,750.00
13,062.50
1,400.00
4,565.00
642,071.70
642,071.00

Jml. Harga
105,000.00
1,950.00
2,450.00
3,325.00
350.00
220.00
113,295.00
113,295.00

11,329.50

Jml. Harga
101,250.00
4,500.00
200.00
18,200.00
12,350.00
1,300.00
1,430.00
139,230.00
139,230.00

21,190.00
33,280.00
54,470.00

Jml. Harga
90,000.00
6,000.00
400.00
63,000.00
29,750.00
17,000.00
23,100.00
15,675.00
1,650.00
1,815.00
248,390.00
248,390.00

41,230.00
42,240.00
83,470.00
Jml. Harga
90,000.00
6,000.00
400.00
75,600.00
29,750.00
17,000.00
23,100.00
15,675.00
1,650.00
1,815.00
260,990.00
260,990.00

43,750.00
42,240.00
85,990.00

Jml. Harga
105,750.00
7,350.00
800.00
63,000.00
29,750.00
51,000.00
25,200.00
15,675.00
1,650.00
1,815.00
301,990.00
301,990.00

51,530.00
44,340.00
95,870.00

Jml. Harga
50,880.00
9,792.00
3,735.00
3,900.00
21,700.00
16,625.00
1,750.00
1,650.00
110,032.00
110,032.00
Jml. Harga
48,760.00
9,792.00
3,237.00
3,900.00
21,700.00
16,625.00
1,750.00
1,650.00
107,414.00
107,414.00

Jml. Harga
47,700.00
223.20
1,494.00
5,820.00
21,700.00
16,625.00
1,750.00
1,650.00
96,962.20
96,962.00

Jml. Harga
63,600.00
27.60
249.00
75.00
3,150.00
4,275.00
450.00
275.00
72,101.60
72,101.00

Jml. Harga
1,500,000.00
5,400.00
115,500.00
52,250.00
50.00
8,800.00
1,682,000.00
1,682,000.00
Jml. Harga
740,000.00
88,800.00
7,200.00
830.00
45,000.00
79,750.00
8,625.00
6,000.00
976,205.00
976,205.00

Jml. Harga
66,000.00
19,250.00
3,780.00
8,550.00
900.00
275.00
98,755.00
98,755.00
Jml. Harga
9,600.00
980.00
1,260.00
2,850.00
300.00
110.00
15,100.00
15,100.00

Jml. Harga
49,600.00
30,380.00
1,225.00
2,850.00
300.00
99.00
84,454.00
84,454.00

Jml. Harga
770,000.00
8,750.00
5,937.50
650.00
715.00
786,052.50
786,050.00

Jml. Harga

350,000.00

5,600.00
7,600.00
800.00
440.00
364,440.00
364,425.00
Jml. Harga
300,000.00
6,000.00
8,800.00
9,200.00
480.00
24,480.00
24,480.00

Jml. Harga
6,050.00
6,000.00
8,800.00
9,200.00
480.00
30,530.00
30,530.00

Jml. Harga
85,000.00
350.00
23,750.00
500.00
275.00
109,875.00
109,875.00

Jml. Harga
50,000.00
350.00
23,750.00
500.00
275.00
74,875.00
74,875.00

Jml. Harga
8,400.00
1,600.00
1,000.00
75.00
135.00
2,100.00
2,375.00
250.00
165.00
16,100.00
16,100.00
angit-langit 2 lapis dengan cat tembok,menggunakan kuas

Jml. Harga
2,400.00
6,300.00
1,500.00
101.25
36.00
2,800.00
2,850.00
300.00
220.00
16,507.25
16,507.00

Jml. Harga
280,000.00
60,000.00
5,000.00
1,000.00
10,925.00
3,675.00
360,600.00
360,600.00

Jml. Harga
14,000.00
10,925.00
3,675.00
28,600.00
28,600.00

Jml. Harga
16,000.00
10,925.00
3,675.00
30,600.00
30,600.00

Jml. Harga
50,000.00
10,925.00
3,675.00
64,600.00
64,600.00
Jml. Harga
28,000.00
10,925.00
3,675.00
42,600.00
42,600.00
RENCANA ANGGARAN BIAYA (RAB)

PROGRAM : PEMBANGUNAN RUMAH TINGGAL


PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL 2 LANTAI Drs. H. SUYOTO, M.Si
LOKASI : JL. RAYA DANDER NGUMPAKDALEM DANDER BOJONEGORO

REKAPITULASI SELURUH PEKERJAAN

NO PEKERJAAN JUMLAH HARGA

I PEKERJAAN LANTAI I & II


A PEKERJAAN PENDAHULUAN Rp 3,521,000.00
B PEKERJAAN TANAH Rp 6,837,499.12
C PEKERJAAN BETON Rp 421,286,578.01
D PEKERJAAN PASANGAN & PLESTERAN Rp 121,292,649.77
E PEKERJAAN PLAFOND Rp 65,887,854.15
F PEKERJAAN KUSEN JENDELA / PINTU / PENGUNCI Rp 44,591,655.78
G PEKERJAAN KERAMIK Rp 65,578,754.41
H PEKERJAAN PENGECATAN Rp 18,728,540.83
I PEKERJAAN LISTRIK Rp 10,966,800.00
J PEKERJAAN SANITAIR Rp 39,440,484.80
K PEKERJAAN SAPTICTANK Rp 2,718,016.33
L PEKERJAAN SUMUR RESAPAN & SALURAN Rp 4,909,813.78
M PEKERJAAN LAIN-LAIN Rp 8,092,497.50
JUMLAH TOTAL Rp 813,852,144.48

JUMLAH TOTAL Rp 813,852,144.48

PPN 10% Rp 81,385,214.45

JUMLAH (+PPN 10 %) Rp 895,237,358.93

DIBULATKAN Rp 895,237,000.00

DELAPAN RATUS SEMBILAN PULUH LIMA JUTA DUA RATUS TIGA PULUH TUJUH RIBU
TERBILANG =
RUPIAH

Mengetahui : Dibuat Oleh :

PEMILIK KEGIATAN PEMBANGUNAN KONSULTAN PERENCANA

RUMAH TINGGAL 2 LANTAI CV. RAJEKWESI CONSULTANT

Drs. SUYOTO, M.Si ADITYA BURHANUDIN


Drafter
RENCANA ANGGARAN BIAYA (RAB)

PROGRAM : PEMBANGUNAN RUMAH TINGGAL


PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL 2 LANTAI Drs. H. SUYOTO, M.Si
LOKASI : JL. RAYA DANDER NGUMPAKDALEM DANDER BOJONEGORO

PERINCIAN SUB PEKERJAAN

NAMA BARANG/ SAT VOLUME HARGA SATUAN JUMLAH HARGA


No.
JENIS PEKERJAAN

1 2 3 4 5 6

I PEKERJAAN LANTAI I & II

A PEKERJAAN PENDAHULUAN
1 Persiapan dan pembersihan lokasi pekerjaan ls 1.00 Rp 521,000.00 Rp 521,000.00
2 Pemasangan Bowplank ls 1.00 Rp 3,000,000.00 Rp 3,000,000.00
JUMLAH-A Rp 3,521,000.00

B PEKERJAAN TANAH
1 Galian tanah strous Ø 30-300 m' 132.00 Rp 5,124.95 Rp 676,493.53
2 Galian tanah poor 120/120/50 m³ 37.57 Rp 27,625.00 Rp 1,037,871.25
3 Galian tanah poor 80/80/30 m³ 0.36 Rp 27,625.00 Rp 10,027.88
4 Urugan Tanah kembali m³ 56.64 Rp 9,208.33 Rp 521,599.90
5 Urugan pasir m³ 77.76 Rp 59,050.00 Rp 4,591,506.56
JUMLAH-B Rp 6,837,499.12

C PEKERJAAN BETON
C.1. PEKERJAAN BESI
1 Besi strous Ø 30-300 kg 1,290.30 Rp 11,329.50 Rp 14,618,453.85
2 Besi poor 120/120/50 ( P1 ) kg 1,255.99 Rp 11,329.50 Rp 14,229,706.98
3 Besi poor 80/80/30 ( P2 ) kg 35.16 Rp 11,329.50 Rp 398,399.60
4 Besi Sloof 25/40 ( S1 ) kg 1,805.76 Rp 11,329.50 Rp 20,458,357.92
5 Besi kolom 25/25 ( K1 ) kg 4,044.53 Rp 11,329.50 Rp 45,822,520.76
6 Besi kolom 15/15 ( K2 ) kg 1,567.71 Rp 11,329.50 Rp 17,761,404.43
7 Besi Balok Induk 25/40 ( B1 ) kg 1,942.01 Rp 11,329.50 Rp 22,002,019.29
8 Besi Balok Anak 15/30 ( B2 ) kg 528.25 Rp 11,329.50 Rp 5,984,849.16
9 Besi plat beton/ dek T: 12cm kg 2,132.35 Rp 11,329.50 Rp 24,158,481.98
10 Besi plat Beton/ dek T: 10cm kg 886.38 Rp 11,329.50 Rp 10,042,242.21
11 Besi beton kanopi / dek T: 8cm kg 475.20 Rp 11,329.50 Rp 5,383,778.40
JUMLAH-C.1. Rp 180,860,214.59
C.2. PEKERJAAN BEKESTING
1 Bekesting poor 120/120/50 ( P1 ) m² 62.40 Rp 54,470.00 Rp 3,398,928.00
2 Bekesting poor 80/80/30 ( P2 ) m² 17.28 Rp 54,470.00 Rp 941,241.60
3 Bekisting Sloof 25/40 ( S1 ) m² 207.90 Rp 54,470.00 Rp 11,324,313.00
4 Bekisting kolom 25/25 ( K1 ) m² 285.20 Rp 83,470.00 Rp 23,805,644.00
5 Bekisting kolom 15/15 ( K2 ) m² 130.20 Rp 83,470.00 Rp 10,867,794.00
6 Bekisting Balok Induk 25/40 ( B1 ) m² 150.15 Rp 85,990.00 Rp 12,911,398.50
7 Beekisting Balok Anak 15/30 ( B2 ) m² 42.00 Rp 85,990.00 Rp 3,611,580.00
8 Bekesting plat beton/ dek T: 12cm m² 316.80 Rp 95,870.00 Rp 30,371,616.00
9 Bekesting plat beton/ dek T: 10cm m² 205.70 Rp 95,870.00 Rp 19,720,459.00
10 Bekesting beton kanopi/ dek T: 8cm m² 148.50 Rp 95,870.00 Rp 14,236,695.00
JUMLAH-C.2. Rp 142,057,463.10
NAMA BARANG/ SAT VOLUME HARGA SATUAN JUMLAH HARGA
No.
JENIS PEKERJAAN

1 2 3 4 5 6
C.3. PEKERJAAN BETON
1 Beton strous Ø 30-300 m³ 0.21 Rp 642,071.00 Rp 136,210.78
2 Rabatan beton tebal 8 cm m³ 8.29 Rp 642,071.00 Rp 5,325,336.87
3 Beton poor 120/120/50 ( P1 ) m³ 18.72 Rp 642,071.00 Rp 12,019,569.12
4 Beton poor 80/80/30 ( P2 ) m³ 0.19 Rp 642,071.00 Rp 123,277.63
5 Beton Sloof 25/40 ( S1 ) m³ 19.80 Rp 642,071.00 Rp 12,713,005.80
6 Beton kolom 25/25 ( K1 ) m³ 17.83 Rp 642,071.00 Rp 11,444,915.58
7 Beton kolom 15/15 ( K2 ) m³ 4.88 Rp 642,071.00 Rp 3,134,911.66
8 Beton Balok Induk 25/40 ( B1 ) m³ 14.30 Rp 642,071.00 Rp 9,181,615.30
9 Beton Balok Anak 15/30 ( B2 ) m³ 2.52 Rp 642,071.00 Rp 1,618,018.92
10 Beton plat beton/ dek T: 12cm m³ 34.56 Rp 642,071.00 Rp 22,189,973.76
11 Beton plat beton/ dek T: 10cm m³ 18.70 Rp 642,071.00 Rp 12,006,727.70
12 Beton kanopi / dek T: 8cm m³ 13.20 Rp 642,071.00 Rp 8,475,337.20
JUMLAH-C.3. Rp 98,368,900.31
JUMLAH-C Rp 421,286,578.01

D PEKERJAAN PASANGAN & PLESTERAN


1 Pasang diding (1 Pc : 5 Pp) m² 971.69 Rp 66,926.00 Rp 65,031,425.33
2 Plesteran dinding Bangunan m² 1,943.38 Rp 28,680.00 Rp 55,736,224.44
3 Benangan ls 1.00 Rp 525,000.00 Rp 525,000.00
JUMLAH-D Rp 121,292,649.77

E PEKERJAAN PLAFOND
1 Pasang Rangka Plafond Hollow m² 594.90 Rp 73,640.00 Rp 43,808,421.27
2 Pasang Plafond Gypsum T : 9mm m² 594.90 Rp 30,600.00 Rp 18,203,933.88
3 Pasang list plafond gypsum m¹ 211.10 Rp 15,090.00 Rp 3,185,499.00
4 Pasang ornamen Gypsum pada lampu bh 23.00 Rp 30,000.00 Rp 690,000.00
JUMLAH-E Rp 65,887,854.15

F PEKERJAAN KUSEN JENDELA / PINTU / PENGUNCI


1 Pasang kusen pintu jendela PJ1 m¹ 11.62 Rp 70,478.00 Rp 818,954.36
2 Pasang kusen pintu jendela PJ2 m¹ 26.08 Rp 70,478.00 Rp 1,838,066.24
3 Pasang kusen Pintu P1 m' 51.70 Rp 70,478.00 Rp 3,643,712.60
4 Pasang kusen Pintu P2 m' 25.35 Rp 70,478.00 Rp 1,786,617.30
5 Pasang kusen pintu P3 m' 12.48 Rp 70,478.00 Rp 879,565.44
6 Pasang kusen jendela J1 m' 26.36 Rp 70,478.00 Rp 1,857,800.08
7 Pasang kusen jendela J2 m' 99.18 Rp 70,478.00 Rp 6,990,008.04
8 Pasang kusen jendela J3 m' 43.76 Rp 70,478.00 Rp 3,084,117.28
9 Pasang kusen jendela J4 m' 29.08 Rp 70,478.00 Rp 2,049,500.24
10 Pasang kusen boven V1 m' 16.60 Rp 329,537.00 Rp 5,470,314.20
11 Pasangan Engsel Bh 48.00 Rp 300,000.00 Rp 14,400,000.00
12 Pasangan Engsel Pintu Kamar Mandi Bh 18.00 Rp 11,000.00 Rp 198,000.00
13 Pasang Kunci 2x Putar Bh 15.00 Rp 85,000.00 Rp 1,275,000.00
14 Pasang Kunci Tanam Kamar Mandi Bh 6.00 Rp 50,000.00 Rp 300,000.00
JUMLAH-F Rp 44,591,655.78

G PEKERJAAN KERAMIK
1 Pasang keramik 40x40 Polos m² 453.55 Rp 110,032.00 Rp 49,905,013.60
2 Pasang keramik tangga 30x30 m² 2.78 Rp 107,414.00 Rp 298,073.85
3 Pasang keramik Lantai Kamar Mandi 20x20 m² 25.50 Rp 107,414.00 Rp 2,739,057.00
4 Pasang keramik Dinding Kamar Mandi 25x20 m² 127.50 Rp 96,962.00 Rp 12,362,655.00
5 Pasang list keramik Dinding Kamar Mandi 10x20 M' 3.80 Rp 72,101.00 Rp 273,954.96
JUMLAH-G Rp 65,578,754.41

H PEKERJAAN PENGECATAN
1 Cat dinding m² 890.98 Rp 16,100.00 Rp 14,344,778.00
2 Cat Plafond m² 204.49 Rp 16,507.00 Rp 3,375,516.43
3 Cat plat beton m² 62.62 Rp 16,100.00 Rp 1,008,246.40
JUMLAH-H Rp 18,728,540.83
NAMA BARANG/ SAT VOLUME HARGA SATUAN JUMLAH HARGA
No.
JENIS PEKERJAAN

1 2 3 4 5 6

I PEKERJAAN LISTRIK
1 Instalasi listrik lantai I dan II Ttk 23.00 Rp 360,600.00 Rp 8,293,800.00
2 Pasang Stop Kontak bh 14.00 Rp 28,600.00 Rp 400,400.00
3 Pasang Saklar Tuggal Dan Ganda bh 23.00 Rp 30,600.00 Rp 703,800.00
4 Boks MCB bh 1.00 Rp 200,000.00 Rp 200,000.00
5 Pas, Lampu Pijar 24 W 220V Komplit Ttk 20.00 Rp 42,600.00 Rp 852,000.00
6 Pas, Lampu TL 40 W 220V Komplit Ttk 8.00 Rp 64,600.00 Rp 516,800.00
JUMLAH-I Rp 10,966,800.00

J PEKERJAAN SANITAIR
1 Pasang Closet duduk + Tank Lengkap bh 6.00 Rp 1,682,000.00 Rp 10,092,000.00
2 Pasang Washtafel Lengkap bh 5.00 Rp 976,205.00 Rp 4,881,025.00
3 Instalasi Air Bersih Pipa PVC 3/4 " AW + Asecories m¹ 40.50 Rp 15,100.00 Rp 611,550.00
4 Instalasi Air Kotor Pipa PVC 3/4 " AW + Asecories m¹ 34.50 Rp 84,454.00 Rp 2,913,663.00
5 Pipa Outlet PVC 4" AW m¹ 34.50 Rp 45,000.00 Rp 1,552,500.00
6 Pasang Floor Drain / Penguras Bak KM bh 6.00 Rp 20,250.00 Rp 121,500.00
7 Pasang Avour Lantai bh 6.00 Rp 60,000.00 Rp 360,000.00
8 Pasang Kran Air 3/4 " AW bh 14.00 Rp 25,362.00 Rp 355,068.00
9 Pasang Kran Toller Closset bh 6.00 Rp 25,362.00 Rp 152,172.00
10 Water Torn Kapasitas 500 ltr Stainless Steel unit 1.00 Rp 1,500,000.00 Rp 1,500,000.00
11 Pasang Pompa air unit 1.00 Rp 1,500,000.00 Rp 1,500,000.00
12 Pasang Shower + aksesories Set 6.00 Rp 200,000.00 Rp 1,200,000.00
13 Pasang tempat sabun unit 6.00 Rp 25,000.00 Rp 150,000.00
14 Pasang tempat tissue unit 6.00 Rp 35,000.00 Rp 210,000.00
15 Pasang Pompa Booster unit 6.00 Rp 700,000.00 Rp 4,200,000.00
16 Kaca Cermin + Frame & Aksesoris unit 6.00 Rp 364,425.00 Rp 2,186,550.00
17 Pasang partisi Kaca ( kaca temperet t = 10 mm ) m2 5.62 Rp 786,050.00 Rp 4,414,456.80
18 Buat sumur bor ls 1.00 Rp 1,000,000.00 Rp 1,000,000.00
19 Korden Plastik & Aksesoris unit 6.00 Rp 340,000.00 Rp 2,040,000.00
JUMLAH-J Rp 39,440,484.80

K PEKERJAAN SAPTICTANK
1 Pasangan bata trasram (( kedap air ) m2 26.10 Rp 66,926.00 Rp 1,746,768.60
2 Plesteran dinding septiktank m2 6.46 Rp 28,680.00 Rp 185,330.16
3 Pasir urug tebal 15 cm m3 0.68 Rp 59,050.00 Rp 39,858.75
4 Beton plat tebal 12 cm ( tutup septiktank ) m3 0.39 Rp 642,071.00 Rp 249,637.20
5 Pembesian beton plat tebal 12 cm kg 30.60 Rp 11,329.50 Rp 346,682.70
6 Bekisting plat tutup septiktank m2 0.94 Rp 54,470.00 Rp 50,983.92
7 Pipa udara galvanis ø 1 1/2 " m' 1.00 Rp 98,755.00 Rp 98,755.00
JUMLAH-K Rp 2,718,016.33

L PEKERJAAN SUMUR RESAPAN & SALURAN


1 Pasangan bata trasram (( kedap air ) m2 24.98 Rp 66,926.00 Rp 1,671,811.48
2 plesteran ( saluran & sumur resapan ) m2 24.98 Rp 28,680.00 Rp 716,426.40
3 Pasir urug tebal 25 cm m3 0.20 Rp 59,050.00 Rp 11,588.56
4 Beton plat tebal 12 cm ( tutup septiktank ) m3 0.09 Rp 642,071.00 Rp 60,483.09
5 Pembesian beton plat tebal 12 cm kg 7.41 Rp 11,329.50 Rp 83,951.60
6 Bekisting plat tutup septiktank m2 0.38 Rp 54,470.00 Rp 20,524.30
7 Beton plat tebal 10 cm ( tutup saluran air ) m3 0.55 Rp 642,071.00 Rp 350,570.77
8 Pembesian beton plat tebal 10 cm kg 42.98 Rp 11,329.50 Rp 486,941.91
9 Bekisting plat tutup saluran air m2 3.70 Rp 54,470.00 Rp 201,539.00
10 Lapisan ijuk m3 0.09 Rp 25,000.00 Rp 2,355.00
11 Pasangan bata kosongan m2 6.28 Rp 31,926.00 Rp 200,495.28
12 Pasang Buis beton U 20 saluran air m' 18.20 Rp 52,767.00 Rp 960,359.40
13 Pasang Buis dekker ø 1 m m' 1.00 Rp 142,767.00 Rp 142,767.00
JUMLAH-L Rp 4,909,813.78
M PEKERJAAN LAIN-LAIN
1 Water Profing Lantai Atap m² 297.45 Rp 25,000.00 Rp 7,436,247.50
2 Water Profing Area Toilet m² 26.25 Rp 25,000.00 Rp 656,250.00
JUMLAH-M Rp 8,092,497.50
NAMA BARANG/ SAT VOLUME HARGA SATUAN JUMLAH HARGA
No.
JENIS PEKERJAAN

1 2 3 4 5 6
JUMLAH Rp 813,852,144.48
PLAT RANGKA GANDA ( PLAT GORONG2)
Dimensi = 0.12 Jarak Sengkang 0.15
Jumlah Tul = 8.33
Panjang Tul.= 15.33 m Panjang Per m3 127.78
Bj TulØ12 p= 10 0.616
Bj Begel pe =
Jumlah BJ = 78.71 Kg 78.710
NAMA KEGIATAN : PEMBANGUNAN FISIK POLINDES
JENIS PEKERJAAN : PEMBANGUNAN POLINDES JATI TENGAH
LOKASI : KEC. SUGIHWARAS, KABUPATEN BOJONEGORO

PERINCIAN BACK UP VOLUME

No. JENIS PEKERJAAN URA

(1) (2)
I. PEKERJAAN PERSIAPAN
1 Pekerjaan Persiapan & Pembersihan
2 Bongkar atap & teras
3 Pasang Bouwplank
II. PEKERJAAN TANAH & URUGAN
1 Galian Tanah Plat poer =
Septiktank =
Sumur resapan =

2 Urugan Tanah kembali


3 Urugan Tanah Halaman
3 Urugan Tanah Ruangan
4 Urugan Pasir
5 Bor Strouss Ø30 cm pj=3m

III. PEKERJAAN BETON


1 Strouss Pile Ø 30 cm
2 Plat Poer 20x50x50
3 Sloof 20/25 (S 1)
4 Sloof 15/15 (S 2)
5 Kolom 15/20 (K1)
6 Kolom 15/15 (k2)
7 Ring Balk 12/15 (Rb)
8 Balok latei 12/12 (bL)
9 Kuda-kuda 12/15
10 Plat atap, teras tebal 10 cm
11 Plat kanopi tebal 8 cm
12 Rabat beton t=5 cm blakng 0.40 dpan 0.45
13 Rabat beton t=5 cm ruangan
IV. PEKERJAAN BESI
1 Pembesian Strouss Pile Ø 30 cm Volume Strouss Pile Ø 30 cm
2 Pembesian Plat Poer 25x50x50 Volume Plat Poer 25x50x50
3 Pembesian Sloof 20/25 (S 1) Volume Sloof 20/25 (S 1)
4 Pembesian Sloof 15/15 (S 2) Volume Sloof 15/15 (S 2)
5 Pembesian Kolom 15/20 (K1) Volume Kolom 15/20 (K1)
6 Pembesian Kolom 15/15 (k2) Volume Kolom 15/15 (k2)
7 Pembesian Ring Balk 12/15 (Rb) Volume Ring Balk 12/15 (Rb)
8 Pembesian Balok latei 12/12 (bL) Volume Balok latei 12/12 (bL)
9 Pembesian Kuda-kuda 12/15) Volume Kuda-kuda 12/15
10 Pembesian Plat Atap, teras tebal 10 cm Volume Plat atap, teras tebal 10 cm
11 Pembesian plat kanopi tebal 8 cm Volume Plat kanopi tebal 8 cm
V. PEKERJAAN BEKESTING
1 Bekesting Plat Poer 25x50x50 =
2 Bekesting Sloof 20/25 (S 1) =
3 Bekesting Sloof 15/15 (S 2) =
4 Bekesting Kolom 15/20 (K1) =
5 Bekesting Kolom 15/15 (k2) =
6 Bekesting Ring Balok 12/15 (Rb) =
7 Bekesting Balok latei 12/12 (bL) =
8 Bekesting Kuda-kuda 12/15 =
9 Bekesting Plat atap, teras tebal 10 cm =
10 Bekesting Plat kanopi tebal 8 cm =
VI. PEKERJAAN PASANGAN
1 Pasangan Bata Trasram Camp 1:3 KM = =
t= 1m Teras = =
Ruang = =

2 Pasangan Bata Camp 1:5 KM = =


t=3.22m Ruang = 260.19 220.42 - 31.40
Gewel = = (0.5*2.76*2)+((2.1+1.6)/2*0.7)+(0
Teras 1 =
Teras 2 =
Teras 3 =

3 Pasang batu kumbung 20*20*40 teras+jalam masuk =


doble

3 Pasang bis decker U 30 Saluran =


Pasang bis decker Ø 60 Saluran =

Jendela,Pintu,Bv jd 6.84
pintu 22.70
bv 1.86
VII. PEKERJAAN PLESTERAN
1 Plesteran + acian campuran 1 : 5 Ruang = =
2 Plesteran tanpa acian (kasar) 1 : 5 Teras 1 =
3 Plesteran motif Garis 1 : 3 Teras 2 =
VIII. PEKERJAAN PINTU DAN BOVEN
1 Kusen Almuniu BV1 3 buah =
BV2 1 buah =
BV3 2 buah =
J1 4 buah =
J2 2 buah =
J3 1 buah =
J4 1 buah =
P1 6 buah =
P2 2 buah =
km/wc P3 2 buah =
PJ 1 buah =

2 Selimar Almun J1 4 buah =


J2 2 buah =
J3 1 buah =
P1 6 buah =
P2 2 buah =
km/wc P3 2 buah =
PJ 1 buah =

3 Pas. Kaca Sel BV1 3 buah =


transparan BV2 1 buah =
BV3 2 buah =
J1 4 buah =
J2 2 buah =
P1 6 buah =
P2 2 buah =
PJ 1 buah =

Pas. Kaca Ray J3 1 buah =


J4 1 buah =

4 Pasang Papan Almunium t=4mm =


IX. PEKERJAAN PENGGANTUNG
1 Pasang Engsel Pintu =
2 Pasang Engsel jendela =
3 Pasang Kunci 2x Putar (Pintu) =
4 Pasang grendel besar (Km/Wc) =
5 Pasang grendel kecil (Jendela) =
6 Pasang Hak Angin (Jendela) =

X. PEKERJAAN PLAFOND
1 Pasang Rangka Plafond Galfalum +
Penutup Kalsiboard
2 Penutup Kalsiboard
1 Pasang Rangka Plafond 100x100 cm Kamar Mandi =
Galfalm Kamar Tidur
Ruang bersalin =
Ruang pengobatan =
Ruang apotik =
Ruang dapur
Ruang keluarga+tamu

2 Pasang Plafond Kalsiboard 100x100 cm


Ekspose Tanpa Rangka Ruang Tengah =

3 Psng Plafond Triplek 3 mm Tanpa Rangka


5 Pasang List gifsum Profi Plafond
X. PEKERJAAN ATAP
1 Pasang genteng Metalic =
2 Pasang Genteng Bumbungan =
3 Pasang Listplank 2x20 =
4 Pasang LipsChannel 100.50.20 (4*10)+(3*3.15)+(3*2.5)+(5*6) x 24.36kg/ljr
86.95 m' x 24.36kg/ljr
5 Pasang Usuk + Reng Galfalum
5 Pasang Usuk + Reng jati =
6 Pasang Trekstang Ø10 Tiap 1,5m =
7 Pasang Plat Pengikat Usuk-Lip cannel 13.872 bh lip cnl x 36 bh / lip chnl
XI. PEKERJAAN LANTAI & KERAMIK
1 Pasang Keramik K. Mandi 20x20 Kamar Mandi = =
2 Keramik Dinding 20 x 30 Kamar Mandi = =
dengan Bak Mandi Bak mandi = =

3 Pasang Keramik 40x40 Putih Semua Ruang =


4 Keramik Dinding 20x40 Orange Untuk Ruang bersalin =
5 Keramik Dinding 20x40 Orange Untuk Teras =

6 List Keramik 10x20 Coklat Untuk Kamar Mandi =


Untuk Ruang bersalin =
Untuk Teras =

6 Pasang Keramik Teras 30x30 Orange =

XII. PEKERJAAN PENGECATAN


1 Cat Dinding (Warna Kuning Sunlight ) ( (40.250+228.790)*2+(4.007+1.950)*2+(2.5*5.6)+(1.2*3.5)+(3.85*0.5) ) - ( 1.25*(6.5+6) + (3
2 Cat Plafond ( Warna putih )
3 Cat Listplank ( Warna coklat tua ) =
2 Cat Gording Lip Channel 13.872 bh lip cnl 0.14
XIII. PEKERJAAN SANITASI
1 Kloset Duduk
2 Kloset Jongkok
3 Pasang Wastafel
4 Kran Air Ø 3/4"
5 Smbng siku Ø 3/4"
6 Smbng T Ø 3/4"
7 Smbng siku Ø 3"
8 Smbng T Ø 3"
9 Pipa Air Bersih Ø 3/4" Panjang Pipa Atas 5.0
10 Pipa Air Kotor+Kotoran Ø 4" Untuk Sal. Ke Septictank
11 Pasang Septictank
- Rabat Beton t = 8 cm
- Pas Bata Trasram 1.55 + 1.30 + 0.90
- Beton Plat
- Pembesian Plat Penutup Volume Plat Penutup Septictank
- Pasang Pipa Obosan
12 Pasang Sumur Resapan
XIV. PEKERJAAN LISTRIK
1 Pasang Lampu Tl 40 watt
2 Pasang Lampu Tornado 15 Watt
3 Pasang Skalar Tunggal
4 Pasang Stop kontak
5 Pasang Skalar Ganda
6 Pasang Instalasi Listrik + Pipa Pvc & Clip

1 PEKERJAAN LANSUUM
Untuk Persiapan dan Pembersihan = 4 hari
1 Tukang 47,500.00
4 Kuli #REF!

Untuk Pembongkaran = 15 Hari


1 Tukang 47,500.00
5 Kuli #REF!
URAIAN VOLUME
JUMLAH
(3) (4)

1.00 1.000 Ls
3.00 3.000 Ls
2.00 x 2.00 4.000 m'

= 0.2*0.5*0.5*31 = 1.550 m3
= 0.83*2*1 = 1.660 m3
= 3.14*1*1*2 = 6.280 m3
total 9.490 m3
= (I18+I23)/2 = 6.865 m3
= (0.5*2.5*10)+(0.5*2.25*3.5) = 16.438 m3
= (9*0.8*10)-I19 = 65.136 m3
= 9*0.15*10 = 13.500 m3
= 3.14*0.15*0.15*2.5*24 = 4.239 m3

= 3.14*0.15*0.15*2.2*24 3.696 m3
= 0.2*0.5*0.5*31 1.550 m3
= 0.2*0.25*(43.82+46.96) 4.539 m3
= 0.15*0.15*(20+37) 1.283 m3
= 0.15*0.2*4.52*18 2.441 m3
= (0.15*0.15*4.52*20) 2.034 m3
= 0.12*0.15*46 0.828 m3
= 0.12*0.12*26 0.374 m3
= 0.12*0.15*(19.91+26.66+21.1+26.93+17.75) 2.022 m3
= (0.1*3.68*1.65)+(0.1*3.45*1.75)+(0.1*2.25*3.5)+(0.1*0.5*2.96) 2.146 m3
= 0.08*0.5*(1.3+0.8+0.8+2.2) 0.204 m3
= 0.400+0.452 0.852 m3
4.500 m3

x 55.08 = 203.598 kg
x 141.68 = 219.604 kg
x 128.62 = 583.806 kg
x 193.83 = 248.587 kg
x 204.51 = 499.168 kg
x 187.26 = 380.887 kg
x 168.92 = 139.866 kg
x 204.99 = 76.748 kg
x 168.92 = 341.607 kg
x 94.45 = 202.732 kg
x 59.13 = 12.063 kg

(0.2+0.5)*2*31 21.700 m2
(0.25+0.25)*(43.82+46.96) 22.695 m2
(0.15+0.15)*(20+37) 8.550 m2
(0.15+0.15)*4.02*18 10.854 m2
((0.15+0.15)*4.02*20) 12.060 m2
(0.12+0.15)*46 6.210 m2
(0.12+0.12)*26 3.120 m2
(0.12+0.12)*(19.91+26.66+21.1+26.93+17.75)*0.75 13.482 m2
((0.1+3.68)*1.65)+((0.1+3.45)*1.75)+((0.1+2.25)*3.5)+((0.1+0.5)*2.96) 16.838 m2
(0.08+0.5)*(1.3+0.8+0.8+2.2) 1.479 m2
m2
1*(6.5+6) = 12.500 m2
1*(1.5+0.5+1.5+0.25+1.5+1.5+2+0.5) = 9.250 m2
1*(10+10+10+7.5+4.5+5+7) = 54.000 m2
total 75.750 m2
3.22*(6.5+6) = 40.250 m2
= 228.790 m2
(0.5*2.76*2)+((2.1+1.6)/2*0.7)+(0.5*3.36*1.95*2)+((1.85+2.8)/2*1.62*2)+(0.5*3.11*1.8*2) 23.738 m2 35.71
((3.45+1.75+1.75)*0.5)+((2.1+1.75)*0.5)+(0.6*2.9) = 7.140 m2
((1.98+3.4+0.98)*0.63) = 4.007 m2
(1.75+2.15)*0.5 = 1.950 m2
total 305.874 m2
2*((10*1)+(3.5*2)+(2.25*1)) = 38.500 m2

1*9 = 9.00 m1
1*3 = 3.00 bh

(40.250+228.790)*2 = 538.079 m2
(4.007+1.950)*2 = 11.914 m2
(2.5*5.6)+(1.2*3.5)+(3.85*0.5) = 20.125 m2

(0.5+0.4)*2*3 = 5.40 m'


(0.6+1.27)*2*1 = 3.74 m'
(0.25+1)*2*2 = 5.00 m'
(1.1+0.5)*2*4 = 12.80 m'
((1.1+0.95)*2*2)+1 = 9.20 m'
(1.7+0.5)*2*1 = 4.40 m'
((1.7+1)*2*1)+2 = 7.40 m'
(2.05+0.9+2.05)*6 = 30.00 m'
(2.05+1.4+2.05)*2 = 11.00 m'
(2.05+0.7+2.05)*2 = 9.60 m'
(2.05+2.05+1.3+1)+(1.8+0.9+0.9) = 10.00 m'
total 108.54
(0.99+0.4)*2*4 = 11.12 m'
(0.99+0.4)*2*4 = 11.12 m'
1.6+0.4)*2*1 = 4.00 m'
1.9+0.8)*2*6 = 32.40 m'
(1.95+1.3)*2*2 = 13.00 m'
(1.95+0.6)*2*2 = 10.20 m'
((1.95+0.8)*2)+((0.99+0.4)*2*4) = 16.62 m'
total 98.46
0.4*0.3*3 = 0.36 m2
0.5*0.56*2 = 0.56 m2
0.15*1*2 = 0.30 m2
0.83*0.24*4 = 0.80 m2
0.83*0.24*4 = 0.80 m2
0.9*0.15*6 = 0.81 m2
1.88*0.48*2*2 = 3.61 m2
(0.9*0.15)+(0.83*0.24*2) = 0.53 m2
total 7.77
1.43*0.24*1 = 0.34 m2
0.33*0.5*6 = 0.99 m2
total 1.33 m2
7*((1.88*0.63)-(0.15*0.9))+2*(1.88*0.43) = 8.96 m2
Bh
11*3 = 33.0 Bh
9*2 = 18.0 Bh
6+2+1 = 9.0 Bh
2.00 = 2.0 Bh
4+4+1 = 9.0 Bh
4+4+1 = 9.0 Bh

57.500 m2
12.500 m2

4.88 m2
9.00 m2
9.00 m2
9.00 m2
5.00 m2
6.75 m2
9.00 m2
total 52.63 m2

18.75 m2

Sama Dengan Luas Rangka Plafond Eternit 100x100 52.63 m2


58.00 m'
(5.43*10)+(4.13*5.75)+(4.83*5.25) = 103.41 m2
1*10 = 10.00 m'
(10*2)+((1.7+2.4)*2) = 28.20 m'
x = 353.02 kg

Hitungan 1 m datar 82.70 m2


(5.43*10)+(4.13*5.75)+(4.83*5.25) = 103.41 m2
(6.75+2)*(4.75/1.5)+(5.25/1.5)*(4.73+4)/12*7.4 46.55 kg
x 0.000005 Penampang x 7,850 bj besi = 19.60 kg

(1.75*1.5)+(1.5*1.5) = 4.88 m2
1.25*(6.5+6) = 15.625 m2
(((0.67+0.7)*2*0.8)+((0.7+0.67)*0.8))*2 = 6.58 m2
total 22.20 m2
(10*7)-(1.75*1.5)+(1.5*1.5) = 69.63 m2
(3+3)*2*1.25 = 15.00 m2
1.25*(2.1+1.35+0.85) = 5.38 m2
total 20.38 m2
(6.5+6)*0.1 = 1.25 m2
(3+3)*2*0.1 = 1.20 m2
= 0.43 m2
total 2.88 m2
(3*1.5)+(3.5*2.25)+(2.25*2) = 16.88 m2
m

)+(3.85*0.5) ) - ( 1.25*(6.5+6) + (3+3)*2*1.25 ) = 534.12 m2


Sama Dengan Luas Plafond 100x100cm 71.38 m2
(10*2)+((1.7+2.4)*2) 28.20 m2
1.94 m2

Jumlah 1 buah 1.00 Bh


Jumlah 1 buah 1.00 Bh
Jumlah 1 Buah 1.00 Bh
5.00 Bh
15.00 Bh
6.00 Bh
10.00 Bh
2.00 Bh
Panjang Pipa Tegak 4.00 Pipa Bawah 15.0 25.96 m'
4 Untuk Sal. Air 3.0 20.01 m'

0.08 x 2.0 x 1.00 = 0.16 m3


x 2.00 x 2.00 6.45 m2
2.0 x 1.0 x 0.09 = 0.36 m3
= 0.360 x 60.45 = 21.76 Kg
Pipa Obosan Panjang 2 m 2.00 m'
Buis Beton dia 100 cm Kedalaman 2 meter 2.00 m'

Lampu TL untuk teras 3 Buah 2.00 Bh


Lampu Untuk KM, R. Bersalin, R. Periksa, R.Tunggu, Teras ) 13.00 Bh
Skalar Tunggal Merek Broco Jumlah 3 Buah 7.00 Bh
Stop kontak utk R. Periksa , & R. Bersalin 2 Buah 7.00 Bh
Skalar Tunggal Merek Broco Jumlah 5 Buah 4.00 Bh
Pasang Instalasi Listrik ( lihat Analisa ) 40.00 m'

190,000.00
#REF!
#REF!

712,500.00
#REF!
#REF!
19.91 114.66
26.66
21.1
26.93
17.75
112.35

44
44.25

2.431

2.495
2.5 4 10
10.15 1 10.15
3.5 2 7
2.25 2 4.5

31.65

63.3
22
27.70833

48

30.555

2.1

1.35
0.85
PERHITUNGAN VOLUME
PROGRAM : PEMBANGUNAN RUMAH TINGGAL 6
PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL 2 LANTAI Drs. H. SUYOTO, M.Si
LOKASI : JL. RAYA DANDER NGUMPAKDALEM DANDER BOJONEGORO

PERHITUNGAN SAT VOLUME


Beton Besi Bekisting Plesteran Benangan

19 LUAS BOUVEN
BV 52 x 62 Luas = 0.32 x 10.00 = 3.22 m2
Jumlah = 10 Panjang Kusen = 1.66 m panjang kusen kayu 1.66 x 10.00 m' 16.60
Panjang Kusen (a) = 1.04 m panjang kusen kayu 2.28 x 10.00 m' 22.80
Panjang Kusen (b) = 1.24 m
2.28
Daun Kaca mati = 0.72 m'
20 LUAS PINTU JENDELA
PJ1 P 206 x 132 Luas = 2.72 x 1.00 = 2.72 m2
Jumlah = 1 Panjang Kusen = 5.44 m panjang kusen kayu 5.44 x 1.00 m' 5.44
Daun Pintu = 2.49 m daun Pintu kayu 2.49 x 1.00 Bh 2.49
J 216 x 36 Luas = 0.78 x 2 = 1.56 m2
Jumlah = 2 Panjang Kusen (a) = 0.72 m panjang kusen kayu 5.81 x 2.00 m' 11.62
Panjang Kusen (b) = 4.32 m daun Pintu kayu +kaca 5.88 x 2.00 m' 11.76
Panjang Kusen (c) = 0.77 m Daun Kaca mati 4.44 x 2.00 m' 8.88
5.81
Daun Jendela = 5.88 m'
Daun Kaca mati = 4.44 m'
21 LUAS PINTU JENDELA
PJ2 P 245 x 136 Luas = 3.33 x 2.00 = 6.66 m2
Jumlah = 2 Panjang Kusen = 6.26 m panjang kusen kayu 6.26 x 2.00 m' 12.52
Daun Pintu = 3.08 m daun Pintu kayu 3.08 x 2.00 Bh 6.16
J 227 x 65 Luas = 1.48 x 4 = 5.90 m2
Jumlah = 4 Panjang Kusen (a) = 1.30 m panjang kusen kayu 6.52 x 4.00 m' 26.08
Panjang Kusen (b) = 4.54 m daun Pintu kayu +kaca 5.52 x 4.00 m' 22.08
Panjang Kusen (c) = 0.68 m Daun Kaca mati 3.50 x 4.00 m' 14.00
6.52
Daun Jendela = 5.52 m'
Daun Kaca mati = 3.50 m'
PERHITUNGAN VOLUME
PROGRAM : PEMBANGUNAN RUMAH TINGGAL 5
PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL 2 LANTAI Drs. H. SUYOTO, M.Si
LOKASI : JL. RAYA DANDER NGUMPAKDALEM DANDER BOJONEGORO

PERHITUNGAN SAT VOLUME


Beton Besi Bekisting Plesteran Benangan
13 LUAS PINTU Luas = 1.58 x 6 = 9.50 m2
P2 217 x 73 Panjang Kusen = 5.07 m panjang kusen kayu 5.07 x 5.00 m' 25.35
Jumlah = 6 Daun Pintu = 1.44 m Daun pintu panil 1.44 x 5.00 Bh 7.21
14 LUAS PINTU Luas = 3.25 x 2 = 6.49 m2
P3 246 x 132 Panjang Kusen = 6.24 m panjang kusen kayu 6.24 x 2.00 m' 12.48
Jumlah = 2 Daun Pintu = 3.05 m daun Pintu panil 3.05 x 2.00 Bh 6.09

15 LUAS JENDELA Luas = 2.97 x 2 = 5.95 m2


J1 197 x 151 Panjang Kusen (a) = 3.02 m panjang kusen kayu 13.18 x 2.00 m' 26.36
Jumlah = 2 Panjang Kusen (b) = 7.88 m daun Jendela kayu+kaca 13.92 x 2.00 m' 27.84
Panjang Kusen (c) = 2.28 m Daun Kaca mati 4.44 x 2.00 m' 8.88
13.18
Daun Jendela = 13.92 m'
Daun Kaca mati = 4.44 m'
16 LUAS JENDELA Luas = 4.33 x 6 = 26.00 m2
J2 197 x 220 Panjang Kusen (a) = 4.40 m panjang kusen kayu 16.53 x 6.00 m' 99.18
Jumlah = 6 Panjang Kusen (b) = 9.85 m daun Jendela kayu+kaca 13.92 x 6.00 m' 83.52
Panjang Kusen (c) = 2.28 m Daun Kaca mati 8.78 x 6.00 m' 52.68
16.53
Daun Jendela = 13.92 m'
Daun Kaca mati = 8.78 m'
17 LUAS JENDELA Luas = 7.58 x 2 = 15.17 m2
J3 197 x 385 Panjang Kusen (a) = 7.70 m panjang kusen kayu 21.88 x 2.00 m' 43.76
Jumlah = 2 Panjang Kusen (b) = 11.82 m daun Jendela kayu+kaca 14.40 x 2.00 m' 28.80
Panjang Kusen (c) = 2.36 m Daun Kaca mati 13.20 x 2.00 m' 26.40
21.88
Daun Jendela = 14.40 m'
Daun Kaca mati = 13.20 m'
18 LUAS JENDELA Luas = 1.65 x 3 = 4.94 m2
J4 136 x 121 Panjang Kusen (a) = 2.42 m panjang kusen kayu Err:522 x 3.00 m' Err:522
Jumlah = 3 Panjang Kusen (b) = 5.44 m daun Jendela kayu+kaca 5.52 x 3.00 m' 16.56
Panjang Kusen (c) = 0.68 m Daun Kaca mati 13.20 x 3.00 m' 39.60
Err:522
Daun Jendela = 5.52 m'
Daun Kaca mati = 13.20 m'
PERHITUNGAN VOLUME
PROGRAM : PEMBANGUNAN RUMAH TINGGAL 4
PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL 2 LANTAI Drs. H. SUYOTO, M.Si
LOKASI : JL. RAYA DANDER NGUMPAKDALEM DANDER BOJONEGORO

PERHITUNGAN SAT VOLUME


Beton Besi Bekisting Plesteran Benangan
9 PLAT, t = 12 cm L = 1.00 m 13 Beton 1.00 x 1.00 x 0.12 x 288.00 m3 34.56
(di hitung volume per m2) b = 1.00 m Besi (Tul bagi) 1.00 x 0.62 x 6.00 x 288.00 x 2.00 Kg 2,132.35
h = 0.12 m Bekisting 1.00 x 1.00 + 0.10 x 288.00 m2 316.80
Tul. Arah x dan y = f 10 - 20 Benangan 28.00 x 2.00 m2 56
Jumlah Tul = 6.00
Luas Total = 288.00 m2
Panjang Total = 28.00 m2 34.56 2,132.35 316.80 56.00

10 PLAT, t = 10 cm L = 1.00 m 13 Beton 1.00 x 1.00 x 0.10 x 187.00 m3 18.70


(di hitung volume per m2) b = 1.00 m Besi (Tul bagi) 1.00 x 0.40 x 6.00 x 187.00 x 2.00 Kg 886.38
h = 0.10 m Bekisting 1.00 x 1.00 + 0.10 x 187.00 m2 205.70
Tul. Arah x dan y = f 8 - 20 Benangan 28.00 x 2.00 m2 56
Jumlah Tul = 6.00
Luas Total = 187.00 m2
Panjang Total = 28.00 m2 18.70 886.38 205.70 56.00

11 PLAT KANOPI, t = 8 cm L = 1.00 m 13 Beton 1.00 x 1.00 x 0.08 x 165 m3 13.20


(di hitung volume per m2) b = 0.80 m Besi (Tul bagi) 0.80 x 0.30 x 6.00 x 165 x 2.00 Kg 475
h = 0.08 m Bekisting 0.80 x 1.00 + 0.10 x 165 m2 149
Tul. Arah x dan y = f 6 - 20 Benangan 165.00 x 2.00 m2 330
Jumlah Tul = 6.00
Panjang Total = 165.00 m1 13.20 475 149 330.00

12 LUAS PINTU Luas = 1.80 x 10.00 = 18.01 m2


P1 217 x 83 Panjang Kusen = 5.17 m panjang kusen Kayu 5.17 x 10.00 m' 51.70
Jumlah = 10 Daun Pintu = 1.61 m daun Pintu panil 1.61 x 10.00 m2 16.15
PERHITUNGAN VOLUME
PROGRAM : PEMBANGUNAN RUMAH TINGGAL 3
PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL 2 LANTAI Drs. H. SUYOTO, M.Si
LOKASI : JL. RAYA DANDER NGUMPAKDALEM DANDER BOJONEGORO

PERHITUNGAN SAT VOLUME


Beton Galian Besi Bekisting Plesteran Benangan

6 BALOK SLOOF 25/40 (S1) L = 1.00 m 6 Beton 1.00 x 0.25 x 0.40 x 198.00 m3 19.80
(di hitung volume per m') b = 0.25 m Besi (Tul Pokok) 1.00 x 0.89 x 4.00 x 198.00 Kg 703.30
h = 0.40 m Besi (Tul Pokok) 1.00 x 0.89 x 2.00 x 198.00 Kg 351.65
Tul. Pokok = f 12 Besi (Tul bagi) 1.20 x 0.40 x 8.00 x 198.00 Kg 750.82
Tul. Pokok = f 12 Bekisting 1.05 x 1.00 x 198.00 m2 207.90
Tulangan 2Ø12
Tulangan Ø8-150
Jumlah Tul Pokok = 8.00
Tul. Bagi = f 8 - 15 19.80 1,805.76 207.90 -
Tulangan 2Ø12 Jumlah Tul bagi = 8.00
Panjang Total = 198.00 m

7 BALOK INDUK 25/40 (B1) L = 1.00 m 7 Beton 1.00 x 0.25 x 0.40 x 143 m3 14.30
(di hitung volume per m') b = 0.25 m Besi (Tul Pokok 1) 1.00 x 1.58 x 6.00 x 143 Kg 1,355.64
20 h = 0.40 m Besi (Tul Pokok 2) 0.25 x 0.62 x 2.00 x 143 Kg 44.12
3Ø16
Tul. Pokok (1) = f 16 Besi (Tul bagi) 1.20 x 0.40 x 8.00 x 143 Kg 542.26
Tul. Pokok (2) = f 10 Bekisting 1.05 x 1.00 x 143 m2 150.15
2Ø10

Jumlah Tul Pokok (1) = 6.00 Plesteran 1.05 x 1.00 m2 1.05


40
Ø8-150
Jumlah Tul Pokok (2) = 2.00 CAT 1.05 x 1.00 m2 1.05
Tul. Bagi = f 8 - 15 14.30 1,942.01 150.15 -
Jumlah Tul bagi = 8.00
3Ø16

Panjang Total = 143 m


8 BALOK Anak 15/30 (B2) L = 1.00 m 8 Beton 1.00 x 0.15 x 0.30 x 56 m3 2.52
(di hitung volume per m') b = 0.15 m Besi (Tul Pokok 1) 1.00 x 1.12 x 6.00 x 56 Kg 376.32
h = 0.30 m Besi (Tul Pokok 2) 0.15 x 0.62 x 2.00 x 56 Kg 10.37
15 Tul. Pokok (1) = f 14 Besi (Tul bagi) 0.80 x 0.40 x 8.00 x 56 Kg 141.57
3Ø14
Tul. Pokok (2) = f 10 Bekisting 0.75 x 1.00 x 56 m2 42.00
Jumlah Tul Pokok (1) = 6.00 Plesteran 0.75 x 1.00 m2 0.75
2Ø10
Jumlah Tul Pokok (2) = 2.00 CAT 0.75 x 1.00 m2 0.75
30 Ø8-15
Tul. Bagi = f 8 - 15 2.52 528.25 42.00 -
3Ø14
Jumlah Tul bagi = 8.00
Panjang Total = 56 m
PERHITUNGAN VOLUME
PROGRAM : PEMBANGUNAN RUMAH TINGGAL 2
PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL 2 LANTAI Drs. H. SUYOTO, M.Si
LOKASI : JL. RAYA DANDER NGUMPAKDALEM DANDER BOJONEGORO

PERHITUNGAN SAT VOLUME


Beton Galian Besi Bekisting Plesteran Benangan Titik

5 KOLOM 15/15 (K2) Pjg = 6.20 5 Beton 6.20 x 0.15 x 0.15 x 35.00 m3 4.88
b = 0.15 m Besi (Tul Pokok) 6.85 x 0.89 x 6.00 x 35.00 Kg 1,277.39
15 2Ø12 h = 0.15 Besi (Tul bagi) 0.50 x 0.40 x 42.00 x 35.00 Kg 290.33
Jml = 35.00 Ttk Bekisting 0.60 x 6.20 x 35.00 m2 130.20

Ø6-15
Tul. Pokok = f 12 Benangan 4.00 x 6.20 x 4.00 m' 99.20
15
Jumlah Tul Pokok = 6.00 Plesteran 0.60 x 6.20 m2 3.72
Tul. Bagi = f 8 - 15 CAT 0.60 x 6.20 m2 3.72
2Ø12
Jumlah Tul bagi = 42.00 4.88 1,567.71 130.20 3.72 99.20 3.72
tebal Poer = 0.40 m
Panjang Penyaluran (ke poer) = 0.30 m
PERHITUNGAN VOLUME
PROGRAM : PEMBANGUNAN RUMAH TINGGAL 1
PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL 2 LANTAI Drs. H. SUYOTO, M.Si
LOKASI : JL. RAYA DANDER NGUMPAKDALEM DANDER BOJONEGORO

PERHITUNGAN SAT VOLUME


Beton Galian Besi Bekisting Plesteran Benangan Titik

1 BOR PILE Dia = 0.30 m 1 Pengeboran 44.00 Ttk 44.00


Pjg = 3.00 m Beton 3.14 x 0.02 x 3.00 x 1.00 m3 0.21
Galian Tanah 44.00 x 3.00 132.00
Jml = 44.00 Ttk Besi (Tul Pokok) 6.00 x 3.20 x 1.12 x 44.00 Kg 946.18
Tul. Pokok = 6 f 14 Besi (Tul Bagi) 0.94 x 21.00 x 0.40 x 44.00 Kg 344.12
Tul. Bagi = f 8 - 15 JML 0.21 132.00 1,290.30 - - - 44.00
0.30

2 POER PONDASI (P1) Pjg = 1.20 m 2 Beton 1.20 x 1.20 x 0.50 x 26.00 m3 18.72
L = 1.20 m Besi (Tul mmng / atas) 1.25 x 0.89 x 8.00 x 26.00 Kg 230.88
0.05 1.15 0.05 Tebal = 0.50 m Besi (Tul mmng / Bawah) 2.15 x 0.89 x 8.00 x 26.00 Kg 397.11
0.45 0.45 0.50 m Jml = 26.00 Ttk Besi (Tul mltg / atas) 1.25 x 0.89 x 8.00 x 26.00 Kg 230.88
1.15 Tul. Pokok (mmnjg) = f 12 - 18 Besi (Tul mmng / Bawah) 2.15 x 0.89 x 8.00 x 26.00 Kg 397.11
1.20 m Jumlah Tul mmnjg = 8.00 Bekisting 4.80 x 0.50 x 26.00 m2 62.40
Tul. Pokok (mltg) = f 12 - 18 Pasir Urug 1.20 x 1.20 x 0.05 x 26.00 m3 1.87
Jumlah Tul mltg = 8.00 Galian 1.70 x 1.70 x 0.50 x 26.00 m3 37.57 37.57
0.05 1.15 0.05 Tebal Pasir urug = 5.00 cm JML 18.72 37.57 1,255.99 62.40 - - 39.44
0.45 0.45 0.50 m
1.15 Kedalamn Galian = 0.50 m
1.20 m

3 POER PONDASI (P2) Pjg = 0.80 m 3 Beton 0.80 x 0.80 x 0.30 x 18.00 m3 0.19
L = 0.80 m Besi (Tul mmng / atas) 0.85 x 0.89 x 9.00 x 18.00 Kg 6.79
0.05 0.75 0.05 Tebal = 0.30 m Besi (Tul mmng / Bawah) 1.35 x 0.89 x 9.00 x 18.00 Kg 10.79
0.25 0.25 0.30 m Jml = 18.00 Ttk Besi (Tul mltg / atas) 0.85 x 0.89 x 9.00 x 18.00 Kg 6.79
0.75 Tul. Pokok (mmnjg) = f 12 - 10 Besi (Tul mmng / Bawah) 1.35 x 0.89 x 9.00 x 18.00 Kg 10.79
0.80 m Jumlah Tul mmnjg = 9.00 Bekisting 3.20 x 0.30 x 18.00 m2 17.28
Tul. Pokok (mltg) = f 12 - 10 Pasir Urug 0.80 x 0.80 x 0.05 x 18.00 m3 0.58
Jumlah Tul mltg = 9.00 Galian 1.10 x 1.10 x 0.30 x 18.00 m3 0.36 6.53
0.05 0.75 0.05 Tebal Pasir urug = 5.00 cm 0.19 0.36 35.16 17.28 - - 7.11
0.25 0.25 0.30 m
0.75 Kedalamn Galian = 0.30 m
0.80 m

4 KOLOM 25/25 (K1) Pjg = 6.20 m 4 Beton 6.20 x 0.25 x 0.25 x 46.00 m3 17.83
b = 0.25 m Besi (Tul Pokok) 6.85 x 0.89 x 12.00 x 46.00 Kg 3,357.71
h = 0.25 m Besi (Tul bagi) 0.90 x 0.40 x 42.00 x 46.00 Kg 686.83
0.25 Jml = 46.00 Ttk Bekisting 1.00 x 6.20 x 46.00 m2 285.20
Tul. Pokok = f 12 Benangan 4.00 x 6.20 x 46.00 m' 1,140.80
Jumlah Tul Pokok = 12.00 17.83 4,044.53 285.20 1,140.80
0.25 Tul. Bagi = f 8 - 15
Jumlah Tul bagi = 42.00
tebal Poer = 0.40 m
Panjang Penyaluran (ke poer) = 0.30 m
PERHITUNGAN VOLUME

Pekerjaan Pasangan keramik LEBAR PANJANG JUMLAH KOREKSI KRAMIK 30X30 VOLUME SATUAN
Pasangan keramik lantai 40x40 cm 5 8.2 2 82.00 M2
5.5 7.5 6 247.50 M2
5.7 12 2 12.75 124.05 M2
TOTAL 453.55 M2

Pasangan keramik tangga 30x30 cm 1.85 1.5 1 2.78 M2


2.78 M2
Pasangan keramik km/wc 20x20 cm 1.7 2.5 6 25.50 M2
TOTAL 25.50 M2
Pasangan Lis keramik dinding km/wc 10x20 cm 2.5 2.5 12 3.80 M1
TOTAL 3.80 M1
Pasangan keramik dinding km/wc 25x20 cm 2.5 2.5 12 75.00 M2
1.75 2.5 12 52.50 M2
TOTAL 127.50 M2

Pekerjaan Pasangan Plafon LEBAR PANJANG JUMLAH VOLUME SATUAN

Pasangan Plafon Lt. 1 12.43 23.93 1 297.45 M2


Pasangan Rangka Plafon Lt. 1 12.43 23.93 1 297.45 M2
Pasangan Plafon Lt. 2 12.43 23.93 1 297.45 M2
Pasangan Rangka Plafon Lt. 2 12.43 23.93 1 297.45 M2

PANJAN
Pekerjaan Pasangan Dinding TINGGI JUMLAH KOREKSI KUSEN VOLUME SATUAN
G

Pasangan Dinding Lt.1 2.00 3.55 5 35.50 M2


2.89 3.55 25 256.4875 M2
4.30 3.55 10 31.255 121.395 M2
4.89 2.00 7 68.46 M2
TOTAL 481.84 M2
Pasangan Dinding Lt.2 2.89 3.55 12 123.11 M2
2.00 3.55 20 142.00 M2
3.80 3.55 14 19 169.86 M2
2.50 3.55 5 5.4 38.98 M2
1.50 3.55 4 5.4 15.90 M2
TOTAL 489.85 M2
TOTAL Lt1 + Lt2 971.69 M2

Pekerjaan Plesteran 2x Pasangan Dinding 1,943.38 M2

Pekerjaan Pengecatan 2x Pasangan Dinding 1,943.38 M2

Pekerjaan Pengecatan Plafon 594.90 M2