Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 7

CURRICULUM VITAE

PERSONAL RESUME
Name : MUKTI SUWITA
Place / Date of Birth : Cilegon, June 26th, 1964
Address : Komp. Jerang Baru Permai – Cilegon Bsnten 42417
Mobile Phone : 087880882112 / 081315505288
Religion : Moslem
Marital Status : Married
Education : - Geology Tech S.T.T.NAS (1988) – YOGYAKARTA
: - Senior High School (1983) – YOGYAKARTA
: - Junior High School (1980) – CILEGON
: - Elementary School (1976) – CILEGON
Nationality : Indonesia
Qualification : Structural, Architecture, Mechanical & Welding Inspector
Employment History : Corse,
A. Welding Inspector, Van Ovan Welding School – Cilegon
B. Data Entry Operator LPSIK – Jakarta
C. Auto CAD SCC – Jakarta
D. Welding Inspector AKJ – Jakarta
E. Induction
F. Shocard
G. PPE
H. Incident and Accident Investigation Report
I. Risk Assessment and Job Safety Analysis
J. Training on Introduction of ISO 9000
K. Hazard Identification And RA (HIRA)

SUMMARY OF EXPERIENCES
1. PT. ARTA TEKNIK ABADI
Augt 20th 2017 – Nov 26th 2017
Position : Qc Engineer
Type of Work : Inspection of Dimensiional & Welding Process
Fabrication of Brace Beams 1
Between Head Stocks
Tangguh Jetty 2 LNG Project
2. PT. YAMA ENGINEERING
Sept 11th 2015 – Decth 2015
Position : Qc Inspector Assigned Welding Inspector
Type of Work : Inspector of Dimensional & Welding Process
: Man Power & Equipment supply for piping work
(INCOLOY & CDDS)
EPC-1 Banyu Urip Project
EXXON Mobil Cepu Ltd
Responsibilies Include
 Dimensional as per Design, Specification Standard Code
 Inspection Welding Process
 Dossier for final acceptance

3. PT. SAIPEM LEIGHTON CONSORTIUM


March 09th 2012 – March 31th 2013
Position : Qc Inspector Assigned in Dimensional Inspector
Type of Work : Inspection of Dimensiional
Fabrication of Gordon Project
LNG JETTY BARROW ISLAND
AUSTRALIA
HANJUNG YARD
BANDAR – LAMPUNG
SUMATERA
Responsibilies Include
 Dimensional as per Design, Specification Standard Code
 Inspection Welding Process
 Dossier for final acceptance

4. PT. BAKRIE CONTRUCTION


May 30th 2011 – September 20th 2011
Position : Qc Inspector Assigned in Structurad Inspector
Type of Work : Inspection of Structural
Fabrication of monopod jacket and deck
Onshore Fabricate PNE (PERTAMINA) INDONESIA
Responsibilies Include
 Dimensional as per Design, Specification Standard Code
 Inspection Welding Process
 Dossier for final acceptance

5. PT. GUNANUSA UTAMA FABRICATORS (PMDN)


Augusts, 27th 2009 – February 28th 2011
Position : Qc Inspector Assigned in Structural, Architectural,
Mechanical & Welding Inspector
Type of Work : Inspection Structural, Architectural, Mechanical Welding Process on
Fabricate of :
 Liquid Development
 Ujung Pangkah
 OFFSHORE FACILITYS FEED HESS – INDONESIA
Responsibilies Include
 Dimensional as per Design, Specification Standard Code
 Architectural Installation
 Mechanical Installation Equipment
 Welding Process Inspection

6. PT. GUNANUSA UTAMA FABRICATORS


September, 03th 2007 – November 30th 2008
Position : Qc Inspector Assigned in Structural
Type of Work : Inspection Structural, and Mechanical of fabricate of :
 Phase 11 (TN 11 S / EPSC 1+2) TOTAL E & INDONESIA
Responsibilies Include
 Dimensional as per Design, Specification Standard Code
 Mechanical Installation Equipment

7. PT. CAHAYA ANUGRAH TAMA


November 13th 2006 – March 2007
Position : Qc Inspector Assigned in Structural
Type of Work : Inspection Structural Dimensional and final dossier
 LNG Project BP Tangguh
Responsibilies Include
 Dimensional as per Design, Specification Standard Code
 Dossier for final acceptance

8. PT. GUNANUSA UTAMA FABRICATORS (PMDN)


September, 2005 – October 2006
Position : Qc Inspector Assigned in Structural and Mechanical
Type of Work : Inspection Structural, and welding on fabricate of:
 Sisi Nubi PSSN 1 / EPSC 1 PROJECT
TOTAL INDONESIA OIL COMPANY
Responsibilies Include
 Dimensional as per Design, Specification Standard Code
 Dossier for final acceptance

9. PT. CILEGON FABRICATORS


April, 22th 2005 – September 06h 2005
Position : Qc Inspector Assigned in Structural
Type of Work : Inspection Structural
 IHI Project
 Tanjung bin Jahor Malaysia
Responsibilies Include
 Dimensional as per Design, Specification Standard Code
 Dossier for final acceptance

10. PT. GUNANUSA UTAMA FABRICATORS (PMDN)


May, 01th 2003 – March 31th 2004
Position : Qc Inspector Assigned in Structural and Mechanical
Type of Work : Inspection Structural, and Welding on fabricate of:
 PECIKO 4 / EPSC 2
TOTAL INDONESIA OIL COMPANY
Responsibilies Include
 Dimensional as per Design, Specification Standard Code
 Mechanical Installation Equipment
 Precomisioning, dossier for final Acceptance
11. PT. GUNANUSA UTAMA FABRICATORS (PMDN)
August, 01th 2002 –January 31th 2003
Position : Qc Inspector Assigned in Structural and Mechanical
Type of Work : Inspection Structural, and Welding on fabricate of:
 TOTAL INDONESIA OIL COMPANY
Responsibilies Include
 Dimensional as per Design, Specification Standard Code
 Mechanical Installation Equipment
 Precomisioning
 Dossier for final Acceptance

12. PT. GUNANUSA UTAMA FABRICATORS (PMDN)


March , 03th 2001 – June 03th 2002
Position : Qc Inspector Assigned in Structural Jacket and Deck
Type of Work : Inspection Structural:
 Nort Compression Platfrom (NPC)
TOTAL INDONESIA OIL COMPANY
Responsibilies Include
 Dimensional as per Design, Specification Standard Code
 Straightness load Out, Tie Down and Sail Out
 Dossier for final Acceptance

13. PT. GUNANUSA UTAMA FABRICATORS (PMDN)


August , 23th 1999 – November 22th 2000
Position : Qc Inspector Assigned in Structural Jacket and Deck
Type of Work : Inspection Structural and Welding on Fabricate of :
 Tunu Compression Platform (TCP)
TOTAL INDONESIA OIL COMPANY
 “VITA-A’ Jacket & Deck Retrofit Well Platform
MAXSUS South East Sumatra INC
 “LES” & “EWF” Project
ARCO Indonesia
Responsibilies Include
 Dimensional as per Design, Specification Standard Code
 Straightness load Out, Tie Down and Sail Out
 Dossier for final Acceptance

14. PT. GUNANUSA UTAMA FABRICATORS (PMDN)


March , 1994 – February 1998
Position : Qc Inspector Assigned in Structural
Type of Work : Inspection Structural of fabricate of :
 Nort Processing Unit (NPU)
TOTAL INDONESIA OIL COMPANY
 GTS “J”
TOTAL INDONESIA OIL COMPANY
 “KNA” & “BM” ARII Project
Responsibilies Include
 Dimensional as per Design, Specification Standard Code
 Straightness load Out, Tie Down and Sail Out
 Dossier for final Acceptance

15. PT. NIPPON STEEL CONSTRUCTION INDONESIA


April 14, 1992 – Dec 01, 1992
Position : Sdtructural Engineering
Type of Work : Shop Drawing check for release fabricate as perdesign
Arco Project (ARII BZBT & EES PROJECT)
Balongan Indramayu Cirebon
 Nort Processing Unit (NPU)
TOTAL INDONESIA OIL COMPANY
 GTS “J”
TOTAL INDONESIA OIL COMPANY
 “KNA” & “BM” ARII Project
16. PT. YOGA SARANA ARTHA
June 29 ,1990 – June 01, 1992
Position : Sdtructural Inspector
Type of Work :
 Dimensional as per Design, Specification Standard Code
 Inspection Process
PT. CABOT CHEMICAL
PT. GEMA POLYTAMA KIMIA ANYAR - SERANG

You might also like