The document shows electricity load data from 2012 and 2017 for 32 transformer sites. It includes the transformer capacity in kVA, the maximum load in 2012 and 2017 in kVA, kW, and kVAr, and the increase in load from 2012 to 2017 for most sites. Many sites saw an increase in maximum load between 20-40% from 2012 to 2017.
The document shows electricity load data from 2012 and 2017 for 32 transformer sites. It includes the transformer capacity in kVA, the maximum load in 2012 and 2017 in kVA, kW, and kVAr, and the increase in load from 2012 to 2017 for most sites. Many sites saw an increase in maximum load between 20-40% from 2012 to 2017.
The document shows electricity load data from 2012 and 2017 for 32 transformer sites. It includes the transformer capacity in kVA, the maximum load in 2012 and 2017 in kVA, kW, and kVAr, and the increase in load from 2012 to 2017 for most sites. Many sites saw an increase in maximum load between 20-40% from 2012 to 2017.