Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan

paip air & paip pembetungan


Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(1) Pasir RM Per Tan Metrik
Sand RM Per Metric Ton
Pasir Sungai 2011 Dis 39.49 40.32 21.30
River Sand 2012 Jan 39.64 40.39 21.35
Feb 39.64 40.39 21.35
Mac 39.66 40.39 21.46
Apr 39.66 40.39 21.60
Mei 39.66 40.39 21.60
Jun 39.66 40.39 21.60
Jul 39.68 40.39 21.60
Ogos 39.77 40.45 21.60
Sept 39.77 40.45 21.60
Okt 39.77 40.60 21.19
Nov 39.70 40.60 21.19
Dis 40.01 40.60 21.19

Pasir Lombong 2011 Dis 26.57 44.00 29.25


Mining Sand 2012 Jan 26.57 43.96 29.25
Feb 26.57 44.12 29.25
Mac 26.57 44.12 29.25
Apr 26.57 44.12 29.25
Mei 26.57 44.12 29.25
Jun 26.57 44.12 29.25
Jul 26.57 44.04 29.25
Ogos 26.57 43.84 29.25
Sept 26.57 43.34 29.25
Okt 26.57 43.05 29.25
Nov 26.57 43.24 29.25
Dis 26.57 43.24 29.25
(2) Batu Baur
Aggregates

Granite 2011 Dis 30.22 27.30 32.09


10mm (3/8") 2012 Jan 30.61 28.71 32.41
Granite Feb 30.89 28.57 32.19
10mm (3/8") Mac 31.00 28.57 32.19
Apr 31.00 28.57 32.19
Mei 31.40 28.57 32.19
Jun 31.40 28.57 32.19
Jul 31.40 28.61 32.19
Ogos 31.67 28.61 32.19
Sept 31.67 28.84 32.19
Okt 31.67 28.84 32.19
Nov 31.67 28.99 32.19
Dis 31.67 28.99 32.19

Harga bagi pasir, batu baur dan premix adalah termasuk kos pengangkutan bagi jarak 30km dari outlet.
The prices for sand, aggregates and premix are inclusive of transportation charge for 30km from the outlets.

-7-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(2) Batu Baur (Samb.) RM Per Tan Metrik
Aggregates (Cont'd) RM Per Metric Ton
Granite 2011 Dis 32.43 25.53 27.56
20mm (3/4") 2012 Jan 32.64 25.60 27.56
Granite Feb 32.86 25.60 27.56
20mm (3/4") Mac 32.86 25.60 27.56
Apr 32.86 25.60 27.56
Mei 32.86 25.70 27.56
Jun 32.86 25.70 27.56
Jul 32.86 25.51 27.56
Ogos 32.86 25.51 27.56
Sept 32.86 25.45 27.56
Okt 32.86 25.45 27.56
Nov 32.86 25.45 27.56
Dis 32.86 25.45 27.56

Granite 2011 Dis 26.50 26.90 25.60


40mm (1 1/2") 2012 Jan 26.50 27.35 27.20
Granite Feb 26.50 27.18 27.20
40mm (1 1/2") Mac 26.50 27.18 27.20
Apr 26.50 27.18 27.20
Mei 26.50 27.18 27.20
Jun 26.50 27.18 27.20
Jul 26.50 27.27 27.20
Ogos 26.50 27.35 27.20
Sept 26.50 27.35 27.80
Okt 26.50 27.35 27.80
Nov 26.50 27.64 27.80
Dis 26.50 27.64 27.80

Crushed Aggregate (Crusher Run)


Crushed Aggregate (Crusher Run)

Crusher Run 2011 Dis 20.32 21.90 20.92


Crusher Run 2012 Jan 20.50 22.27 21.20
Feb 20.41 22.14 21.20
Mac 20.41 22.14 21.20
Apr 20.41 22.14 21.20
Mei 20.60 22.20 21.20
Jun 20.60 22.20 21.20
Jul 20.60 22.19 21.20
Ogos 20.60 22.28 21.20
Sept 20.60 22.70 21.20
Okt 20.60 22.70 21.20
Nov 20.60 22.81 21.39
Dis 20.60 22.81 21.76

-8-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(3) Premix Asphaltic Concrete RM Per Tan Metrik
Premix Asphaltic Concrete RM Per Metric Ton

AC 10 (Wearing Course) 2011 Dis 159.67 162.80 212.00


2012 Jan 167.75 166.95 212.00
Feb 173.00 167.70 212.00
Mac 170.67 167.70 212.00
Apr 170.67 169.70 212.00
Mei 170.67 170.80 212.00
Jun 172.30 171.40 212.00
Jul 172.30 171.18 212.00
Ogos 172.30 170.84 212.00
Sept 172.30 171.40 212.00
Okt 171.50 171.95 212.00
Nov 174.58 173.62 212.00
Dis 180.25 173.73 212.00

AC 14 (Wearing Course) 2011 Dis 157.00 158.90 185.90


2012 Jan 165.08 163.90 185.90
Feb 170.50 164.60 185.90
Mac 170.67 164.60 185.90
Apr 170.67 166.40 185.90
Mei 170.67 167.40 191.80
Jun 172.30 167.90 197.80
Jul 172.30 167.73 197.80
Ogos 172.30 167.43 197.80
Sept 172.30 167.93 197.80
Okt 168.80 168.43 197.80
Nov 172.00 169.93 199.25
Dis 172.00 170.03 203.00

AC 28 (Binder Course) 2011 Dis 155.17 161.70 179.80


2012 Jan 162.92 165.60 179.80
Feb 167.80 166.50 179.80
Mac 168.30 166.50 179.80
Apr 168.30 168.50 179.80
Mei 168.30 169.60 187.00
Jun 170.00 170.10 194.30
Jul 170.00 169.92 194.30
Ogos 170.00 169.58 194.30
Sept 170.00 170.14 194.30
Okt 166.20 170.69 194.30
Nov 169.33 171.80 195.75
Dis 174.88 171.92 198.75

-9-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(3) Premix Asphaltic Concrete (samb.) RM Per Tan Metrik
Premix Asphaltic Concrete (cont'd) RM Per Metric Ton

ACW 20 (Wearing Course) 2011 Dis 157.50 158.40 194.80


2012 Jan 165.58 161.90 194.80
Feb 171.00 162.60 194.80
Mac 170.70 162.60 194.80
Apr 170.70 164.40 194.80
Mei 170.70 165.40 194.80
Jun 172.30 165.90 194.80
Jul 172.30 165.73 194.80
Ogos 172.30 165.43 194.80
Sept 172.30 165.93 194.80
Okt 171.50 166.43 194.80
Nov 174.67 167.93 194.80
Dis 180.25 168.03 194.80

-10-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(3) Premix Bituminous Macadam RM Per Tan Metrik
Premix Bituminous Macadam RM Per Metric Ton
BMR40 (Bound Roadbase) 2011 Dis 153.50 161.20 144.00
2012 Jan 156.50 163.30 144.00
Feb 159.00 162.80 144.00
Mac 159.00 162.80 144.00
Apr 159.20 165.80 144.00
Mei 159.20 167.20 144.00
Jun 159.00 168.00 144.00
Jul 159.00 167.83 144.00
Ogos 159.00 167.33 144.00
Sept 159.00 168.17 144.00
Okt 159.00 169.00 144.00
Nov 159.00 170.50 144.00
Dis 159.00 170.67 144.00

BMR28 (Bound Roadbase) 2011 Dis 155.00 153.00 153.00


2012 Jan 157.50 154.40 153.00
Feb 160.00 154.10 153.00
Mac 160.00 154.10 153.00
Apr 160.00 156.40 153.00
Mei 160.00 157.40 153.00
Jun 160.00 158.00 153.00
Jul 160.00 157.80 153.00
Ogos 160.00 157.40 153.00
Sept 160.00 158.00 153.00
Okt 160.00 158.63 153.00
Nov 160.00 159.75 153.00
Dis 160.00 159.88 153.00

BML10 (Levelling Course) 2011 Dis 157.00 162.60 172.00


2012 Jan 159.50 164.30 172.00
Feb 162.00 163.90 172.00
Mac 162.00 163.90 172.00
Apr 162.00 166.40 172.00
Mei 162.00 167.60 172.00
Jun 162.00 168.30 172.00
Jul 162.00 168.10 172.00
Ogos 162.00 167.70 172.00
Sept 162.00 168.40 172.00
Okt 162.00 169.14 172.00
Nov 162.00 170.43 172.00
Dis 162.00 170.57 172.00

-11-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(3) Premix Bituminous Macadam (samb.) RM Per Tan Metrik
Premix Bituminous Macadam (cont'd) RM Per Metric Ton
BMB28 (Binder Course) 2011 Dis 151.67 156.60 168.00
2012 Jan 158.17 158.50 168.00
Feb 163.00 158.10 168.00
Mac 158.20 158.10 168.00
Apr 153.30 160.40 168.00
Mei 158.00 161.40 168.00
Jun 161.30 162.00 168.00
Jul 158.00 161.80 168.00
Ogos 158.00 161.40 168.00
Sept 158.00 162.00 168.00
Okt 158.00 162.63 168.00
Nov 161.00 163.75 168.00
Dis 165.00 163.88 168.00

BMB20 (Binder Course) 2011 Dis 153.67 150.60 189.30


2012 Jan 155.33 152.10 189.30
Feb 157.00 151.90 189.30
Mac 157.00 151.90 189.30
Apr 157.00 153.70 189.30
Mei 157.00 154.50 189.30
Jun 157.00 155.00 192.70
Jul 157.00 154.80 192.70
Ogos 157.00 154.50 192.70
Sept 157.00 155.00 192.70
Okt 157.00 155.50 196.00
Nov 160.00 156.40 196.00
Dis 160.00 156.50 196.00
BMW14 (Wearing Course) 2011 Dis 154.67 161.40 190.00
2012 Jan 159.50 164.60 190.00
Feb 162.67 163.90 190.00
Mac 157.70 163.30 190.00
Apr 157.70 166.80 190.00
Mei 157.70 167.80 190.00
Jun 161.00 167.10 193.30
Jul 157.67 166.90 193.30
Ogos 157.67 166.50 193.30
Sept 157.67 167.50 193.30
Okt 157.67 168.75 199.33
Nov 159.67 170.88 199.33
Dis 161.67 171.00 199.33

-12-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(3) Premix Bituminous Macadam (samb.) RM Per Tan Metrik
Premix Bituminous Macadam (cont'd) RM Per Metric Ton

BMW20 (Wearing Course) 2011 Dis 157.00 158.30 200.00


2012 Jan 159.50 161.20 200.00
Feb 162.00 160.60 200.00
Mac 162.00 160.00 200.00
Apr 162.00 163.10 200.00
Mei 162.00 164.00 200.00
Jun 162.00 163.40 200.00
Jul 162.00 163.20 200.00
Ogos 162.00 162.90 200.00
Sept 162.00 163.80 200.00
Okt 162.00 164.89 200.00
Nov 166.50 166.78 200.00
Dis 166.50 166.89 200.00

-13-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(4) Fabric Reinforcement RM Per Kg
Fabric Reinforcement RM Per Kg

A4, MS145 2011 Dis 2.68 3.00 3.45


2012 Jan 2.53 3.00 3.45
Feb 2.53 3.00 3.45
Mac 2.60 2.98 3.45
Apr 2.60 2.98 3.45
Mei 2.68 2.98 3.45
Jun 2.68 2.98 3.45
Jul 2.68 2.98 3.45
Ogos 2.68 2.98 3.45
Sept 2.68 2.98 3.45
Okt 2.56 2.98 3.45
Nov 2.60 2.98 3.45
Dis 2.60 2.98 3.45

A5, MS145 2011 Dis 2.68 2.97 3.42


2012 Jan 2.71 2.97 3.42
Feb 2.71 2.97 3.42
Mac 2.60 2.95 3.42
Apr 2.60 2.95 3.42
Mei 2.68 2.95 3.42
Jun 2.68 2.95 3.42
Jul 2.68 2.95 3.42
Ogos 2.68 2.95 3.42
Sept 2.68 2.95 3.42
Okt 2.56 2.95 3.42
Nov 2.60 2.95 3.42
Dis 2.60 2.95 3.42

A6, MS145 2011 Dis 2.40 2.62 3.07


2012 Jan 2.26 2.62 3.07
Feb 2.26 2.62 3.07
Mac 2.33 2.61 3.07
Apr 2.33 2.61 3.07
Mei 2.40 2.61 3.07
Jun 2.40 2.61 3.07
Jul 2.40 2.61 3.07
Ogos 2.40 2.61 3.07
Sept 2.40 2.61 3.07
Okt 2.30 2.61 3.07
Nov 2.33 2.61 3.07
Dis 2.33 2.61 3.07

-14-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(4) Fabric Reinforcement (samb.) RM Per Kg
Fabric Reinforcement (cont'd) RM Per Kg

A7, MS145 2011 Dis 2.39 2.62 3.07


2012 Jan 2.26 2.62 3.07
Feb 2.26 2.62 3.07
Mac 2.33 2.61 3.07
Apr 2.33 2.61 3.07
Mei 2.39 2.61 3.07
Jun 2.39 2.61 3.07
Jul 2.39 2.61 3.07
Ogos 2.39 2.61 3.07
Sept 2.39 2.61 3.07
Okt 2.29 2.61 3.07
Nov 2.33 2.61 3.07
Dis 2.33 2.61 3.07

A8, MS145 2011 Dis 2.40 2.65 3.07


2012 Jan 2.27 2.65 3.07
Feb 2.27 2.65 3.07
Mac 2.33 2.64 3.07
Apr 2.33 2.64 3.07
Mei 2.40 2.64 3.07
Jun 2.40 2.64 3.07
Jul 2.40 2.64 3.07
Ogos 2.40 2.64 3.07
Sept 2.40 2.64 3.07
Okt 2.30 2.64 3.07
Nov 2.34 2.64 3.07
Dis 2.34 2.64 3.07

A9, MS145 2011 Dis 2.39 2.62 3.07


2012 Jan 2.26 2.62 3.07
Feb 2.26 2.62 3.07
Mac 2.32 2.61 3.07
Apr 2.32 2.61 3.07
Mei 2.39 2.61 3.07
Jun 2.39 2.61 3.07
Jul 2.39 2.61 3.07
Ogos 2.39 2.61 3.07
Sept 2.39 2.61 3.07
Okt 2.29 2.61 3.07
Nov 2.33 2.61 3.07
Dis 2.33 2.61 3.07

-15-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(4) Fabric Reinforcement (samb.) RM Per Kg
Fabric Reinforcement (cont'd) RM Per Kg

A10, MS145 2011 Dis 2.40 2.62 3.07


2012 Jan 2.26 2.62 3.07
Feb 2.26 2.62 3.07
Mac 2.33 2.55 3.07
Apr 2.33 2.55 3.07
Mei 2.40 2.55 3.07
Jun 2.40 2.55 3.07
Jul 2.40 2.55 3.07
Ogos 2.40 2.55 3.07
Sept 2.40 2.55 3.07
Okt 2.30 2.55 3.07
Nov 2.33 2.55 3.07
Dis 2.33 2.55 3.07

B5, MS145 2011 Dis 2.65 2.96 3.41


2012 Jan 2.50 2.96 3.41
Feb 2.50 2.96 3.41
Mac 2.57 2.94 3.41
Apr 2.57 2.94 3.41
Mei 2.65 2.94 3.41
Jun 2.65 2.94 3.41
Jul 2.65 2.94 3.41
Ogos 2.65 2.94 3.41
Sept 2.65 2.94 3.41
Okt 2.54 2.94 3.41
Nov 2.57 2.94 3.41
Dis 2.57 2.94 3.41

B6, MS145 2011 Dis 2.40 2.63 3.07


2012 Jan 2.26 2.63 3.07
Feb 2.26 2.63 3.07
Mac 2.33 2.62 3.07
Apr 2.33 2.62 3.07
Mei 2.40 2.62 3.07
Jun 2.40 2.62 3.07
Jul 2.40 2.62 3.07
Ogos 2.40 2.62 3.07
Sept 2.40 2.62 3.07
Okt 2.29 2.62 3.07
Nov 2.33 2.62 3.07
Dis 2.33 2.62 3.07

-16-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(4) Fabric Reinforcement (samb.) RM Per Kg
Fabric Reinforcement (cont'd) RM Per Kg

B7, MS145 2011 Dis 2.40 2.66 3.07


2012 Jan 2.26 2.66 3.07
Feb 2.26 2.66 3.07
Mac 2.33 2.65 3.07
Apr 2.33 2.65 3.07
Mei 2.40 2.65 3.07
Jun 2.40 2.65 3.07
Jul 2.40 2.65 3.07
Ogos 2.40 2.65 3.07
Sept 2.40 2.65 3.07
Okt 2.30 2.65 3.07
Nov 2.33 2.65 3.07
Dis 2.33 2.65 3.07

B8, MS145 2011 Dis 2.40 2.66 3.07


2012 Jan 2.24 2.66 3.07
Feb 2.27 2.66 3.07
Mac 2.33 2.65 3.07
Apr 2.33 2.65 3.07
Mei 2.40 2.65 3.07
Jun 2.40 2.65 3.07
Jul 2.40 2.65 3.07
Ogos 2.40 2.65 3.07
Sept 2.40 2.65 3.07
Okt 2.30 2.65 3.07
Nov 2.33 2.65 3.07
Dis 2.33 2.65 3.07

B9, MS145 2011 Dis 2.40 2.66 3.07


2012 Jan 2.26 2.66 3.07
Feb 2.26 2.66 3.07
Mac 2.33 2.65 3.07
Apr 2.33 2.65 3.07
Mei 2.40 2.65 3.07
Jun 2.40 2.65 3.07
Jul 2.40 2.65 3.07
Ogos 2.40 2.65 3.07
Sept 2.40 2.65 3.07
Okt 2.30 2.65 3.07
Nov 2.33 2.65 3.07
Dis 2.33 2.65 3.07

-17-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(4) Fabric Reinforcement (samb.) RM Per Kg
Fabric Reinforcement (cont'd) RM Per Kg

B10, MS145 2011 Dis 2.39 2.66 3.07


2012 Jan 2.26 2.66 3.07
Feb 2.26 2.66 3.07
Mac 2.33 2.64 3.07
Apr 2.33 2.64 3.07
Mei 2.39 2.64 3.07
Jun 2.39 2.64 3.07
Jul 2.39 2.64 3.07
Ogos 2.39 2.64 3.07
Sept 2.39 2.64 3.07
Okt 2.29 2.64 3.07
Nov 2.33 2.64 3.07
Dis 2.33 2.64 3.07
B12, MS145 2011 Dis 2.99 2.91 3.39
2012 Jan 2.69 2.91 3.39
Feb 2.69 2.91 3.39
Mac 2.84 2.90 3.39
Apr 2.84 2.90 3.39
Mei 2.99 2.90 3.39
Jun 2.99 2.90 3.39
Jul 2.99 2.90 3.39
Ogos 2.99 2.90 3.39
Sept 2.99 2.90 3.39
Okt 2.76 2.90 3.39
Nov 2.84 2.90 3.39
Dis 2.84 2.90 3.39

C5, MS145 2011 Dis 3.01 2.85 3.42


2012 Jan 2.70 2.85 3.42
Feb 2.70 2.85 3.42
Mac 2.85 2.84 3.42
Apr 2.85 2.84 3.42
Mei 3.01 2.84 3.42
Jun 3.01 2.84 3.42
Jul 3.01 2.84 3.42
Ogos 3.01 2.84 3.42
Sept 3.01 2.84 3.42
Okt 2.78 2.84 3.42
Nov 2.85 2.84 3.42
Dis 2.85 2.84 3.42

-18-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(4) Fabric Reinforcement (samb.) RM Per Kg
Fabric Reinforcement (cont'd) RM Per Kg

C6, MS145 2011 Dis 3.00 2.85 3.41


2012 Jan 2.70 2.85 3.41
Feb 2.70 2.85 3.41
Mac 2.85 2.84 3.41
Apr 2.85 2.84 3.41
Mei 3.00 2.84 3.41
Jun 3.00 2.84 3.41
Jul 3.00 2.84 3.41
Ogos 3.00 2.84 3.41
Sept 3.00 2.84 3.41
Okt 2.78 2.84 3.41
Nov 2.85 2.84 3.41
Dis 2.85 2.84 3.41

C7, MS145 2011 Dis 3.00 2.96 3.41


2012 Jan 2.70 2.96 3.41
Feb 2.70 2.96 3.41
Mac 2.85 2.94 3.41
Apr 2.85 2.94 3.41
Mei 3.00 2.94 3.41
Jun 3.00 2.94 3.41
Jul 3.00 2.94 3.41
Ogos 3.00 2.94 3.41
Sept 3.00 2.94 3.41
Okt 2.78 2.94 3.41
Nov 2.85 2.94 3.41
Dis 2.85 2.94 3.41

C8, MS145 2011 Dis 3.00 3.03 3.40


2012 Jan 2.70 3.03 3.40
Feb 2.70 3.03 3.40
Mac 2.85 3.01 3.40
Apr 2.85 3.01 3.40
Mei 3.00 3.01 3.40
Jun 3.00 3.01 3.40
Jul 3.00 3.01 3.40
Ogos 3.00 3.01 3.40
Sept 3.00 3.01 3.40
Okt 2.77 3.01 3.40
Nov 2.85 3.01 3.40
Dis 2.85 3.01 3.40

-19-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(4) Fabric Reinforcement (samb.) RM Per Kg
Fabric Reinforcement (cont'd) RM Per Kg

C9, MS145 2011 Dis 3.00 2.95 3.41


2012 Jan 2.70 2.95 3.41
Feb 2.70 2.95 3.41
Mac 2.85 2.94 3.41
Apr 2.85 2.94 3.41
Mei 3.00 2.94 3.41
Jun 3.00 2.94 3.41
Jul 3.00 2.94 3.41
Ogos 3.00 2.94 3.41
Sept 3.00 2.94 3.41
Okt 2.77 2.94 3.41
Nov 2.85 2.94 3.41
Dis 2.85 2.94 3.41

C10, MS145 2011 Dis 3.00 2.96 3.41


2012 Jan 2.70 2.96 3.41
Feb 2.70 2.96 3.41
Mac 2.85 2.94 3.41
Apr 2.85 2.94 3.41
Mei 3.00 2.94 3.41
Jun 3.00 2.94 3.41
Jul 3.00 2.94 3.41
Ogos 3.00 2.94 3.41
Sept 3.00 2.94 3.41
Okt 2.77 2.94 3.41
Nov 2.85 2.94 3.41
Dis 2.85 2.94 3.41

DA4, MS145 2011 Dis 3.03 2.98 3.44


2012 Jan 2.73 2.98 3.44
Feb 2.73 2.98 3.44
Mac 2.88 2.97 3.44
Apr 2.88 2.97 3.44
Mei 3.03 2.97 3.44
Jun 3.03 2.97 3.44
Jul 3.03 2.97 3.44
Ogos 3.03 2.97 3.44
Sept 3.03 2.97 3.44
Okt 2.80 2.97 3.44
Nov 2.88 2.97 3.44
Dis 2.88 2.97 3.44

-20-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(4) Fabric Reinforcement (samb.) RM Per Kg
Fabric Reinforcement (cont'd) RM Per Kg

DA5, MS145 2011 Dis 3.01 2.97 3.42


2012 Jan 2.71 2.97 3.42
Feb 2.71 2.97 3.42
Mac 2.86 2.89 3.42
Apr 2.86 2.89 3.42
Mei 3.01 2.89 3.42
Jun 3.01 2.89 3.42
Jul 3.01 2.89 3.42
Ogos 3.01 2.89 3.42
Sept 3.01 2.89 3.42
Okt 2.79 2.89 3.42
Nov 2.86 2.89 3.42
Dis 2.86 2.89 3.42

DA6, MS145 2011 Dis 2.70 2.65 3.07


2012 Jan 2.43 2.65 3.07
Feb 2.43 2.65 3.07
Mac 2.57 2.64 3.07
Apr 2.57 2.64 3.07
Mei 2.70 2.64 3.07
Jun 2.70 2.64 3.07
Jul 2.70 2.64 3.07
Ogos 2.70 2.64 3.07
Sept 2.70 2.64 3.07
Okt 2.50 2.64 3.07
Nov 2.57 2.64 3.07
Dis 2.57 2.64 3.07

DA7, MS145 2011 Dis 2.70 2.66 3.07


2012 Jan 2.43 2.66 3.07
Feb 2.43 2.66 3.07
Mac 2.57 2.65 3.07
Apr 2.57 2.65 3.07
Mei 2.70 2.65 3.07
Jun 2.70 2.65 3.07
Jul 2.70 2.65 3.07
Ogos 2.70 2.65 3.07
Sept 2.70 2.65 3.07
Okt 2.50 2.65 3.07
Nov 2.57 2.65 3.07
Dis 2.57 2.65 3.07

-21-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(4) Fabric Reinforcement (samb.) RM Per Kg
Fabric Reinforcement (cont'd) RM Per Kg

DA8, MS145 2011 Dis 2.70 2.66 3.07


2012 Jan 2.43 2.66 3.07
Feb 2.43 2.66 3.07
Mac 2.57 2.65 3.07
Apr 2.57 2.65 3.07
Mei 2.70 2.65 3.07
Jun 2.70 2.65 3.07
Jul 2.70 2.65 3.07
Ogos 2.70 2.65 3.07
Sept 2.70 2.65 3.07
Okt 2.50 2.65 3.07
Nov 2.57 2.65 3.07
Dis 2.57 2.65 3.07

DA9, MS145 2011 Dis 2.70 2.66 3.07


2012 Jan 2.43 2.66 3.07
Feb 2.43 2.66 3.07
Mac 2.57 2.65 3.07
Apr 2.57 2.65 3.07
Mei 2.70 2.65 3.07
Jun 2.70 2.65 3.07
Jul 2.70 2.65 3.07
Ogos 2.70 2.65 3.07
Sept 2.70 2.65 3.07
Okt 2.50 2.65 3.07
Nov 2.57 2.65 3.07
Dis 2.57 2.65 3.07

DA10, MS145 2011 Dis 2.70 2.66 3.06


2012 Jan 2.43 2.66 3.06
Feb 2.43 2.66 3.06
Mac 2.57 2.64 3.06
Apr 2.57 2.64 3.06
Mei 2.70 2.64 3.06
Jun 2.70 2.64 3.06
Jul 2.70 2.64 3.06
Ogos 2.70 2.64 3.06
Sept 2.70 2.64 3.06
Okt 2.50 2.64 3.06
Nov 2.57 2.64 3.06
Dis 2.57 2.64 3.06

-22-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(5) Guardrail RM Per Meter
Guardrail RM Per Metre

Single Mounted 2011 Dis 147.41 147.28 149.71


i) 1.95m Post Spacing 2012 Jan 145.93 145.80 148.21
Feb 145.93 145.80 148.21
Mac 145.93 145.80 148.21
Apr 145.93 145.80 148.21
Mei 145.93 145.80 148.21
Jun 145.93 145.80 148.21
Jul 145.93 145.80 148.21
Ogos 145.93 145.80 148.21
Sept 145.93 145.80 148.21
Okt 145.93 145.80 148.21
Nov 145.93 145.80 148.21
Dis 145.93 145.80 148.21

ii) 3.80m Post Spacing 2011 Dis 101.52 102.61 104.29


2012 Jan 100.50 101.58 103.24
Feb 100.50 101.58 103.24
Mac 100.50 101.58 103.24
Apr 100.50 101.58 103.24
Mei 100.50 101.58 103.24
Jun 100.50 101.58 103.24
Jul 100.50 101.58 103.24
Ogos 100.50 101.58 103.24
Sept 100.50 101.58 103.24
Okt 100.50 101.58 103.24
Nov 100.50 101.58 103.24
Dis 100.50 101.58 103.24

Harga guardrail adalah termasuk kos pengangkutan bagi jarak 30km dari outlet.
The prices for guardrail are inclusive of transportation charges for 30km from the outlets.

-23-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(5) Guardrail (samb.) RM Per Meter
Guardrail (cont'd) RM Per Metre

Double Mounted 2011 Dis 214.37 221.49 225.16


i) 1.95m Post Spacing 2012 Jan 217.17 219.27 222.90
Feb 217.17 219.27 222.90
Mac 217.17 219.27 222.90
Apr 217.17 219.27 222.90
Mei 217.17 219.27 222.90
Jun 217.17 219.27 222.90
Jul 217.17 219.27 222.90
Ogos 217.17 219.27 222.90
Sept 217.17 219.27 222.90
Okt 217.17 219.27 222.90
Nov 217.17 219.27 222.90
Dis 217.17 219.27 222.90

ii) 3.80m Post Spacing 2011 Dis 166.96 168.79 171.32


2012 Jan 165.29 167.09 169.60
Feb 165.29 167.09 169.30
Mac 165.29 167.09 169.60
Apr 165.29 167.09 169.60
Mei 165.29 167.09 169.60
Jun 165.29 167.09 169.60
Jul 165.29 167.09 169.60
Ogos 165.29 167.09 169.60
Sept 165.29 167.09 169.60
Okt 165.29 167.09 169.60
Nov 165.29 167.09 169.60
Dis 165.29 167.09 169.60

-24-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Semenanjung Malaysia
Peninsular Malaysia
(6a) Paip Air RM Per Meter
Water Pipe RM Per Metre
Mild Steel Pipe 2011 Dis 214.00
300mm 2012 Jan 212.00
Feb 217.00
Mac 217.00
R
Apr 215.00
Mei 215.00
Jun 215.00
Jul 215.00
Ogos 214.00
Sept 212.00
Okt 208.00
Nov 208.00
Dis 208.00
Stainless Steel Pipe 2011 Dis 30.00
25mm 2012 Jan 30.00R
Feb 30.00
Mac 29.00
Apr 28.00
Mei 27.00
Jun 27.00
Jul 27.00
Ogos 27.00
Sept 26.00
Okt 26.00
Nov 26.00
Dis 26.00
Ductile Iron Pipe 2011 Dis 246.30
300mm 2012 Jan 232.00
Feb 232.00
Mac 232.00
Apr 232.00
Mei 232.00
Jun 232.00
Jul 232.00
Ogos 232.00
Sept 232.00
Okt 232.00
Nov 232.00
Dis 232.00
232.00
Harga bagi paip air dan paip pembetungan adalah harga di kilang.
The prices for water pipe and sewerage pipe are ex-factory prices.

R = Kemaskini/Revised

-25-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Semenanjung Malaysia
Peninsular Malaysia
(6a) Paip Air (samb.) RM Per Meter
Water Pipe (cont'd) RM Per Metre
High Density Polyethylene 2011 Dis 1.34
R
(HDPE) Pipe 2012 Jan 1.33
i. Compression Fitting Using Feb 1.34
For Jointing Mac 1.40R
25mm Apr 1.42
Mei 1.42
Jun 1.42
Jul 1.42
Ogos 1.42
Sept 1.42
Okt 1.35
Nov 1.35
Dis 1.35

ii. Electrofusion Jointing 2011 Dis 66.11


R
160mm 2012 Jan 65.69
Feb 66.11
Mac 68.17R
Apr 69.07
Mei 69.07
Jun 69.07
Jul 69.07
Ogos 69.07
Sept 69.07
Okt 66.17
Nov 66.17
Dis 66.17

iii. Butt Fussion 2011 Dis 51.43


R
160mm 2012 Jan 51.02
Feb 51.43
Mac 53.50R
Apr 54.39
Mei 54.39
Jun 54.39
Jul 54.39
Ogos 54.39
Sept 54.39
Okt 51.50
Nov 51.50
Dis 51.50
R = Kemaskini/Revised

-26-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Semenanjung Malaysia
Peninsular Malaysia
(6b) Paip Pembetungan (samb.) RM Per Meter
Sewerage Pipe (cont'd) RM Per Metre

Mild Steel Pipe 2011 Dis 231.12


300mm 2012 Jan 228.96
Feb 234.36
Mac 234.36
Apr 224.64
Mei 232.20
Jun 232.20
Jul 232.20
Ogos 231.12
Sept 228.96
Okt 224.64
Nov 224.64
Dis 224.64

Ductile Iron Pipe 2011 Dis 185.00


250mm 2012 Jan 185.00
Feb 185.00
Mac 185.00
Apr 185.00
Mei 185.00
Jun 185.00
Jul 185.00
Ogos 185.00
Sept 185.00
Okt 185.00
Nov 185.00
Dis 185.00

High Density Polyethylene 2011 Dis 16.50


(HDPE) Pipe 2012 Jan 16.50
i. Profile Pipe Feb 16.50
150mm Mac 17.90R
Apr 17.90
Mei 17.90
Jun 17.90
Jul 17.90
Ogos 17.90
Sept 17.90
Okt 17.90
Nov 17.90
Dis 17.90
R = Kemaskini/Revised

-27-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Semenanjung Malaysia
Peninsular Malaysia
(6b) Paip Pembetungan (samb.) RM Per Meter
Sewerage Pipe (cont'd) RM Per Metre

High Density Polyethylene 2011 Dis 62.60


(HDPE) Pipe 2012 Jan 62.60
R
ii. Solid Pipe Feb 58.20
250mm Mac 60.80R
Apr 60.80
Mei 60.80
Jun 60.80
Jul 60.80
Ogos 60.80
Sept 60.80
Okt 60.80
Nov 60.80
Dis 60.80

Vitrified Clay Pipe 2011 Dis 62.90


i. Standard Pipe 2012 Jan 62.90
225mm Feb 62.90
Mac 62.90
Apr 62.90
Mei 62.90
Jun 62.90
Jul 62.90
Ogos 62.90
Sept 62.90
Okt 62.90
Nov 62.90
Dis 62.90

ii. Jacking Pipe 2011 Dis 302.00


225mm 2012 Jan 302.00
Feb 302.00
Mac 302.00
Apr 302.00
Mei 302.00
Jun 302.00
Jul 302.00
Ogos 302.00
Sept 302.00
Okt 302.00
Nov 302.00
Dis 302.00

R = Kemaskini/Revised

-28-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Semenanjung Malaysia
Peninsular Malaysia
(6b) Paip Pembetungan (samb.) RM Per Meter
Sewerage Pipe (cont'd) RM Per Metre

Reinforced Concrete Pipe 2011 Dis 185.30


i. Without Lining 2012 Jan 185.30
900mm Feb 185.30
Mac 185.30
Apr 185.30
Mei 185.30
Jun 185.30
Jul 185.30
Ogos 185.30
Sept 185.30
Okt 185.30
Nov 185.30
Dis 185.30

ii. With Lining (High Alumina) 2011 Dis 241.70


900mm 2012 Jan 241.70
Feb 241.70
Mac 241.70
Apr 241.70
Mei 241.70
Jun 241.70
Jul 241.70
Ogos 241.70
Sept 241.70
Okt 241.70
Nov 241.70
Dis 241.70

iii. With Lining (Sacrificial Lining) 2011 Dis 213.60


900mm 2012 Jan 213.60
Feb 213.60
Mac 213.60
Apr 213.60
Mei 213.60
Jun 213.60
Jul 213.60
Ogos 213.60
Sept 213.60
Okt 213.60
Nov 213.60
Dis 213.60

-29-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Semenanjung Malaysia
Peninsular Malaysia
(6b) Paip Pembetungan (samb.) RM Per Meter
Sewerage Pipe (cont'd) RM Per Metre

ABS Pipe 2011 Dis 28.92


i. Gravity 2012 Jan 28.92
110mm Feb 28.92
Mac 28.92
Apr 28.92
Mei 28.92
Jun 28.92
Jul 28.92
Ogos 28.92
Sept 28.92
Okt 28.92
Nov 28.92
Dis 28.92

ii. Force Main 2011 Dis 81.65


225mm 2012 Jan 81.65
Feb 81.65
Mac 81.65
Apr 81.65
Mei 81.65
Jun 81.65
Jul 81.65
Ogos 81.65
Sept 81.65
Okt 81.65
Nov 81.65
Dis 81.65